5A-Schedule of Materials (Eng).xlsx

XLSX spreadsheet 89 KB Posted

Attached to
RPR/ADD RADR VEHICLE MX, B121 Federal contract opportunity
Solicitation number
FA557525B0008
Issued by
Department of the Air Force United States Air Forces in Europe - Air Forces Africa

About this file

The file is a Schedule of Materials for Project QUUG 23-1001, a renovation and maintenance project for a RADR Vehicle Maintenance facility at Moron Air Base in Spain. The comprehensive document details over 450 specific material submittals across multiple construction sections, including requirements for concrete, masonry, steel, roofing, electrical, mechanical, fire protection, and other critical building systems. Submittals range from warranty letters and construction schedules to technical specifications for components like sprinkler systems, air conditioning, lighting fixtures, and crane systems.

The associated federal contract opportunity is a solicitation (FA557625B0008) valued between $1-5 million, specifically restricted to local Spanish contractors authorized to perform government works. Key dates include a pre-proposal conference on 11 July 2025, a question submission deadline of 18 July 2025, and bid submission deadline of 30 July 2025. The project is being executed by the Department of Air Force's United States Air Forces in Europe - Air Forces Africa, with multiple contracting points of contact provided. Notably, the solicitation emphasizes using Spanish materials, labor, and equipment where feasible, and warns that funds are not currently available, with the bid acceptance period extended through 31 December 2025.

View the file

Other files for this federal contract opportunity

Other files attached to RPR/ADD RADR VEHICLE MX, B121, newest first.
File Type Posted
MFR QUUG 23-1001 Questions and Answers.pdf PDF
Solicitation Amendment FA557525B00080002 SF 30.pdf PDF
8. SPECIAL CONDITIONS REV1.pdf PDF
9. CONDICIONES ESPECIALES REV1.pdf PDF
11. DISTRIBUCIÓN DE AIRE HVAC REV1.pdf PDF
5a. Schedule of Materials (Eng) REV1.xlsx XLSX spreadsheet
7. ALCANCE DE LOS TRABAJOS Y PLANOS REV1.pdf PDF
Solicitation Amendment FA557525B00080001 SF 30.pdf PDF
4. Cost Estimated Blank REV1.xlsx XLSX spreadsheet
6. SCOPE OF WORK AND DRAWINGS REV1.pdf PDF
12. Drawing MD601-REV1.pdf PDF
5b. Schedule of Materials (Spa) REV1.xlsx XLSX spreadsheet
10. HVAC AIR DISTRIBUTION REV1.pdf PDF
13. Drawing MH601-REV1.pdf PDF
14. Drawing MP601-REV1.pdf PDF
4-Cost Estimated Blank QUUG 23-1001.xlsx XLSX spreadsheet
5B-Schedule of Materials (Spa).xlsx XLSX spreadsheet
Solicitation - FA557525B0008.pdf PDF
2-Specifications (Eng) QUUG 23-1001.pdf PDF
3-Specifications (Spa) QUUG 23-1001.pdf PDF
Show all 20

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Material Submittals Schedule

SCHEDULE OF MATERIAL SUBMITTALSPROJECT NUMBER
QUUG 23-1001EDI RPR/ADD RADR VEHICLE MX, B121SOLICITATION / CONTRACT NO.
(To be completed by Project Engineer)(To be completed by Contract Administrator)
NUMBER OF COPIES REQUIRED
LINE NUMBERITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTALCERTIFICATION OF COMPLIANCESHOP DRAWINGSSAMPLESCOLOR SELECTIONMANUFACTURER'S RECOMMENDATIONMANUFACTURER'S WARRANTYCATALOG DATAOPERATING INSTRUCTIONSSCHEDULES, LISTINGS, REPORTS, PLANSTECHNICAL DATATEST REPORTSFIELD REPORTSREQUIRED SUBMISSION DATE

: Enter the due date from the Contractor (MM/DD/YY)

DATE RECEIVED IN CONTRACTING

: Enter the date received from the Contractor. (MM/DD/YY)

DATE TO CIVIL ENGINEERING

: Enter the date submittal was given to CE for review. (MM/DD/YY)

RETURN SUSPENSE DATE

: Enter the date the submittal is due back from CE

(MM/DD/YY)

SUBMITTAL NUMBERS

: Enter the Submittal Number

DATE CONTRACTOR NOTIFIED CONTRACTOR RESUBMITTAL

: Enter Resubmittal Number

FINAL APPROVAL

: Enter the submittal final approval date

(MM/DD/YY)

REMARKS

: Enter any comments pertaining to the submittal

APPROVED

: Enter date the Contractor was notified of submittal approval

(MM/DD/YY)

