CONTRACTOR QUESTION:
| REFERENCE: |
| GOVERNMENT ANSWER: |
1. Do subcontractor consent letters count against the 30-page Past Performance volume limitation?
Draft RFP Section L
F. Part III – Past Performance Information (Evaluation Factor 3)
6. Subcontractor/Teaming Partner Consent
(page 118 of draft RFP)
Subcontractor consent letters do not count against the 30-page Past performance volume limitation.
2. Will tables be considered graphics with regard to allowing 11x17 page size and font size smaller than 11 point?
Draft RFP Section L
C. Specific Instructions, paragraph 6, regarding page and point size for Parts I and II.
Tables are not considered graphics. Accordingly a larger page size and smaller font size are not applicable to tables. Section L of the solicitation has been revised to reflect such.
3. Are all positions called out within each functional area mandatory? Or may the offeror staff each area using an alternative mix of personnel, provided all specified tasks, duties, and responsibilities are accounted for, and American Nationals are accountable for all work assigned in the PWS to ‘Mandatory AN’ individuals?
Draft PWS Chapters 3-8, where specific function positions are called out.
Example: 3.40. SPECIFIC CIVIL ENGINEERING PERSONNEL POSITIONS. In addition to the above requirements, listed below are the qualification and experience requirements for specific Civil Engineering personnel positions.
All positions called out within each functional area of the PWS are considered mandatory. Alternative mix of personnel that are mandatory in all functional areas is not authorized.
4. Once the government has received and reviewed all questions received by Feb. 8, how soon will a new milestone calendar be provided to potential offerors stating anticipated release of the final rfp, submittal deadline, and any interim deadlines?
Email from Anna Rusinowski, 1/22/2013
Please note any questions from the Site Visit and in regards to the DRAFT RFP should be submitted to TSBMC.2@ramstein.af.mil NLT COB Friday 08 Feb 2013. The Government will then post the responses in a Question and Answer format to FebBizOpps on a later date.
Revised milestones have been posted. All prospective offerors are responsible to retrieve updated information via the FBO website. Information and timelines shall be uploaded and revised via this website as we proceed in the process.
5. Will potential offerors have the opportunity for one-on-one conversations with the contracting officer? What is the benefit of attending the pre-bid/pre-proposal conference?
Is this conference date predicated on a specific date for final release of the RFP? Or is this date likely subject to change?
Draft RFP, Section L
5352.215.9001 A pre-bid/pre-proposal conference will be conducted at the USAFE Conference Center, Bldg 306, Ramstein Air Base on 25 Mar 2013 at 08:00 am Central European Time (CET) for the purpose of making all attendees familiar with the solicitation requirements and to provide them the opportunity to raise questions they may have.
The Government does not anticipate to have one-on-one conversations with attendees at the Pre-Proposal Conference. The purpose of the conference is to make all attendees familiar with the solicitation requirements (terms and conditions) and to provide them the opportunity to raise questions to the issued RFP package. The anticipated date for the conference is based on the final release date of the RFP and may be subject to change. All prospective offerors are responsible to retrieve updated information via the FBO website.
| 6. Is this deadline for submitting questions predicated on a specific date for final release of the RFP? Or is this date likely subject to change? |
| Draft RFP, Section L |
5352.215.9001
… Questions to the solicitation shall be accepted by the Government up to 01 Apr 2013.
If the pre-proposal conference is delayed, a new deadline for submission of questions shall be established in the RFP.
7. Is this deadline for submitting proposals predicated on a specific date for final release of the RFP? Or is this date likely subject to change?
Draft RFP, Section L
A. SPECIFIC INSTRUCTIONS:
1. Receipt of Proposals:
2. … (Proposals) must be received no later than 03:00 pm Central European Summer Time (CEST) on 30 Apr 2013.
If the issue date of the RFP is delayed, a new proposal closing date shall be established. All prospective offerors are responsible to retrieve updated information via the FBO website.
8. Will the Government still evaluate projects that, while relevant in other areas, do not meet the “minimum value of $30M annually on one contract…”?
If so, can you explain the system by which you will evaluate projects that meet most criteria but not 100 percent of criteria?
For example, if a project does not meet the $30M annual value but does meets the criteria for multiple functions under one contract performed at multiple locations, large workforce, performance overseas and management of a foreign workforce, experience with Collective Labor Agreement negotiations, contingency support and performance of phase-in/phase-out duties, as well as many or most of the PWS required services, will the project still be considered?
Draft RFP, Section L
PART III – PAST PERFORMANCE INFORMATION (EVALUATION FACTOR 3)
2. PAST PERFORMANCE INFORMATION:
Each offeror shall provide recent past performance information according to the format identified below …. Relevancy in regards to magnitude will be assessed based on, but not limited to, the similarities between a given past performance effort and the TSBMC requirement in terms of overall contract value to include performance of base O&M-type efforts with a minimum value of $30M annually on one contract. …
Draft RFP, Section M
C. Performance Confident Assessment
D. In evaluating past performance, the Government reserves the right to give greater consideration to information on those contracts deemed most relevant to the effort described in this RFP.
… Relevancy in regards to magnitude of effort will be assessed based on, but not limited to, the similarities between a given past performance effort and the TSBMC requirement in terms of overall contract value to include performance of base O&M-type efforts with a minimum value of $30M annually on one contract.
The Government will evaluate all submitted past performance information, provided the information meets the submittal format requirements and limitations in Section L of the RFP.
