Attachment_2_Draft_QASP_TSBMC_II_15_MAR_13.docx

DOCX document 106 KB Posted

Attached to
Turkey Spain Base Maintenance Contract (TSBMC) II
Solicitation number
FA5613-13-R-0005TSBMCII
Issued by

About this file

Attachment 2-Draft QASP TSBMCII 31 Jan 2013

View the file

Other files

File Type Posted
Additional_industry_Q As_29_May_2013.pdf PDF
Amendment_0002.doc DOC document
Attachment_1TSBMC_PWS_3_May_2013.pdf PDF
Appendix_J-VALTurkey.pdf PDF
Appendix_I-VAL_Spain.pdf PDF
Amendment_0001.doc DOC document
Atch_12_CDRL_Package.pdf PDF
Appendix_L-VAL_Turkey_Consulate_Vehicle_List.pdf PDF
Appendix_B-Required_Reports.pdf PDF
Atch_13_Certificate.pdf PDF
Appendix_A-Workload_Estimates.pdf PDF
Attachment_3_Legible_DD254_Turkey.pdf PDF
PPC_Questions_and_Answers_06_May_13.pdf PDF
PPC_Meeting_Minutes_5_Apr_13.pdf PDF
Industry_Attendance_Roster_PPC_3_Apr_13.xlsx XLSX spreadsheet
Briefing_Slides_PPC_3_Apr_13.pdf PDF
PPC_Agenda_FBO.docx DOCX document
Appendix_H_Instructions_for_Cost_Element_Breakdown.docx DOCX document
Attach_6_-_CLA_Spain_(2009).doc DOC document
Appendix_E-Ground_Maint_Stds_10_Jan_13.docm DOCM document
Attachment_9 _Past_Performance_Questionnaire.doc DOC document
Appendix_J-VAL_Turkey2.pdf PDF
Appendix_J-VAL_Turkey1.pdf PDF
Appendix_B--Required_Reports_7_FEB_13.xlsx XLSX spreadsheet
Atch_10_EEOCClearanceRequestInfo.doc DOC document
FINAL_RFP_15_Mar_2013.doc DOC document
Appendix_F-Grass_Map_Turkey.pdf PDF
Appendix_A-Workload_Estimates_15_MAR_13.docx DOCX document
Attach_5_-_CLA_Turkey_(2012-2014).docx DOCX document
Appendix_C-Expected_Operational_Rates.docm DOCM document
Attachment_4_DD254_Spain.pdf PDF
Attachment_1TSBMC_PWS_15_MAR.doc DOC document
Attachment_3_DD254_Turkey.pdf PDF
Appendix_I-VAL_Spain.pdf PDF
Appendix_J-VAL_Turkey3.pdf PDF
Appendix_F-Grass_Map_Spain.pdf PDF
Appendix_G_-_AF_Integrated_Solid_Waste_Management_Standards.docx DOCX document
Attachment_11 _Subcontractor_Consent_Letter.doc DOC document
Appendix_D-Custodial_Standards_15_MAR_2013.doc DOC document
Appendix_K_Government_Furnished_Property_Turkey_and_Spain_10_Jan_13.xlsx XLSX spreadsheet
Sign_In_Sheet_07_Jan_2013.pdf PDF
Site_Visit_Questions_and_Answers.doc DOC document
Show all 42

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

QUALITY ASSURANCE

SURVEILLANCE PLAN

For

Turkey/Spain Base Maintenance Contract (TSBMC) II

FA5613-13-R-0005

Incirlik AB, Izmir AS, Ankara ASF, Turkey & Moron Air Base, Spain

31 Jan 2013

MULTI-FUNCTIONAL TEAM REVIEW & ACCEPTANCE.

Multi-Functional Team (MFT) member’s signatures below indicate their review and acceptance of the Quality Assurance Surveillance Plan (QASP) for the TSBMC II Service Contract. These signatures indicate coordination on this QASP at the time of development and will remain in effect until the plan is changed. The inclusion of alternates and successors to these below-named individuals is effected automatically upon their assumption of duties.

Mr. Wayne Goulet, USAFE/A8Z Date Program Analyst

Ms. Lola Bauch, USAFE CONS Specialized Flight Date Procuring Contracting Officer (PCO)

Ms. Anna Rusinowski, USAFE CONS Specialized Flight Date Contract Specialist

Paula Hull, 700 CONS/LGCP Date Quality Assurance Program Coordinator (QAPC)

Mr. Douglas Chicka, 700 CONS/JA Date Legal Advisor

Ms. Ynuaka Newsome, USAFE/A7KP Date

HQ USAFE/A7K POC

Randal Cummins, 39 CONS/LGCM Date Administrative Contracting Officer (ACO)

Julian Bargas, 496 ABS/LGC Date Administrative Contracting Officer (ACO)

TABLE OF CONTENTS

Subject Page

1.0 Overview 4

2.0 Description of Services 4

3.0 Objectives 4

4.0 MFT Results 4

5.0 MFT Roles and Responsibilities 4-5

6.0 MFT Management Approach 6

7.0 Performance Assessment Approach 6-7

8.0 Performance Objectives 7-8

9.0 Performance Assessment Documentation 8-9

10.0 Reporting Requirements 9-10

11.0 Certification of Services 10

12.0 Services Summary 11-27

13.0 Corrective Action Report (CAR) 28-29

14.0 Corrective Action Report (CAR) Log 30

15.0 Quality Assurance Surveillance Plan (QASP) Checklist 31-57

16.0 CPARS Definitions 58-59

17.0 Customer Complaint Record and Customer Feedback Log 60-61

18.0 Initial Contract Performance Review 62-64

1.0 OVERVIEW.

1.1 Purpose. This Quality Assurance Surveillance Plan (QASP) has been developed and will be implemented in accordance with (IAW) Air Force Federal Acquisition Regulation Supplement (AFFARS) Mandatory Procedure (MP) 5346.103, Contracting Office Responsibilities guidelines. This plan will be used by the Multi-Functional Team (MFT) and Contracting Officer Representative (COR) to ensure contractor compliance with the performance requirements of the TSBMC II contract. This plan will focus on the level of performance required by the Performance Work Statement (PWS), not the contractor’s methodology or process.

