Asbestos Survey.pdf

PDF 166 KB Posted

Attached to
Repair Interior/Exterior B-2013, Repair Interior B-2005, Repair Steam Heat System B-2024
Solicitation number
FA8201-11-B-0006
Issued by

About this file

Asbestos Survey

View the file

Other files

File Type Posted
15410 - Water Distribution Piping and Equiment-26July2011.pdf PDF
15420 - Drainage and Vent Systems and Equipment-26July2011.pdf PDF
15515 - HVAC-26July2011.pdf PDF
Contractor Questions Answers - 14 July 2011 -FA8201-11-B-0006 - MAMS II Area - Bldgs 2005 20132024.pdf PDF
16010 - General Requirements-26July2011.pdf PDF
Amendment 05 - FA8201-11-B-0006 - Bldgs 2005 2013 2024.pdf PDF
Humidifier Drawings Spec.pdf PDF
B2005-Equipment_Layout.pdf PDF
B2024-Equipment_Layout.pdf PDF
Additonal Project Information.pdf PDF
B2013-Equipment_Layout.pdf PDF
Wage Determination-UT100037- 17 June 2011-UT37.mht MHT file
Amendment of Solicitation - 04.pdf PDF
SECTION 01 11 01 - Revised 29 June 2011.pdf PDF
B2013-Sequencing Plan.pdf PDF
Project Overview 5 July 2011.pdf PDF
SAFETY 01 35 26.pdf PDF
SECTION 01 32 01-Project Schedule.pdf PDF
Amendment 03.pdf PDF
Amendment 02 - SF 30.doc DOC document
Site Visit Attendance Record.pdf PDF
06 61 16 Countertops.pdf PDF
Bldgs 2024 Pics.zip ZIP file
Building 2013 Pics - Set 5.zip ZIP file
LBP Letter.pdf PDF
Amendment to Solicitation.pdf PDF
Building 2013 Pics - Set 4.zip ZIP file
Additional Specs.pdf PDF
Building 2013 Pics - Set 1.zip ZIP file
Contractor Questions FA8201-11-B-0006 - MAMS II Area - Bldgs 2005 20132024.pdf PDF
Building 2013 Pics - Set 3.zip ZIP file
LBP Evaluation.pdf PDF
Fire Alarm-Performance Based Spec.pdf PDF
Wage Determination - UT100037 - 13 May 2011.pdf PDF
Bldg 2005 Pics.zip ZIP file
Building 2013 Pics - Set 2.zip ZIP file
100 Fire Mech Specs Div. 13 15 PDF.zip ZIP file
SECTION 01 11 00.pdf PDF
Visitor Authorization List.pdf PDF
100 Arch Specs PDF.zip ZIP file
Sequencing Plan KRSM062067 Bldg 2013.pdf PDF
SECTION 01 57 20 ENVIRONMENTAL.pdf PDF
100 Electrical Specs Div 16 PDF.zip ZIP file
Drawings KRSM 062067 062069 072070-Complete Set-Locked.pdf PDF
SAFETY 01 35 26.pdf PDF
Solicitation FA8201-11-B-0006.pdf PDF
Wage Determination UT 100037 4 Feb 2011 UT37.pdf PDF
Show all 47

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARTMENT OF THE AIR FORCE

75TH CIVIL ENGINEERING (CEOHA)

HILL AIR FORCE BASE, UTAH

ASBESTOS SURVEY FOR BUILDING 2013

RENOVATE FACILITY

During February 2009, Mr. Al Lewis with 775 th

CES requested an asbestos survey of building

2013, to provide information for a project to renovate the facility. The scope of this project is as follows:

Work Location: Building 2013

Work Order: # 49980

Statement of Work:

Renovate the facility.

The information provided for this survey is based on samples collected by Nickolas King (Utah

Certified Asbestos Inspector ASB-#2257). Samples for this survey were collected on 25

February 2009. Dixon Information Inc., utilizing EPA Method 600R-93-116, analyzed all samples. EPA Method 600R-93-116 is similar to NIOSH Manual of Analytical Methods 9002.

Civil Engineering personnel also reviewed all available asbestos survey databases of suspect asbestos containing building materials (ACM) that could potentially be encountered in this area.

The information gathered from all current and previous surveys is shown below by homogenous area.

Drywall/joint compound wall system (6000’ sq) was sampled from the southwest corner of room

8, from the northeast corner of room 17, from the southwest corner of the gear box repair area, from the south side of the small clean room, from the southwest corner of the hall, from the northeast corner of the men’s restroom, from the northeast corner of the large clean room, and from the south side of the small clean room. These samples were analyzed as a non-asbestos containing material (GM091201, GM091202, GM091203, GM091204, GM091205, GM091206, GM091207, and GM091208).

Thermal system hard tank insulation, (500’ sq) was sampled from the east side of the tank in mechanical room #2, from the east side of the tank in mechanical room #2, and from the west side of the tank in mechanical room #2. These samples were analyzed as a non-asbestos containing material (GM091209, GM091210, and GM091211).

