CDRLs_SABER.pdf

PDF 203 KB Posted

Attached to
Hill AFB - Simplified Acquisition of Base Engineering Requirements (SABER)
Solicitation number
FA8201-10-R-0025
Issued by

About this file

CDRLs

View the file

Other files

File Type Posted
Q A_Solicitation_7.xls XLS spreadsheet
Q A_Solicitation_6.xls XLS spreadsheet
Q A_Solicitation_5.xls XLS spreadsheet
Q A_Solicitation_4.xls XLS spreadsheet
Q A_Solicitation_2.xls XLS spreadsheet
AMEND_1_Solicitation.pdf PDF
REV_1_SABER_Section L.pdf PDF
REV_1_SAMPLE_TASK_SOW.pdf PDF
Q A_Solicitation.xls XLS spreadsheet
Request for Proposal_SABER.pdf PDF
Statement of Work.pdf PDF
Lead Based Paint —
B 214 Floor plans-1st floor Existing.pdf PDF
SAMPLE TASK SOW.pdf PDF
FIRE PREV GUIDE-HILL AFB.pdf PDF
B 214 Comm Layout.pdf PDF
SABER_Section L.pdf PDF
Wage Determinations.pdf PDF
TEP Worksheet.xls XLS spreadsheet
Asebestos Inspection Report.pdf PDF
Bldg 214 - New Layout.pdf PDF
Bldg 214 Old Tire Shop layout 1-Ansi.pdf PDF
SABER_SECTION M.pdf PDF
Tab K.pdf PDF
Section 1000.pdf PDF
214 Power Station.pdf PDF
Bldg 214 New Layout - People.pdf PDF
BASE FACILITY DESIGN STANDARD.pdf PDF
Existing Offices-South Hall.pdf PDF
Consolidated Tire-Bearing Shop As Built drawings.pdf PDF
QAs_Site_Visit_Final.xls XLS spreadsheet
Asbestos Inspection Report.pdf PDF
Lead Based Paint —
Site Walk Attendance Form.pdf PDF
DRAFT_SAMPLE TASK_SOW_2.doc DOC document
SABER Site Visit RSVP.doc DOC document
SABER_DRAFT_SAMPLE TASK_SOW.doc DOC document
DRAFT_SABER_Section L.doc DOC document
DRAFT_SABER_SECTION M.doc DOC document
DRAFT_SABER_SOW.doc DOC document
Industry Day_Slides.ppt PPT presentation
Industry Day_Answers.docx DOCX document
Attendance_Industry_Day.pdf PDF
Statement Of Work.SABER First Draft 2010.doc DOC document
Show all 44

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PREVIOUS EDITION MAY BE USED. Page 1 of 3 Pages

DD FORM 1423-1, FEB 2001

The public reporting burden for this collection of information is estimated to average 110 hours per response including time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188).

Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a Government issuing Contracting Officer for the Contract/PR no. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

A

C. CATEGORY:

TDP ____ TM ____ OTHER _________________________________________

D. SYSTEM/ITEM

E. CONTRACT/PR NO.

F2DOAC1060A001

F. CONTRACTOR

1. DATA ITEM NO.

A001

2. TITLE OF DATA ITEM

Contractors Progress, Status & Management Report

3. SUBTITLE

Annual TCIR/DART Rates

4. AUTHORITY (Data Acquisition Document No.)

DI-MGMT-80227

5. CONTRACT REFERENCE

SOW-Appendix C

6. REQUIRING OFFICE

75 CES/CEOS

7. DD 250 REQ

LT

8. APP CODE

NA

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No. 0704-0188

10. FREQUENCY

BLOCK 16

11. AS OF DATE

9. DIST STATEMENT

REQUIRED

D

12. DATE OF FIRST SUBMISSION

BLOCK 16

13. DATE OF SUBSEQUENT SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft

Final Reg

Repro

18. ESTIMATED

TOTAL PRICE

17. PRICE GROUP

BLOCK 16 1 1

J. DATE

18 March 2011

I. APPROVED BY

David Battle, 75 ABW/SEG

H. DATE

0 1 2

G. PREPARED BY

Rodney Sanders, 75 CES/CEOS

16. REMARKS

1. Block 4: Contractor format is acceptable

2. Blocks 10, 11, 12, 13:

Date of Submission: 15 January of each year

3. Block 14: 1 Electronic Copy

Deliver to:

OO-ALC/PKOB

ATTN: SABER Contracting Officer

6038 Aspen Ave

Bldg 1289 NE

Hill AFB, UT 84056-5805

14. TOTAL

PREVIOUS EDITION MAY BE USED. Page 2 of 3 Pages

The public reporting burden for this collection of information is estimated to average 110 hours per response including time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188).

Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a Government issuing Contracting Officer for the Contract/PR no. listed in Block E.

A. CONTRACT LINE ITEM NO.

A002

Accident/Incident Report

3. SUBTITLE

Mishap Notification & Reporting

DI-SAFT-81563

5. CONTRACT REFERENCE

SOW-Appendix C

8. APP CODE

NA

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

BLOCK 16

1. Block 4: Contractor format is acceptable

Date of Initial Submission: NLT three calendar days from the mishap.

Additional information shall be provided NLT 20 calendar days from the mishap.

6038 Aspen Ave

PREVIOUS EDITION MAY BE USED. Page 3 of 3 Pages

The public reporting burden for this collection of information is estimated to average 110 hours per response including time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188).

Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a Government issuing Contracting Officer for the Contract/PR no. listed in Block E.

A. CONTRACT LINE ITEM NO.

A003

Contractor’s Standard Operating Procedures

3. SUBTITLE

Contractor’s Safety and Health Plan and/or Quality

Control Program Updates

DI-MGMT-81580

5. CONTRACT REFERENCE

SOW-Appendix C

8. APP CODE

NA

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

BLOCK 16

1. Block 4: Contractor format is acceptable. Tailored as follows: Delete paragraph 3.

Date of Initial Submission: NLT 15 calendar days from change.

6038 Aspen Ave