B2013-Sequencing Plan.pdf
PDF 102 KB Posted
- Attached to
- Repair Interior/Exterior B-2013, Repair Interior B-2005, Repair Steam Heat System B-2024
- Solicitation number
- FA8201-11-B-0006
About this file
Building 2013 - Sequencing Plan (Amendment 04)
View the file
Other files
Show all 47
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
2 2
3a
5a
5a
F
4 4 6 61 / 7
1 / 7
5b
F
F F
COLOR / PATTERN ZONE
PREFERRED
SEQUENCING
ORDER
MAX.
DOWN
TIME
VALVE ROOM/
CLEAN ROOM
CLEANING LINE/
NEW RESTROOM
CE EQUIPMENT ROOMS/
MENS RESTROOM/
WOMENS RESTROOM
TURBINE BALANCER
ROOM
3 F
FUEL TANK SERVICE /
STORAGE
GEAR BOX REPAIR /
OFFICE
3a F FEXIBLE
SCHEDULE
5a
1 / 7
INITIALIZATION /
FINALIZATION OF
NW. OFFICE / MIC
5b 1 / 7
2 WEEKS
OPEN
OPEN
2 WEEKS
4 WEEKS
3 DAYS
BREAK / LOCKER
ROOM6 6 OPEN
COLOR / PATTERN ZONE
PREFERRED
SEQUENCING
ORDER
MAX.
DOWN
TIME
BLDG. 2005, INTERIOR AND EXTERIOR. THIS
BLDG. IS LOCATED WEST OF BLDG. 2013
SOUTH AWNING OF BLDG. 2013
EXTERIOR OF BLDG. 2013
BLDG. 2024, INTERIOR AND EXTERIOR. THIS
BLDG. IS LOCATED SOUTHEAST OF BLDG.
10 4 WEEKS
9 OPEN
8 3 WEEKS3b
CLEANING LINE/
TANK #6 AREA 4 WEEKS
NOTE #53
4 WEEKS
NOTE #5
STEP
QUANTITY OF
PEOPLE
QUANTITY OF
PEOPLESTEP
3a3a
3a 3a
3b
H
IL
L A
IR
F
O R
C E
B A
S E
D E
P A
R
TM
E N
T O
F
TH
E A
IR
F
O R
C E
O G
D E
N A
IR
L
O G
IS
TI
C S
C E
N
TE
R
9T H
M A
IN
TE
N A
N C
E W
IN
G
S E
Q U
E N
C
IN
G P
LA
N
B
LD
G . 2
2 2
NOTES:
1. ACCESS SHALL BE PROVIDED 1 DAY PER WEEK TO TEST STANDS
IN NORTHEAST CORNER OF VALVE ROOM.
2. THE ROOM DOES NOT HAVE TO BE COMPLETED IN 3 DAYS BUT
THE TURBINE BALANCER ITSELF CAN ONLY BE INACCESSIBLE FOR
A MAXIMUM OF 3 DAYS. ACCESS TO USE THIS MACHINE NEEDS
TO BE FROM 0500-0630 HOURS DAILY.
EXTRA SPECIAL ATTENTION NEEDS TO BE PROVIDED TO PROTECT
THIS PIECE OF EQUIPMENT FROM DAMAGE AND VIBRATION.
3. COMPLETE ALL BLDG. 2013 INTERIOR WORK, AND THEN START ON BLDG. 2005.
DO NOT DO THE EXTERIOR OF BLDG. 2013 UNTIL BLDG. 2005 IS COMPLETE.
4. BLDG. 2005 IS A CRITICAL FACILITY. IF THIS WORK IS NOT COMPLETED IN
3 WEEKS THE CONTRACTOR SHALL RETURN OCCUPANCY OF FACILITY BACK
TO THE GOVERNMENT. OCCUPANCY SHALL BE SUCH THAT TEST STAND AND
FACILITY ARE SAFE AND OPERATIONAL. MINOR INCONVENIENCES PER APPROVAL
OF SHOP SUPERVISOR AND FACILITY ENGINEER MAYBE TEMPORARILY APPROVED.
THE CONTRACTOR SHALL THEN OBTAIN COORDINATION FROM THE GOVERNMENT
FOR COMPLETION OF WORK. APPROVAL IS CONTINGENT UPON THE SHOP AND
THE GROUNDED AIRCRAFT WORKLOAD.
5. CUMULATIVE TOTAL OF 3a PLUS 3b.
File details come from the government source that posted it. Updated .