5A-Schedule of Materials (Eng).xlsx
XLSX spreadsheet 89 KB Posted
- Attached to
- RPR/ADD RADR VEHICLE MX, B121 Federal contract opportunity
- Solicitation number
- FA557525B0008
About this file
The file is a Schedule of Materials for Project QUUG 23-1001, a renovation and maintenance project for a RADR Vehicle Maintenance facility at Moron Air Base in Spain. The comprehensive document details over 450 specific material submittals across multiple construction sections, including requirements for concrete, masonry, steel, roofing, electrical, mechanical, fire protection, and other critical building systems. Submittals range from warranty letters and construction schedules to technical specifications for components like sprinkler systems, air conditioning, lighting fixtures, and crane systems.
The associated federal contract opportunity is a solicitation (FA557625B0008) valued between $1-5 million, specifically restricted to local Spanish contractors authorized to perform government works. Key dates include a pre-proposal conference on 11 July 2025, a question submission deadline of 18 July 2025, and bid submission deadline of 30 July 2025. The project is being executed by the Department of Air Force's United States Air Forces in Europe - Air Forces Africa, with multiple contracting points of contact provided. Notably, the solicitation emphasizes using Spanish materials, labor, and equipment where feasible, and warns that funds are not currently available, with the bid acceptance period extended through 31 December 2025.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| MFR QUUG 23-1001 Questions and Answers.pdf | ||
| Solicitation Amendment FA557525B00080002 SF 30.pdf | ||
| 8. SPECIAL CONDITIONS REV1.pdf | ||
| 9. CONDICIONES ESPECIALES REV1.pdf | ||
| 11. DISTRIBUCIÓN DE AIRE HVAC REV1.pdf | ||
| 5a. Schedule of Materials (Eng) REV1.xlsx | XLSX spreadsheet | |
| 7. ALCANCE DE LOS TRABAJOS Y PLANOS REV1.pdf | ||
| Solicitation Amendment FA557525B00080001 SF 30.pdf | ||
| 4. Cost Estimated Blank REV1.xlsx | XLSX spreadsheet | |
| 6. SCOPE OF WORK AND DRAWINGS REV1.pdf | ||
| 12. Drawing MD601-REV1.pdf | ||
| 5b. Schedule of Materials (Spa) REV1.xlsx | XLSX spreadsheet | |
| 10. HVAC AIR DISTRIBUTION REV1.pdf | ||
| 13. Drawing MH601-REV1.pdf | ||
| 14. Drawing MP601-REV1.pdf | ||
| 4-Cost Estimated Blank QUUG 23-1001.xlsx | XLSX spreadsheet | |
| 5B-Schedule of Materials (Spa).xlsx | XLSX spreadsheet | |
| Solicitation - FA557525B0008.pdf | ||
| 2-Specifications (Eng) QUUG 23-1001.pdf | ||
| 3-Specifications (Spa) QUUG 23-1001.pdf |
Show all 20
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Material Submittals Schedule
| SCHEDULE OF MATERIAL SUBMITTALS | PROJECT NUMBER | |||
| QUUG 23-1001 | EDI RPR/ADD RADR VEHICLE MX, B121 | SOLICITATION / CONTRACT NO. |
| (To be completed by Project Engineer) | (To be completed by Contract Administrator) | ||||||||||||||
| NUMBER OF COPIES REQUIRED | |||||||||||||||
| LINE NUMBER | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | CERTIFICATION OF COMPLIANCE | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S RECOMMENDATION | MANUFACTURER'S WARRANTY | CATALOG DATA | OPERATING INSTRUCTIONS | SCHEDULES, LISTINGS, REPORTS, PLANS | TECHNICAL DATA | TEST REPORTS | FIELD REPORTS | REQUIRED SUBMISSION DATE |
: Enter the due date from the Contractor (MM/DD/YY)
DATE RECEIVED IN CONTRACTING
: Enter the date received from the Contractor. (MM/DD/YY)
DATE TO CIVIL ENGINEERING
: Enter the date submittal was given to CE for review. (MM/DD/YY)