9. Is FedEx a viable alternative to mailing? Which shipment method is more reliable for receipt?
| All parts, paper and electronic, shall be mailed to 700 Contracting Squadron/USAFE CONS Specialized Flight, Attn: TSBMC II Team, Unit 3115, APO AE 09021 (when mailing from the US) or delivered to 700 Contracting Squadron/USAFE CONS Specialized Flight, Attn: TSBMC II Team, Kapaun Air Station, Geb 2767, Room 315, 67661 Kaiserslautern, Germany (when mailing from outside the US). |
| The Government is not directing or suggesting any shipping methods. It is the offerors’ sole responsibility to ensure timely receipt of their proposal at final destination. |
10. Should a cover/transmittal letter be included, and would it count against page limitations? Does the government have a preference for where this letter should be included?
Draft RFP, Section L
L-3 PROPOSAL PREPARATION INSTRUCTIONS
(Inclusion of a transmittal letter is not addressed. )
The page limitation for all parts is inclusive of all material except: the front and back cover, title page, tabs, and table of contents. The Government has no preference for where this letter should be included.
11. Please confirm that the “# of copies” stated includes the “Original.”
Draft RFP, Section L
Table 1 – Proposal Organization According to the solicitation, the number of copies stated in Table 1 includes the “Original”.
12. Does the word ‘versions’ in this context mean copies?
Draft RFP, Section L
C. Specific Instructions, paragraph 4.
In addition to the specified hard copies, the offeror shall submit two electronic versions of Parts I through III on re-writable CDs/DVDs.
Correct. The language has been revised in the RFP.
13. Is two-column format allowed?
Draft RFP, Section L
L-3 PROPOSAL PREPARATION INSTRUCTIONS (Page layouts are not addressed. )
The solicitation does not prohibit use of two-column format.
Para. L-3, C. however addresses the page set-up.
14. What housing or other operations will the offeror support in Istanbul?
Draft PWS, Section 3.34. (ISTANBUL, IZMIR, ANKARA, & MORON) OFF-BASE HOUSING SUPPORT. Manage and implement an off-base housing program IAW AFI 32-6001. Maintain a list of available housing and provide personalized assistance for off-base housing matters. Monitor the Automated Housing Referral Network (AHRN) on a daily basis, if applicable. Assist customers in locating off-base housing and finalizing housing agreements. Prepare the Housing Referral Office Rental Agreement form and the rental condition checklist. Provide utilities information and translation and/or interpreter assistance as required. Act as liaison between housing customers and landlords during lease negotiations and lease terminations. Assist members in settling disputes with landlords. Provide community information brochures. Inspect local community housing to ensure adequacy.
(Workload data includes entries, primarily pertaining to real estate/housing/financial management/maintenance work in Istanbul, along with other tasks there. ) Istanbul support shall be provided according to Chapter 3 of the PWS.
| 15. Will the government provide workload estimates that include more detail on individual pieces of equipment? For example, is a listing available to account for each generator and boiler by serial number and location, and associated KW and BTU details? |
| Section J, Attachment 1 – Performance Work Statement |
(Appendix A) A copy of the Government Furnished Property listing shall be provided as part of the RFP. The listing does not reflect the serial number and capacity of each equipment item.
| 16. Are the Patriot Village generators (total of six) included in the total number of generators in manned generator plants (total of ten)? Meaning that there are six at Patriot Village and four in the main power plant? |
| Section J, Attachment 1 – Performance Work Statement |
APPENDIX A
The 6 generators at Patriot Village and 4 generators at the main power plant are all part of Appendix A.
17. Do positions described in 6.18.5 through 6.23.4.1 apply only to Incirlik? Please verify.
For clarification across all sections, would the government provide a listing of all called-out positions by site?
Section J, Attachment 1 – Performance Work
Statement 6.18.5 through 6.23.4.1. (Items 6.18.1 through 6.18.4 are designated as Moron positions. Remaining positions are not designated.
All called-out (mandatory) positions are already identified throughout the PWS, at the end of each chapter. For those postions that don’t show a specific location, the contractor will have to determine the location of that position based on the performance (PWS) requirements and applicable place of performance.
| 18. Will the Government define bulk food in this context, prior to proposal submission? AFMAN 32-240 does not. |
| Section J, Attachment 1 – Performance Work Statement |
5.1.7 Flight Meals
(Requirement stated:
Provide no-notice meals within 30 minutes of notification and bulk food within one hour of notification. ) AFMAN 34-240 is the correct reference and uses the term ‘bulk subsistence'. The PWS Chapter 5 has been revised.
| 19. The paragraph on Page 120 of 122 of the DRFP practically eliminates all the small businesses. Hence the paragraph on Page 68 of 122 does not apply. Then why is the one on Page 120 of 122 of the DRFP necessary? |
| On Page 120 of 122, the evaluation criteria contain “Relevancy in regards to magnitude of effort will be assessed based on, but not limited to, the similarities between a given past performance effort and the TSBMC requirement in terms of overall contract value to include performance of base O&M-type efforts with a minimum value of $30M annually on one contract.” |
On Page 68 of 122, the DRFP states that “The Government will make payments to the Contractor when requested as work progresses, but (except for small business concerns) not more often than once every 2 weeks, in amounts determined to be allowable by the Contracting Officer in accordance with Federal Acquisition Regulation (FAR) subpart 31.2 in effect on the date of this contract and the terms of this contract.”
FAR clause 52.216-7 has been removed from the RFP.
