000_TABLE OF CONTENTS.pdf

PDF 70 KB Posted

Attached to
TINKER AFB MAC BOA WWYK190023 Renovate Restrooms B117
Solicitation number
FA813726R0030
Issued by

About this file

This is a table of contents document for Tinker Air Force Base General Requirements issued in January 2022.

The document outlines the organizational structure of general requirements applicable to construction projects on Tinker Air Force Base. Division 00 establishes procurement and contracting requirements, including general construction requirements (00 70 00), general safety requirements (00 71 00), general environmental requirements (00 72 00), and special provisions for working on Tinker AFB (00 80 00 and 00 80 05), with the latter specifically addressing work on or near the airfield. Division 01 presents general requirements covering small project construction progress schedules (01 32 16.00 20), submittal procedures (01 33 00), design data for design-after-award projects (01 33 16.00 10), sources for reference publications (01 42 00), quality control (01 45 00.00 10), contractor facilities (01 50 00), closeout submittals (01 78 00), and operation and maintenance data (01 78 23). This table of contents serves as a reference guide to the detailed specifications and requirements that contractors must comply with when executing construction work at Tinker Air Force Base.

View the file

Other files

File Type Posted
03 39 00.00 10.pdf PDF
03 62 16.pdf PDF
04 20 00.pdf PDF
05 21 00.pdf PDF
06 20 00.pdf PDF
06 61 16.pdf PDF
07 60 00.pdf PDF
07 61 14.00 20.pdf PDF
07 84 00.pdf PDF
07 92 00.pdf PDF
08 11 16.pdf PDF
08 36 13.pdf PDF
08 71 00.pdf PDF
09 68 00.pdf PDF
10 28 13.pdf PDF
13 48 00.pdf PDF
21 13 17.pdf PDF
22 00 00.pdf PDF
23 00 00.pdf PDF
23 08 00.pdf PDF
23 11 25.pdf PDF
23 35 00.pdf PDF
23 64 26.pdf PDF
23 82 16.00 40.pdf PDF
23 82 43.00 40.pdf PDF
26 56 00.pdf PDF
31 23 06.pdf PDF
32 01 14.pdf PDF
32 13 74.pdf PDF
02 41 00.pdf PDF
06 10 00.pdf PDF
07 12 00.pdf PDF
07 42 13.pdf PDF
07 42 63.pdf PDF
07 53 23.pdf PDF
07 54 19.pdf PDF
07 62 13.pdf PDF
08 41 13.pdf PDF
08 51 13.pdf PDF
08 51 23.pdf PDF
09 51 00.pdf PDF
00 71 00.pdf PDF
01 78 23.pdf PDF
00 72 00.pdf PDF
00 80 00.pdf PDF
Solicitation - FA813726R0030.pdf PDF
Att10_190023_SOW.pdf PDF
EAL List - BLANK to Contractors WWYK190023.xlsx XLSX spreadsheet
Att11_190023_Submittal Register_Final.pdf PDF
Wage Determination.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Tinker AFB Tinker General Requirements

January 2022 Page 1 TABLE OF CONTENTS

TABLE OF CONTENTS

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

00 70 00

00 71 00

00 72 00

00 80 00 00 80 05

GENERAL REQUIREMENTS FOR CONSTRUCTION ON TINKER AIR FORCE

BASE

GENERAL SAFETY REQUIREMENTS FOR CONSTRUCTION ON TINKER AIR

FORCE BASE

GENERAL ENVIRONMENTAL REQUIREMENTS FOR CONSTRUCTION ON

TINKER AIR FORCE BASE

SPECIAL PROVISIONS FOR WORKING ON TINKER AFB

SPECIAL PROVISIONS FOR WORKING ON OR NEAR THE AIRFIELD ON

TINKER AFB

DIVISION 01 - GENERAL REQUIREMENTS

01 32 16.00 20 SMALL PROJECT CONSTRUCTION PROGRESS SCHEDULES

01 33 00 SUBMITTAL PROCEDURES

01 33 16.00 10 DESIGN DATA (DESGIN AFTER AWARD)

01 42 00 SOURCES FOR REFERENCE PUBLICATIONS

01 45 00.00 10 QUALITY CONTROL

01 50 00 CONTRACTOR FACILITIES

01 78 00 CLOSEOUT SUBMITTALS

01 78 23 OPERATION AND MAINTENANCE DATA

-- End of Table of Contents –-

File details come from the government source that posted it. Updated .