1.2 Intent. The intent of this plan is to rely on the Contractor’s quality control, thus changing the Government’s role from “oversight” to “insight”. Performance Objectives (POs) will be periodically monitored and the quality program evaluated but the Contractor is left as free as possible to develop the most efficient methodology to meet and exceed the required thresholds of service.

2.0 DESCRIPTION OF SERVICES

2.1 Scope of Work. The contract will provide contractor non-personal services in support of United States Air Force Europe (USAFE) base facilities in Turkey and Spain. The contractor shall provide all personnel, supervision, equipment, tools, materials, transportation, and other items and services necessary to perform day-to-day base operation and maintenance services. Some of these services are considered to be mission essential; see paragraph 1.14 of the PWS for specifics. The COR’s place of performance is at installations in Turkey, to include Incirlik Air Base (AB), Izmir Air Station (AS), Ankara and Office of Defense Cooperation (ODC-T), and Moron AB, Spain.

SECTION 1 CONTRACT MANAGEMENT

3.0 OBJECTIVE. This QASP is designed to provide the COR an effective systematic surveillance method for each item listed on the Services Summary (SS). The goal of Performance Based Service Acquisition (PBSA) is to design mission support strategies that obtain higher levels of contractor performance, foster synergistic partnerships, accommodate changing or unforeseen mission needs, and leverage commercial best practices. These support strategies align mission performance needs with performance-based work statements and acquisition approaches designed to deliver the desired mission support results.

4.0 MFT RESULTS. The results in managing this acquisition through this QASP are to provide internal and external customers with quality customer support and services that are delivered on time in support of the various missions.

5.0 MFT ROLES & RESPONSIBILITIES. The following Government officials will participate in performance management of the contractor. Their roles and responsibilities are described as follows:

5.1. Contracting Officer Representative (COR): Individuals designated to perform quality assessment functions, and manage performance IAW the QASP. They serve as on-site technical managers assessing contractor performance against contract performance thresholds. Personnel in this area may have different titles, but most often they will be referred to as a COR. They are responsible for monitoring, assessing, recording, and reporting on contractor compliance with the terms and conditions of the contract. These individuals will have primary responsibility for completing quality assurance checklists that will be used to document the inspection and evaluation of the contractor's performance. The COR will maintain monthly surveillance documentation, notify the COR Supervisor of any significant performance deficiencies and recommend improvements to the QASP and PWS throughout the life of the acquisition. The COR will provide a report to the COR Supervisor of surveillance performed and results at least monthly. The COR will monitor contractor property control.

5.2. The Contracting Officer (CO): The CO has overall responsibility for oversight of the contractor's performance. The CO will also be responsible for the monitoring of the contractor's performance in the areas of contract compliance, contract administration, and cost control; reviewing the COR assessment of the contractor's performance; and resolving all differences between the COR version and the contractor's version of events. The CO is the only person with the authority to direct the contractor in the performance of their duties under the contract and to make interpretations of and changes to the contract.

5.3. COR Supervisor duties include:

5.3.1 Identifying mission essential services, to include developing the necessary documents IAW DODI 1100.22, Guidance for Determining Workforce Mix.

5.3.2. Assigning primary and alternate CORs unless another Quality Assurance organization or method can satisfy performance assessment requirements (e.g., Program Management Office).

5.3.3. Reviewing contractor performance documentation, prepared by CORs, on a regular basis to ensure performance is compatible with contract and mission objectives while supporting a higher level of contractor performance, and fostering synergistic partnerships.

5.3.4. Reviewing the PWS and QASP annually and coordinating any changes with the contracting squadron.

5.4. The Contracting Squadron Commander’s duties include:

5.4.1. Serving as the Business Advisor to senior leadership.

5.4.2. Providing the health of services acquisition to senior leadership; providing annual execution review reports on services acquisitions to the MAJCOM for consolidation. Subjects may include the effectiveness of the performance assessment and performance management of the service acquisition; the effectiveness of POs, contract cost changes, acquisition planning, strategic sourcing issues, and the centralized MFT; and the effectiveness of the MFT and senior leadership business objectives.

5.4.3. Making sure the MFT exercises acquisition authorities and responsibilities according to the Federal Acquisition Regulation (FAR), Department of Defense Federal Acquisition Regulation Supplement (DFARS) and the Air Force Federal Acquisition Regulation Supplement (AFFARS).

5.5. The Quality Assurance Program Coordinator (QAPC): The QAPC develops, manages and implements the base Quality Assurance Program; supports the MFT in the development of contract requirements ensuring requirements are clearly stated and enforceable; aids in development of the SS and QASP and provides training to COR Supervisors, CORs, and others that interact with this contract as needed.

5.6. The Contract Specialist (CS): The CS is the contracting office’s focal point for issues regarding the contract. The CS prepares and processes modifications to the contract, assists the CO in ensuring contractor performance meets contract standards, and records and transcribes minutes for meetings. The CS shall inspect the CORs files at least yearly to ensure documentation is maintained.

6.0 MFT MANAGEMENT APPROACH TO VALIDATE THE OBJECTIVES AND GOALS OF THE QUALITY ASSURANCE SURVEILLANCE PLAN.

6.1. Program reviews with MFT members will address funding status, contract progress, rationale for any contemplated changes, COR oversight, contract compliance, and overall customer satisfaction. MFT meetings will be held annually and when required thereafter.

6.2 Annual execution review reports and annual briefings to the commander on the health of services contracts will also be used as a management tool to assess and validate the objectives and goals identified as part of the QASP.

6.3. The actions listed in 5.1, 5.2 and 5.3 will assist the MFT in assessing contractor performance and validating that the performance metrics align with the performance-based work statement and overall mission support objectives. The MFT meets at least quarterly with contractor counterparts to review and discuss performance. Monthly updates may be provided to the contractor to keep them aware of performance data.

SECTION 2. CONTRACTOR MANAGEMENT – PERFORMANCE ASSESSMENT

7.0 PERFORMANCE ASSESSMENT APPROACH

7.1. Purpose. This section details the method(s) used to verify contractor compliance with PWS requirements. The key elements of this process are the contractor's quality program and Government identified performance objectives. The performance objectives from paragraph 8 of this QASP dictate the minimum inspection requirements COR must accomplish on a periodic basis. This QASP provides the procedures on how to conduct the evaluations for performance objectives and how to document them in a correct and effective manner.

