32 12 10.2.pdf
PDF 19 KB Posted
- Solicitation number
- FA813726R0030
About this file
This is a technical specification document for bituminous prime coat application at Tinker Air Force Base, Oklahoma, dated April 2019.
The specification establishes requirements for applying a bituminous prime coat to pavement surfaces as a preparatory treatment before subsequent paving layers. The bituminous material required is emulsified asphalt, SS-1 or SS-1h, conforming to Oklahoma Department of Transportation (ODOT) standards, sourced from Oklahoma State Highway Commission-approved suppliers. Application rates must range between 0.15 and 0.40 gallons per square yard, with exact quantities determined by the Contracting Officer to suit field conditions. The material shall be applied at temperatures between 70-160 degrees Fahrenheit to achieve specified viscosity ranges (10-60 seconds Saybolt Furol or 20-120 centistokes kinematics). The contractor must provide all equipment, including a bituminous distributor with pneumatic tires, pressure gauges, volume-measuring devices, heaters, and thermometers, capable of maintaining ±5 percent variation from specified application rates. Surface preparation requires removal of all loose materials, dirt, and clay immediately before application. Weather limitations restrict application to conditions where atmospheric temperature is at least 50 degrees Fahrenheit and has not fallen below 35 degrees Fahrenheit in the preceding 12 hours. The contractor is responsible for calibrating the distributor using ASTM D 2995 standards, conducting trial applications at 0.25 gallons per square yard across at least 100-foot lengths, and performing quality control sampling and testing. The primed surface must cure undisturbed for a minimum of 48 hours before placement of subsequent pavement layers, with the contractor responsible for surface maintenance and repair at no additional government cost.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Tinker AFB, OK TAFB Technical Specifications 2019
April 2019 Page 1 Section 32 12 10.2
SECTION 32 12 10.2
BITUMINOUS PRIME COAT
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by basic designation only. Unless specifically noted, the current edition of the reference will be used.
AMERICAN SOCIETY FOR TESTING AND MATERIALS (ASTM)
ASTM D 2995 Determining Application Rate of
Bituminous Distributors
OKLAHOMA DEPARTMENT OF TRANSPORTATION (ODOT)
ODOT SSHC Standard Specifications for Highway Construction. (SSHC)
1.2 SUBMITTALS
Government approval is required for all submittals. The following shall be submitted in accordance with Section 01 33 00, SUBMITTAL
PROCEDURES:
SD-09 Reports; FIO.
1.2.1 Field Quality Control; Sampling and Testing
Copies of all test results for bituminous materials shall be submitted within 24 hours of completion of tests. Certified copies of the manufacturer's test reports indicating compliance with applicable specified requirements.
1.3 PLANT, EQUIPMENT, MACHINES AND TOOLS
1.3.1 General Requirements
Plant, equipment, machines, and tools used in the work shall be subject to approval and shall be maintained in a satisfactory working condition at all times. The equipment shall be adequate and shall have the capability of producing the results specified.
1.3.2 Bituminous Distributor
The distributor shall have pneumatic tires of such size and number to prevent rutting, shoving, or otherwise damaging the
April 2019 Page 2 Section 32 12 10.2 base surface or other layers in the pavement structure. The distributor shall be designed and equipped to spray the bituminous material in a double or triple lap at the specified temperature, at readily determined and controlled rates with an allowable variation from the specified rate of not more than plus or minus 5 percent, and at variable widths. Distributor equipment shall include a separate power unit for the bitumen pump, full-circulation spray bars, tachometer, pressure gauges, volume-measuring devices, adequate heaters for heating of materials to the proper application temperature, a thermometer for reading the temperature of tank contents, and a hand hose attachment suitable for applying bituminous material manually to areas inaccessible to the distributor. The distributor shall be equipped to circulate and agitate the bituminous material during the heating process.
1.3.3 Power Brooms and Power Blowers
Power brooms and power blowers shall be suitable for cleaning the surfaces to which the prime coat is to be applied.
1.3.4 Storage Tanks
Tanks shall be capable of heating the bituminous material, under effective and positive control at all times, to the required temperature. Heating shall be accomplished by steam coils, hot oil, or electricity. An armored thermometer shall be affixed to the tank so that the temperature of the bituminous material may be read at all times.
1.4 WEATHER LIMITATIONS
The prime coat shall be applied only when the subgrade, subbase, or base course is dry enough to promote uniform coverage and the desired penetration into the treated surface. The prime coat shall be applied only when the atmospheric temperature in the shade is 50 degrees or above and when the temperature has not been below 35 degrees F for the 12 hours prior to application.