RETURN SUSPENSE DATE
: Enter the date the submittal is due back from CE
(MM/DD/YY)
SUBMITTAL NUMBERS
: Enter the Submittal Number
DATE CONTRACTOR NOTIFIED CONTRACTOR RESUBMITTAL
: Enter Resubmittal Number
FINAL APPROVAL
: Enter the submittal final approval date
(MM/DD/YY)
REMARKS
: Enter any comments pertaining to the submittal
APPROVED
: Enter date the Contractor was notified of submittal approval
(MM/DD/YY)
: Enter Resubmittal Number
DISAPPROVED
: Enter date the Contractor was notified of submittal disapproval
(MM/DD/YY)
: Enter the submittal final approval date
(MM/DD/YY)
: Enter any comments pertaining to the submittal
| SECTION 01 11 01 | |||||||||||||
| 1 | Warranty Letter | 4 | Acceptance +15 | ||||||||||
| 2 | Construction Schedule | CNTP+7 | |||||||||||
| 3 | Progress Schedule | 4 | CNTP+10 | ||||||||||
| 4 | Work Plan | CNTP+7 | |||||||||||
| 5 | Mobility Plan | 4 | CNTP+15 | ||||||||||
| 6 | Project Sign | CNTP+15 | |||||||||||
| 7 | Quality Control Plan | 4 | CNTP+15 | ||||||||||
| 8 | Environmental Protection Plan | 4 | CNTP+15 | ||||||||||
| 9 | DD Form 1354 | 4 | FI+15 | ||||||||||
| 10 | Waste & Construction Debris Management | 4 | Final Inspection | ||||||||||
| 11 | As-Built Drawings | 4 | FI+15 | ||||||||||
| 12 | Spatial Data | 4 | As Built+10 | ||||||||||
| 13 | Key Staff | 4 | DNTP+15 | ||||||||||
| 14 | Health and Safety Plan | 4 | CNTP +15 | ||||||||||
| SECTION 02 41 00 | |||||||||||||
| 15 | Demolition plan | 1 | |||||||||||
| 16 | Manager of waste from demolition and construction | 1 | |||||||||||
| 17 | Authorized dump or treatment and recovery plant; | 1 | |||||||||||
| 18 | Certified technician for Air Conditioning Systems demolition. | 1 | |||||||||||
| 19 | Delivery and disposal certificate of waste from construction and demolition | 1 | |||||||||||
| SECTION 03 30 53 | |||||||||||||
| 20 | Laboratory Qualifications for Concrete Qualification Testing | 1 | |||||||||||
| 21 | Laboratory Accreditation | 1 | |||||||||||
| 22 | Dry-shake hardener | 1 | 1 | ||||||||||
| 23 | Reinforcement | 1 | |||||||||||
| 24 | Expansion Joint Filler Strips, Premolded | 1 | |||||||||||
| 25 | Waterproofing materials | 1 | |||||||||||
| 26 | Epoxy resin for construction joints (bonding bridge), if used | 1 | |||||||||||
| 27 | Cementitious mortar | 1 | |||||||||||
| 28 | Curing compound, if used | 1 | |||||||||||
| 29 | Concrete Mix Design | 1 | 1 | ||||||||||
| 30 | Quality Control Program | 1 | |||||||||||
| 31 | Compressive Strength Tests | 1 | |||||||||||
| SECTION 03 45 00 | |||||||||||||
| 32 | Laboratory Qualifications for Concrete Qualification Testing | 1 | |||||||||||
| 33 | Laboratory Accreditation | 1 | |||||||||||
| 34 | Precast Drawings | 1 | |||||||||||
| 35 | Cast-In Embedded Items And Connectors | 1 | |||||||||||
| 36 | Connection Devices | 1 | |||||||||||
| 37 | Gasket | 1 | |||||||||||
| 38 | Bearing Pads, if used | 1 | |||||||||||
| 39 | Design Calculations | 1 | |||||||||||
| 40 | Contractor-Furnished Mix Design | 1 | |||||||||||
| 41 | Concrete Mix Design for Repair of Surface Defects | 1 | |||||||||||
| 42 | Strength Tests | 1 | |||||||||||
| 43 | Slump | 1 | |||||||||||
| 44 | Air Content | 1 | |||||||||||
| 45 | Test for Concrete Materials | 1 | |||||||||||
| 46 | Water | 1 | |||||||||||
| SECTION 04 20 00 | |||||||||||||
| 47 | Clay or Shale Brick | 1 | |||||||||||
| 48 | Perforated Bricks | 1 | |||||||||||
| 49 | Hollow brick | 1 | |||||||||||
| 50 | Cementitious Mortar | 1 | |||||||||||
| 51 | Gypsum Mortar | 1 | |||||||||||
| 52 | Precast Lintels | 1 | |||||||||||
| 53 | Plaster Reinforcement | 1 | |||||||||||
| SECTION 04 23 00 | |||||||||||||
| 54 | Glass Masonry Units | 1 | 1 | 1 | |||||||||
| 55 | Joint Reinforcement | 1 | |||||||||||
| 56 | Mortar | 1 | |||||||||||
| SECTION 05 12 00 | |||||||||||||
| 57 | Steel | 1 | |||||||||||
| 58 | Bolts, Nuts, and Washers | 1 | |||||||||||
| 59 | Galvanizing | 1 | |||||||||||
| 60 | Welding Procedures and Qualifications | 1 | |||||||||||
| 61 | Welding Electrodes and Rods | 1 | 1 | ||||||||||
| 62 | Certified Welding Inspector | 1 | |||||||||||
| 63 | Fabrication Drawings | 1 | |||||||||||
| 64 | Shop Primer | 1 | |||||||||||
| 65 | Non-Shrink Grout | 1 | |||||||||||
| 66 | Structural Steel | 1 | |||||||||||
| 67 | Class B Coating | 1 | |||||||||||
| 68 | Weld Inspection Reports | 1 | |||||||||||
| 69 | Pre-engineered stell ladder | 1 | 1 | ||||||||||
| 70 | Field Quality Control | 1 | |||||||||||
| SECTION 05 30 00 | |||||||||||||
| 71 | Galvanizing | 1 | |||||||||||
| 72 | Welding Procedures and Qualifications | 1 | |||||||||||
| 73 | Certified Welding Inspector | 1 | |||||||||||
| 74 | Fabrication Drawings | 1 | |||||||||||
| 75 | Deck Units | 1 | |||||||||||
| 76 | Galvanizing Repair Paint | 1 | |||||||||||
| 77 | Mechanical Fasteners, if used | 1 | |||||||||||
| 78 | Welding Equipment | 1 | |||||||||||
| 79 | Welding Electrodes and Rods | 1 | |||||||||||
| 80 | Weld Inspection Reports | 1 | |||||||||||
| 81 | Field Quality Control | 1 | |||||||||||
| SECTION 07 41 13 | |||||||||||||
| 82 | Roofing System | 1 | |||||||||||
| 83 | Roof Panels | 1 | |||||||||||
| 84 | Accessories | 1 | |||||||||||
| 85 | Fasteners | 1 | |||||||||||
| 86 | Gaskets and Sealing Compounds | 1 | |||||||||||
| 87 | Repair Pains, if apply | 1 | |||||||||||
| 88 | Leakage Test Report | 1 | |||||||||||
| SECTION 07 55 00 | |||||||||||||
| 89 | Vapor barrier | 1 | 1 | ||||||||||
| 90 | Lightweight Concrete | 1 | 1 | 1 | |||||||||
| 91 | Protective Fleece Layer | 1 | 1 | 1 | |||||||||
| 92 | Waterproof Membrane | 1 | 1 | 1 | 1 | ||||||||
| 93 | Filtering tile | 1 | 1 | 1 | |||||||||
| 94 | Flashing | 1 | 1 | ||||||||||
| 95 | Chemical Welding Compunds (THF) | 1 | 1 | 1 | |||||||||
| 96 | Mastic | 1 | 1 | 1 | |||||||||
| 97 | Sealant for Expansion Joints | 1 | 1 | 1 | |||||||||
| 98 | Gutters and Downspouts | 1 | 1 | ||||||||||
| 99 | Fall Arresting System | 1 | 1 | ||||||||||
| 100 | Insulation; | 1 | |||||||||||
| SECTION 07 60 00 | |||||||||||||
| 101 | Warranty of finishes | 1 | |||||||||||
| 102 | Exposed Sheet Metal Coverings | 1 | |||||||||||
| 103 | Gutters | 1 | |||||||||||
| 104 | Downspouts | 1 | |||||||||||
| 105 | Expansion Joints | 1 | |||||||||||
| 106 | Splash Pans | 1 | |||||||||||
| 107 | Flashing for Roof Drains | 1 | |||||||||||
| 108 | Base Flashing | 1 | |||||||||||
| 109 | Counterflashing | 1 | |||||||||||
| 110 | Flashing at Roof Penetrations and Equipment Supports | 1 | |||||||||||
| 111 | Reglets | 1 | |||||||||||
| 112 | Scuppers | 1 | |||||||||||
| 113 | Copings | 1 | |||||||||||
| 114 | Drip Edges | 1 | |||||||||||
| 115 | Conductor Heads | 1 | |||||||||||
| 116 | Eave Flashing | 1 | |||||||||||
| SECTION 07 84 00 | |||||||||||||
| 117 | Firestopping Materials | 1 | 1 | ||||||||||
| 118 | Installer Qualifications | 1 | |||||||||||
| 119 | Firestopping System | 1 | |||||||||||
| 120 | Inspection | 1 | |||||||||||
| SECTION 07 92 00 | |||||||||||||
| 121 | Indoor Air Quality for Sealants | 1 | |||||||||||
| 122 | Sealants | 1 | |||||||||||
| 123 | Primers | 1 | |||||||||||
| 124 | Backstops | 1 | |||||||||||
| SECTION 08 11 13 | |||||||||||||
| 125 | Doors | 1 | 1 | ||||||||||
| 126 | Frames | 1 | 1 | ||||||||||
| 127 | Hardware | 1 | 1 | ||||||||||
| SECTION 08 14 00 | |||||||||||||
| 128 | Interior doors | 1 | |||||||||||
| 129 | Door frames | 1 | |||||||||||
| 130 | Door hardware | 1 | |||||||||||
| SECTION 08 34 16 | |||||||||||||
| 131 | Manufacturer's Qualifications | 1 | |||||||||||
| 132 | Installer's Qualifications | 1 | |||||||||||
| 133 | Horizontal Rolling Steel Doors | 1 | 1 | 1 | |||||||||
| 134 | Door Motor | 1 | 1 | ||||||||||
| 135 | Motor Control Panel | 1 | 1 | ||||||||||
| 136 | Wiring diagrams | 1 | |||||||||||
| 137 | Photocell curtain | 1 | |||||||||||
| SECTION 08 51 13 | |||||||||||||
| 138 | Windows; | 1 | 1 | ||||||||||
| 139 | Glass; | 1 | |||||||||||
| 140 | Hardware; | 1 | 1 | ||||||||||
| 141 | Fasteners; | 1 | |||||||||||
| 142 | Window Performance; | 1 | |||||||||||
| 143 | Thermal-Barrier Windows; | 1 | |||||||||||
| 144 | Mullions; | 1 | |||||||||||
| 145 | Window Cleaners' Bolts; | 1 | |||||||||||
| 146 | Screens; | 1 | |||||||||||
| 147 | Accessories; | 1 | |||||||||||
| 148 | Adhesives; | 1 | |||||||||||
| 149 | Submit manufacturer's product data; | 1 | |||||||||||
| 150 | Thermal Performance; | 1 | |||||||||||
| 151 | Electrical motors; | 1 | |||||||||||
| 152 | Transformers; | 1 | |||||||||||
| SECTION 09 22 01 | |||||||||||||
| 153 | Non-load Bearing Wall Framing | 1 | |||||||||||
| 154 | Gypsum Board | 1 | |||||||||||
| 155 | Accessories | 1 | |||||||||||
| SECTION 09 30 10 | |||||||||||||
| 156 | Ceramic wall tile | 1 | |||||||||||
| 157 | Porcelanic gres floor tile | 1 | |||||||||||
| 158 | Terrazzo tile, if required | 1 | |||||||||||
| SECTION 09 51 00 | |||||||||||||
| 159 | Removable suspended ceiling | 1 | |||||||||||
| SECTION 09 90 00 | |||||||||||||
| 160 | Coatings | 1 | 1 | ||||||||||
| 161 | Paints | 1 | 1 | ||||||||||
| 162 | Sealants | 1 | 1 | ||||||||||
| 163 | Solvents | 1 | 1 | ||||||||||
| 164 | Waterproofing | 1 | 1 | ||||||||||
| 165 | Manufacturer’s delivery note | 1 | |||||||||||
| SECTION 10 28 13 | |||||||||||||
| 166 | Mirrors | 1 | |||||||||||
| 167 | Toilet paper dispenser | 1 | |||||||||||
| 168 | Paper towel dispenser | 1 | |||||||||||
| 169 | Shower soap holder | 1 | |||||||||||
| 170 | Lavatory shelf | 1 | |||||||||||
| 171 | Waste receptacles | 1 | |||||||||||
| 172 | Water savings devices | 1 | |||||||||||
| SECTION 10 71 13 | |||||||||||||
| 173 | Retractable awnings | 1 | |||||||||||
| 174 | Awnings Motor | 1 | |||||||||||
| 175 | Wind sensor and control | 1 | |||||||||||
| SECTION 13 48 73 | |||||||||||||
| 176 | Bracing | 1 | 1 | ||||||||||
| 177 | Resilient Vibration Isolation Devices | 1 | |||||||||||
| 178 | Equipment Requirements | 1 | 1 | ||||||||||
| 179 | Anchor Bolts | 1 | |||||||||||
| 180 | Vibration Isolators | 1 | |||||||||||
| 181 | Snubbers | 1 | |||||||||||
| 182 | Design Calculations | 1 | |||||||||||
| SECTION 21 13 13 | |||||||||||||
| 183 | Sprinkler System Designer | 1 | |||||||||||
| 184 | Sprinkler System Installer | 1 | |||||||||||
| 185 | Sprinklers | 1 | 1 | ||||||||||
| 186 | Pipe | 1 | 1 | ||||||||||
| 187 | Fittings | 1 | 1 | ||||||||||
| 188 | Verification of Compliant Installation | 1 | |||||||||||
| 189 | Fire Suppression System | 1 | |||||||||||
| 190 | Valves | 1 | 1 | ||||||||||
| 191 | Alarm Initiating and Supervisory Devices; | 1 | 1 | ||||||||||
| 192 | Pipe Hangers and Supports | 1 | |||||||||||
| 193 | Air Vent | 1 | |||||||||||
| 194 | Seismic Bracing | 1 | |||||||||||
| 195 | Nameplates | 1 | |||||||||||
| 196 | Hydraulic Calculations | 1 | |||||||||||
| 197 | Hangers and Supports Calculations | 1 | |||||||||||
| 198 | Seismic Bracing Calculations | 1 | |||||||||||
| 199 | Testing | 1 | |||||||||||
| SECTION 22 00 00 | |||||||||||||
| 200 | Air compressor piping and fittings; | 1 | |||||||||||
| 201 | Oil supply and storage system; | 1 | |||||||||||
| 202 | Pipe: Above Ground Water Supply | 1 | |||||||||||
| 203 | Pipe: Underground Water Supply | 1 | |||||||||||
| 204 | Pipe: Sanitary Drainage | 1 | |||||||||||
| 205 | Wash Basins | 1 | |||||||||||
| 206 | Water Closets | 1 | |||||||||||
| 207 | Wall Mounted Urinals | 1 | |||||||||||
| 208 | Showers | 1 | |||||||||||
| 209 | Drinking-Water Coolers / Bottle Filling Station Combination | 1 | |||||||||||
| 210 | Air Compressor | 1 | |||||||||||
| 211 | Air compressor piping and fittings; | 1 | |||||||||||
| 212 | Air dryer | 1 | |||||||||||
| 213 | Hose Reels; | 1 | |||||||||||
| 214 | Store oil tank; | 1 | |||||||||||
| 215 | Spillage decking; | 1 | |||||||||||
| 216 | Pneumatic oil pump; | 1 | |||||||||||
| 217 | Hose reel stand; | 1 | |||||||||||
| 218 | Arm hose reel; | 1 | |||||||||||
| 219 | Control valve; | 1 | |||||||||||
| 220 | Wall mount drip pocket; | 1 | |||||||||||
| 221 | Fluid management control system components; | 1 | |||||||||||
| 222 | Piping oil; | 1 | |||||||||||
| 223 | Pit Rolling Drainer; | 1 | |||||||||||
| 224 | Pneumatic Diaphragm Pump System; | 1 | |||||||||||
| 225 | Emergency Eyewash and Shower; | 1 | |||||||||||
| 226 | Tests | 1 | |||||||||||
| SECTION 22 05 48.00 20 | |||||||||||||
| 227 | Isolators | 1 | 1 | ||||||||||
| SECTION 23 05 48.19 | |||||||||||||
| 228 | Flexible Couplings or Joints | 1 | 1 | 1 | |||||||||
| 229 | Coupling And Bracing; | 1 | 1 | 1 | |||||||||
| SECTION 23 05 93 | |||||||||||||
| 230 | TAB Agency and Personnel Qualifications; | 1 | |||||||||||
| 231 | Instrument Calibration Certificates; | 1 | |||||||||||
| 232 | TAB Schematic Drawings; | 1 | |||||||||||
| 233 | TAB Work Execution Schedule; | 1 | |||||||||||
| 234 | TAB Procedures Summary; | 1 | |||||||||||
| 235 | Design Review Report; | 1 | |||||||||||
| 236 | TAB Reports; | 1 | |||||||||||
| SECTION 23 07 00 | |||||||||||||
| 237 | Environmental Product Declaration; | 1 | |||||||||||
| 238 | Pipe Insulation Systems; | 1 | 1 | ||||||||||
| 239 | Duct Insulation Systems; | 1 | 1 | ||||||||||
| SECTION 23 30 00 | |||||||||||||
| 240 | Detail Drawings | 1 | |||||||||||
| 241 | Metal Ductwork | 1 | |||||||||||
| 242 | Flexible Duct | 1 | |||||||||||
| 243 | General Service Flexible Duct Connectors | 1 | |||||||||||
| 244 | Duct Access Doors | 1 | |||||||||||
| 245 | Manual Balancing Dampers | 1 | |||||||||||
| 246 | Constant Flow Control Damper | 1 | 1 | ||||||||||
| 247 | Supply Diffusers | 1 | |||||||||||
| 248 | Return Registers | 1 | |||||||||||
| 249 | Outside Air Louvers | 1 | |||||||||||
| 250 | In-Line Fans | 1 | 1 | ||||||||||
| 251 | Centrifugal Cabinet Fans | 1 | 1 | ||||||||||
| 252 | Single Inlet Centrifugal Fan | 1 | 1 | ||||||||||
| 253 | Thermostat | 1 | 1 | ||||||||||
| 254 | Time Clocks | 1 | 1 | ||||||||||
| 255 | Operation and Maintenance Manuals | 1 | |||||||||||
| 256 | Ductwork Leak Test | 1 | |||||||||||
| SECTION 23 57 10.00 10 | |||||||||||||
| 257 | Pipes | 1 | |||||||||||
| 258 | Fittings | 1 | |||||||||||
| 259 | System Equipment and Accessories | 1 | |||||||||||
| 260 | Valves | 1 | |||||||||||
| 261 | Radiators | 1 | |||||||||||
| 262 | Operation and Maintenance Manuals | 1 | |||||||||||
| 263 | Testing and Cleaning | 1 | |||||||||||
| SECTION 23 81 00 | |||||||||||||
| 264 | Split-System Air Conditioners | 1 | 1 | ||||||||||
| 265 | Pipe, Fittings and End Connections | 1 | |||||||||||
| 266 | Operation and Maintenance Manuals | 1 | |||||||||||
| SECTION 26 11 16 | |||||||||||||
| 267 | Transformer Losses Report | 1 | |||||||||||
| 268 | Contractor’s or sub-contractor’s certification for installation of High Voltage electrical installations | 1 | |||||||||||
| 269 | Contractor or sub-contractor individual’s personal license for installation of High Voltage electrical installations | 1 | |||||||||||
| 270 | HV Switchgear | 1 | 1 | ||||||||||
| 271 | Transformer | 1 | |||||||||||
| 272 | Manufacturer’s Instructions for installation and start-up and testing procedures | 1 | |||||||||||
| 273 | Protective Device Coordination Study for Interconnection Point Relay Settings | 1 | |||||||||||
| 274 | Protective Device Settings | 1 | |||||||||||
| 275 | Transformer Routine Test | 1 | |||||||||||
| 276 | Switchgear Routine Tests | 1 | |||||||||||
| 277 | Field Quality Control | 1 | |||||||||||
| SECTION 26 20 00 | |||||||||||||
| 278 | Panelboards | 1 | 1 | 1 | |||||||||
| 279 | Conduits and Fittings | 1 | |||||||||||
| 280 | Cable Trays | 1 | |||||||||||
| 281 | Transfer Switch | 1 | |||||||||||
| 282 | Outlet Boxes and Covers | 1 | |||||||||||
| 283 | Wires and Cables | 1 | |||||||||||
| 284 | Circuit Breakers | 1 | |||||||||||
| 285 | Network Analyzer | 1 | |||||||||||
| 286 | Receptacles | 1 | |||||||||||
| 287 | Toggle Switches | 1 | |||||||||||
| 288 | Safety Switches | 1 | |||||||||||
| 289 | Manual Transfer Switch | 1 | |||||||||||
| 290 | Ground Bus | 1 | |||||||||||
| 291 | Cable Tags | 1 | |||||||||||
| 292 | Transformer | 1 | |||||||||||
| 293 | Single line diagram of the “as-built” building electrical system | 1 | |||||||||||
| 294 | Schematic diagram of electrical control system | 1 | |||||||||||
| 295 | Manufacturers’ operating and maintenance on active electrical equipment | 1 | |||||||||||
| 296 | Devices Subject to Manual Operation | 1 | |||||||||||
| 297 | Resistance to Ground Test | 1 | |||||||||||
| 298 | Wiring Test | 1 | |||||||||||
| 299 | Acceptance Checks and Tests | 1 | |||||||||||
| 300 | Field Quality Control | 1 | |||||||||||
| SECTION 26 41 00 | |||||||||||||
| 301 | Air terminals | 1 | |||||||||||
| 302 | Conductors | 1 | |||||||||||
| 303 | Lightning strike counter | 1 | |||||||||||
| 304 | Field Quality Control | 1 | |||||||||||
| SECTION 26 51 00 | |||||||||||||
| 305 | Lighting Fixture Type L1 | 1 | 1 | 1 | |||||||||
| 306 | Lighting Fixture Type L2 | 1 | 1 | 1 | |||||||||
| 307 | Lighting Fixture Type L3 | 1 | 1 | 1 | |||||||||
| 308 | Lighting Fixture Type L4 | 1 | 1 | 1 | |||||||||
| 309 | Lighting Fixture Type L5 | 1 | 1 | 1 | |||||||||
| 310 | Lighting Fixture Type L6 | 1 | 1 | 1 | |||||||||
| 311 | Spares Luminaires Delivery | 1 | |||||||||||
| 312 | Light Occupancy Sensor | 1 | 1 | ||||||||||
| 313 | Photocell Switch | 1 | 1 | ||||||||||
| 314 | Photometric Plan | 1 | |||||||||||
| SECTION 28 31 70 | |||||||||||||
| 315 | Verification of Compliant Installation | 1 | |||||||||||
| 316 | Wiring Diagrams | 1 | |||||||||||
| 317 | System Layout | 1 | |||||||||||
| 318 | Notification Appliances | 1 | |||||||||||
| 319 | Initiating devices | 1 | |||||||||||
| 320 | Battery Power Calculations | 1 | |||||||||||
| 321 | Voltage Drop Calculations | 1 | |||||||||||
| 322 | Fire Alarm Control Unit (FACU) | 1 | 1 | ||||||||||
| 323 | Manual Stations | 1 | 1 | ||||||||||
| 324 | Detectors | 1 | 1 | ||||||||||
| 325 | Notification Appliances | 1 | 1 | ||||||||||
| 326 | Batteries | 1 | 1 | ||||||||||
| 327 | Battery Chargers | 1 | 1 | ||||||||||
| 328 | Surge Protective Devices | 1 | 1 | ||||||||||
| 329 | Interface Addressable Module (IAM) | 1 | 1 | ||||||||||
| 330 | Alarm Wiring | 1 | |||||||||||
| 331 | Back Boxes and Conduit | 1 | |||||||||||
| 332 | Operation and Maintenance (O&M) Instructions | 1 | |||||||||||
| 333 | Instruction of Government Employees | 1 | |||||||||||
| 334 | Battery Power Calculations | 1 | |||||||||||
| 335 | Voltage Drop Calculations | 1 | |||||||||||
| 336 | Testing | 1 | |||||||||||
| SECTION 31 00 00 | |||||||||||||
| 337 | Structural Fill | 1 | |||||||||||
| 338 | Common Fill | 1 | |||||||||||
| 339 | Excavation and Trenching Plan | 1 | |||||||||||
| 340 | Compaction Density Tests | 1 | |||||||||||
| SECTION 32 03 30 | |||||||||||||
| 340 | Selected soil acceptance control (embankment core) | 1 | 1 | 1 | 1 | ||||||||
| SECTION 32 04 22 | |||||||||||||
| 341 | Geotextile | 1 | 1 | ||||||||||
| SECTION 32 05 30 | |||||||||||||
| 342 | Prime coat origin control | 1 | |||||||||||
| 343 | Coverage aggregate origin control | 1 | |||||||||||
| 344 | Qualifications | 1 | |||||||||||
| 345 | Prime coat application rate to be applied | 1 | |||||||||||
| 346 | Coverage aggregate application rate to be placed | 1 | |||||||||||
| 347 | Existing surface | 1 | |||||||||||
| 348 | Execution control | 1 | |||||||||||
| SECTION 32 05 31 | |||||||||||||
| 349 | Tack coat origin control | 1 | |||||||||||
| 350 | Coverage aggregate origin control | 1 | |||||||||||
| 351 | Qualifications | 1 | |||||||||||
| 352 | Tack coat application rate to be applied | 1 | |||||||||||
| 353 | Coverage aggregate application rate to be placed | 1 | |||||||||||
| 354 | Existing surface | 1 | |||||||||||
| 355 | Execution control | 1 | |||||||||||
| SECTION 32 05 32 | |||||||||||||
| 356 | Curing coat origin control | 1 | |||||||||||
| 357 | Coverage aggregate origin control | 1 | |||||||||||
| 358 | Qualifications | 1 | |||||||||||
| 359 | Curing coat application rate to be applied | 1 | |||||||||||
| 360 | Coverage aggregate application rate to be placed | 1 | |||||||||||
| 361 | Existing surface | 1 | |||||||||||
| 362 | Execution control | 1 | |||||||||||
| SECTION 32 05 42 | |||||||||||||
| 363 | Bitumen origin control: | 1 | |||||||||||
| 364 | Aggregates origin control: | 1 | |||||||||||
| 365 | Filler origin control: | 1 | |||||||||||
| 366 | Job mix formula: | 1 | |||||||||||
| 367 | Production plant: | 1 | |||||||||||
| 368 | Paving plan: | 1 | |||||||||||
| 369 | Placement and compaction control: | 1 | |||||||||||
| 370 | Acceptance control: | 1 | |||||||||||
| SECTION 32 11 23 | |||||||||||||
| 371 | Aggregates origin control: | 1 | |||||||||||
| 372 | Job mix formula: | 1 | |||||||||||
| 373 | Aggregates plan: | 1 | |||||||||||
| 374 | Aggregates: | 1 | |||||||||||
| SECTION 32 11 33.13 | |||||||||||||
| 375 | Cement origin control: | 1 | |||||||||||
| 376 | Soil origin control: | 1 | |||||||||||
| 377 | Job Mix Formula: | 1 | |||||||||||
| 378 | Cement-Stabilized Base Course plan: | 1 | |||||||||||
| 379 | Test section: | 1 | |||||||||||
| 380 | Execution control: | 1 | |||||||||||
| 381 | Acceptance control: | 1 | |||||||||||
| SECTION 32 17 23 | |||||||||||||
| 382 | CE certification of the painting. | 1 | |||||||||||
| 383 | CE certification of the glass microspheres | 1 | |||||||||||
| 384 | Qualifications. | 1 | |||||||||||
| 385 | Signing system | 1 | |||||||||||
| SECTION 32 31 13 | |||||||||||||
| 386 | Fence Fabric; | 1 | |||||||||||
| 387 | Barbed Wire; | 1 | |||||||||||
| 388 | Barbed Wire Supporting Arms; | 1 | |||||||||||
| 389 | Ground Rods; | 1 | |||||||||||
| 390 | Ground Wires; | 1 | |||||||||||
| 391 | Exothermic Welding; | 1 | |||||||||||
| 392 | Acceptance Checks and Tests | 1 | |||||||||||
| SECTION 33 30 00 | |||||||||||||
| 393 | Manholes | 1 | 1 | ||||||||||
| 394 | Frames and Covers | 1 | 1 | ||||||||||
| 395 | Gravity Pipe anf Fittings | 1 | 1 | ||||||||||
| 396 | Plan and topographic profile | 1 | |||||||||||
| 397 | Tests | 1 | |||||||||||
| SECTION 33 71 02 | |||||||||||||
| 398 | Handholes | 1 | 1 | 1 | |||||||||
| 399 | Handhole covers | 1 | 1 | 1 | |||||||||
| 400 | Low voltage distribution conduits and fittings | 1 | |||||||||||
| 401 | Underground low voltage cables | 1 | |||||||||||
| 402 | Buried Warning and Identification Tape | 1 | |||||||||||
| 403 | Grounding Test/Bar Wells | 1 | |||||||||||
| 404 | Grounding bars | 1 | |||||||||||
| 405 | Ground rods | 1 | |||||||||||
| 406 | Ground wires | 1 | |||||||||||
| 407 | Exothermic welding | 1 | 1 | ||||||||||
| 408 | Acceptance Checks and Tests | 1 | |||||||||||
| SECTION 41 22 13.15 | |||||||||||||
| 409 | Wire Rope | 1 | |||||||||||
| 410 | Crane Runway | 1 | |||||||||||
| 411 | Loss of Power Test | 1 | |||||||||||
| 412 | Overload Test | 1 | |||||||||||
| 413 | Brake Adjustment Record | 1 | |||||||||||
| 414 | Software and Services | 1 | |||||||||||
| 415 | Overhead Electric Crane System | 1 | |||||||||||
| 416 | Complete Schematic Wiring Diagram | 1 | |||||||||||
| 417 | Control System and Network Drawings | 1 | |||||||||||
| 418 | Hoist Brakes | 1 | |||||||||||
| 419 | Travel Brakes | 1 | |||||||||||
| 420 | Load Block and Hook | 1 | |||||||||||
| 421 | Hoist and Trolley Units | 1 | |||||||||||
| 422 | Hoisting Rope | 1 | |||||||||||
| 423 | Hoisting Chain | 1 | |||||||||||
| 424 | Insulated Lifting Link | 1 | |||||||||||
| 425 | Travel Reducer | 1 | |||||||||||
| 426 | Wheels | 1 | |||||||||||
| 427 | Bridge End Trucks | 1 | |||||||||||
| 428 | Crane Bridge Girder | 1 | |||||||||||
| 429 | End Stops | 1 | |||||||||||
| 430 | Bumpers | 1 | |||||||||||
| 431 | Crane Runway System | 1 | |||||||||||
| 432 | Motors | 1 | |||||||||||
| 433 | Enclosures | 1 | |||||||||||
| 434 | Circuit Breakers | 1 | |||||||||||
| 435 | Disconnect Switch | 1 | |||||||||||
| 436 | Contactors and Relays | 1 | |||||||||||
| 437 | Fuses | 1 | |||||||||||
| 438 | Variable Frequency Drives | 1 | |||||||||||
| 439 | Control System | 1 | |||||||||||
| 440 | Crane Controllers | 1 | |||||||||||
| 441 | Warning Devices | 1 | |||||||||||
| 442 | Runway Conductor System | 1 | |||||||||||
| 443 | Bridge Conductor System | 1 | |||||||||||
| 444 | Overload Protection | 1 | |||||||||||
| 445 | Painting System | 1 | |||||||||||
| 446 | Control System and Network | 1 | |||||||||||
| 447 | Operation and Maintenance Manuals | 1 | |||||||||||
| 448 | Load and Sizing Calculations | 1 | |||||||||||
| 449 | Post-Erection Inspection | 1 | |||||||||||
| 450 | Operational Tests | 1 | |||||||||||
| 451 | Hook Tram Measurement | 1 | |||||||||||
| 452 | Load Tests | 1 | |||||||||||
| SECTION 46 25 14 | |||||||||||||
| 453 | Separator | 1 | 1 | 1 | |||||||||
| 454 | Alarm system | 1 | |||||||||||
| 455 | In-Service Tests | 1 |