20. Would you consider that the past performance of the individuals be counted as the company past performance?
It is a fact that in the follow on contract to this type of project, the awardee hires almost 80% of the employees of the incumbent contractor, if the awardee is not the incumbent. That is, “Companies come and go. But people stay.”
The Government shall consider past performance of key personnel, who have relevant experience, sub-contractors that will perform major or critical aspects of the requirement, as well as teaming partners in the past performance evaluation for the principal offeror, as applicable. Key personnel has been defined in Section L of the solicitation.
21. Does the Turkish National Employee Listing, Attch 7, include all the Turkish National employees presently, as of Jan, 2013, working for the incumbent?
| Attachment 7 |
| The listing provided as part of the RFP reflects all Turkish National Employees on board with the incumbent from 01 Oct 2011 through 30 Sep 2012, and the associated employee cost for an entire year. |
22. Does the Spanish National Employee Listing, Attch 8, include all the Spanish National employees presently, as of Jan, 2013, working for the incumbent?
| Attachment 8 |
| The listing provided as part of the RFP reflects all Spanish National Employees on board with the incumbent from 01 Oct 2011 through 30 Sep 2012, and the associated employee cost for an entire year. |
23. Does the new contractor have no legal obligation to pay the severance payment to non-Turkish or non-Spanish national employees?
The contractor has a legal obligation to pay severance to any employee when required by the anticipated contract, Collective Labor Agreement or applicable labor law.
24. If there are new listings, is the Government going to post them?
The Government may post more current employee listings by amendment during the acquisition process. All prospective offerors are responsible to retrieve updated information via the FBO website.
25. When visiting Phantom Housing we notice a lot of mold growing on the sidewalks and housing, would this house meet the minimum requirements under the new PWS?
Mold abatement is a requirement in Chapter 3 of the PWS.
26. Are life guards for the Pools provided by the contractor?
According to the PWS Chapter 5, Lifeguard Services are a requirement for the contractor to perform.
27. Are U-drive vehicles provided by transportation at all locations and if they are does the government provide or are they COCO?
U-drive vehicles are Government provided at all locations.
28. Does the Transportation department provide Body Shop work and if so to what level do they provide it?
Body shop work is a requirement according to PWS Chapter 6.
29. During the site visit at all locations Golf carts where seen being used by the incumbent contractor, are those provided by the government?
Golf carts are not provided as Government Furnished Property.
30. Does the Golf course at Incirlik have a central watering system that covers all areas requiring watering?
Yes, Incirlik has a central watering system that covers all areas.
31. At Incirlik we saw several Computers and TV being used in the community center; is the maintenance and inventory of these items covered under this contract?
Maintenance and inventory of computers and TVs are not a requirement under this RFP.
32. AT OCDT in several areas (air Handler rooms) it appeared that these areas could have Asbestos that was used in the original construction. If so, has it all been encapsulated and rendered harmless and if so will the process of monitoring these areas and maintaining the encapsulation and possible removal of this hazard be part of the new contract?
The contractor is responsible for asbestos abatement management according to PWS Chapter 3.
33. Several Computers were noticed in the Library at the ASF School will those be the responsibility of the contractor?
No, the contractor is not responsible for these computers.
34. The actual Gym equipment being used at the ASF School will that be the responsibility of the contractor?
ASF School Gym equipment will not be the responsibility of the contractor.
35. Will Snow removal on the sidewalks around the ASF School be the responsibility of the contractor?
Yes, the contractor must provide a snow and ice control program IAW PWS Chapter 3.
36. Will the contractor conduct housekeeping in the AFOSI areas at all locations?
The contractor shall conduct housekeeping in the AFOSI areas IAW PWS Chapter 5 and Appendix D.
37. Do all clinic and hospital areas contained on this contract have to comply with the Joint Commission?
The Contractor is responsible for preventive maintenance at the clinic IAW PWS Chapter 8.
38. Can the government provide maps showing areas to be mowed at all locations? Can the maps show if the mowing is improved VS unimproved cutting?
Mowing maps for Spain and Turkey shall be provided as part of the RFP, as an Appendix to the PWS. They identify the improved/unimproved cutting areas.
39. At all locations is the cable TV system on the contract?
The cable TV system is not on the contract.
40. What types of classes are held at Moron base gym by the contractor and the frequency?
The types and frequencies of classes held at the Moron base gym are described in Appendix A, Chapter 5.
41. The Piano tuning and maintenance in the TLF area at Moron the responsibility of the contractor?
No, piano tuning services are not a requirement.
42. How does the contractor dispose of the grease used in the cooking facilities throughout the contract?
PWS Chapter 3 has been revised.
43. Notice fire extinguishers placed in Eagle Housing at Incirlik. Is the maintenance and accountability of these fire extinguishers the responsibility of the contractor? Same question for appliances (refrigerator, Stove, washer and dryer)?
No, fire extinguishers are not required and are being removed through attrition.
FMO-supplied appliances are accounted for and maintained by the contractor as described in Chapter 3 of the PWS.
44. At Incirlick are there oil water separators used around the Hazardous material storage area? If so are they the responsibility of the contractor?
There are no oil water separators near the HAZMAT Material Storage Facility.
