This document is a Special Conditions section for a federal contract opportunity (QUUG 23-1001) for RPR/ADD RADR Vehicle Maintenance at Moron Air Base, Spain. The contract has a performance period of 527 calendar days and requires the contractor to have specific Spanish classification certificates covering a wide range of work activities, including electrical installations, mechanical work, construction, and infrastructure projects. Key requirements include using only US-manufactured equipment for certain components, potential subcontracting of all works, and reuse or proper disposal of removed/demolished materials.
The contract mandates strict laboratory testing protocols, with all sampling and testing to be performed by an independent, accredited laboratory registered with Junta de Andalucía. The project is valued between $1-5 million and is specifically intended for local sources licensed and registered to conduct construction business in Spain. Bids must be received by 10:00 hours local time on 30 July 2025, with a bid acceptance period valid through 31 December 2025. The solicitation is issued by the Department of the Air Force, United States Air Forces in Europe - Air Forces Africa, with the understanding that funds are not currently available and the government reserves the right to cancel the solicitation.
View the file
Other files for this federal contract opportunity
Show all 20
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
QUUG 23-1001. EDI RPR/ADD RADR VEHICLE MX, B121
SECTION 01 11 02 - 1
SECTION 01 11 02
SPECIAL CONDITIONS
1 PERFORMANCE PERIOD:
The performance period estimated by the Government for the completion of the entire work ready for use, including from the preconstruction activities through the finish works, is 527 calendar days, including an average inclement weather days. The required field investigation to detect underground services, including unforeseen utilities, may slow work progress.
1.1 It shall be the sole responsibility of the Contractor to ensure all required submittals are submitted to Construction Management for approval in a timely manner, which shall not incur any delay in completion of the project. For materials or equipment requiring a long term of procurement and delivery, said term shall be included in the period of performance. Delay in delivery/procurement will not justify an extension of the period of performance.
2 GOVERNMENT-FURNISHED MATERIAL (GFM)
The Government will furnish the material and equipment shown below for installation by the Contractor. The materials and equipment will be available to the Contractor already installed in the building(s) or on hand stored on base. Contractor shall install GFM. The Contractor shall notify the Contracting Officer in writing not less than 15 calendar days in advance of the date materials or equipment will be needed. All existing material or equipment to be reinstalled in building(s) shall be carefully removed, stored, and maintained by Contractor.
NOTE: The Contractor must include in its offer, the labor required for removal and reinstallation, or installation of GFM.
ITEM DESCRIPTION QUANTITY UNIT
Fire Extinguishers Fire Extinguishers 8 Unit
3 EQUIPMENT, CONTROLS, AND MATERIAL OF THE UNITED STATES OF AMERICA
3.1 Equipment List
The following listed equipment, controls, and materials shall be manufactured in the United States of America or in another country where the supplier is under license of the United States of America manufacturer and the product meets the same applicable specifications and/or standards. No substitutions will be allowed.
a) Drinking fountain.
b) Fire protection equipment.
c) Safety switches.
d) Electrical conduits, boxes and accessories.
e) Receptacles, plugs and lighting switches/dimmers.
f) Drivers, emergency drivers.
g) Fire doors.
h) Chiller unit.
SECTION 01 11 02 - 2
3.2 Excess
The Contractor shall submit to Construction Management, prior to final inspection (FI), a consolidated inventory of all excess supplies, materials, and equipment imported duty free for use under this contract. The Contractor shall either pay required duties on the excesses or re-export the excesses.
4 CERTIFICATES
The submitted certificates shall be original or a notarized copy. The Contractor shall submit the certificates within 30 calendar days after the Contract Award Date.
4.1 Classification Certificate of the Contractor
Contractor and/or key subcontractors must hold an updated Certificate of Classification issued by the Spanish “Registro Oficial de Licitadores y Empresas Clasificadas del Estado” of the "Ministerio de Hacienda y Administraciones Públicas" covering the following groups, subgroups, and categories. The certificate holder must execute the activities related to the certificate.