: Enter Resubmittal Number

DISAPPROVED

: Enter date the Contractor was notified of submittal disapproval

(MM/DD/YY)

: Enter the submittal final approval date

(MM/DD/YY)

: Enter any comments pertaining to the submittal

SECTION 01 11 01
1Warranty Letter4Acceptance +15
2Construction ScheduleCNTP+7
3Progress Schedule4CNTP+10
4Work PlanCNTP+7
5Mobility Plan4CNTP+15
6Project SignCNTP+15
7Quality Control Plan4CNTP+15
8Environmental Protection Plan4CNTP+15
9DD Form 13544FI+15
10Waste & Construction Debris Management4Final Inspection
11As-Built Drawings4FI+15
12Spatial Data4As Built+10
13Key Staff4DNTP+15
14Health and Safety Plan4CNTP +15
SECTION 02 41 00
15Demolition plan1
16Manager of waste from demolition and construction1
17Authorized dump or treatment and recovery plant;1
18Certified technician for Air Conditioning Systems demolition.1
19Delivery and disposal certificate of waste from construction and demolition1
SECTION 03 30 53
20Laboratory Qualifications for Concrete Qualification Testing1
21Laboratory Accreditation1
22Dry-shake hardener11
23Reinforcement1
24Expansion Joint Filler Strips, Premolded1
25Waterproofing materials1
26Epoxy resin for construction joints (bonding bridge), if used1
27Cementitious mortar1
28Curing compound, if used1
29Concrete Mix Design11
30Quality Control Program1
31Compressive Strength Tests1
SECTION 03 45 00
32Laboratory Qualifications for Concrete Qualification Testing1
33Laboratory Accreditation1
34Precast Drawings1
35Cast-In Embedded Items And Connectors1
36Connection Devices1
37Gasket1
38Bearing Pads, if used1
39Design Calculations1
40Contractor-Furnished Mix Design1
41Concrete Mix Design for Repair of Surface Defects1
42Strength Tests1
43Slump1
44Air Content1
45Test for Concrete Materials1
46Water1
SECTION 04 20 00
47Clay or Shale Brick1
48Perforated Bricks1
49Hollow brick1
50Cementitious Mortar1
51Gypsum Mortar1
52Precast Lintels1
53Plaster Reinforcement1
SECTION 04 23 00
54Glass Masonry Units111
55Joint Reinforcement1
56Mortar1
SECTION 05 12 00
57Steel1
58Bolts, Nuts, and Washers1
59Galvanizing1
60Welding Procedures and Qualifications1
61Welding Electrodes and Rods11
62Certified Welding Inspector1
63Fabrication Drawings1
64Shop Primer1
65Non-Shrink Grout1
66Structural Steel1
67Class B Coating1
68Weld Inspection Reports1
69Pre-engineered stell ladder11
70Field Quality Control1
SECTION 05 30 00
71Galvanizing1
72Welding Procedures and Qualifications1
73Certified Welding Inspector1
74Fabrication Drawings1
75Deck Units1
76Galvanizing Repair Paint1
77Mechanical Fasteners, if used1
78Welding Equipment1
79Welding Electrodes and Rods1
80Weld Inspection Reports1
81Field Quality Control1
SECTION 07 41 13
82Roofing System1
83Roof Panels1
84Accessories1
85Fasteners1
86Gaskets and Sealing Compounds1
87Repair Pains, if apply1
88Leakage Test Report1
SECTION 07 55 00
89Vapor barrier11
90Lightweight Concrete111
91Protective Fleece Layer111
92Waterproof Membrane1111
93Filtering tile111
94Flashing11
95Chemical Welding Compunds (THF)111
96Mastic111
97Sealant for Expansion Joints111
98Gutters and Downspouts11
99Fall Arresting System11
100Insulation;1
SECTION 07 60 00
101Warranty of finishes1
102Exposed Sheet Metal Coverings1
103Gutters1
104Downspouts1
105Expansion Joints1
106Splash Pans1
107Flashing for Roof Drains1
108Base Flashing1
109Counterflashing1
110Flashing at Roof Penetrations and Equipment Supports1
111Reglets1
112Scuppers1
113Copings1
114Drip Edges1
115Conductor Heads1
116Eave Flashing1
SECTION 07 84 00
117Firestopping Materials11
118Installer Qualifications1
119Firestopping System1
120Inspection1
SECTION 07 92 00
121Indoor Air Quality for Sealants1
122Sealants1
123Primers1
124Backstops1
SECTION 08 11 13
125Doors11
126Frames11
127Hardware11
SECTION 08 14 00
128Interior doors1
129Door frames1
130Door hardware1
SECTION 08 34 16
131Manufacturer's Qualifications1
