Fire Alarm-Performance Based Spec.pdf

PDF 64 KB Posted

Attached to
Repair Interior/Exterior B-2013, Repair Interior B-2005, Repair Steam Heat System B-2024
Solicitation number
FA8201-11-B-0006
Issued by

About this file

Fire Alarm - Performance Based Specification

View the file

Other files

File Type Posted
15410 - Water Distribution Piping and Equiment-26July2011.pdf PDF
15420 - Drainage and Vent Systems and Equipment-26July2011.pdf PDF
15515 - HVAC-26July2011.pdf PDF
Contractor Questions Answers - 14 July 2011 -FA8201-11-B-0006 - MAMS II Area - Bldgs 2005 20132024.pdf PDF
16010 - General Requirements-26July2011.pdf PDF
Amendment 05 - FA8201-11-B-0006 - Bldgs 2005 2013 2024.pdf PDF
Humidifier Drawings Spec.pdf PDF
B2005-Equipment_Layout.pdf PDF
B2024-Equipment_Layout.pdf PDF
Additonal Project Information.pdf PDF
B2013-Equipment_Layout.pdf PDF
Wage Determination-UT100037- 17 June 2011-UT37.mht MHT file
Amendment of Solicitation - 04.pdf PDF
SECTION 01 11 01 - Revised 29 June 2011.pdf PDF
B2013-Sequencing Plan.pdf PDF
Project Overview 5 July 2011.pdf PDF
SAFETY 01 35 26.pdf PDF
SECTION 01 32 01-Project Schedule.pdf PDF
Amendment 03.pdf PDF
Amendment 02 - SF 30.doc DOC document
Site Visit Attendance Record.pdf PDF
06 61 16 Countertops.pdf PDF
Asbestos Survey.pdf PDF
Bldgs 2024 Pics.zip ZIP file
Building 2013 Pics - Set 5.zip ZIP file
LBP Letter.pdf PDF
Amendment to Solicitation.pdf PDF
Building 2013 Pics - Set 4.zip ZIP file
Additional Specs.pdf PDF
Building 2013 Pics - Set 1.zip ZIP file
Contractor Questions FA8201-11-B-0006 - MAMS II Area - Bldgs 2005 20132024.pdf PDF
Building 2013 Pics - Set 3.zip ZIP file
LBP Evaluation.pdf PDF
Wage Determination - UT100037 - 13 May 2011.pdf PDF
Bldg 2005 Pics.zip ZIP file
Building 2013 Pics - Set 2.zip ZIP file
100 Fire Mech Specs Div. 13 15 PDF.zip ZIP file
SECTION 01 11 00.pdf PDF
Visitor Authorization List.pdf PDF
100 Arch Specs PDF.zip ZIP file
Sequencing Plan KRSM062067 Bldg 2013.pdf PDF
SECTION 01 57 20 ENVIRONMENTAL.pdf PDF
100 Electrical Specs Div 16 PDF.zip ZIP file
Drawings KRSM 062067 062069 072070-Complete Set-Locked.pdf PDF
SAFETY 01 35 26.pdf PDF
Solicitation FA8201-11-B-0006.pdf PDF
Wage Determination UT 100037 4 Feb 2011 UT37.pdf PDF
Show all 47

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FIRE ALARM – PERFORMANCE BASED SPECIFICATION

The existing system does not comply with current fire alarm code requirements. Sheet EX101 of the project drawings shows existing conditions only. In reference to sheet EX101 and according to the requirements of specification section 28 31 64, the contractor shall:

1) Install a new addressable intelligent fire alarm system throughout the facility. New system is to include a new remote enunciator panel. Ensure that explosion proof devices are placed in compliance with current code. The existing system must remain operational until the new system is approved and accepted in writing by the Contracting Officer.

a. Remove existing Smoke detection devices throughout facility. Install new as required under NFPA 72 and NFPA 90A.

b. Provide and install Horn/Strobes on ceilings throughout the facility as required by

NFPA 72. Install strobes only in restrooms.

c. Remove existing Pyrotronics panel. Install new panel in compliance with UFC 3-

600-01 and NFPA 72 and in the ‘Base Facility Design Standard, Hill Air Force

Base’ dated 15 Apr 2010.

d. Provide and install all new fire alarm wiring, devices, conduits, smoke detectors and connectors. Remove the existing alarm system in it’s entirety once the new system is complete and accepted. (This does not include any fully functional heat detectors installed in the EPU tank repair area). NOTE: Mounting boxes in false ceilings and hard pan ceilings not being reused for new alarms shall be removed, as well as connecting conduits back to alarm loop conduit boxes, and the ceiling patched or false ceiling panel replaced. Alarm wiring is NOT permitted to be abandoned. Abandoned empty conduits and boxes in false ceiling spaces shall be marked ‘For Future Use’ and all others removed.

e. Pull stations shall be installed per code requirements (NFPA 72) adjacent to facility exits.

f. Provide shop drawings of alarm system for Government approval prior to installation.

g. Certifications and requirements for installers and other work related to the fire alarm system shall be according to specification section 28 31 64.