Group Subgroup Category
A 1 2
C 1 2
C 2 2
C 3 2
C 4 2
C 6 2
C 7 2
C 8 2
C 9 2
E 4 2
G 4 2
G 5 2
I 1 2
I 5 2
I 6 2
I 7 2
I 9 2
J 1 2
J 2 2
J 3 2
J 4 2
J 5 2
K 4 2
K 9 2
Certificate of Classification A12 corresponds to work activities related to disassembling and emptying with an annual average cost of greater than 150,000 euros and no greater than 360,000 euros.
Certificate of Classification C12 corresponds to work activities related to demolitions with an annual average cost of greater than 150,000 euros and no greater than 360,000 euros.
SECTION 01 11 02 - 3
Certificate of Classification C22 corresponds to work activities related to bearing walls and concrete structures with an annual average cost of greater than 150,000 euros and no greater than 360,000 euros.
Certificate of Classification C32 corresponds to work activities related to metal structures with an annual average cost of greater than 150,000 euros and no greater than 360,000 euros.
Certificate of Classification C42 corresponds to work activities related to masonry, parenting and finishes with an annual average cost of greater than 150,000 euros and no greater than 360,000 euros.
Certificate of Classification C62 corresponds to work activities related to flooring, floor and wall tiles with an annual average cost of greater than 150,000 euros and no greater than 360,000 euros.
Certificate of Classification C72 corresponds to work activities related to insulation and waterproofing with an annual average cost of greater than 150,000 euros and no greater than 360,000 euros.
Certificate of Classification C82 corresponds to work activities related to wooden carpentry with an annual average cost of greater than 150,000 euros and no greater than 360,000 euros.
Certificate of Classification C92 corresponds to work activities related to metallic carpentry with an annual average cost of greater than 150,000 euros and no greater than 360,000 euros.
Certificate of Classification E42 corresponds to work activities related to ditches and drains with an annual average cost of greater than 150,000 euros and no greater than 360,000 euros.
Certificate of Classification G42 corresponds to work activities related to bituminous mix pavements with an annual average cost of greater than 150,000 euros and no greater than 360,000 euros.
Certificate of Classification G52 corresponds to work activities related to road signs and beacons with an annual average cost of greater than 150,000 euros and no greater than 360,000 euros.
Certificate of Classification I12 corresponds to work activities related to lighting, illumination and illuminated signs with an annual average cost of greater than 150,000 euros and no greater than 360,000 euros.
Certificate of Classification I52 corresponds to work activities related to transformer substations and high voltage distribution with an annual average cost of greater than 150,000 euros and no greater than 360,000 euros.
Certificate of Classification I62 corresponds to work activities related to low voltage distribution with an annual average cost of greater than 150,000 euros and no greater than 360,000 euros.
Certificate of Classification I72 corresponds to work activities related to telecommunications and radio installations with an annual average cost of greater than 150,000 euros and no greater than 360,000 euros.
Certificate of Classification I92 corresponds to work activities related to electrical installation without specific qualification with an annual average cost of greater than 150,000 euros and no greater than 360,000 euros.
Certificate of Classification J12 corresponds to work activities related to elevators or conveyors with an annual average cost of greater than 150,000 euros and no greater than 360,000 euros.
Certificate of Classification J22 corresponds to work activities related to ventilation, heating and air conditions works with an annual average cost of greater than 150,000 euros and no greater than 360,000 euros.
Certificate of Classification J32 corresponds to work activities related to refrigerators with an annual average cost of greater than 150,000 euros and no greater than 360,000 euros.
Certificate of Classification J42 corresponds to work activities related to plumbing and sanitary with an annual average cost of greater than 150,000 euros and no greater than 360,000 euros.