April 2019 Page 3 Section 32 12 10.2
PART 2 PRODUCTS
2.1 BITUMINOUS MATERIALS
Emulsified asphalt, SS-1 or SS-1h, conforming to OSHC SSHC, Section 708.03. Bituminous material delivered to the job shall come from a source approved for use by the Oklahoma State Highway Commission. The seal number from the tank and a copy of the Oklahoma State Highway Commission's Laboratory test report shall accompany each shipment, or the Contractor shall furnish a test report certifying the material meets the specified requirements.
PART 3 EXECUTION
3.1 PREPARATION OF SURFACE
Immediately before applying the prime coat, all loose material, dirt, clay, or other objectionable material shall be removed from the surface to be treated. To assure a uniform spread of the bituminous material, the portion of the subgrade, subbase, or base course prepared for treatment, if excessively dry, shall be lightly sprinkled with water immediately before the application, as directed.
3.2 PRIME COATING
The exact quantities within the range specified, which may be varied to suit field conditions, will be determined by the Contracting Officer.
3.2.1 Application Rate
Bituminous material for the prime coat shall be applied in quantities of not less than 0.15 gallon nor more than 0.40 gallon per square yard of pavement surface.
3.2.2 Application Temperature
NORMAL SPRAY APPLICATION TEMPERATURES FOR
Emulsified Asphalt 70-160 degrees F *
Emulsified asphalt application temperature shall provide an application viscosity between 10 and 60 seconds, Saybolt Furol, or between 20 and 120 centistokes, kinematics. The temperature viscosity relation shall be furnished to the Contracting Officer.
*These temperature ranges include or exceed the flash point of the material, and care should be taken in their heating.
3.2.3 Application
April 2019 Page 4 Section 32 12 10.2
Following preparation and subsequent inspection of the surface, the prime coat shall be applied at the specified rate with uniform distribution over the surface to be treated. To obtain uniform application of the prime coat on the surface treated at the junction of previous and subsequent applications, building paper shall be spread on the surface for a sufficient distance back from the ends of each application so that the prime coat may be started and stopped on the paper. Immediately after application, the building paper shall be removed and destroyed.
All areas and spots missed by the distributor shall be properly treated with the hand spray. Following application of the prime material, the surface shall be allowed to cure without being disturbed for a period of at least 48 hours or longer, as may be necessary to attain penetration into the treated course and evaporation of the volatiles from prime material. As directed, sand shall be spread to effectively blot up and cure any excess bituminous material. Until the succeeding layer of pavement is placed, the primed surface shall be maintained by protecting the surface against damage and by repairing and repriming deficient areas at no additional cost to the Government. No smoking, fire, or flames other than the heaters that are a part of the equipment shall be permitted within 25 feet of heating, distributing, or transferring operation for bituminous materials other than emulsions.
3.3 FIELD QUALITY CONTROL
Samples of the bituminous material used will be obtained by the Contractor as directed, under the supervision of the Contracting Officer. The sample will be retained and tested by the Government at no cost to the Contractor.
3.4 SAMPLING AND TESTING
3.4.1 Initial Sampling and Testing
3.4.2 Calibration Test
The Contractor shall furnish all equipment, materials, and labor necessary to calibrate the bituminous distributor. Calibration shall be made with the approved job material and prior to applying the prime coat material to the prepared surface.
Calibration of the bituminous distributor shall be in accordance with ASTM D 2995.
April 2019 Page 5 Section 32 12 10.2
3.4.3 Trial Applications
As a preliminary to providing the complete prime coat, three lengths of at least 100 feet for the full width of the distributor bar shall be primed to evaluate the amount of prime that can be satisfactorily applied. Unless otherwise authorized, the trial application rate of bituminous materials shall be applied in the amount of 0.25 gallon per square yard. Other trial applications shall be made using various amounts of material as may be deemed necessary.
3.4.4 Sampling and Testing During Construction
Quality control sampling and testing shall be performed as required in paragraph FIELD QUALITY CONTROL.
- End of Section -
| Part 1 GENERAL |
| 1.1 REFERENCES |
| 1.2 SUBMITTALS |
| 1.3 PLANT, EQUIPMENT, MACHINES AND TOOLS |
| 1.3.1 General Requirements |
| 1.3.2 Bituminous Distributor |
| 1.3.3 Power Brooms and Power Blowers |
| 1.3.4 Storage Tanks |
1.4 WEATHER LIMITATIONS
| Part 2 PRODUCTS |
| 2.1 BITUMINOUS MATERIALS |
| Part 3 EXECUTION |
| 3.1 PREPARATION OF SURFACE |
| 3.2 prime coating |
| 3.2.1 Application Rate |
| 3.2.2 Application Temperature |
| 3.2.3 Application |
| 3.3 FIELD QUALITY CONTROL |
| 3.4 SAMPLING AND TESTING |
| 3.4.1 Initial Sampling and Testing |
| 3.4.2 Calibration Test |
| 3.4.3 Trial Applications |
| 3.4.4 Sampling and Testing During Construction |