45. Is the TSA screening equipment at the PAC’s terminal at all locations a contractor responsibility?
No, the TSA screening equipment is not a responsibility under this acquisition.
| 46. We request the Government expand the window of Past Performance recentness to a more reasonable five or six year window to avoid unduly restricting competition and allow for more participation from industry in order to give the Government the option of selecting from a sufficient pool of qualified firms. |
| The draft RFP has defined Past Performance recentness in a narrow three year window of experience. This window is so restrictive that several of our most relevant contracts fall outside of the criteria the Government has established and may cause us to decide against proposing on this solicitation. |
Based on nature of the work required under the requirement in Turkey and Spain a 3-year window for past performance information to be recent is considered in the Government’s best interest. No change is being made.
| 47. We request the Government revise the sentences in Section L and M that state “To be recent, the contract must have been performed within the past three (3) years from the date of issuance of this solicitation for a minimum of a one (1) year period” to “To be recent, the contract must have been performed within the past six (6) years from the date of issuance of this solicitation for a minimum of a one (1) year period.” This modest expansion of the contracts considered recent will greatly enhance the participation of industry providing more options for the Government to select the most desirable offer. |
| The overly restrictive requirement in Section L is found in the Draft RFP on page 117 of 122 in paragraph F.2 Past performance information. The restrictive requirement in Section M is found in the Draft RFP on page 120 of 122 in paragraph C Performance Confidence Assessment. |
| See response to question 46. |
| 48. What are the government’s requirements regarding page margins for submittals? |
| Draft RFP, Section L |
L-3 PROPOSAL PREPARATION INSTRUCTIONS
Page margins are not addressed.
Pages must have a minimum 1 inch margin for all four margins.
| 49. Please verify that Attachment #10 is the correct form to be used for requesting EEOC Clearance. |
| SECTION L |
E. PART II – PRICE/CONTRACT DOCUMENTATION PROPOSAL
DEPARTMENT OF LABOR EQUAL EMPLOYMENT OPPORTUNITY CLEARANCE (EEOC): In accordance with FAR Subpart 22.805, in order for the Contracting Officer to request clearance from the appropriate Office of Federal Contract Compliance Programs (OFCCP) regional office, Section J, Attachment 11 shall be completed and submitted as part of Part II. Provide the date of the most recent Pre-Award On-Site Equal Opportunity Review (if any), and name and address of the cognizant U.S. Department of Labor, Office of Federal Compliance Programs Office. Preaward clearances for contracts and subcontracts of $10 million or more are required unless the contractor is listed in OFCCP’s National Preaward Registry. If an offeror is listed in OFCCP’s National Preaward Registry, submit verification of the registry with the completed attachment. More information is available at www.dol-esa.gov/preaward/.
Attachment #11 is a Sample Subcontractor Consent Letter.
However, Attachment #10 is a DOL EEOC Clearance Request Information form.
Revision made for consistency.
| 50. Please verify that Attachment #11 is the sample the government would like offerors to follow in obtaining subcontractor consent. |
| SECTION L |
PART III – PAST PERFORMANCE INFORMATION (EVALUATION FACTOR 3)
6. SUBCONTRACTOR/TEAMING PARTNER CONSENT: Past performance information pertaining to a Subcontractor/Teaming Partner cannot be disclosed to the prime offeror without the subcontractor’s/ teaming partner’s consent. Past performance information from subcontractors/teaming partners that is not supported by a consent letter will not be considered for evaluation. A sample subcontractor/teaming partner consent letter is provided as
There is no Attachment L-2.
However, Attachment #11 is Sample Subcontractor Consent Letter.
Revision made, Attachment #11 of the RFP is the sample form the Government would like offerors to follow in obtaining Subcontractor/Teaming Partner Consent.
| 51. Will the government address and answer these questions in the final PWS? |
| Section J – Performance Work Statement |
The draft PWS contains numerous questions and notations in tracked-changes mode.
All questions/comments in the tracked-changes mode have been addressed by the Government and the PWS was finalized.
| 52. It appears that paragraph (c) is incomplete. Will the government verify whether this paragraph is complete and, if not, provide the additional information for that paragraph? |
| Section H – Special Contract Requirements |
H-9 EQUITABLE ADJUSTMENT FOR FLUCTUATIONS IN VALUE OF FOREIGN CURRENCY.
(Page 62/63 of Draft RFP)
H-9 item (c) reads, “The contractor is required to provide on a monthly basis …” Complete verbiage shall be provided in the formal solicitation package.
53. At a minimum, how many business days does it currently take to receive Express Mail parcels from the United States?
How many days should be allowed?
Will the government consider electronic submittal as an alternative to hard copies?
All parts, paper and electronic, shall be mailed to 700 Contracting Squadron/USAFE CONS Specialized Flight, Attn: TSBMC II Team, Unit 3115, APO AE 09021 (when mailing from the US) or delivered to 700 Contracting Squadron/USAFE CONS Specialized Flight, Attn: TSBMC II Team, Kapaun Air Station, Geb 2767, Room 315, 67661 Kaiserslautern, Germany (when mailing from outside the US).
In addition to concerns about transit time for submitting offeors via U.S. Mail, offerors are cautioned about the possibility that the base gate can be closed to visitors at any time for exercises.