SECTION 01 11 02 - 4
Certificate of Classification J52 corresponds to work activities related to mechanical installations without specific qualification with an annual average cost of greater than 150,000 euros and no greater than 360,000 euros.
Certificate of Classification K42 corresponds to work activities related to paints and metallizations with an annual average cost of greater than 150,000 euros and no greater than 360,000 euros.
Certificate of Classification K92 corresponds to work activities related to fire protection installations with an annual average cost of greater than 150,000 euros and no greater than 360,000 euros.
5 SPECIAL GENERAL REQUIREMENTS
The following special conditions apply:
5.1 Subcontractor: The Contractor could subcontract all the works.
5.2 Reuse of removed, demolished, milled and/or excavated material: The materials removed, demolished, milled and/or excavated during the execution of the project that can be reused are: ground, selected soil, adequate soil, tolerable soil, marginal soil, inadequate soil, graded crushed aggregate, stabilized soil, materials treated with cement (cement-soil and cement-gravel), surface treatment by means of gravel of small size, milled asphalt (cold micro-asphalt and bituminous mixes) and crushed concrete (concrete and lean concrete).
5.2.1 Reuse of removed, demolished, milled and/or excavated material: The materials removed, demolished, milled and/or excavated during the execution of the project that can be reused are: ground, selected soil, adequate soil, tolerable soil, marginal soil, inadequate soil, graded crushed aggregate, stabilized soil, materials treated with cement (cement-soil and cement-gravel), surface treatment by means of gravel of small size, milled asphalt (cold micro-asphalt and bituminous mixes) and crushed concrete (concrete and lean concrete).
The materials removed, demolished, milled and / or excavated during the execution of the project can be reused as long as they meet the project requirements and are previously approved.
If the Contractor does not reuse the removed, demolished, milled and/or excavated material, the Contractor shall transport said material to an authorized dump.
If there is a surplus of the material removed, demolished, milled and/or excavated after its reuse by the Contractor, the Contractor shall transport said material to an authorized dump.
If any workshop of Morón Air Base needs all or part of the material removed, demolished, milled and/or excavated that the Contractor does not reuse or that was surplus after the reuse by the Contractor, the Contractor shall transport the material required by the workshop of the Morón Air Base to the stockpile area designated by the Contracting Office and the rest of the material to the authorized dump.
The representative of the Contracting Office and/or Construction Management shall coordinate with the Chief of Operations and Maintenance of the Base the exact location of the stockpile area of the material required by any shop of Morón air Base.
5.3 Stockpiling area for Contractor material and Contractor offices: The C.O. representative shall coordinate with the base Chief of Operations and Maintenance the exact location for Contractor offices and stockpiling.
5.4 Laboratory: The Contractor shall submit the laboratory certificate within 30 calendar days after the Contract Award Date. All sampling and testing shall be performed by an approved laboratory, independent from the Contractor, that is accredited in accordance with a current UNE-EN 9001:2000 and registered by Junta de Andalucía for the following tests. The laboratory shall be the responsible to perform the entire
SECTION 01 11 02 - 5
quality control of the project, shall be as a consultant and shall provide the technical assistance that can be required.
5.4.1 Building Tests
1. Road Tests (VS)
2. Tests of Structures of Structural Concrete (EH)
3. Tests of Structures of Structural Steel (EA)
4. Tests of Brickwork (EFA)
5. Building Tests (EDIF-OTROS)
5.4.2 Civil Engineering Tests
1. Tests of Soils, Bituminous Pavements and Other Materials (OL-A)
2. Tests of Cementitious Materials, Aggregates, Water, Concrete and Concrete Prefabricated Elements
(OL-B)
3. Tests of Metal Products and Signage (OL-C)
4. Tests of Geotechnical Inspection (OL-D)
5. No Standardized Tests (OL-OTROS)
5.5 Laboratory Tests: Laboratory tests performed more than 6 months before the submission date shall not be accepted.
*** END OF SECTION ***