7.2. Performance Assessment Approach. To facilitate the performance assessment of the contractor's quality program, COR will verify contractor compliance with designated performance objectives. The intent of the performance assessment approach is to gain confidence in the contractor’s ability to provide satisfactory services and then adjusting the level of performance assessment to a point that maintains confidence. This performance assessment approach is subject to change based on the contractor’s performance.

7.2.1. Review of the Contractor's Quality Control Plan and quality control records will ensure contractor compliance with the Contractor’s Quality Control Plan in pursuit and fulfillment of the contract's quality requirements.

7.2.2. Review of all deliverables for accuracy, quality and timeliness IAW the SS will be accomplished. Specific deliverables are listed in Appendix B, Required Reports.

7.2.3. Daily interaction with the Contractor will serve to ensure understanding of the internal and external customer initiatives outlined in the PWS.

7.3 Customer Complaints. When customer complaints are to be used as a method of Performance assessment, the COR will conduct an investigation to determine the validity of any negative comments received.

7.3.1. If the COR determines that the negative comment is not valid, the customer will be informed of the reason(s) why and carry on further correspondence if necessary. The complaint will be closed on the feedback log.

7.3.2. For validated negative comments, the COR will notify the contractor to allow the opportunity for investigation, comment and any corrective action. The COR will refer to the procedures in paragraph 9 to determine whether it is necessary to initiate a Corrective Action Report (CAR) and coordinate with the COR Supervisor and CO on any CAR. If acceptable action is taken by the contractor, the complaint is closed on the log. If unacceptable action is taken or the complaint cannot be resolved at the COR level, it will be elevated to the CO for final resolution

7.3.3. The COR will also notify the customer of the corrective action taken by the contractor, if applicable.

7.3.4. The COR, with assistance from the COR Supervisor, will conduct trend analysis, as required, of validated negative comments.

7.4 Annual Review. The COR must review QASP performance objectives, assess their applicability and recommend the addition or subtraction of performance objectives as conditions warrant to the MFT or CO through the COR Supervisor. This review must be accomplished annually as a minimum.

7.5 Combating Trafficking In Persons (CTIP): The COR will ensure the contractor complies with FAR Clause 52.222-50, “Combating Trafficking in Persons (Feb 2009)”, Alternate 1, and any future updates to this clause and report any violations to the Contracting Officer.

8.0 PERFORMANCE OBJECTIVES

8.1. Performance Objectives. Attachment #2 lists the contractual performance objectives to be validated by COR. Each performance objective includes a Government-determined performance threshold and the method that is used to perform the verification. The performance objectives in this Attachment represent the minimum items that must have performance assessment accomplished on a periodic basis. Any performance assessment of PWS requirements not required by the QASP must still be documented in the QASP Checklist as described in paragraph 9.1.

8.2 Services Summary: See Attachment 2

8.3. Assessment Method. The methods of surveillance identified in the “Assessment Method” column indicate the Government’s primary approach to quality assurance and assessment for the given performance objectives. Each of these methods is subject to unilateral change by the Government, without notice to the contractor and without the necessity of a contract modification. The contractor’s performance may be monitored using any of the following methods: periodic assessment/inspection (PI), customer complaint (CC), third party audits or assessments (3rd), trend analysis (TA) or other.

8.4. Re-Performance. If any of the services performed do not conform to contract requirements, the Government may require the contractor to perform the services again in conformity with the contract requirements at no additional cost to the Government. The COR will document the conformity and forward it to the CO. When the defects in services cannot be corrected by re-performance, the Government will:

8.4.1. Require the contractor to take all avenues of corrective action(s) to ensure adherence to the contract.

8.4.2. Reduce contract price to reflect the value of sub-standard performance.

9.0 PERFORMANCE ASSESSMENT DOCUMENTATION.

9.1. Quality Assurance Surveillance Plan (QASP) Checklist. COR must document performance as it is accomplished IAW the assessment method and frequency as it relates to the performance thresholds set forth in the QASP. The COR will document results on the QASP Checklist. Both the COR and the COR Supervisor will sign and date the document. The COR will forward the completed documentation to the CS and CO within seven business days of the following month to document the previous month’s performance. A performance assessment will be documented at least monthly on a bilateral checklist, signed by the COR and the contractor Site Lead Manager. The QASP Checklist is an official Government record of inspections of the performance objectives and other inspection items contained in this QASP.

9.1.1. The QASP Checklist is locally developed; seeAttachment #2.

9.1.2. Completed QASP Checklists will be maintained in the COR’s performance assessment folder until such time as they are stored in the contract performance assessment file. At the completion of the contract, the COR will contact the CO for disposition instructions of the performance assessment records. The QASP Checklists can be maintained in soft-copy form as long as there is ample backup to preclude loss of data.

9.2. Deficiency Reporting. When performance is determined less than satisfactory, the COR must inform the contractor's on-site representative that performance is unacceptable and document the finding on a Corrective Action Report (CAR). If evidence is shown where the contractor's quality control program has already documented the deficiency and timely corrective action is working the problem, a CAR may not need to be issued. The COR would then evaluate and document the contractor's action in correcting the cited deficiency and assure effective and timely corrective action is being obtained. The COR will also coordinate the deficiency report through the COR supervisor to the ACO and retain a copy in the official file.

9.2.1. A Corrective Action Report (CAR) is used by the COR to document findings observed during checklist completion; see paragraph 13 for sample. A finding is any SS or non-SS item that has less than satisfactory performance. A CAR can also be used by the CO for any discrepancies on a contract issue.

9.2.2. The COR is responsible for initiating the CAR. If there are other questions as to how the CAR is completed, the COR should consult the CS or CO. The COR must forward a copy of the initiated CAR to the CS and CO. For a contractual discrepancy, the CO will initiate the CAR.

9.2.3. The COR will elevate any CAR that cannot be resolved with the contractor to the CO for resolution.

9.2.4. If the contractor receives a CAR over the course of the CPARs rating period, a determination will be made by the CO whether to include the negative performance data in that year’s CPAR.

9.2.5. Categories of Findings. A finding is any Government-identified noncompliance with contract requirements that specifies that an activity or action did not take place or was not performed to the quality or timeliness standard required by the contract. A finding can be categorized as either major or minor. Findings will be documented on a CAR and must also be tracked in an activity log. Major/minor Findings are defined as follows:

9.2.5.1. Major Finding. A conclusion that identifies a condition having a significant adverse effect on the quality of the activity under review such as:

9.2.5.1.1. Failure to meet a Performance Threshold.

9.2.5.1.2. Significant mission degradation in any contracted function.

9.2.5.1.3. A situation that is likely to result in hazardous or unsafe conditions for individuals (or any other Government resource) coming into contact with the work.

9.2.5.1.4. Failure to provide adequate corrective action to preclude reoccurrence of Government identified findings.

9.2.5.1.5. Failure to provide corrective action to deficiencies identified by the Contractor within a prescribed suspense period.

9.2.5.1.6. Any failure to adhere to security regulations that results in a security incident.

9.2.5.2. Minor Finding. A departure from established standards which has little bearing on service provided. However, if the same minor finding is repeatedly identified, it may be an indication that a major finding is occurring or has occurred because the contractor quality system has not acted to prevent recurrence. In this case, the minor finding should be elevated to the level of a major finding and a new CAR initiated.

9.3 The COR is required to upload all documentation required (training certificates, monthly reports, etc.) into the Department of Defense (DoD) Contracting Officer Representative Tracking (CORT) Tool. The CORT Tool manages COR nominations and approvals and provides monthly status report tracking.

9.4 Timely Feedback to the Contractor. CORs will provide timely feedback regarding any deficiencies or substandard work for contractor corrective action. In addition, any correspondence with regard to deficiencies identified during contract performance shall be identified in the QASP Checklist and forwarded to the CS and CO.

9.5. Joint Surveillance. Periodically the CS and/or the QAPC may accompany the COR during inspections. This is to ensure the COR is performing surveillance in accordance with this QASP.

10. REPORTING REQUIREMENTS

10.1. COR Inputs to the COR Supervisor. The COR is required to report detailed results of performance objective verifications to the COR Supervisor on a monthly basis. The COR will compile inputs in the QASP Checklist that includes an overall performance rating configured to correspond to the ratings used to complete CPARS assessments. The QASP Checklist will also include deficiencies identified during the period, along with COR comments as necessary. In addition, the COR will identify those areas where the contractor has exceeded the minimum requirements of the PWS and their resultant benefit to the government. Both the COR and Contractor Site Lead Manager shall sign the monthly checklist to ensure bilateral understanding of results/rating.

10.2 Contractor Performance Assessment Reporting System (CPARS). Items that are surveyed IAW this QASP should be reviewed and considered as supporting documentation to the CPARS. The COR who is performing the performance assessment should keep in mind that details of the inspections from the QASP Checklist can be used to this purpose. The inclusion of more detailed documentation of inspection results would be very helpful to the MFT that develops the CPARS. CPARS will be accomplished annually on service contracts which exceed $1M.

10.3. Initial Contract Performance Review. Within thirty days after contractor assumes full performance responsibilities an initial performance review will be conducted. Assessment Criteria for the review can be found in the document listed in paragraph 16. The review will result in one of the following assessment values:

Rating

Green
No issues.
Yellow
Issue(s) but contractor has an adequate mitigation or corrective action plan in

place.

Red*
Issue(s) with inadequate or no contractor mitigation or corrective action plan.

*Any red assessment shall include the government proposed actions with respect to the failing contractor.

11.0 CERTIFICATION OF SERVICES. Certification of services is performed by the PCO office via the Wide Area Work Flow (WAWF) system, based on input from the CORs. At the end of each billing period, the contractor inputs invoice information into WAWF. WAWF automatically notifies the PCO office via email of pending invoice. The PCO representative accesses, within 7 calendar days from notification, WAWF in order to verify accuracy of contractor’s data. If data is correct, the services are received and accepted by the PCO office and the invoice is processed for payment by Defense Finance Accounting System (DFAS). If errors are encountered in contractor’s invoice, the PCO office consults with the contractor and COR to mutually rectify data. Additionally, any invoice discrepancy that affects the terms and conditions and /or price of the contract must be brought to the attention of the PCO.

12.0 Services Summary

The Services Summary (SS) performance objectives and associated performance thresholds establish a baseline for the Government’s surveillance program. The Government may unilaterally change the inspection methods or frequencies, based on the contractor’s demonstrated successful or unsuccessful performance.

Item
Performance Objective
PWS Sec I Paragraph
Performance Threshold
Inspection Method (Ref Para 8.3)
Frequency

Chapter 1 General Requirements Chapter 2 Program Management

1
Contractor provides adequate support for military exercises.
1.9
No more than 2 valid customer complaints per exercise.
CC
Per exercise
2
Continued operation of mission essential services are provided without interruption to include periods of crisis or worker unrest.
1.13
100% of the time during crisis.
PI, CC
Monthly
3
Contractor implements and complies with an internal MPAP that ensures compliance with PWS requirements.
2.4
No more than 7 valid customer complaints per month; no more than one re-occurrence per month following corrective action.
CC, TA
Monthly
4
Reports – Data provided is timely, accurate and complete.
2.6, 2.8
Reports submitted IAW contract requirements or not more than three reports returned to correct valid customer complaints and/or deficiencies per month.
PI, CC, TA
Monthly

Chapter 3 – Civil Engineering

Item
Performance Objective
PWS Sec I Paragraph
Performance Threshold
Inspection Method (Ref Para 8.3)
Frequency
5
Meetings and administration are coordinated and attended as required.
3.2

3.3

No more than 1 scheduled or required meeting missed per month. No more than 2 late suspense dates on data calls, correspondence and reports.
PI, CC
Monthly
6
Accomplish efficient and effective planning, reporting and management of CE finances and resources.
3.4

3.5 No more than 2 inaccurate financial documents and/or records per month.

PI, CC, TA
Monthly
7
USAF Real Property records are maintained and accurate.
3.6
No more than 2 records are inaccurate, out of date, or incomplete per month.
PI, CC, 3rd
Monthly
8
Real Property Leases are properly established, maintained, and terminated in accordance with USAF and USAFE guidance.
3.7
All leases are accurate and up to date at all times.
PI, CC
Monthly
9
Manage, operate and maintain IT systems specific to Civil Engineering and ensure systems are secure.
3.8
No more than 1 valid customer complaint and/or discrepancy for system access and user support.
PI, CC
Monthly
10
Manage and update the Base Comprehensive Plan and all associated plans. Plan and program new facility construction, repair and maintenance projects in accordance with Facilities Board priorities and available funding.
3.10

3.11

No delays in project funding or construction due to contractor negligence. No more than 2 late suspense dates on data calls, correspondence and reports.
PI, CC, 3rd
Monthly
11
Design services are provided in support of projects. Designs are correct, cost-effective and meet the requirement.
3.12
Contract modifications may not exceed 4% of project cost due to design flaws per project.
PI, CC
Monthly
12
GeoBase program and Common Installation Picture are effectively managed.
3.13
No more than 5 valid customer complaints and/or discrepancies between actual real estate data and drawings/maps.
PI, CC
Monthly
13
Manage and inspect construction projects IAW AFI 32-1023 and contract specifications.
3.14
Contract modifications may not exceed 5% of project cost due to construction management (CM) negligence.
PI, CC
Monthly
14
Establish an escort office to coordinate escort request by base agencies.
3.14.1

3.14.2

No more than 1 hour of contractor delay weekly due to negligence.
PI, CC
Monthly
15
Base Energy Program is implemented and effectively managed. Base energy consumption is reduced to meet annual energy goals established by USAF.
3.15
No more than 2 missed inspections per month.
PI, CC, 3rd
Monthly
16
Manage environmental compliance, pollution prevention and hazardous material/waste plans and programs in compliance with USAF, USAFE, and all local standards.
3.16

3.17 3.18 3.19

All programs are inspection ready and no more than 2 valid customer complaints and/or discrepancies per month. Close out 5% of open findings each month on average over the course of 12 months.
PI, CC, 3rd. TA

Monthly

17
Service calls and Direct Scheduled Work (DSWs) are completed within prescribed times. Work requests are properly received, logged, coordinated on, approved and scheduled within the time limits based on priority. Cost estimates and bills of material for planned work are accurate.
3.20

3.21 3.21.1 3.21.2

DSW’s: 100% of emergencies; 90% of urgent; 85% of routines will be completed within prescribed times.

WO’s: 90% of approved work orders are completed within six months after material complete and 25% of the estimated costs.

PI, CC
Monthly
18
Establish and maintain an effective Recurring Work Program (RWP)
3.20, 3.21, & 3.21.3
RWP: 90% completion rate per shop code per month.
PI, CC
Monthly
19
Establish and maintain an effective Real Property Installed Equipment (RPIE) program.
3.20, 3.21, & 3.21.3
No more than two valid customer complaints and/or discrepancies in the RPIE records per month.
PI, CC
Monthly
20
Necessary materials are procured, received, issued, and inventoried in support of Civil Engineer Work requirements to include materials, supplies, tools, equipment, and vehicles.
3.21.4
No more than 4 valid customer complaints and/or discrepancies between CEMAS inventory and actual stock. 95% of Bills of Materials shall be purchased within prescribed time.
PI, CC
Monthly
21
Establish and maintain a self help store capability, providing common repair parts and tools for use by Facility Managers and MFH occupants.
3.21.5
No more than 2 valid customer complaints and/or discrepancies per month.
PI, CC
Monthly
22
Establish, manage and conduct a facility manager education program. Annually update the RPIE listing.
3.21.6
No more than 3 valid customer complaints and/or discrepancies within the Facility Manager Program and the RPIE lists.
PI, CC
Monthly
23
Effectively maintain and repair all heating/cooling systems IAW USAF directives, manufacture’s manuals, and host nation FGS.
3.21.7
HVAC equipment will be out of service no more than 1 calendar day when parts are available. No more than 2 valid customer complaints and/or discrepancies per month.
PI, CC
Monthly
24
Effectively control and manage the base Refrigerant Management Program.
3.21.7
Zero valid customer complaints and/or discrepancies in tracking and disposing of refrigerant.
PI, CC
Monthly
25
Provide structural repair and maintenance to include lead based paint abatement, asbestos abatement, masonry, carpentry, sheet metal, fencing, roofing and interior and exterior finishes.
3.21.8
No more than 2 valid customer complaints and/or discrepancies per month.
PI, CC
Monthly
26
Manage a safe maintenance and repair program.
3.22
Respond to safe maintenance requests within 2 hrs for local sites and 2 duty days for GSUs.
PI, CC
Monthly
27
Provide custodial services to ensure facilities are clean, presentable, safe and sanitary IAW Appendix D.
3.23
No more than 3 valid customer complaints and/or discrepancies per month.
PI, CC
Monthly
28
Maintain and repair airfield surfaces including joint and crack sealing/resealing, and other airfield maintenance tasks as necessary.
3.25
Zero aircraft damage or mission impact due to FOD or deteriorated pavements. No more than 2 valid customer complaints and/or discrepancies per month.
PI, CC
Monthly
29
Maintain, repair, inspect and certify all aircraft arresting systems and applicable records as prescribed. Ensure systems are operational on a 24/7 basis.
3.25.2
All applicable standards must be met at all times.
PI, CC, 3rd
Monthly
30
All airfield lighting systems are properly maintained and repaired as required.
3.25.3
Ensure systems are operational 24/7, respond for repair within 20 minutes.
PI, CC, 3rd
Monthly
31
Maintain, inspect and repair pavement surfaces to include: roads, parking lot, curbs and gutters, sidewalks, drainage systems.
3.26.1
No more than 3 valid customer complaints and/or discrepancies per month.
PI, CC, 3rd
Monthly
32
Provide grounds maintenance and service as necessary and in response to seasonal weather. Grass is cut according to the standards/measurements in Appendix E.
3.26.2
No more than 3 valid customer complaints and/or discrepancies per month.
PI, CC
Monthly
33
Provide pest management services to ensure pests do not damage resources, health, or morale. BASH program will be supported in accordance with safety regulations.
3.26.3

3.27

No more than 3 valid customer complaints and/or discrepancies per month.
PI, CC
Monthly
34
Operate, maintain, inspect, repair, overhaul, install, and logistically support all electrical power production equipment and Emergency Pump engines as prescribed.
3.28.1
No more than 3 valid customer complaints and/or discrepancies per month.
PI, CC, 3rd
Monthly
35
Electrical Distribution Systems/Corrosion control program will be maintained, inspected, repaired and over hauled as prescribed.
3.28

3.28.2

No more than 2 valid customer complaints and/or discrepancies in electrical power distribution and secondary systems per month.
PI, CC, 3rd
Monthly
36
Effectively operate and maintain all water production and distribution systems. Ensure safe, clean potable water to base population.
3.28.3

3.28.4 3.28.4.1

Water will be safe to drink at all times with zero Notice of Violations.
PI, CC, 3rd
Monthly
37
Provide continuous, cost effective and efficient collection and treatment of all wastewater. Dispose of waste and debris as required.
3.29
Waste Water will be properly treated at all times with zero Notice of Violations.
PI, CC
Monthly
38
Maintain storm water systems to include storm sewer lines, inlets, catch basins, sump pumps, surge tanks, perforated sub-drains, oil/water separators and piping.
3.30
No more than 2 storm water valid customer complaints and/or discrepancies per month. Zero oil/water separator discrepancies.
PI, CC
Monthly
39
Manage liquid fuels storage and distribution systems. Operate, maintain, inspect, repair, overhaul and logistically support all liquid fuel storage and dispensing systems.
3.31
No more than 3 valid customer complaints and/or discrepancies per month.
PI, CC
Monthly
40
Provide housing management and update all associated IT systems, reports, and documents as necessary.
3.32

3.33 3.34

No more than 3 valid customer complaints and/or discrepancies per month.
PI, CC
Monthly
41
Provide allowable FMO items to eligible members and deliver/pick-up FMO items within the specified time period.
3.35
No more than 3 valid customer complaints and/or discrepancies per month.
PI, CC
Monthly
42
Provide all FES Management functions IAW all applicable standards and regulations.
3.36

No more than 2 valid customer complaints and/or discrepancies per month.

PI, CC, 3rd
Monthly
43
Manage installation Fire Emergency Services Department to include maintaining Operating Instructions, Master Plans, and Standards of Coverage (SoC). Effectively administer manpower, equipment and supplies.
3.36.1

No more than 2 valid customer complaints and/or discrepancies per month.

PI, CC, 3rd
Monthly
44
Provide 24/7 Fire Emergency Services support for the installation. The scope of services will include on-scene incident management, aircraft rescue and firefighting, structural firefighting, defense response to hazardous materials at the operations level, technical rescue, to include auto extrication and confined space rescue, and emergency medical services support.
3.36.2

100% of the time

PI, CC, 3rd
Monthly
45
Conduct Fire Prevention inspection at a frequency appropriate to facility occupancy classification. Coordinate all inspections and fire drills with the facility manager and advise them of any hazards or fire safety deficiencies. Maintain records documenting inspections, maintenance, and repairs.
3.36.3

No more than 2 valid customer complaints and/or discrepancies per month.

PI, CC, 3rd
Monthly
46
Manage and document recurring proficiency training and firefighter certification programs for all Fire Emergency Services functional areas. Ensure Fire Emergency Services personnel achieve and maintain certification commensurate with their rank and assigned duties.
3.36.4

No more than two discrepancies per month.

PI, 3rd
Monthly
47
Ensure all communication equipment and facilities comply with NFPA 1221. Track and report fire department responses via ACES-FD and the National Fire Incident Reporting system.
3.36.5

No more than two valid customer complaints and/or discrepancies per month.

PI, CC, 3rd
Monthly
48
Ensure coverage for Optimum Level of Service (OLS) for the appropriate airfield category/vehicle set.
3.36.6
Ensure OLS staffing is provided 100% of the time during peak daily hours.
PI, CC, 3rd
Monthly
49
Provide 24/7 base recovery response capability, participate fully in base exercises and assist exercise planning as required.
3.37
100% of the time
PI, CC, 3rd
Monthly

Chapter 4 – Postal Services and Communications Support

Item
Performance Objective
PWS Sec I Paragraph
Performance Threshold
Inspection Method (Ref Para 8.3)
Frequency
50
Safeguard all Government and US Postal Service property and facilities. Maintain accountability of registered mail, accountable & expendable items.
4.0.
100% of the time.
PI, CC, 3rd
Monthly
51
COPE credit and finance accounts are properly maintained and accounted.
4.1, 4.2
100% of the time.
PI, CC, TA, 3rd

Weekly

52
Operate a mail delivery and retrieval service to and from Morón De La Frontera post office as required. Mail is properly loaded and secured.
4.3.
95% of the time.
PI, CC, 3rd

Monthly

53
Process mail in accordance with standards, class, and USAFE sprint charts.
4.4.
No more than 2 valid customer complaints and/or discrepancies per month.
PI, CC,3rd

Monthly

54
Maintain customer database. Process mail according to USPS standards and procedures and provide friendly customer-focused postal service. Maintain hours of operation as directed. Incoming daily mail posting shall be completed same day as receipt.
4.4, 4.5.
98% of the time.
PI, CC, 3rd

Monthly

55
Accountability of IT equipment is maintained and accurate.
4.11, 4.11.1, 4.11.2
99% of the equipment is available or disposition properly identified.
PI, CC, 3rd

Weekly

56
No unauthorized use of network assets.
4.11.3
No more than 2 accounts are revoked annually.
PI, CC, 3rd

Weekly

57
Automated Information systems (AIS) are properly loaded and configured.
4.11.3, 4.11.4
97% compliance of AFCERT and anti-virus protection is achieved.
PI, CC, TA, 3rd

Weekly

Chapter 5 -Force Support

Item
Performance Objective
PWS Sec I Paragraph
Performance Threshold
Inspection Method (Ref Para 8.3)
Frequency

Food Service Operations

58
Contractor provides full range of facility and food services operations to ensure customer satisfaction, cleanliness, and safety.
5.1, 5.1.1, 5.1.10
No more than 2 valid customer complaints per month.
CC
Monthly
59
Contractor complies with sanitation requirements of the food code and state and local laws/regulations.
5.1.10
No more than 2 valid customer complaints and/or discrepancies per month.
PI, CC, 3rd
Monthly
60
Accounting and Food Accountability Reports are accurate on the first submittals. Cash drawer with POS reports and cash are turned in on-time.
5.1.9.1
No more than 1 valid customer complaint or deficiency per month.
PI, CC
Monthly

Golf Course Maintenance Operations (Incirlik Only)

61
Golf course is properly maintained in accordance with maintenance schedule. Grounds are properly maintained, irrigated, and free of pest.
5.2, 5.2.1, 5.2.2
No more than 2 valid customer complaints and/or discrepancies per month.
PI, CC
Monthly

BOWLING CENTER EQUIPMENT MAINTENANCE (MORÓN ONLY)

62
Contractor Provides full range maintenance and operation support of bowling center equipment/lanes to ensure customer satisfaction, cleanliness and safety.
5.3 – 5.3.4
No more than 2 valid customer complaints and/or discrepancies per month.
PI, CC, 3rd
Monthly

Lodging Services

63
Facilities are cleaned and properly maintained (Moron).
5.4, 5.4.2
No more than 2 valid customer complaints and/or discrepancies per month.
CC, PI, 3rd
Monthly
64
Funds and property are fully accounted, APF and NAF budgets and 5 year plans are properly submitted (Moron).
5.4.3
100% accountability of funds.
PI, CC, 3rd
Monthly
65
Reservations are recorded completely and accurately (Moron).
5.4.4
No more than 2 valid customer complaints per month and/or discrepancies.
CC, PI, 3rd
Monthly
66
Maintain Occupancy Records and inventory of available quarters (Izmir Only).
5.5
No more than 2 valid customer complaints and/or discrepancies per month on accuracy of personnel living locations daily.
PI, CC
Monthly

Fitness and Sports (Moron Only)

67
Fitness and Sports programs and facilities satisfied customer needs. Sports, fitness events, and Self-incentive programs are planned, coordinated and publicized.
5.6-5.6.2
No more than 2 valid customer complaints and/or discrepancies per month.
PI, CC, 3rd
Monthly
68
Equipment and supplies are maintained and tracked. Inventories are accurate and new purchase requirements submitted as required.
5.6.3-5.6.5
No more than 2 valid customer complaints and/or deficiencies per month.
PI, CC, 3rd
Monthly

Life Guard/Pool Services (Moron Only)

69
Pool services are adequate, lifeguards are available and trained, facilities and equipment is clean and safe, and pool water is maintained to proper PH values.
5.7, 5.7.1
No more than 1 valid customer complaint and/or discrepancy per month. Lifeguards are fully certified.
PI, CC, 3rd
Monthly

Library and Information Services (Moron Only)

70
Full range of Library services and programs are provided to satisfy customer needs. Inventory and data records are completed accurately and on time.
5.8-5.8.1
No more than 2 valid customer complaints and/or discrepancies per month.
PI, CC, 3rd
Monthly

Publicity and Computer Data Support (Moron Only)

71
Final products look professional, accurate and posted on time. Web pages are maintained, up to date, and assistance/guidance is provided for on call service.
5.9-5.9.2
No more than 1 valid customer complaint and/or discrepancy per month.
PI, CC, 3rd
Monthly

Chapter 6 – Logistic Support Services

Item
Performance Objective
PWS Sec I Paragraph
Performance Threshold
Inspection Method (Ref Para 8.3)
Frequency
72
Provide minor and major maintenance and inspections of AGE either scheduled or unscheduled.
6.0, 6.0.2
86% of the time all assigned equipment shall be in commission.
PI, CC, TA
Monthly
73
TOs, publications, forms and files are maintained and current.
6.0.1
95% of the time T.O. and files are accurate and in good order.
PI, CC
Monthly
74
All parts and supplies are accountable, master ID listing of all AGE is current and bench stock levels are adequate.
6.0.1
90% of the time bench stock levels are adequate and TMDE is serviceable.
PI, CC, TA
Monthly
75
Equipment and supplies documentation are logged in with correct status.
6.0.2
90% of the time documents correctly reflect current status.
PI, CC
Monthly
76
Hazardous material are handled or disposed of IAW host nation laws and the FGS.
6.0.3
100% of the time hazardous material storage and handling guidelines are followed.
PI, CC
Monthly

Vehicle Management

Vehicles and equipment are maintained in safe and serviceable condition. Strict accountability of tools and shop equipment as implemented.

6.1

No more than 2 valid customer complaints and/or discrepancies per month.

PI, CC

Monthly

78
Provide Vehicle Management and Analysis (VM&A) Services.
6.1.2
No more than 2 valid customer complaints and/or discrepancies per month.
PI, CC
Monthly
79
Fleet Management services (including complete reports, inventories, analysis, plans and lists) are provided and timely accomplished.
6.1.-6.1.2
No more than 2 valid customer complaints and/or discrepancies per month.
PI, CC
Monthly
80
Vehicle Control Program is effectively administered.
6.1.2
No more than 2 valid customer complaints and/or discrepancies per month.
PI, CC
Monthly
81
Effective Material Control services are performed.
6.1
No more than 2 valid customer complaints and/or discrepancies per month.
PI, CC
Monthly
82
Vehicle Mission Capable (MC) rates are maintained.
6.1.2
Attain USAFE end of month fleet MC goal of 90%.
PI, CC,
Monthly
83
Vehicle Operation support is adequately provided.
6.1.3
No more than 2 valid customer complaints and/or discrepancies per month.
PI, CC
Monthly
84
Provide Priority & Time Sensitive Delivery services to include all priority and MICAPS to installation units. (Incirlik Only)
6.1.3
No more than 2 valid customer complaints and/or discrepancies per month.
PI, CC
Monthly
85
DoDDS bus service is provided. (Incirlik & Ankara Only)
6.1.3
No more than 2 valid customer complaints and/or discrepancies per month.
PI, CC
Monthly

Material Management

86
Responsible for stocking, storing, issuing, tracking, eliminating and decentralized inventory management of DoD supplies and equipment IAW Government Regulations.
6.6
No more than 3 valid customer complaints and/or discrepancies per month.
PI, CC
Monthly
87
Receiving functions performed in a timely manner. Priority receipts will be processed ahead of routine receipts.
6.6, 6.6.1
No more than 3 valid customer complaints and/or discrepancies per month.
PI, CC
Monthly
88
Storage controls are in place. Supplies and equipment are accurately tracked.
6.6
No more than 3 valid customer complaints and/or discrepancies per month.
PI, CC
Monthly

Management & Systems

89
Ensure efficient operation of processes. Monitor performance to ensure quality service and accountability. Responsible for all funds management/resource management.
6.7
No more than 1 valid customer complaint and/or discrepany per month.
CC, PI
Monthly
90
Reject listings are monitored to ensure rejects generated from a contractor controlled terminal are corrected or forced cleared in a timely manner.
6.7.1
All rejects are cleared with-in six (6) duty days or less.
PI, CC
Monthly
91
One-stop customer service section is provided.
6.7.4
No more than 2 valid customer complaints per month.
CC
Monthly

Traffic Management

92
Freight Traffic is managed effectively and associated duties are performed correctly for transporting/ receiving cargo.
6.8-6.8.2
No more than 2 valid customer complaints and/or discrepancies per month.
PI, CC
Monthly
93
Travel documents for passenger movement are completed IAW prescribed directives.
6.8.3
No more than 2 valid customer complaints and/or discrepancies for the month.
PI, CC
Monthly
94
Inbound and outbound personal property shipments are processed correctly and on time.
6.8.4, 6.8.5
95% of the time per month.
PI, CC, TA
Monthly

Customs Border Clearance Agents Program:

95
Departure briefing is given to all departing personnel.
6.9
No more than 3 valid customer complaints and/or discrepancies per quarter.
PI, CC
Monthly
96
Contractor complies with customs requirements.
6.9-6.9.2
100% of the time.
PI, CC, 3rd
Monthly
97
Pack out log books and all documentation are IAW applicable EUCOM directives.
6.9, 6.9.1
No more than 2 valid customer complaints and/or discrepancies per quarter.
PI, CC
Monthly
98
Custom stamps are stored in a lockable safe and are closely controlled. Sign out/in stamp log is maintained for each time a stamp is removed from/returned to storage IAW applicable EUCOM Directives.
6.9, 6.9.1
100% compliant.
PI, CC, 3rd
Monthly

Chapter 7 - Safety, Occupational Health & Industrial Hygiene

Item
Performance Objective
PWS Sec I Paragraph
Performance Threshold
Inspection Method (Ref Para 8.3)
Frequency
99
Safety, Occupational Health, and Industrial Hygiene program, plans, and records provides a clean, safe, healthy work environment that complies with all applicable regulations, directives, codes, standards, and Host Nation laws.
7.0-7.0.5
No more than 3 valid customer complaints and/or discrepancies per quarter.
PI, CC
Quarterly
100
All potential health hazards, required controls, required training; medical surveillance requirements are identified and occupational medical exams and industrial hygiene analytical services performed.
7.0-7.1
No more than 2 valid customer complaints and/or discrepancies per month.
PI, CC
Quarterly
101
Develop, implement and manage a comprehensive ground safety, vehicle safety and HAZMAT program.

7.2-7.2.16

All aspects of the ground and vehicle safety and HAZMAT program are compliant.
PI, CC, 3rd
Quarterly

Ambulance Services (Moron only)

102
Emergency patient transport, in-flight emergency response, and participation in 496 ABS exercises are effectively accomplished.
7.4, 7.5, 7.6
No more than 1 valid customer complaint and/or discrepancy per exercise.
PI, CC
Monthly
103
The contractor responds within 5 minutes of the request for ambulance support to emergencies.
7.4
100% of the time.
PI, CC
Monthly

Chapter 8 – Medical Maintenance Operation Management Services (MOMMS)

Item
Performance Objective
PWS Sec I Paragraph
Performance Threshold
Inspection Method (Ref Para 8.3)
Frequency
104
Provide all requested information and the necessary personnel to support facility inspections.
8.1, 8.1.1.
100% of the time.
PI, CC
Monthly
105
Ensure electrical generators provide back-up service.
8.2.2
100% of the time.
PI
Monthly
106
Ensure Repair Work is performed in a timely manner.
8.3
98% complete within 5 duty days. 100% complete within 30 duty days.
PI, CC
Monthly
107
Ensure Preventive Maintenance is performed in a timely manner.
8.4
98% complete within 30 calendar days. 100%complete within 60 calendar days.
PI, CC
Monthly
108
Comply with removing the medical waste from the accumulation point at the 39th MDG and have it disposed in accordance with the local laws and regulations.
8.12
100% of the time.
PI, CC
Monthly

Chapter 9 – Turkey Administrative Services

Item
Performance Objective
PWS Sec I Paragraph
Performance Threshold
Inspection Method (Ref Para 8.3)
Frequency
109
Payroll information to the Financial Services Office is provided timely and accurate.
9.1
98% accurate and complete.
PI, CC, TA
Monthly

Chapter 10 – Transient Alert

Item
Performance Objective
PWS Sec I Paragraph
Performance Threshold
Inspection Method (Ref Para 8.3)
Frequency
110
Ensure compliance with foreign object damage (FOD) program, to include FOD inspections 30 minutes prior to aircraft arrival and departure.
10.1.2., 10.1.6.1.
100% of the time.
PI, CC
Monthly
111
Ensure personnel and equipment are on hand 30 minutes prior to aircraft arrival and departure and all aircraft are properly marshaled, parked, grounded, and serviced.
10.1.6.1. and 10.1.6.2.

95% of the time.

PI, CC
Monthly
112
Tow teams are current on proper tow procedures on all transient MDS aircraft arriving/departing Moron AB. Aircraft crash damaged/disabled recovery program and equipment are managed effectively, to include responding to crash recovery requirements.
10.2. and 10.2.1.

90% of the time

PI, CC
Monthly
113
Non-destructive inspection (NDI) program is in place and used.

10.1.6.3.

98% of the time.

PI, CC
Monthly

13.0 Corrective Action Report:

CORRECTIVE ACTION REPORT (CAR)

(If More Space is Needed Use Reverse and Identify By Number)

1. CONTRACTOR

2. CONTRACT NUMBER

3. TYPE OF SERVICES

4. FUNCTIONAL AREA

5. SUSPENSE DATE

6. CONTROL NUMBER

7. MAJOR |_|MINOR |_|

FINDING:

FINDING IMPACT:

Please respond with a written corrective action plan that details the corrective action of the cited deficiency, the cause of the deficiency, and actions taken to prevent recurrence by…