The Government is not directing or suggesting any shipping methods. It is the offerors’ sole responsibility to ensure timely receipt of their proposal at final destination. Electronic submittal is not considered a suitable alternative and is not authorized due to the bulkiness of the project.
| 54. Will the Government clarify the difference between maintenance projects and maintenance repair projects? |
| DRFP Appendix A, Workload Estimates-Spain, Engineering Design on page 3. |
| There is no difference between maintenance and maintenance repair projects. Verbiage updated in Appendix A. |
| 55. Will the Government provide the frequency for disposal of this weight? |
| DRFP Appendix A, Workload Estimates-Spain, Environmental on page 4. The amount of hazardous waste that requires disposal in a year is 26,000 LB. |
| The frequency is driven by the Final Governing Standards (FGS), as referred to in the PWS Chapter 3. |
| 56. How many lights are in a KLF, or what is the actual light count? |
| DRFP Appendix A, Workload Estimates on pages 4 and 21. For Moron and Incirlik, the airfield lighting is given in KLF. |
| Numbers vary depending on location and design of flightline. |
| 57. Will the Government provide LF of runway requiring painting and frequency of painting? |
| DRFP Appendix A, Workload Estimates on page 5. |
| Unable to provide solid workload factor and frequency. Airfield management determines painting requirements and intervals as needed. This is work order driven (AF Form 332). |
| 58. Does Moron have any arresting gear? If so what are the quantities and parameters? |
| DRFP Appendix A, Workload Estimates on page 5. |
| According to Appendix A, there are 2 sets of Barrier Arresting Kids (BAK)12 on the runway at Moron. |
| 59. Will the structural maintenance floors requiring refinishing be provided for Moron? |
| DRFP Appendix A, Workload Estimates on pages 5 and 18. |
| The requested information is not instantly available and no changes will be made as a result of this question. |
| 60. How many fuel pumps, hydrants, tanks, cathodic protection, leak sensors, and pantographs are at Moron Airfield? |
| DRFP Appendix A, Workload Estimates on page 6. |
| Appendix A Chapter 3 has been updated to reflect equipment at Moron Airfield. |
| 61. Does "Manned Boiler" mean 24 hour operation or watch requirement? |
| DRFP Appendix A, Workload Estimates on page 6. |
| Appendix A Chapter 3 has been revised to remove “Manned Boiler” verbiage and to incorporate resetting safety switch requirement. |
| 62. Are the Fire Trucks fully furnished? |
| DRFP Appendix A, Workload Estimates on pages 6, 7, and 18. |
| Yes, fire trucks are fully furnished. |
| 63. What are the hours of operation for the Airfields and what are the expected refueling capabilities during this time? |
| DRFP Appendix A, Workload Estimates on pages 6 and 20. |
| Airfield hours have been added to Appendix A, Workload Estimates. |
Moron AB: Refueling capabilities are no longer a requirement of the revised PWS.
| 64. Are Incirlik and Moron the only locations with a water production and water collection/treatment requirement? |
| DRFP Appendix A, Workload Estimates on pages 7 and 27. |
| There is a water production and water collection/treatment plant at Incirlik and Moron. Ankara treats the city supplied water and waste removal is all done by the city sewer system. |
| 65. What are the hours of operation for the water production and treatment plants? |
| DRFP Appendix A, Workload Estimates on pages 7 and 27. |
| Chapter 3 of the PWS has been revised. |
| 66. How many tanks comprise the 125 KBL storage capacity? What are their sizes? |
| DRFP Appendix A, Workload Estimates on pages 7 and 27. |
| Appendix A has been updated. |
| 67. Will the Government provide the number of Transformers, LF of Power Lines, transfer panels, switchgear, fuel pumps, and other supported equipment for all sites? |
| DRFP Appendix A, Workload Estimates on pages 7 and 27. |
| The requested information is not instantly available and no changes will be made as a result of this question. |
| 68. Will the Government provide this information? |
| DRFP Appendix A, Workload Estimates on page 9. No fire suppression/prevention data is given for Moron (fire alarms, fire detection, sprinklers, dry chemical, Airfield Halon, inspection, training). |
| This information is not instantly available, no changes will be made as a result of this question. |
| 69. Is there an airfield at Ankara? If so, what are the requirements? |
| DRFP Appendix A, Workload Estimates on page 18. Ankara has an airfield pavement marking requirement, but no lighting or fire protection. |
| There is no airfield at Ankara. Workload estimates in Appendix A do not reflect airfield pavement marking requirements. |
| 70. Is HVAC maintenance and repair required under this contract? |
| DRFP Appendix A, Workload Estimates on pages 19 and 20. Izmir, Incirlik, and Ankara list HVAC parameters (SF of buildings being serviced, number of split pumps, refrigeration and air conditioning). |
| Yes, HVAC maintenance and repair is required at all locations according to Chapter 3 in the PWS and Appendix A. |
| 71. Does Incirlik have a 24 hour watch requirement for the two power plants? |
| DRFP Appendix A, Workload Estimates on page 27. |
| No, Incirlik does not have a 24 hour watch requirement for the two power plants. |
| 72. Does "Manned Water Plants" mean 24 hour operation or watch requirement? |
| DRFP Appendix A, Workload Estimates on page 27. |
| Manned refers to 24/7 operations. |
| 73. Will the Government provide the area size of the floors (carpet, tiles and wood) for the children under 2 years and children over 2 years? |
| DRFP Appendix D, Custodial Standards, Child Development Centers, and School Age Programs on pages 2 and 3. |
| The requested information is not instantly available and no changes will be made as a result of this question. |
| 74. Will the Government provide the area size of the floors for the eating and non-eating areas, the size of the windows (interior and exterior), the size of the walls and interior glass? |
| DRFP Appendix D, Custodial Standards, Child Development Centers, and Youth Centers on pages 2 and 3. |
| The requested information is not instantly available and no changes will be made as a result of this question. |
| 75. Will the Government provide the number and size of trash containers? |
| DRFP Appendix D, Custodial Standards, Outdoor Playgrounds on page 3. |
| The requested information is not instantly available and no changes will be made as a result of this question. |
| 76. Will the Government provide the area size for the required tasks for Lobby and Corridors, Walk Off Mats, Admin Offices, Staff Restrooms, Laundry Rooms and Floors (Damp mop and sweep). |
| DRFP Appendix D, Custodial Standards, General Tasks for Child Development Centers, Youth Centers and School Age Programs on pages 4 and 5. |
| The requested information is not instantly available and no changes will be made as a result of this question. |
| 77. Will the Government provide the size of the areas to be mopped, swept, vacuumed and shampooed in the hallways, corridors, lobbies, stairways, entrance ways and general rooms? |
| DRFP Appendix D, Custodial Standards, Fitness Centers on page 6. |
| The requested information is not instantly available and no changes will be made as a result of this question. |
| 78. Will the Government provide the number of trash containers, drinking fountains, glass doors, windows, lights and fans in the hallways, corridors, lobbies, stairways, entrance ways and general rooms? |
| DRFP Appendix D, Custodial Standards, Fitness Centers on page 6. |
| The requested information is not instantly available and no changes will be made as a result of this question. |
| 79. Will the Government provide the size of the areas to be mopped, swept, vacuumed and shampooed in the locker rooms, public restrooms and family changing areas? |
| DRFP Appendix D, Custodial Standards, Fitness Centers on page 6. |
| The requested information is not instantly available and no changes will be made as a result of this question. |
| 80. Will the Government provide the number of showers, toilets, urinals, sinks and fixtures in the locker rooms, public restrooms and family changing areas? |
| DRFP Appendix D, Custodial Standards, Fitness Centers on page 6. |
| The requested information is not instantly available and no changes will be made as a result of this question. |
| 81. Will the Government provide the size of the areas of floors, glass and walls and the number of benches in the saunas, steam rooms and whirlpools? |
| DRFP Appendix D, Custodial Standards, Fitness Centers on page 6. |
| The requested information is not instantly available and no changes will be made as a result of this question. |
| 82. Will the Government provide the size of the areas of floors (carpet and tiled), glass, mirrors and walls in the exercise rooms? |
| DRFP Appendix D, Custodial Standards, Fitness Centers on page 6. |
| The requested information is not instantly available and no changes will be made as a result of this question. |
| 83. Will the Government provide the size of the areas of floors and mirrors and the number of equipment housing in contact with floor in the parent child areas? |
| DRFP Appendix D, Custodial Standards, Fitness Centers on page 7 |
| The requested information is not instantly available and no changes will be made as a result of this question. |
| 84. Will the Government provide the size of the areas of floors, glass and walls and the number of bleachers and stairs in the basketball/racquetball courts? |
| DRFP Appendix D, Custodial Standards, Fitness Centers on page 7 |
| The requested information is not instantly available and no changes will be made as a result of this question. |
| 85. Will the Government provide the size of the indoor track? |
| DRFP Appendix D, Custodial Standards, Fitness Centers on page 7 |
| There is not an indoor track at either location. PWS Appendix D has been revised. |
| 86. Will the Government provide the size of the floor in the multi-purpose area? |
| DRFP Appendix D, Custodial Standards, Fitness Centers on page 7 |
| The requested information is not instantly available and no changes will be made as a result of this question. |
| 87. Will the Government provide the size of the floor (carpeted and tiled) in the massage rooms? |
| DRFP Appendix D, Custodial Standards, Fitness Centers on page 7 |
| The requested information is not instantly available and no changes will be made as a result of this question. |
| 88. Will the Government provide the size of the floor (carpeted and tiled) and the number and size of the walk-off mats in the admin areas (includes health & wellness centers and massage areas)? |
| DRFP Appendix D, Custodial Standards, Fitness Centers on page 7 |
| The requested information is not instantly available and no changes will be made as a result of this question. |
| 89. Will the Government provide the service level, size of the floor compositions (carpet and tiles) and the number of restrooms and their fixtures for the 16 AFCAP facilities? |
| DRFP Appendix D, Custodial Square Footage for Incirlik Air Base on page 10. |
| The requested information is not instantly available and no changes will be made as a result of this question. |
| 90. How frequently should each area be mowed to achieve the standard? |
| DRFP Appendix E, Grounds Maintenance Standards on page 1. Appendix E gives grounds maintenance standards, but not frequencies. |
| Grass cutting frequency may vary by season, it will be the responsibility of the offeror to determine the frequency in order to adhere to the standard. |
| 91. Are the listed vehicles available for contractor use? |
| Appendix I, VAL Spain and Appendix J, VAL Turkey 1, 2, and 3 Master Vehicle List. |
| The VALs have been updated to reflect availability to contractor personnel. |
| 92. What are the hours of operation for the Airfields? |
| draft PWS paragraph 3.25 (Spain and Incirlik, Turkey) Airfield Maintenance on pages 20 and 21. |
| See answer to question 63. |
93. Will the Government align the number of contingency Flight meals that are shown in the two tables, both in Chapters 5 and 9?
Chapter 5 Workload Estimates - Spain, Level 1 Contingency Support indicates 650 Flight Meals Served per month. Chapter 9 indicates the average flight meals for 2009 and 2010 respectively, were 79 and 128. Please clarify the differences.
Appendix A Workload Estimates
AND
Chapter 9 – Contingency Services, Workload Estimates - Spain
AND
Chapter 5 - Force Support Services (Dining Facility Moron)
Force Support Services - Table
Table with Contingency Food Service Operations (Flight Meals served) doesn't show additional dinner and weekend meal counts described in the PWS.
Chapter 9 requirements (Contingency Level I) have been removed from the PWS for Moron AB.
O&M workload data for Moron AB has been validated and reflects US Goverment estimates based on historical data.
94. Would the Government provide a plug numbers to the RFP that would clarify the following?
1. Where are the lawsuits (what countries, etc)?
2. Is this 75 lawsuits per year?
3. How is the playing field leveled; i.e., will a plug number be given?
4. What CLIN will be used to identify legal costs?
Chapter 1 - General Requirements: Workload Estimates
Spain & Turkey
Retain legal counsel to resolve lawsuits; Approximately 75 lawsuits at any given time
The workload data calls for approximately 75 on-going lawsuits to be handled at any given time during contract performance.
The Government anticipates that the lawsuits will require support in Turkey and Spain.
The cost for retaining legal counsel to resolve those lawsuits need to be considered part of the Fixed-Price Costs in the contract, as identified in the RFP.
95. Would the Government consider reassigning the Chapter 8 Patriot Village Contingency support requirements to Chapter 9 - Contingency Services?
Chapter 9 - Contingency Services: Workload Estimates
Turkey
The Custodial Services and Recurring Maintenance for contingency support via Patriot Village are included in Chapter 8 of the PWS, yet are identified in Chapter 9.0 of the Workload Data.
The Government has reviewed the PWS and determined that Chapter 8 is the appropriate location for Patriot Village Contingency Support. No changes will be made as a result of this question.
| 96. Would the Government consider adding an Oral Presentation bidding requirement to the RFP competition, after a competitive bidder-range determination? |
| Section M |
Evaluation Criteria
Oral Presentation Oral Presentations will not be used during acquisition.
| 97. Will the Government identify the equipment that would correspond with the buildings cited Appendix A Workload Estimates? |
| Appendix K: GFP; |
PWS Section II GFP and Services;
Appendix A Workload Estimates
Equipment List, Istanbul All available data is reflected in the provided Appendices. No changes will be made as a result of this question.
| 98. Will the Government identify the Facilities that would correspond with the buildings cited Appendix A Workload Estimates? |
| PWS Section II GFP and Services; |
Appendix A Workload Estimates
Facilities List, Istanbul
See response on 97.
| 99. Will the Government identify the vehicles that would correspond with Appendix I Vehicle Authorization Listing - Turkey? |
| PWS Section II GFP and Services; |
Appendix A Workload Estimates;
Appendix I Vehicle Authorization Listing – Turkey
Vehicle List, Istanbul
All available data is reflected in the PWS and associated Appendices. All vehicles are listed on the VALs attached to the PWS. No changes will be made as a result of this question.
100. Would the Government issue a revised Instruction set that reflects the current FFP cost requirements?
Appendix H - Instructions for Cost Element Breakdown
The Instruction document contains definitions that are applicable to a CPFF contract, such as: Cost Performance Summary, Budget-Actual-Variance.
Appendix H has been revised and will be issued with the RFP. All prospective offerors are responsible to retrieve updated information via the FBO website.
101. We request the Government provide additional columns to Attachment 7 identifying the job title from Appendix 2 of the collective labor agreement for Turkey for each listed employee and the site of performance (Incirlik, Ankara, or Izmir) so that offerors may reasonably understand what positions are currently staffed in what locations to determine what positions are overstaffed requiring severance.
Failure to provide this information will provide the incumbent an unfair advantage and result in higher pricing from the competitors.
Section L paragraph L-3. E.2 Price/contract document proposal instructions and
Section J Attachment 7 Turkish National employee listing.
Paragraph 2 of the Price/contract document proposal instructions indicates "Offerors considering mass severance of employees, that are no longer required in performance of the contract, shall propose mass severance as well as retention in the base year."
It goes on to say “Calculation by the offeror shall be based on the provided Turkish/Spanish Employee listings, taking into consideration the maximum possible mass severance cost according to labor law requirements." The information provided by Attachment 7 is inadequate for this purpose.
The requested data is unavailable as it would reveal the incumbent’s manning structure and solution. It is the offeror’s responsibility to propose a technical solution to meet the contract requirements.
102. Please clarify if CLIN 0004 is to provide a full 52 weeks of extended operating hours and tasks or some specific fraction of 52 weeks or if no price is required since the work will be negotiated after award.
| Section B supplies or services and prices AND Chapter 9 Contingency services- identifies additional operating hours and tasks for contingency services and CLIN 0004 basic period contingency level I requires a price for 12 months. We understand historically contingency services are ordered as required. |
| CLIN 0004 and Chapter 9 (Contingency Level I requirements for Moron) have been removed from the final RFP package in their entirety. |
| 103. Please clarify this requirement; not all locations in Turkey have the facilities to provide the requested capabilities in paragraph 1.13.1. |
| PWS: |
1.13 MISSION ESSENTIAL SERVICES: Mission essential services are minimum support required to sustain flying operations and maintain key infrastructure. Provide the services designated as mission essential services in accordance with the terms and conditions of the contract during period of crisis. The mission essential services are:
1.13.1 TURKEY (ALL LOCATIONS): CIVIL ENGINEERING - Base Power Plant, Water Production & Sewage Treatment, Runway Sweepers, Fire Department, Liquid Fuels Maintenance, After Duty Emergency Services for Electrical and Mechanical systems; LOGISTICS – MICAP Delivery (TMO), Vehicle Operations, Emergency Vehicle Maintenance for Fire Trucks, MHE, Wreckers, Refuelers, and Command & Control Vehicles, Air Terminal Operations Center; SERVICES – Dining Facility with all food service options.
The Requirements can be met. The facilities provide the capabilities to satisfy the needs of the individual locations.
104. Question: Will the Government please provide the Turkish and Spanish SOFAs as attachments to the solicitation?
Question: Will the Government please provide the text of applicable SOFAs?
Reference: RFP Section L, Part I, Subfactor 2
Discussion: Evaluation Factor I, Subfactor 2 asks for “a description of the offeror’s organization and approach to address Status of Forces Agreement (SOFA)”. However, the Turkish and Spanish SOFAs are not included with the solicitation.
It is the responsbility of the offeror to locate up to date information on applicable SOFAs, labor laws, and other applicable regulations necessary to meet the requirements of the solicitation.
105. Question: If a Foreign Employer is used to provide American National employees, for example as a subcontractor, how will OASDI, Medicare, FUTA and SUTA payments be normalized for comparability purposes?
Reference: RFP Section H, H-12
Discussion: The RFP is silent in regards to OASDI (Social Security), Medicare, FUTA and SUTA payments by Foreign Employers? Foreign Employers of American Nationals are not held to the same standard with regards to OASDI and Medicare payments, this could create a difficult environment to evaluate pricing.
Pricing evaluation shall be accomplished in accordance with the solicitation, no preference will be given based on the location of the “employer”.
106. Question: Will the Government set currency exchange rates in the RFP for bidding purposes so that all bids are comparable and performance risk is understood?
Reference: RFP Section H, H-9
Discussion: The RFP is silent in regards to the currency exchange rate to be used for bidding purposes. Without a common exchange rate, it will be difficult to compare bids and/or understand associated performance risk based upon currency fluctuations between proposal submittal and the first day of execution. A bidder could use an unrealistic bid rate which could present significant performance risk.
The solicitation contains a requirement for the offerors to propose, as part of their price proposal, all foreign currency exchange rates (other than EURO Currency), that were applied in calculating the proposed prices. These proposed rates will be evaluated as part of the price evaluation.
| 107. Question: What on-base housing is available to American Nationals in either Spain or Turkey? |
| General |
| Turkey: Accompanied and Unaccompanied housing is available to American Nationals based on availability. |
Spain: Currently Spain does not provide housing for AN contractors.
108. Question: Will the Government set the rate at the World Bank Rate at time of contract award and provide equitable adjustment, as applicable, to proposed cost during the period from proposal submission to contract start?
Reference: Special Contract Requirement H-9 (pg 62 of 122); entitled - "Equitable Adjustment for Fluctuations in Value of Foreign Currency.”
Discussion: This requirement addresses fluctuations in value of foreign currency during the period of performance, but is silent in reference to the period from proposal submission until contract start, which under current plan appears to be 17 months
The solicitation contains a requirement for the offerors to propose, as part of their price proposal, all foreign currency exchange rates (other than EURO), that were applied in calculating the contract prices. Those rates shall be the base rates for the Foreign Currency Fluctuation.
Special contract clause in Section H of the RFP describes the Foreign Currency adjustment process.
109. Question: Will the Government please list all required reports in the Appendix B, “Required Reports” to ensure clarity?
Reference: PWS in its entirety
Discussion: Throughout the PWS there are reports indicated that are not listed in the "Required Reports” section of Appendix B.
The list of required reports (Appendix B) is not all inclusive. The contractor is held liable to provide all reports listed in Appendix B as well as all reports driven by the given regulations/policies throughout the PWS.
110. Question: Is the intent to maintain this of level maintenance for housing units during normal change of occupancy (usually about 2 weeks per unit), or is this period extended for units that are intended not to be occupied for longer periods, due to reduction in housing needs? If so, please provide an estimated number of units that will be in this status on an annual basis.
Reference: PWS 3.26.2 (pg. 22) entitled "Grounds Maintenance.”
Discussion: Referenced text states, “The grounds around all vacant MFH units and common areas shall be maintained to housing brochure standards.” No clear definition of what the Government’s intent is for the requirement around vacant housing.
According to PWS, Chapter 3, Grounds maintenance standards will be maintained to housing brochure standards, regardless of occupancy status.
111. Question: Will the Government please readdress the "Contractor Personnel Meals” language to accurately describe the requirement?
Reference: PWS 5.1.9.2 (pg. 44) entitled "Contractor Personnel Meals.”
Discussion: Referenced paragraph directs that contractor personnel that eat at the Government dining facilities must pay for their meal to include the surcharge. It also forbids the bringing of food from other sources into the dining facility or flight kitchen. This provision is understandable for American national personnel. However, situations at both Moron and Incirlik could impact local national (LN) employees that work for the contractor.
At Moron, all Spanish employees (contractor’s and the US Government's) can eat at the dining facility per base policy. The LN employees have historically paid for their meals at the basic rate without paying the "surcharge". The reason for this is because in accordance with Spanish labor law the employees only have to pay for the meals cost without any mark-up, which is what the "surcharge" represents. This was confirmed via a Spanish court decree (decision) when an employee of a previous BMC contractor took the matter to court and won his case.
Historically, the situation in Turkey has not been the same as in Spain. However, it only impacts the Turkish national (TN) employees that work in the Incirlik dining facility. Historically, the TNs that work at the dining facility have eaten their lunch meal for free (the meal has been accounted in the AF system in the same manner as that of an individual on meal card). The reason this came to be was the fact the Government doesn't allow the TNs to bring their own food into the dining facility so they do not really have a place to eat their "brown bag" lunch if they were so inclined.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .