07 52 00.pdf

PDF 103 KB Posted

Attached to
TINKER AFB MAC BOA WWYK190023 Renovate Restrooms B117
Solicitation number
FA813726R0030
Issued by

About this file

This is a Technical Specifications document for modified bituminous membrane roofing at Tinker Air Force Base, Oklahoma, issued in April 2019 for Section 07 52 00.

The specification requires installation of a minimum three-ply fiberglass felt base sheet with one ply SBS cap sheet, fully adhered in hot asphalt. All work must follow NRCA RoofMan guidelines and standards. Key material requirements include fiberglass felt base sheets meeting ASTM D4601/D4601M and ASTM D1668/D1668M Type II; SBS cap sheets meeting ASTM D6162/D6162M and ASTM D6164/D6164M, minimum 145 mils thick; asphalt per ASTM D312/D312M Type III or IV; and roof insulation compatible with the membrane system and approved by the manufacturer. The specification mandates a preroofing conference, manufacturer's technical representative site inspections (minimum three visits), and field quality control testing including surface dryness tests, roof drain tests, and infrared scanning eight months after completion to detect moisture intrusion. Environmental requirements prohibit installation below 40°F, during precipitation, or when moisture or ice is present on the roof deck. The roofing system must achieve Class A fire rating and comply with ASCE 7 wind load calculations at 90 mph design wind speed, with non-rated systems requiring licensed engineer validation. Warranties require a 20-year no-dollar-limit manufacturer warranty covering materials and workmanship, and a two-year installer warranty. Applicators must be approved by the manufacturer with minimum five years' experience and provide references for similar projects. The specification includes detailed application procedures for hot asphalt mopping, membrane installation with specified lap widths, flashing details, temporary roofing provisions, and protection of applied materials.

View the file

Other files

File Type Posted
03 11 13.00 10.pdf PDF
03 20 00.00 10.pdf PDF
03 30 00.pdf PDF
07 14 00.pdf PDF
07 19 00.pdf PDF
07 21 16.pdf PDF
07 22 00.pdf PDF
07 31 13.pdf PDF
07 72 20.pdf PDF
08 34 01.pdf PDF
08 34 19.10 20.pdf PDF
08 52 00.pdf PDF
09 29 00.pdf PDF
10 21 13.pdf PDF
10 22 13.pdf PDF
13 34 19.pdf PDF
21 13 13.pdf PDF
23 03 00.pdf PDF
23 05 48.00 40.pdf PDF
23 07 00.pdf PDF
23 09 23.01.pdf PDF
23 34 23.00 40.pdf PDF
23 52 00.pdf PDF
23 65 00.pdf PDF
23 70 03.pdf PDF
26 00 00.00 20.pdf PDF
26 05 48.00 10.pdf PDF
26 29 23.pdf PDF
26 32 14.00 10.pdf PDF
31 23 15.pdf PDF
31 23 16.pdf PDF
32 01 13.pdf PDF
32 11 11.pdf PDF
32 11 29.pdf PDF
32 12 10.1.pdf PDF
32 12 10.2.pdf PDF
32 13 14.pdf PDF
32 13 73.pdf PDF
190023 Renovate Restrooms B117 RFIs_FINAL_COR_Signed.pdf PDF
TAFB_Tech_Reqs (Div 02-48).zip ZIP file
Model.zip ZIP file
000_TABLE OF CONTENTS.pdf PDF
01 32 16.00 20.pdf PDF
01 33 16.00 10.pdf PDF
01 42 00.pdf PDF
01 78 00.pdf PDF
Tinker General Requirements Specifications_Nov 2022_Change Log.pdf PDF
Initial Site Visit WWYK190023.pdf PDF
Att12_190023_Drawings_Final.pdf PDF
Section L - Instructions to Offerors.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Ti nker AFB, OK TAFB Techni cal Spr ci f i cat i ons 2019

SECTI ON 07 52 00

MODI FI ED BI TUMI NOUS MEMBRANE ROOFI NG

PART 1 GENERAL

1. 1 REFERENCES

The publ i cat i ons l i s t ed bel ow f or m a par t of t hi s speci f i cat i on t o t he ext ent r ef er enced. The publ i cat i ons ar e r ef er r ed t o wi t hi n t he t ext by t he basi c desi gnat i on onl y.

AMERI CAN SOCI ETY OF CI VI L ENGI NEERS ( ASCE)

ASCE 7 ( 2010; Er r at a 2011; Supp 1 2013) Mi ni mum Desi gn Loads f or Bui l di ngs and Ot her Structures

AMERI CAN SOCI ETY OF HEATI NG, REFRI GERATI NG AND AI R- CONDI TI ONI NG

ENGI NEERS ( ASHRAE)

ASHRAE 90. 1 - I P ( 2010) Ener gy St andar d f or Bui l di ngs Except Low- Ri se Resi dent i al Bui l di ngs

ASHRAE 90. 1 - SI ( 2010) Ener gy St andar d f or Bui l di ngs Except Low- Ri se Resi dent i al Bui l di ngs

AMERI CAN SOCI ETY OF SAFETY ENGI NEERS ( ASSE/ SAFE)

ASSE/ SAFE A10. 24 ( 2014) Roof i ng - Saf et y Requi r ement s of Low- Sl oped Roof s

ASPHALT ROOFI NG MANUFACTURER' S ASSOCI ATI ON ( ARMA)

ARMA 410BUR88 ( 2001) Manual of Roof Mai nt enance and Repair

ARMA PMBRG98 ( 1998) Qual i t y Cont r ol Gui del i ne f or t he Appl i cat i on of Pol ymer Modi f i ed Bi t umen Roofing

ASTM I NTERNATI ONAL ( ASTM)

ASTM C1153 ( 2010) St andar d Pr act i ce f or Locat i on of Wet I nsul at i on i n Roof i ng Syst ems Usi ng I nf r ar ed I magi ng

ASTM C1289 ( 2016) St andar d Speci f i cat i on f or Faced Ri gi d Cel l ul ar Pol y i socyanur at e Ther mal I nsul at i on Boar d

ASTM C208 ( 2012) Cel l ul osi c Fi ber I nsul at i ng Boar d

ASTM C552 ( 2016) St andar d Speci f i cat i on f or Cel l ul ar Gl ass Ther mal I nsul at i on

ASTM C578 ( 2015b) St andar d Speci f i cat i on f or Ri gi d, Apr i l 2019 Page 1 SECTI ON 07 52 00

Cel l ul ar Pol yst yr ene Ther mal I nsul at i on

ASTM C726 ( 2012) Mi ner al Fi ber Roof I nsul at i on Boar d

ASTM C728 ( 2016) Per l i t e Ther mal I nsul at i on Boar d

ASTM D1668/ D1668M ( 1997a; R 2014; E 2014) Gl ass Fabr i cs ( Woven and Tr eat ed) f or Roof i ng and Waterproofing

ASTM D1863/ D1863M ( 2005; R 2011; E 2012) Mi ner al Aggr egat e Used on Bui l t - Up Roof s

ASTM D1970/ D1970M ( 2015a) Sel f - Adher i ng Pol ymer Modi f i ed Bi t umi nous Sheet Mat er i al s Used as St eep Roof i ng Under l ayment f or I ce Dam Pr ot ect i on

ASTM D2170/ D2170M ( 2010) Ki nemat i c Vi scosi t y of Asphal t s (Bitumens)

ASTM D2824/ D2824M ( 2013) Al umi num- Pi gment ed Asphal t Roof Coat i ngs, Non- Fi ber ed, Asbest os Fi ber ed, and Fi ber ed wi t hout Asbest os

ASTM D312/ D312M ( 2016) St andar d Speci f i cat i on f or Asphal t Used i n Roof i ng

ASTM D4073 ( 2006; R 2013) St andar d Test Met hod f or Tensi l e- Tear St r engt h of Bi t umi nous Roof i ng Membr anes

ASTM D41/ D41M ( 2011) Asphal t Pr i mer Used i n Roof i ng, Damppr oof i ng, and Wat er pr oof i ng

ASTM D4263 ( 1983; R 2012) I ndi cat i ng Moi st ur e i n Concr et e by t he Pl ast i c Sheet Met hod

ASTM D4402/ D4402M ( 2015) Vi scosi t y Det er mi nat i on of Asphal t at El evat ed Temper at ur es Usi ng a Rot at i onal Vi scomet er

ASTM D4586/ D4586M ( 2007; E 2012; R 2012) Asphal t Roof Cement , Asbest os- Fr ee

ASTM D4601/ D4601M ( 2004; R 2012) Asphal t - Coat ed Gl ass Fi ber Base Sheet Used i n Roof i ng

ASTM D4637/ D4637M ( 2015) EPDM Sheet Used i n Si ngl e- Pl y Roof Membrane

ASTM D4897/ D4897M ( 2001; R 2009) St andar d Speci f i cat i on f or Asphal t - Coat ed Gl ass- Fi ber Vent i ng Base Sheet Used i n Roof i ng

ASTM D5147/ D5147M ( 2014) St andar d Test Met hods f or Sampl i ng and Test i ng Modi f i ed Bi t umi nous Sheet Material

ASTM D6162/ D6162M ( 2000a; R 2015; E 2015) St andar d

Apr i l 2019 Page 2 SECTI ON 07 52 00

Speci f i cat i on f or St yr ene But adi ene St yr ene ( SBS) Modi f i ed Bi t umi nous Sheet Mat er i al s Usi ng a Combi nat i on of Pol yest er and Gl ass Fi ber Rei nf or cement s

ASTM D6163/ D6163M ( 2000; R 2015; E 2015) St andar d Speci f i cat i on f or St yr ene But adi ene St yr ene ( SBS) Modi f i ed Bi t umi nous Sheet Mat er i al s Usi ng Gl ass Fi ber Rei nf or cement s

ASTM D6164/ D6164M ( 2011) St yr ene But adi ene St yr ene ( SBS) Modi f i ed Bi t umi nous Sheet Mat er i al s Usi ng Pol yest er Rei nf or cement s

ASTM D6222/ D6222M ( 2011) At act i c Pol ypr opyl ene ( ARP) Modi f i ed Bi t umi nous Sheet Mat er i al s Usi ng Pol yest er Rei nf or cement s

ASTM D6223/ D6223M ( 2002; E 2009; R 2009) St andar d Speci f i cat i on f or At act i c Pol ypr opyl ene ( ARP) Modi f i ed Bi t umi nous Sheet Mat er i al s Usi ng a Combi nat i on of Pol yest er and Gl ass Fi ber Rei nf or cement s

ASTM D6298 ( 2013) Fi ber gl ass Rei nf or ced St yr ene- But adi ene- St yr ene ( SBS) Modi f i ed Bi t umi nous Sheet wi t h Fact or y Appl i ed Met al Sur f ace

ASTM E108 ( 2011) Fi r e Test s of Roof Cover i ngs

FM GLOBAL ( FM)

FM 4470 ( 2010) Si ngl e- Pl y, Pol ymer - Modi f i ed Bi t umen Sheet , Bui l t - up Roof ( BUR) , and Li qui d Appl i ed Roof Assembl i es f or Use i n Cl ass 1 and Noncombust i bl e Roof Deck Construction

FM APP GUI DE ( updat ed on- l i ne) Appr oval Gui de http://www.approvalguide.com/

I NTERNATI ONAL CODE COUNCI L ( I CC)

I CC I BC ( 2015) I nt er nat i onal Bui l di ng Code

I NTERNATI ONAL SAFETY EQUI PMENT ASSOCI ATI ON ( I SEA)

ANSI / I SEA Z87. 1 ( 2015) Occupat i onal and Educat i onal Per sonal Eye and Face Pr ot ect i on Devi ces

MI DWEST ROOFI NG CONTRACTORS ASSOCI ATI ON ( MRCA)

CERTA ( 2003) NRCA/ MRCA Cer t i f i ed Roof i ng Tor ch Appl i cat or Pr ogr am

NATI ONAL FI RE PROTECTI ON ASSOCI ATI ON ( NFPA)

NFPA 241 ( 2013; Er r at a 2015) St andar d f or

Apr i l 2019 Page 3 SECTI ON 07 52 00

Saf eguar di ng Const r uct i on, Al t er at i on, and Demol i t i on Oper at i ons

NFPA 58 ( 2014; TI A 13- 1; TI A 13- 2; Er r at a 13- 1;

TI A 13- 3; Er r at a 14- 2) Li quef i ed Pet r ol eum Gas Code

NATI ONAL ROOFI NG CONTRACTORS ASSOCI ATI ON ( NRCA)

NRCA C3701 ( 2002) Repai r Manual f or Low Sl ope Membr ane Roof Syst ems

NRCA Det ai l s ( 2003) NRCA Roof Per i met er Fl ashi ng Syst ems Const r uct i on Det ai l s f or Cl ass 1 Roof Const r uct i on

NRCA Roof Man ( 2011 t hr u 2014) The NRCA Roof i ng Manual

SHEET METAL AND AI R CONDI TI ONI NG CONTRACTORS' NATI ONAL ASSOCI ATI ON

(SMACNA)

SMACNA 1793 ( 2012) Ar chi t ect ur al Sheet Met al Manual , 7t h Edi t i on

SI NGLE PLY ROOFI NG I NDUSTRY ( SPRI )

ANSI / SPRI / FM 4435/ ES- 1 ( 2011) Wi nd Desi gn St andar d f or Edge Syst ems Used wi t h Low Sl ope Roof i ng Syst ems

U. S. NATI ONAL ARCHI VES AND RECORDS ADMI NI STRATI ON ( NARA)

29 CFR 1910 Occupat i onal Saf et y and Heal t h St andar ds

29 CFR 1910. 12 Const r uct i on Wor k

29 CFR 1926 Saf et y and Heal t h Regul at i ons f or Construction

29 CFR 1926. 16 Rul es of Const r uct i on

UNDERWRI TERS LABORATORI ES ( UL)

UL 790 ( 2004; Repr i nt Jul 2014) St andar d Test Met hods f or Fi r e Test s of Roof Cover i ngs

UL RMSD ( 2012) Roof i ng Mat er i al s and Syst ems Directory

1. 2 DESCRI PTI ON OF ROOF MEMBRANE SYSTEMS

Mi ni mum t hr ee- pl y f i ber gl ass f el t and one pl y cap sheet . Modi f i ed bi t umen r oof membr ane must be set i n hot asphal t .

Al l wor k must f ol l ow t he NRCA Roof Man gui del i nes and st andar ds st at ed wi t hi n t hi s Sect i on.

Apr i l 2019 Page 4 SECTI ON 07 52 00

1. 3 SUBMITTALS

Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" desi gnat i on;

submi t t al s not havi ng a " G" desi gnat i on ar e f or Cont r act or Qual i t y Cont r ol appr oval . Submi t t he f ol l owi ng i n accor dance wi t h Sect i on 01 33 00

SUBMI TTAL PROCEDURES:

SD- 02 Shop Dr awi ngs

Roof pl an; G dr awi ng depi ct i ng wi nd l oads and boundar i es of enhanced per i met er and cor ner at t achment s of r oof syst em component s, as appl i cabl e

SD- 03 Pr oduct Dat a

Modi f i ed Bi t umen Sheet s; G

Asphalt

Fi ber gl ass Fel t ; G

Primer

Modi f i ed Bi t umen Roof Cement

Pr e- Manuf act ur ed Accessor i es

Fast ener s And Pl at es; G

Sampl e War r ant y cer t i f i cat e; G

Submi t al l dat a r equi r ed by Sect i on 07 22 00 ROOF AND DECK I NSULATI ON, t oget her wi t h r equi r ement s of t hi s sect i on. I ncl ude i n dat a wr i t t en accept ance by t he r oof membr ane manuf act ur er of t he pr oduct s and accessor i es pr ovi ded. Pr oduct s must be as l i s t ed i n t he appl i cabl e wi nd upl i f t and f i r e r at i ng c l assi f i cat i on l i s t i ngs, unl ess appr oved ot her wi se by t he Cont r act i ng Of f i cer .

SD- 05 Desi gn Dat a

Wi nd Upl i f t Cal cul at i ons; G

Pr ovi de Engi neer i ng cal cul at i ons, s i gned, seal ed, and dat ed by a qual i f i ed Engi neer val i dat i ng t he wi nd r esi st ance per ASCE 7, ASTM D4073, and ANSI / SPRI / FM 4435/ ES- 1 of non- r at ed r oof syst em.

SD- 07 Cer t i f i cat es

Pr ovi de evi dence t hat pr oduct s used wi t hi n t hi s speci f i cat i on ar e manuf act ur ed i n t he Uni t ed St at es.

Qual i f i cat i on of Manuf act ur er

Cer t i f y t hat t he manuf act ur er of t he modi f i ed bi t umen membr ane meet s r equi r ement s speci f i ed under par agr aph ent i t l ed " Qual i f i cat i on of Manuf act ur er . "

Apr i l 2019 Page 5 SECTI ON 07 52 00

Qual i f i cat i on of Appl i cat or

Cer t i f y t hat t he appl i cat or meet s r equi r ement s speci f i ed under par agr aph ent i t l ed " Qual i f i cat i on of Appl i cat or . "

Qual i f i cat i on of Engi neer of Recor d

Cer t i f y t hat t he Engi neer of Recor d i s f ul l y qual i f i ed, compet ent , and cur r ent l y l i censed t o pr act i ce i n t he pr oj ect j ur i sdi ct i on.

Bi l l of Ladi ng

Submi t bi l l of l adi ng when l abel s of asphal t cont ai ner s do not bear t he f l ash poi nt ( FP) , f i ni shed bl owi ng t emper at ur e ( FBT) , and equi v i scous t emper at ur e ( EVT) .

Wi nd Upl i f t Resi st ance; G cl assi f i cat i on, as appl i cabl e

Fi r e Resi st ance cl assi f i cat i on; G

Submi t t he r oof syst em assembl y wi nd upl i f t and f i r e r at i ng c l assi f i cat i on l i s t i ngs.

SD- 08 Manuf act ur er ' s I nst r uct i ons

Modi f i ed Bi t umen Membr ane Appl i cat i on; G

Fl ashi ng; G

Temper at ur e Li mi t at i ons f or Asphal t

Base Sheet at t achment , i ncl udi ng pat t er n and f r equency of mechani cal at t achment s r equi r ed i n f i el d of r oof , cor ner s, and per i met er s t o pr ovi de f or t he speci f i ed wi nd r esi st ance.

Primer

Fasteners

Vent i l at i ng Base Sheet s

Col d Weat her I nst al l at i on; G

I ncl ude det ai l ed appl i cat i on i nst r uct i ons and st andar d manuf act ur er dr awi ngs al t er ed as r equi r ed by t hese speci f i cat i ons.

I ncl ude membr ane manuf act ur er r equi r ement s f or nai l er s and backnai l i ng of r oof membr ane on st eep sl opes. Expl i c i t l y i dent i f y i n wr i t i ng, di f f er ences bet ween manuf act ur er ' s i nst r uct i ons and t he speci f i ed r equi r ement s.

SD- 11 Cl oseout Submi t t al s

Warranty

Apr i l 2019 Page 6 SECTI ON 07 52 00

I nf or mat i on Car d

I nst r uct i ons To Gover nment Per sonnel

I ncl ude copi es of Mat er i al Saf et y Dat a Sheet s f or mai nt enance/ r epai r mat er i al s.

Submi t 20 year " No- Dol l ar - Li mi t " war r ant y f or l abor and mat er i al s.

1. 4 QUALI TY ASSURANCE

1. 4. 1 Qual i f i cat i on of Manuf act ur er

Modi f i ed bi t umen sheet r oof i ng syst em manuf act ur er must have a mi ni mum of 5 year s exper i ence i n manuf act ur i ng modi f i ed bi t umen r oof i ng pr oduct s.

1. 4. 2 Qual i f i cat i on of Appl i cat or

Roof i ng syst em appl i cat or must be appr oved, aut hor i zed, or l i censed i n wr i t i ng by t he modi f i ed bi t umen sheet r oof i ng syst em manuf act ur er and have a mi ni mum of f i ve year s exper i ence as an appr oved, aut hor i zed, or l i censed appl i cat or wi t h t hat manuf act ur er and be appr oved at a l evel capabl e of pr ovi di ng t he speci f i ed war r ant y. The appl i cat or must suppl y t he names, l ocat i ons and cl i ent cont act i nf or mat i on of f i ve pr oj ect s of s i mi l ar s i ze and scope t hat t he appl i cat or has const r uct ed usi ng t he manuf act ur er ' s r oof i ng pr oduct s submi t t ed f or t hi s pr oj ect wi t hi n t he pr evi ous t hr ee years.

1. 4. 3 Qual i f i cat i ons of Phot ovol t ai cs ( PV) Roof t op Appl i cat or

The PV r oof t op appl i cat or must be appr oved, aut hor i zed, or cer t i f i ed by a Roof I nt egr at ed Sol ar Ener gy ( RI SE) Cer t i f i ed Sol ar Roof i ng Pr of essi onal ( CSRP) , and compl y wi t h appl i cabl e codes, st andar ds, and r egul at or y r equi r ement s t o mai nt ai n t he weat her pr oof i ng abi l i t i es of bot h t he i nt egr at ed r oof syst em and phot ovol t ai c syst em.

1. 4. 4 Qual i f i cat i on of Engi neer of Recor d

Engi neer of Recor d must be cur r ent l y l i censed wi t hi n t he j ur i sdi ct i on of t he pr oj ect .

1. 4. 5 Fi r e Resi st ance

Compl et e r oof cover i ng assembl y must :

a. Be Cl ass A r at ed i n accor dance wi t h ASTM E108, FM 4470, or UL 790; and

b. Be l i s t ed as par t of Fi r e- Cl assi f i ed r oof deck const r uct i on i n UL RMSD, or Cl ass I r oof deck const r uct i on i n FM APP GUI DE.

FM or UL appr oved component s of t he r oof cover i ng assembl y must bear t he appr opr i at e FM or UL l abel .

1. 4. 6 Wi nd Upl i f t Resi st ance

The compl et e r oof syst em assembl y shal l be r at ed and i nst al l ed t o r esi st wi nd l oads cal cul at ed i n accor dance wi t h ASCE 7 and val i dat ed by upl i f t r esi st ance t est i ng i n accor dance wi t h Fact or y Mut ual ( FM) t est

Apr i l 2019 Page 7 SECTI ON 07 52 00 pr ocedur es. Non- r at ed syst ems must not be i nst al l ed, except as appr oved by t he Cont r act i ng Of f i cer . Submi t l i censed engi neer ' s Wi nd upl i f t cal cul at i ons and subst ant i at i ng dat a t o val i dat e any non- r at ed r oof syst em. Base wi nd upl i f t measur ement s on a desi gn wi nd speed of 90 mph i n accor dance wi t h ASCE 7and/ or ot her appl i cabl e bui l di ng code r equi r ement s.

1. 4. 7 Pr er oof i ng Conf er ence

Af t er appr oval of submi t t al s and bef or e per f or mi ng r oof i ng and i nsul at i on syst em i nst al l at i on wor k, hol d a pr er oof i ng conf er ence t o r evi ew t he following:

a. Dr awi ngs, i ncl udi ng Roof Pl an, speci f i cat i ons and submi t t al s r el at ed t o t he r oof wor k

Fi el d i nspect i on and ver i f i cat i on of al l exi st i ng condi t i ons, i ncl udi ng al l f i r e saf et y i ssues, exi st i ng st r uct ur e, and exi st i ng mat er i al s, i ncl udi ng conceal ed combust i bl es, whi ch may r equi r e addi t i onal pr ot ect i on dur i ng i nst al l at i on.

b. Roof syst em component s i nst al l at i on

c. Pr ocedur e f or t he r oof manuf act ur er ' s t echni cal r epr esent at i ve' s onsi t e i nspect i on and accept ance of t he r oof st r uct ur e, and r oof i ng subst r at e, t he name of t he manuf act ur er ' s t echni cal r epr esent at i ves, t he f r equency of t he onsi t e v i s i t s, di st r i but i on of copi es of t he i nspect i on r epor t s f r om t he manuf act ur er ' s t echni cal r epr esent at i ves t o r oof manuf act ur er

d. Cont r act or ' s pl an f or coor di nat i on of t he wor k of t he var i ous t r ades i nvol ved i n pr ovi di ng t he r oof i ng syst em and ot her component s secur ed t o t he r oof i ng

e. Qual i t y cont r ol , ( ARMA PMBRG98) pl an f or t he r oof syst em i nst al l at i on f . Saf et y r equi r ement s

Coor di nat e pr er oof i ng conf er ence schedul i ng wi t h t he Cont r act i ng Of f i cer .

The conf er ence must be at t ended by t he Cont r act or , t he Cont r act i ng Of f i cer ' s desi gnat ed per sonnel , and per sonnel di r ect l y r esponsi bl e f or t he i nst al l at i on of r oof i ng and i nsul at i on, f l ashi ng and sheet met al wor k, mechani cal and el ect r i cal wor k, ot her t r ades i nt er f aci ng wi t h t he r oof wor k, desi gnat ed saf et y per sonnel t r ai ned t o enf or ce and compl y wi t h ASSE/ SAFE A10. 24, and r epr esent at i ve of t he r oof i ng mat er i al s manuf act ur er . Bef or e begi nni ng r oof i ng wor k, pr ovi de a copy of meet i ng not es and act i on i t ems t o al l at t endi ng par t i es. Not e act i on i t ems r equi r i ng r esol ut i on pr i or t o st ar t of r oof wor k.

1. 5 DELI VERY, STORAGE, AND HANDLI NG

1. 5. 1 Delivery

Del i ver mat er i al s i n manuf act ur er s ' or i gi nal unopened cont ai ner s and r ol l s wi t h l abel s i nt act and l egi bl e. Mar k and r emove wet or damaged mat er i al s f r om t he si t e. Wher e mat er i al s ar e cover ed by a r ef er enced speci f i cat i on, t he cont ai ner must bear t he speci f i cat i on number , t ype, and cl ass, as appl i cabl e. Label s or bi l l of l adi ng f or r oof i ng asphal t must i ndi cat e asphal t t ype, FP, FBT, and EVT, t hat i s , t he t emper at ur e at whi ch t he vi scosi t y i s ei t her 125 cent i st okes when t est ed i n accor dance wi t h

Apr i l 2019 Page 8 SECTI ON 07 52 00

ASTM D2170/ D2170M or 75 cent i poi se when t est ed i n accor dance wi t h ASTM D4402/ D4402M. Del i ver mat er i al s i n suf f i c i ent quant i t y t o al l ow wor k t o pr oceed wi t hout i nt er r upt i on.

1. 5. 2 Storage

Pr ot ect mat er i al s agai nst moi st ur e absor pt i on and cont ami nat i on or ot her damage. Avoi d cr ushi ng or cr i nkl i ng of r ol l mat er i al s. St or e r ol l mat er i al s on end on cl ean r ai sed pl at f or ms or pal l et s one l evel hi gh i n dr y l ocat i ons wi t h adequat e vent i l at i on, such as an encl osed bui l di ng or c l osed t r ai l er . Do not st or e r ol l mat er i al s i n bui l di ngs under const r uct i on unt i l concr et e, mor t ar , and pl ast er wor k i s f i ni shed and dr y. Mai nt ai n r ol l mat er i al s at t emper at ur es above 50 degr ees F f or 24 hour s i mmedi at el y bef or e appl i cat i on. Do not st or e mat er i al s out door s unl ess appr oved by t he Cont r act i ng Of f i cer . Compl et el y cover f el t s st or ed out door s, on and of f r oof , wi t h wat er pr oof canvas pr ot ect i ve cover i ng. Do not use pol yet hyl ene sheet as a cover i ng. Ti e cover i ng secur el y t o pal l et s t o make compl et el y weat her pr oof . Pr ovi de suf f i c i ent vent i l at i on t o pr event condensat i on. Do not st or e mor e mat er i al s on r oof t han can be i nst al l ed t he same day and r emove unused mat er i al s at end of each days wor k. Di st r i but e mat er i al s t empor ar i l y st or ed on r oof t o st ay wi t hi n l i ve l oad l i mi t s of t he r oof const r uct i on.

Mai nt ai n a mi ni mum di st ance of 35 f oot f or al l s t or ed f l ammabl e mat er i al s, i ncl udi ng mat er i al s cover ed wi t h shr i nk wr aps, cr af t paper and/ or t ar ps f r om al l t or ch/ wel di ng appl i cat i ons.

I mmedi at el y r emove wet , cont ami nat ed or ot her wi se damaged or unsui t abl e mat er i al s f r om t he si t e. Damaged mat er i al s may be mar ked by t he Cont r act i ng Of f i cer .

1. 5. 3 Handling

Pr event damage t o edges and ends of r ol l mat er i al s. Do not i nst al l damaged mat er i al s i n t he wor k. Sel ect and oper at e mat er i al handl i ng equi pment t o pr event damage t o mat er i al s or appl i ed r oof i ng.

1. 6 ENVI RONMENTAL REQUI REMENTS

Do not i nst al l r oof i ng syst em when ai r t emper at ur e i s bel ow 40 degr ees F, dur i ng any f or m of pr eci pi t at i on, i ncl udi ng f og, or when t her e i s i ce, f r ost , moi st ur e, or any ot her v i s i bl e dampness on t he r oof deck. Fol l ow manuf act ur er ' s pr i nt ed i nst r uct i ons f or Col d Weat her I nst al l at i on.

1. 7 SEQUENCING

Coor di nat e t he wor k wi t h ot her t r ades t o ensur e t hat component s whi ch ar e t o be secur ed t o or st r i pped i nt o t he r oof i ng syst em ar e avai l abl e and t hat per manent f l ashi ng and count er f l ashi ng, per NRCA Det ai l s, and ar e i nst al l ed as t he wor k pr ogr esses. Ensur e t empor ar y pr ot ect i on measur es ar e i n pl ace t o pr ecl ude moi st ur e i nt r usi on or damage t o i nst al l ed mat er i al s. Appl i cat i on of r oof i ng must i mmedi at el y f ol l ow appl i cat i on of i nsul at i on as a cont i nuous oper at i on. Coor di nat e r oof i ng oper at i ons wi t h i nsul at i on wor k so t hat al l r oof i nsul at i on appl i ed each day i s cover ed wi t h r oof membr ane i nst al l at i on t he same day.

1. 8 WARRANTY

Pr ovi de r oof syst em mat er i al and wor kmanshi p war r ant i es meet i ng speci f i ed

Apr i l 2019 Page 9 SECTI ON 07 52 00 r equi r ement s. Pr ovi de r evi s i on or amendment t o st andar d membr ane manuf act ur er war r ant y as r equi r ed t o compl y wi t h t he speci f i ed r equi r ement s. Mi ni mum manuf act ur er war r ant y shal l have no dol l ar l i mi t , cover f ul l syst em wat er - t i ght ness, and shal l have a mi ni mum dur at i on of 20 years.

1. 8. 1 Roof Membr ane Manuf act ur er War r ant y

Fur ni sh t he r oof membr ane manuf act ur er ' s 20- year no dol l ar l i mi t r oof syst em mat er i al s and i nst al l at i on wor kmanshi p war r ant y, i ncl udi ng f l ashi ng, i nsul at i on i n compl i ance wi t h ASTM C1289, and accessor i es necessar y f or a wat er t i ght r oof syst em const r uct i on. Pr ovi de war r ant y di r ect l y t o t he Gover nment and commence war r ant y ef f ect i ve dat e at t i me of Gover nment ' s accept ance of t he r oof wor k. The war r ant y must st at e t hat :

a. I f wi t hi n t he war r ant y per i od t he r oof syst em, as i nst al l ed f or i t s i nt ended use i n t he nor mal c l i mat i c and envi r onment al condi t i ons of t he f aci l i t y , becomes non- wat er t i ght , shows evi dence of moi st ur e i nt r usi on wi t hi n t he assembl y, bl i s t er s, spl i t s, t ear s, del ami nat es, separ at es at t he seams, or shows evi dence of excessi ve weat her i ng due t o def ect i ve mat er i al s or i nst al l at i on wor kmanshi p, t he r epai r or r epl acement of t he def ect i ve and damaged mat er i al s of t he r oof syst em assembl y and cor r ect i on of def ect i ve wor kmanshi p ar e t he r esponsi bi l i t y of t he r oof membr ane manuf act ur er . Al l cost s associ at ed wi t h t he r epai r or r epl acement wor k ar e t he r esponsi bi l i t y of t he r oof membr ane manuf act ur er .

b. When t he manuf act ur er or hi s appr oved appl i cat or f ai l t o per f or m t he r epai r s wi t hi n 72 hour s of not i f i cat i on, emer gency t empor ar y r epai r s per f or med by ot her s does not voi d t he war r ant y.

c. Upon compl et i on of i nst al l at i on, and accept ance by t he Cont r act i ng Of f i cer , Const r uct i on Manager and Roof i ng Syst em Engi neer of Recor d, t he manuf act ur er must suppl y t he appr opr i at e war r ant y t o t he Owner .

d. I nst al l er must submi t a mi ni mum t wo year war r ant y t o t he membr ane manuf act ur er f r om t he dat e of accept ance, wi t h a copy t o t he Cont r act i ng Of f i cer , Const r uct i on Manager and Roof i ng Syst em Engi neer of Recor d.

1. 8. 2 Roof i ng Syst em I nst al l er War r ant y

The r oof syst em i nst al l er must war r ant f or a per i od of t wo year s t hat t he r oof syst em, as i nst al l ed, i s f r ee f r om def ect s i n i nst al l at i on wor kmanshi p, t o i ncl ude t he r oof membr ane, f l ashi ng, i nsul at i on, accessor i es, at t achment s, and sheet met al i nst al l at i on i nt egr al t o a compl et e wat er t i ght r oof syst em assembl y. Wr i t e t he war r ant y di r ect l y t o t he Gover nment . The r oof syst em i nst al l er i s r esponsi bl e f or cor r ect i on of def ect i ve wor kmanshi p and r epl acement of damaged or af f ect ed mat er i al s. The r oof syst em i nst al l er i s r esponsi bl e f or al l cost s associ at ed wi t h t he r epai r or r epl acement wor k.

1. 8. 3 Cont i nuance of War r ant y

Repai r or r epl acement wor k, ARMA 410BUR88, NRCA C3701 t hat becomes necessar y wi t hi n t he war r ant y per i od and accompl i shed i n a manner so as t o r est or e t he i nt egr i t y of t he r oof syst em assembl y and val i di t y of t he r oof membr ane manuf act ur er war r ant y f or t he r emai nder of t he manuf act ur er war r ant y per i od.

Apr i l 2019 Page 10 SECTI ON 07 52 00

1. 9 CONFORMANCE AND COMPATI BI LI TY

The ent i r e r oof i ng and f l ashi ng syst em must be i n accor dance wi t h speci f i ed and i ndi cat ed r equi r ement s, i ncl udi ng f i r e and wi nd r esi st ance ( ANSI / SPRI / FM 4435/ ES- 1) r equi r ement s. Wor k not speci f i cal l y addr essed and any devi at i on f r om speci f i ed r equi r ement s must be i n gener al accor dance wi t h r ecommendat i ons of t he NRCA Roof i ng and Wat er pr oof i ng Manual , membr ane manuf act ur er publ i shed r ecommendat i ons and det ai l s, and compat i bl e wi t h sur r oundi ng component s and const r uct i on. Submi t any devi at i on f r om speci f i ed or i ndi cat ed r equi r ement s t o t he Cont r act i ng Of f i cer f or appr oval pr i or t o i nst al l at i on.

1. 10 COOL ROOFS

Meet t he ASHRAE 90. 1 - I P Chapt er 5 val ues f or cool r oof i ng. I f a cool r oof i s not sel ect ed i n zones 1- 3, meet one of t he except i on r equi r ement s l i s t ed i n ASHRAE 90. 1 - I P Chapt er 5 or pr ovi de t her mal i nsul at i on above t he deck wi t h an R val ue of 33 or gr eat er .

1. 11 SUSTAI NABI LI TY REPORTI NG

Coor di nat e wi t h Sect i on 01 33 29 LEED( t m) DOCUMENTATI ON.

1. 11. 1 Recycl ed Mat er i al s

Cont r act or shal l sel ect mat er i al s so t hat t he sum of post - consumer r ecycl ed cont ent val ue pl us one- hal f of post - i ndust r i al r ecycl ed cont ent val ue const i t ut es at l east 10 per cent of t he t ot al mat er i al s cost f or t he pr oj ect . EPA Compr ehensi ve Pr ocur ement Gui del i nes has a suppl i er dat abase: http://www.epa.gov/cpg/products/

1. 11. 2 Local / Regi onal Mat er i al s

Cont r act or shal l sel ect mat er i al s so t hat a mi ni mum of 10 per cent ( by dol l ar val ue) of mat er i al s and pr oduct s f or t he pr oj ect ar e ext r act ed, har vest ed, or r ecover ed, as wel l as manuf act ur ed, r egi onal l y wi t hi n a 500 mi l e r adi us of t he pr oj ect s i t e. PART 2 PRODUCTS

2. 1 MODI FI ED BI TUMEN SHEETS AND FI BERGLASS FELT MATERI ALS

Fur ni sh a combi nat i on of speci f i ed mat er i al s t hat compr i se t he modi f i ed bi t umen manuf act ur er ' s st andar d syst em of t he number and t ype of pl i es speci f i ed. Mat er i al s pr ovi ded must be sui t abl e f or t he ser vi ce and cl i mat i c condi t i ons of t he i nst al l at i on. Modi f i ed bi t umen sheet s must be wat er t i ght and vi sual l y f r ee of pi nhol es, par t i c l es of f or ei gn mat t er , non- di sper sed r aw mat er i al , f act or y spl i ces, or ot her condi t i ons t hat mi ght af f ect ser vi ceabi l i t y . Pol ymer modi f i er must compl y wi t h ARMA PMBRG98 and be uni f or ml y di sper sed t hr oughout t he sheet . Edges of sheet must be st r ai ght and f l at .

b. Fi ber gl ass Fel t Base Sheet : ASTM D4601/ D4601M, ASTM D1668/ D1668M Type I I , wi t hout per f or at i ons and as appr oved by t he modi f i ed bi t umen r oof membr ane manuf act ur er .

e. SBS Cap Sheet : ASTM D6162/ D6162M ASTM D6164/ D6164M ; Type I I , Gr ade G, mi ni mum 145 mi l s t hi ck, and as r equi r ed t o

Apr i l 2019 Page 11 SECTI ON 07 52 00 pr ovi de speci f i ed f i r e saf et y r at i ng.

2. 2 BASE FLASHI NG MEMBRANE

Membr ane manuf act ur er ' s st andar d, mi ni mum t wo- pl y modi f i ed bi t umen membr ane f l ashi ng syst em compat i bl e wi t h t he r oof membr ane speci f i ed and as r ecommended i n membr ane manuf act ur er ' s publ i shed l i t er at ur e. Fl ashi ng membr anes must meet or exceed t he pr oper t i es of t he mat er i al st andar ds speci f i ed f or t he modi f i ed bi t umen base and cap sheet , except t hat f l ashi ng membr ane t hi ckness must be as r ecommended by t he membr ane manufacturer..

2. 3 ASPHALT

ASTM D312/ D312M, Type I I I or I V, i n accor dance wi t h modi f i ed bi t umen membr ane manuf act ur er r equi r ement s and compat i bl e wi t h t he s l ope condi t i ons of t he i nst al l at i on.

2. 4 PRIMER

ASTM D41/ D41M, or ot her pr i mer compat i bl e wi t h t he appl i cat i on and as appr oved i n wr i t i ng by t he modi f i ed bi t umen membr ane manuf act ur er .

2. 5 MODI FI ED BI TUMEN ROOF CEMENT

ASTM D4586/ D4586M, Type I I f or ver t i cal sur f aces, Type I f or hor i zont al sur f aces, compat i bl e wi t h t he modi f i ed bi t umen r oof membr ane and as r ecommended by t he modi f i ed bi t umen membr ane manuf act ur er .

2. 6 CANT AND TAPERED EDGE STRI PS

Pr ovi de st andar d cant s and t aper ed edge st r i ps of t he same mat er i al as t he r oof i nsul at i on t r eat ed wi t h bi t umi nous i mpr egnat i on, s i z i ng, or waxi ng and f abr i cat ed t o pr ovi de maxi mum 45 degr ee change i n di r ect i on of membr ane. Cant st r i ps must be mi ni mum 4 i nch ver t i cal hei ght wi t h 45 degr ee cant angl e, except wher e c l ear ance r est r i ct s hei ght t o l esser di mensi on. Taper edge st r i ps at a r at e of one t o 1- 1/ 2 i nch per f oot t o a mi ni mum of 1/ 8 i nch of t hi ckness. Pr ovi de ki l n- dr i ed pr eser vat i ve- t r eat ed wood cant s, i n compl i ance wi t h r equi r ement s of Sect i on 06 10 00 ROUGH CARPENTRY at base of wood nai l er s set on edge and wood cur bi ng and wher e ot her wi se i ndi cat ed.

2. 7 FASTENERS AND PLATES

Pr ovi de coat ed, cor r osi on- r esi st ant f ast ener s as r ecommended by t he modi f i ed bi t umen sheet manuf act ur er ' s pr i nt ed i nst r uct i ons and meet i ng t he r equi r ement s of FM 4470 and FM APP GUI DE f or Cl ass I r oof deck const r uct i on and t he wi nd upl i f t r esi st ance speci f i ed. For f ast eni ng of membr ane or f el t s t o wood mat er i al s, pr ovi de f ast ener s dr i ven t hr ough 1 i nch di amet er met al di scs, or one pi ece composi t e f ast ener s wi t h heads not l ess t han 1 i nch i n di amet er or 1 i nch squar e wi t h r ounded or 45 degr ee t aper ed cor ner s.

2. 7. 1 Masonr y or Concr et e Wal l s and Ver t i cal Sur f aces

Use har dened st eel nai l s or scr ews wi t h f l at heads, di amond shaped poi nt s, and mechani cal l y def or med shanks not l ess t han 1 i nch l ong f or secur i ng

Apr i l 2019 Page 12 SECTI ON 07 52 00 f el t s, modi f i ed bi t umen sheet s, met al i t ems, and accessor i es t o masonr y or concr et e wal l s and ver t i cal sur f aces. Use power - dr i ven f ast ener sonl y when appr oved i n wr i t i ng by t he Cont r act i ng Of f i cer .

2. 7. 2 Met al Pl at es

Pr ovi de f l at cor r osi on- r esi st ant r ound st r ess pl at es as r ecommended by t he modi f i ed bi t umen sheet manuf act ur er ' s pr i nt ed i nst r uct i ons and meet i ng t he r equi r ement s of FM 4470; not l ess t han 2 i nch i n di amet er . For m di scs t o pr event di shi ng or cuppi ng.

2. 8 PRE- MANUFACTURED ACCESSORI ES

Pr e- manuf act ur ed accessor i es must be manuf act ur er ' s st andar d f or i nt ended pur pose, compat i bl e wi t h t he membr ane r oof syst em and appr oved f or use by t he modi f i ed bi t umen membr ane manuf act ur er .

2. 8. 1 Pr e- f abr i cat ed Cur bs

Pr ovi de 18 gauge G90 gal vani zed cur bs wi t h mi ni mum 4 i nch f l ange f or at t achment t o r oof nai l er s. Cur bs must be mi ni mum hei ght of 10 i nch above t he f i ni shed r oof membr ane sur f ace.

2. 9 WALKPADS

Roof wal kpads must be pol yest er r ei nf or ced, gr anul e- sur f aced modi f i ed bi t umen membr ane mat er i al , mi ni mum 197 mi l s t hi ck, compat i bl e wi t h t he modi f i ed bi t umen sheet r oof i ng and as r ecommended by t he modi f i ed bi t umen sheet r oof i ng manuf act ur er . Panel s must not exceed 4 f oot i n l engt h. Ot her wal kpad mat er i al s r equi r e appr oval of t he Cont r act i ng Of f i cer pr i or t o i nst al l at i on.

2. 10 ROOF I NSULATI ON BELOW MODI FI ED BI TUMEN MEMBRANE SYSTEM

I nsul at i on must be compat i bl e wi t h t he r oof membr ane, appr oved by t he membr ane manuf act ur er and meet i ng al l t he r equi r ement s speci f i ed i n Sect i on 07 22 00 ROOF AND DECK I NSULATI ON.

PART 3 EXECUTI ON

3. 1 EXAMINATION

Ensur e t hat t he f ol l owi ng condi t i ons exi st pr i or t o appl i cat i on of t he r oof i ng mat er i al s:

a. Dr ai ns, cur bs, cant s, cont r ol j oi nt s, expansi on j oi nt s, per i met er wal l s, r oof penet r at i ng component s, and equi pment suppor t s ar e i n place.

b. Sur f aces ar e r i gi d, c l ean, dr y, smoot h, and f r ee f r om cr acks, hol es, and shar p changes i n el evat i on. Joi nt s i n t he subst r at e ar e seal ed t o pr event dr i ppi ng of bi t umen i nt o bui l di ng or down ext er i or wal l s.

c. The pl ane of t he subst r at e does not var y mor e t han 1/ 4 i nchwi t hi n an ar ea 10 by 10 f oot when checked wi t h a10 f oot st r ai ght edge pl aced anywher e on t he subst r at e.

d. Subst r at e i s s l oped as i ndi cat ed t o pr ovi de posi t i ve dr ai nage.

Apr i l 2019 Page 13 SECTI ON 07 52 00

e. Wal l s and ver t i cal sur f aces ar e const r uct ed t o r ecei ve count er f l ashi ng, and wi l l per mi t mechani cal f ast eni ng of t he base f l ashi ng materials.

f . Tr eat ed wood nai l er s ar e i n pl ace on non- nai l abl e sur f aces, t o per mi t nai l i ng of base f l ashi ng at mi ni mum hei ght of 8 i nch above f i ni shed r oof i ng sur f ace.

g. Pr ot ect al l combust i bl e mat er i al s and sur f aces whi ch may cont ai n conceal ed combust i bl e or f l ammabl e mat er i al s. Al l f i r e ext i ngui shi ng equi pment has been pl aced as speci f i ed.

h. Ver i f y al l Fi r e Wat ch per sonnel assi gnment s.

i . Tr eat ed wood nai l er s ar e f ast ened i n pl ace at eaves, gabl e ends, openi ngs, and i nt er sect i ons wi t h ver t i cal sur f aces f or secur i ng of membr ane, edgi ng st r i ps, at t achment f l anges of sheet met al , and r oof f i x t ur es. Sur f ace- appl i ed nai l er s ar e t he same t hi ckness as t he r oof insulation.

j . Cant s ar e secur el y f ast ened i n pl ace i n t he angl es f or med by wal l s and ot her ver t i cal sur f aces. The angl e of t he cant i s 45 degr ees and t he hei ght of t he ver t i cal l eg i s not l ess t han 3- 1/ 2 i nch.

l . Exposed nai l heads i n wood subst r at es ar e pr oper l y set . War ped and spl i t boar ds sheet s have been r epl aced. Ther e ar e no cr acks or end j oi nt s 1/ 4 i nch i n wi dt h or gr eat er . Knot hol es ar e cover ed wi t h sheet met al and nai l ed i n pl ace. Wood decks ar e cover ed wi t h r osi n paper or unsat ur at ed f el t pr i or t o base sheet or r oof membr ane appl i cat i on. Joi nt s i n pl ywood subst r at es ar e t aped or ot her wi se seal ed t o pr event ai r l eakage f r om t he under si de.

m. I nsul at i on boar ds ar e i nst al l ed smoot hl y and evenl y, and ar e not br oken, cr acked, or cur l ed. Ther e ar e no gaps i n i nsul at i on boar d j oi nt s exceedi ng 1/ 4 i nch i n wi dt h. I nsul at i on i s bei ng r oof ed over on t he same day t he i nsul at i on i s i nst al l ed.

n. Cast - i n- pl ace subst r at es have been al l owed t o cur e and t he sur f ace dr yness r equi r ement s speci f i ed under par agr aph ent i t l ed " Fi el d Qual i t y Cont r ol " have been met .

o. Joi nt s bet ween pr ecast concr et e deck uni t s ar e gr out ed, l evel ed, and st r i pped i n wi t h f el t or bi t umi nous st r i ppi ng membr ane set i n bi t umi nous cement pr i or t o appl y i ng ot her r oof i ng mat er i al s over t he area.

p. Roof deck and f r ami ng ar e s l oped as i ndi cat ed t o pr ovi de posi t i ve drainage.

3. 2 PREPARATION

3. 2. 1 Pr ot ect i on of Pr oper t y

3. 2. 1. 1 Pr ot ect i ve Cover i ngs

I nst al l pr ot ect i ve cover i ngs at pavi ng and bui l di ng wal l s adj acent t o hoi st s, and ket t l es pr i or t o st ar t i ng t he wor k. Lap pr ot ect i ve cover i ngs not l ess t han 6 i nch, secur e agai nst wi nd, and vent t o pr event col l ect i on of moi st ur e on cover ed sur f aces. Keep pr ot ect i ve cover i ngs i n pl ace f or

Apr i l 2019 Page 14 SECTI ON 07 52 00 t he dur at i on of t he r oof i ng wor k.

3. 2. 1. 2 Bi t umen St ops

Pr ovi de f el t bi t umen st ops or ot her means t o pr event bi t umen dr i ppage at r oof edges, openi ngs, and ver t i cal pr oj ect i ons bef or e hot mopped appl i cat i on of t he r oof i ng membr ane.

3. 2. 2 Equipment

3. 2. 2. 1 Mechani cal Appl i cat i on Devi ces

Mount mechani cal appl i cat i on devi ces on pneumat i c- t i r ed wheel s. Use devi ces desi gned and mai nt ai ned t o oper at e wi t hout damagi ng t he i nsul at i on, r oof i ng membr ane, or st r uct ur al component s.

3. 2. 2. 2 Fl ame- Heat ed Equi pment

Do not pl ace f l ame- heat ed equi pment on r oof . Pr ovi de and mai nt ai n a f i r e ext i ngui sher adj acent t o f l ame- heat ed equi pment and on t he r oof .

3. 2. 2. 3 El ect r i c- Heat ed Equi pment

Pr ovi de adequat e el ect r i cal ser vi ce as r equi r ed by manuf act ur er of el ect r i cal equi pment t o ensur e agai nst damage t o equi pment and pr oper t y and t o ensur e pr oper appl i cat i on of r oof i ng mat er i al s.

3. 2. 3 Heat i ng of Asphal t

Br eak up sol i d asphal t on a sur f ace f r ee of di r t and debr i s. Heat asphal t i n ket t l e desi gned t o pr event cont act of f l ame wi t h sur f aces i n cont act wi t h t he asphal t . Ket t l es must have vi s i bl e wor ki ng t her momet er and t her most at i c cont r ol s set t o t he t emper at ur e l i mi t s speci f i ed her ei n.

Keep cont r ol s i n wor ki ng or der and cal i br at ed. Use i mmer si on t her momet er , accur at e wi t hi n a t ol er ance of pl us or mi nus 1. 8 degr ees F, t o check t emper at ur es of t he asphal t f r equent l y. When t emper at ur es exceed maxi mums speci f i ed, r emove asphal t f r om t he si t e. Do no per mi t cut t i ng back, adul t er at i ng, or f l uxi ng of asphal t .

3. 2. 3. 1 Temper at ur e Li mi t at i ons f or Asphal t

Heat and appl y asphal t at t he t emper at ur es speci f i ed bel ow unl ess speci f i ed ot her wi se by manuf act ur er ' s pr i nt ed appl i cat i on i nst r uct i ons.

Use t her momet er t o check t emper at ur e dur i ng heat i ng and appl i cat i on. Have ket t l e at t ended const ant l y dur i ng heat i ng pr ocess t o ensur e speci f i ed t emper at ur es ar e mai nt ai ned. Do not heat asphal t above i t s f i ni shed bl owi ng t emper at ur e ( FBT) . Do not heat asphal t bet ween 500 and 525 degr ees F f or l onger t han f our consecut i ve hour s. Do not heat asphal t t o t he f l ash poi nt ( FP) . Appl y asphal t and embed membr ane sheet s when t emper at ur e of asphal t i s wi t hi n pl us or mi nus 25 degr ees F of t he equi v i scous t emper at ur e ( EVT) but not l ess t han 400 degr ees F. Bef or e heat i ng and appl i cat i on of asphal t r ef er t o t he asphal t manuf act ur er ' s l abel or bi l l of l adi ng f or FP, FBT, and EVT of t he asphal t used.

3. 2. 4 Pr i mi ng of Sur f aces

Pr i me al l sur f aces t o be i n cont act wi t h adher ed membr ane mat er i al s.

Appl y pr i mer at t he r at e of 0. 75 gal l on per 100 sq. f t . or as r ecommended by modi f i ed bi t umen sheet manuf act ur er ' s pr i nt ed i nst r uct i ons t o pr omot e

Apr i l 2019 Page 15 SECTI ON 07 52 00 adhesi on of membr ane mat er i al s. Al l ow pr i mer t o dr y pr i or t o appl i cat i on of membr ane mat er i al s t o pr i med sur f ace. Avoi d f l ammabl e pr i mer mat er i al condi t i ons i n t or ch appl i ed membr ane appl i cat i ons.

3. 2. 4. 1 Pr i mi ng of Concr et e and Masonr y Sur f aces

Af t er sur f ace dr yness r equi r ement s have been met , coat concr et e and masonr y sur f aces whi ch ar e t o r ecei ve membr ane mat er i al s uni f or ml y wi t h primer.

3. 2. 4. 2 Pr i mi ng of Met al Sur f aces

Pr i me f l anges of met al component s t o be embedded i nt o t he r oof syst em pr i or t o set t i ng i n bi t umi nous mat er i al s or st r i ppi ng i nt o r oof i ng syst em.

3. 2. 5 Membr ane Pr epar at i on

Unr ol l modi f i ed bi t umen membr ane mat er i al s and al l ow t o r el ax a mi ni mum of 30 mi nut es pr i or t o i nst al l at i on. I n col d weat her , adher e t o membr ane manuf act ur er ' s addi t i onal r ecommendat i ons f or pr e- i nst al l at i on membr ane handl i ng and pr epar at i on. I nspect f or damage, pi nhol es, par t i c l es of f or ei gn mat t er , non- di sper sed r aw mat er i al , f act or y spl i ces, or ot her condi t i ons t hat mi ght af f ect ser vi ceabi l i t y . Edges of seams must be st r ai ght and f l at so t hat t hey may be seamed t o one anot her wi t hout f or mi ng f i sh mout hs or wr i nkl es. Di scar d damaged or def ect i ve mat er i al s.

3. 2. 6 Subst r at e Pr epar at i on

Appl y membr ane t o c l ean, dr y sur f aces onl y. Do not appl y membr ane t o sur f aces t hat have been wet by r ai n or f r ozen pr eci pi t at i on wi t hi n t he pr evi ous 12 hour s. Pr ovi de cl eani ng and ar t i f i c i al dr y i ng wi t h heat ed bl ower s or t or ches as necessar y t o ensur e c l ean, dr y sur f ace pr i or t o membr ane appl i cat i on.

3. 3 APPLICATION

Appl y r oof i ng mat er i al s as speci f i ed her ei n unl ess appr oved ot her wi se by t he Cont r act i ng Of f i cer . Keep r oof i ng mat er i al s dr y bef or e and dur i ng appl i cat i on. Compl et e appl i cat i on of r oof i ng i n a cont i nuous oper at i on.

Begi n and appl y onl y as much r oof i ng i n one day as can be compl et ed t hat same day. Mai nt ai n speci f i ed t emper at ur es f or asphal t . Pr ovi de t empor ar y r oof i ng and f l ashi ng as speci f i ed her ei n pr i or t o appl i cat i on of per manent r oof i ng syst em.

3. 3. 1 Phased Membr ane Const r uct i on

Phased appl i cat i on of membr ane pl i es i s pr ohi bi t ed unl ess ot her wi se appr oved by t he Cont r act i ng Of f i cer and suppor t ed by t he membr ane manuf act ur er ' s wr i t t en appl i cat i on i nst r uct i ons. I f cap sheet i nst al l at i on i s del ayed, t hor oughl y c l ean t he appl i ed membr ane mat er i al sur f ace and dr y i mmedi at el y pr i or t o cap sheet i nst al l at i on. Pr i mi ng of t he appl i ed membr ane sur f ace may be r equi r ed at t he di scr et i on of t he Cont r act i ng Of f i cer pr i or t o cap sheet i nst al l at i on.

3. 3. 2 Tempor ar y Roof i ng and Fl ashi ng

Pr ovi de wat er t i ght t empor ar y r oof i ng and f l ashi ng wher e consi der abl e wor k by ot her t r ades, such as i nst al l i ng cool i ng t ower s, ant ennas, pi pes, duct s, i s t o be per f or med on t he r oof or wher e const r uct i on schedul i ng or

Apr i l 2019 Page 16 SECTI ON 07 52 00 weat her condi t i ons r equi r e pr ot ect i on of t he bui l di ng' s i nt er i or bef or e per manent r oof i ng syst em can be i nst al l ed. Do not i nst al l t empor ar y r oof i ng over per manent l y i nst al l ed i nsul at i on. Pr ovi de r i gi d pads f or t r af f i c over t empor ar y r oof i ng.

3. 3. 2. 1 Removal

Compl et el y r emove t empor ar y r oof i ng and f l ashi ng bef or e cont i nui ng wi t h appl i cat i on of t he per manent r oof i ng syst em.

3. 3. 3 Appl i cat i on Met hod

3. 3. 3. 1 Hot Asphal t Appl i cat i on of Modi f i ed Bi t umen Membr ane

Appl y membr ane i mmedi at el y f ol l owi ng appl i cat i on of hot asphal t . Appl y hot asphal t wi t hi n 6 f oot of r ol l . Do not wor k ahead wi t h asphal t .

Asphal t must be compl et el y f l ui d, wi t h mop t emper at ur es wi t hi n t he asphal t ' s EVT r ange, but not l ess t han 400 degr ees F, at t he i nst ant membr ane comes i nt o cont act wi t h asphal t . Appl i cat i on of bi t umen bet ween l ayer s must be such as t o pr ovi de f ul l , cont i nuous, uni f or m cover age and compl et e cont act of hot asphal t wi t h t he sheet above and bel ow. Embed sheet s i n asphal t . As sheet s ar e bei ng r ol l ed i nt o hot asphal t , i mmedi at el y and t hor oughl y appl y uni f or m posi t i ve pr essur e by squeegee, r ol l , or br oom t o ensur e f ul l adhesi on and l ap seal , el i mi nat e t r apped ai r and t o pr ovi de t i ght , smoot h l ami nat i ons. Avoi d excessi ve ext r usi on of asphal t at l ap ar eas. Cont r ol asphal t bl eed out t o appr oxi mat el y 1 i nch maximum.

3. 3. 4 Vent i l at i ng Base Sheet s

Appl y vent i l at i ng base sheet s wi t h 3 i nch si de l aps and 6 i nch end l aps i n accor dance wi t h manuf act ur er ' s pr i nt ed appl i cat i on i nst r uct i ons f or subst r at e and wi nd upl i f t condi t i ons speci f i ed. Mechani cal at t achment s must be as r equi r ed f or wi nd r esi st ance speci f i ed and t o i ncl ude i ncr eased f r equency of at t achment at cor ner and per i met er ar eas. Dr i ve f ast ener s f l ush wi t h no di shi ng or cuppi ng of f ast ener pl at e. Top mop per f or at ed sheet wi t h a f ul l , cont i nuous moppi ng of hot asphal t .

3. 3. 5 Fi ber gl ass Fel t Base Sheet

Ful l y adher e base sheet s i n accor dance wi t h membr ane manuf act ur er ' s pr i nt ed i nst r uct i ons. Rol l and br oom i n t he base sheet t o ensur e f ul l cont act wi t h t he hot asphal t appl i cat i on. On nai l abl e subst r at es, mechani cal l y f ast en base sheet i n conf or mance wi t h speci f i ed wi nd r esi st ance r equi r ement s and membr ane manuf act ur er ' s pr i nt ed i nst r uct i ons, and t o i ncl ude i ncr eased f ast eni ng f r equency i n cor ner and per i met er ar eas. Dr i ve f ast ener s f l ush wi t h no di shi ng or cuppi ng of f ast ener pl at e. Wher e appl i cabl e, mechani cal l y f ast en base sheet i n conj unct i on wi t h i nsul at i on t o t he subst r at e, i n accor dance wi t h membr ane manuf act ur er s pr i nt ed i nst r uct i ons. Appl y sheet s i n a cont i nuous oper at i on. Appl y sheet s wi t h s i de l aps at a mi ni mum of 2 i nch unl ess gr eat er s i de l ap i s r ecommended by t he manuf act ur er ' s st andar d wr i t t en appl i cat i on i nst r uct i ons. Pr ovi de end l aps of not l ess t han 6 i nch and st agger ed a mi ni mum of 36 i nch. Appl y sheet s par al l el t o t he r oof s l ope .

Ext end base sheet s appr oxi mat el y 2 i nch above t he t op of cant st r i ps at ver t i cal sur f aces and t o t he t op of cant st r i ps el sewher e. Tr i m base sheet t o a neat f i t ar ound vent pi pes, r oof dr ai ns, and ot her pr oj ect i ons t hr ough t he r oof . Appl i cat i on must be f r ee of r i dges, wr i nkl es, and buckles.

Apr i l 2019 Page 17 SECTI ON 07 52 00

3. 3. 6 Modi f i ed Bi t umen Membr ane Appl i cat i on

Ensur e pr oper sheet al i gnment pr i or t o i nst al l at i on. Appl y membr ane l ayer s par al l el t o s l ope of r oof . Bucki ng or backwat er l aps ar e pr ohi bi t ed. Ful l y adher e membr ane sheet s t o under l y i ng subst r at e mat er i al s. Pr ovi de mi ni mum 3 i nch si de l aps and mi ni mum 6 i nch end l aps and as ot her wi se r equi r ed by membr ane manuf act ur er . St agger end l aps mi ni mum 36 i nch. Of f set s i de l aps bet ween membr ane l ayer s a mi ni mum of 12 i nch. Of f set end l aps bet ween membr ane l ayer s a mi ni mum of 36 i nch.

I nst al l al l membr ane l ayer s t he same wor kday, unl ess suppor t ed ot her wi se by r oof membr ane manuf act ur er appl i cat i on i nst r uct i ons and appr oved by t he Cont r act i ng Of f i cer . Pr ovi de t i ght smoot h l ami nat i ons of each membr ane l ayer wi t hout wr i nkl es, r i dges, buckl es, k i nks, f i shmout hs, or voi ds.

Ensur e f ul l membr ane adhesi on and f ul l l ap seal s. Rewor k t o seal any open l aps pr i or t o appl i cat i on of subsequent membr ane l ayer s. The compl et ed membr ane appl i cat i on must be f r ee of sur f ace abr asi ons, ai r pocket s, bl i s t er s, r i dges, wr i nkl es, buckl es, k i nks, f i shmout hs, voi ds, or open seams.

3. 3. 6. 1 Cap Sheet I nst al l at i on

Under l y i ng appl i ed membr ane must be i nspect ed and r epai r ed f r ee of damage, hol es, punct ur e, gouges, abr asi ons, and any ot her def ect s, and f r ee of moi st ur e, l oose mat er i al s, debr i s, sedi ment s, dust , and any ot her condi t i ons r equi r ed by t he membr ane manuf act ur er pr i or t o cap sheet i nst al l at i on. Do not appl y cap sheet i f r ai n or f r ozen pr eci pi t at i on has occur r ed wi t hi n t he pr evi ous 24 hour s. Al i gn cap membr ane and appl y by t he speci f i ed met hod wi t h t he pr oper s i de and end l ap wi dt hs. Set cap sheet i n hot asphal t as r ecommended by t he modi f i ed bi t umen membr ane manuf act ur er . Cut at a 45 degr ee angl e acr oss sel vage edge of cap membr ane t o be over l apped i n end l ap ar eas pr i or t o appl y i ng over l appi ng cap membr ane. Appl y mat chi ng gr anul es i n any ar eas of bi t umen bl eed out whi l e t he asphal t i s st i l l hot . Mi ni mi ze t r af f i c on newl y i nst al l ed cap sheet membr ane.

3. 3. 6. 2 Backnai l i ng of Cap Sheet

Unl ess ot her wi se r ecommended by t he modi f i ed bi t umen membr ane manuf act ur er and appr oved by t he Cont r act i ng Of f i cer , pr ovi de mi ni mum 3- 1/ 2 i nch wi de nai l i ng st r i ps mat chi ng i nsul at i on t hi ckness and appl i ed per pendi cul ar t o r oof s l ope f or backnai l i ng of r oof membr ane. Space nai l i ng st r i ps as r ecommended by t he membr ane manuf act ur er , but not exceedi ng 16 f oot on cent er unl ess appr oved ot her wi se by t he Cont r act i ng Of f i cer . Coor di nat e t he nai l er i nst al l at i on wi t h i nsul at i on r equi r ement s. I nst al l t he modi f i ed bi t umen cap sheet t o pr ovi de f or end l aps at nai l er l ocat i ons.

Nai l t he modi f i ed bi t umen cap sheet at t he end l ap ar ea acr oss t he wi dt h of t he sheet .

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .