Power Station

View the file

Other files

File Type Posted
Q A_Solicitation_7.xls XLS spreadsheet
Q A_Solicitation_6.xls XLS spreadsheet
Q A_Solicitation_5.xls XLS spreadsheet
Q A_Solicitation_4.xls XLS spreadsheet
Q A_Solicitation_2.xls XLS spreadsheet
AMEND_1_Solicitation.pdf PDF
REV_1_SABER_Section L.pdf PDF
REV_1_SAMPLE_TASK_SOW.pdf PDF
Q A_Solicitation.xls XLS spreadsheet
Request for Proposal_SABER.pdf PDF
Statement of Work.pdf PDF
Lead Based Paint —
B 214 Floor plans-1st floor Existing.pdf PDF
CDRLs_SABER.pdf PDF
SAMPLE TASK SOW.pdf PDF
FIRE PREV GUIDE-HILL AFB.pdf PDF
B 214 Comm Layout.pdf PDF
SABER_Section L.pdf PDF
Wage Determinations.pdf PDF
TEP Worksheet.xls XLS spreadsheet
Asebestos Inspection Report.pdf PDF
Bldg 214 - New Layout.pdf PDF
Bldg 214 Old Tire Shop layout 1-Ansi.pdf PDF
SABER_SECTION M.pdf PDF
Tab K.pdf PDF
Section 1000.pdf PDF
Bldg 214 New Layout - People.pdf PDF
BASE FACILITY DESIGN STANDARD.pdf PDF
Existing Offices-South Hall.pdf PDF
Consolidated Tire-Bearing Shop As Built drawings.pdf PDF
QAs_Site_Visit_Final.xls XLS spreadsheet
Asbestos Inspection Report.pdf PDF
Lead Based Paint —
Site Walk Attendance Form.pdf PDF
DRAFT_SAMPLE TASK_SOW_2.doc DOC document
SABER Site Visit RSVP.doc DOC document
SABER_DRAFT_SAMPLE TASK_SOW.doc DOC document
DRAFT_SABER_Section L.doc DOC document
DRAFT_SABER_SECTION M.doc DOC document
DRAFT_SABER_SOW.doc DOC document
Industry Day_Slides.ppt PPT presentation
Industry Day_Answers.docx DOCX document
Attendance_Industry_Day.pdf PDF
Statement Of Work.SABER First Draft 2010.doc DOC document
Show all 44

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

t 4.5"

1.

3.

4.

-----------13.5"---------~~_1 _----6.25"---~~_1 l!Qli;

o

(0 lAB STATIONS DENOTED BY ~ , SHALl

NOT HAVE GPS DEVICE.

o

" OTHE

""-HUBBELL

CUSTOM STAINLESS STEEL

WAUL PLATE

,== = ___ ======2=. =~=3·==~_~=-::?r,---lABEL (TYP.)

60HZ 400HZ 400HZ - DC ~

o o

4.

TEL 1, TEL 2

DATA 1, DATA 2

GPS BNC

~~ 0 0 0 0

(~~u) (~~u) ~ ~ ~ cp

5. 6. 7.

5. DEDICATED 20A.

DUPLEX

6. DEDICATED 20A,

DUPLEX

8. 9.

12DV, 1., 60Hz, 120V, 1., 60Hz, 10.

~HUBBELL

CUSTOM STAINLESS STEEL

WALL PLATE

8. 20A, 208V, 3., 400Hz, SHARED ACROSS 10 STATIONS

NEMA L2 1-20

9. 20A. 120V, 1 •• 400Hz.

SHARED ACROSS 10 STATIONS

GROUND STUD WITH WING NUT 7. 20A, 120/208V, 3 •• 60Hz, (BOTRON OR EQUAl) SHARED ACROSS 6 STATIONS

NEMA L21-20

10. DEDICATED 20A, 28VOC,

NEMA 2-20

(;\ TYPICAL POWER STATION REQUIREMENTS

\ - .J N.T.S.

Paul.Beck Typewritten Text

Paul.Beck Cross-Out

Paul.Beck Text Box CONTRACTOR TO PROVIDE, INSTALL, AND CONNECT JACKS, FACEPLATES, CABLING, AND NECESSARY HARDWARE OF VOICE AND DATA CABLING, IAW Tab K

Paul.Beck Line

Paul.Beck Line

Paul.Beck Text Box Jacks are shown upside down. Install correctly.