Thermal system pipe insulation, white/yellow (1000’ ln) was sampled from the center of the east side of the attic, from the center of the west side of the attic, from the center of the south side of the attic, from the center of mechanical room #1, and from the center of the south side of mechanical room #2. These samples were analyzed as a non-asbestos containing material

(GM091212, GM091213, GM091214, GM091215, and GM091216).

Thermal system pipe fitting insulation, white/yellow (150 ea) was sampled from the center of the attic, from the northwest corner of the attic, from the southeast corner of the attic, from the center

Bldg 2013

Interior Renovation

WO #49980

30 March 2009

1425 hours of mechanical room #1, and from the center of the east side in mechanical room #2. These samples were analyzed as a non-asbestos containing material (GM091217, GM091218, GM091219, GM091220, and GM091221).

Batt insulation, foil/yellow (13,000’ sq) was sampled from the southeast corner of the attic, from the northwest corner of the attic, and from the center of the south side in the attic. These samples were analyzed as a non-asbestos containing material (GM09122, GM091223, and GM091224).

Duct insulation, foil/yellow (3000’ sq) was sampled from the center of the north side in the attic, from the center of the west side of the attic, from the center of the east side of the attic, from the center of mechanical room #1, and from the center of the north side in mechanical room #2.

These samples were analyzed as a non-asbestos containing material (GM091225, GM091226, GM091227, GM091228, and GM091229).

2’ x 4’ white ceiling tile, pockmarks/pinholes (7500’ sq) was sampled from the southeast corner of the hall, from the northeast corner of the hall, from the southwest corner of the break room, from the center of the gear box repair room, and from the northeast corner of the MIC. These samples were analyzed as a non-asbestos containing material (GM091230, GM091231, GM091232, GM091233, and GM091234).

2’ x 4’ white ceiling tile, wormy grooves/pinholes (7500’ sq) was sampled from the southeast corner of the hall, from the northeast corner of the hall, from the northeast corner of the MIC, from the southwest corner of the break room, and from the center of the gear box repair room.

These samples were analyzed as a non-asbestos containing material (GM091235, GM091236, GM091237, GM091239, and GM091240).

12” x 12” floor tile, gray/yellow adhesive (3000’ sq) was sampled from the southeast corner of room 17, from the southeast corner of room 15, from the northwest corner of room 19, from the northeast corner of the locker room, and from the southwest corner of the MIC. These samples were analyzed as a non-asbestos containing material (GM091241, GM091242, GM091243, GM091244, and GM091245).

12” x 12” floor tile, tan/yellow adhesive (1500’ sq) was sampled from the southwest corner of room 8, from the southeast corner of the south entrance, and from the northeast corner of the hall. These samples were analyzed as a non-asbestos containing material (GM091246, GM091247, and GM091248).

3’ x 3’ floor tile, gray/black adhesive (1500’ sq) was sampled from the southeast corner of the large clean room, from the southwest corner of the large clean room, and from the southeast corner of the small clean room. These samples were analyzed as a non-asbestos containing material (GM091249, GM091250, and GM091251).

Bldg 2013

Interior Renovation

WO #49980

30 March 2009

1425 hours

Sheet vinyl flooring, tan/yellow adhesive (500’ sq) was sampled from the northwest corner of the women’s restroom, from the south side of the women’s restroom, and from the east side of the women’s restroom. These samples were analyzed as a non-asbestos containing material

(GM091252, GM091253, and GM091254).

Roofing shingles, brown/black felt paper (13000’ sq) was sampled from the center of the south side of the roof, from the southeast corner of the roof, and from the southwest corner of the roof.

These samples were analyzed as a non-asbestos containing material (GM091255 GM091256, and GM091257).

All Hard Thermal System Insulation not mentioned in this survey; encountered above ceilings, behind walls or in wall chases, in attic spaces, and in mechanical rooms is assumed to be asbestos. This includes all insulation on pipe runs, pipe saddles, tanks and elbows.

Do not move, cut, or disturb this material in any way.

All 9” floor tile and associated black mastic adhesive is assumed to be an asbestos containing material. Do not disturb this material.

Remember that the locations of these building materials (homogenous areas) indicate where these materials were found, but do not necessarily mean that these are the only locations where these materials may be encountered during the project. When any new suspect ACM is encountered, stop work and contact either CEOHA or SGPB to identify any new suspect building materials.

DO NOT DISTURB ANY BUILDING MATERIALS THAT ARE SUSPECTED ACM.

CONTACT TROYE DAVIS AT 586-7094 TO ARRANGE REMOVAL OF THESE

MATERIALS IF THERE IS ANY POTENTIAL FOR THEM TO BE DISTURBED

DURING THIS PROJECT.

The project manager must post a copy of this survey at the project before this project begins, and must remain posted until the project is completed. Please contact Troye L.

Davis at 586-7094 with any questions regarding this survey letter.

Nickolas King th

Civil Engineering Squadron

Maintenance Engineering

Certified Asbestos Inspector

UDAQ #ASB-2257