132Installer's Qualifications1
133Horizontal Rolling Steel Doors111
134Door Motor11
135Motor Control Panel11
136Wiring diagrams1
137Photocell curtain1
SECTION 08 51 13
138Windows;11
139Glass;1
140Hardware;11
141Fasteners;1
142Window Performance;1
143Thermal-Barrier Windows;1
144Mullions;1
145Window Cleaners' Bolts;1
146Screens;1
147Accessories;1
148Adhesives;1
149Submit manufacturer's product data;1
150Thermal Performance;1
151Electrical motors;1
152Transformers;1
SECTION 09 22 01
153Non-load Bearing Wall Framing1
154Gypsum Board1
155Accessories1
SECTION 09 30 10
156Ceramic wall tile1
157Porcelanic gres floor tile1
158Terrazzo tile, if required1
SECTION 09 51 00
159Removable suspended ceiling1
SECTION 09 90 00
160Coatings11
161Paints11
162Sealants11
163Solvents11
164Waterproofing11
165Manufacturer’s delivery note1
SECTION 10 28 13
166Mirrors1
167Toilet paper dispenser1
168Paper towel dispenser1
169Shower soap holder1
170Lavatory shelf1
171Waste receptacles1
172Water savings devices1
SECTION 10 71 13
173Retractable awnings1
174Awnings Motor1
175Wind sensor and control1
SECTION 13 48 73
176Bracing11
177Resilient Vibration Isolation Devices1
178Equipment Requirements11
179Anchor Bolts1
180Vibration Isolators1
181Snubbers1
182Design Calculations1
SECTION 21 13 13
183Sprinkler System Designer1
184Sprinkler System Installer1
185Sprinklers11
186Pipe11
187Fittings11
188Verification of Compliant Installation1
189Fire Suppression System1
190Valves11
191Alarm Initiating and Supervisory Devices;11
192Pipe Hangers and Supports1
193Air Vent1
194Seismic Bracing1
195Nameplates1
196Hydraulic Calculations1
197Hangers and Supports Calculations1
198Seismic Bracing Calculations1
199Testing1
SECTION 22 00 00
200Air compressor piping and fittings;1
201Oil supply and storage system;1
202Pipe: Above Ground Water Supply1
203Pipe: Underground Water Supply1
204Pipe: Sanitary Drainage1
205Wash Basins1
206Water Closets1
207Wall Mounted Urinals1
208Showers1
209Drinking-Water Coolers / Bottle Filling Station Combination1
210Air Compressor1
211Air compressor piping and fittings;1
212Air dryer1
213Hose Reels;1
214Store oil tank;1
215Spillage decking;1
216Pneumatic oil pump;1
217Hose reel stand;1
218Arm hose reel;1
219Control valve;1
220Wall mount drip pocket;1
221Fluid management control system components;1
222Piping oil;1
223Pit Rolling Drainer;1
224Pneumatic Diaphragm Pump System;1
225Emergency Eyewash and Shower;1
226Tests1
SECTION 22 05 48.00 20
227Isolators11
SECTION 23 05 48.19
228Flexible Couplings or Joints111
229Coupling And Bracing;111
SECTION 23 05 93
230TAB Agency and Personnel Qualifications;1
231Instrument Calibration Certificates;1
232TAB Schematic Drawings;1
233TAB Work Execution Schedule;1
234TAB Procedures Summary;1
235Design Review Report;1
236TAB Reports;1
SECTION 23 07 00
237Environmental Product Declaration;1
238Pipe Insulation Systems;11
239Duct Insulation Systems;11
SECTION 23 30 00
240Detail Drawings1
241Metal Ductwork1
242Flexible Duct1
243General Service Flexible Duct Connectors1
244Duct Access Doors1
245Manual Balancing Dampers1
246Constant Flow Control Damper11
247Supply Diffusers1
248Return Registers1
249Outside Air Louvers1
250In-Line Fans11
251Centrifugal Cabinet Fans11
252Single Inlet Centrifugal Fan11
253Thermostat11
254Time Clocks11
255Operation and Maintenance Manuals1
256Ductwork Leak Test1
SECTION 23 57 10.00 10
257Pipes1
258Fittings1
259System Equipment and Accessories1
260Valves1
261Radiators1
262Operation and Maintenance Manuals1
263Testing and Cleaning1
SECTION 23 81 00
264Split-System Air Conditioners11
265Pipe, Fittings and End Connections1
266Operation and Maintenance Manuals1
SECTION 26 11 16
267Transformer Losses Report1
268Contractor’s or sub-contractor’s certification for installation of High Voltage electrical installations1
269Contractor or sub-contractor individual’s personal license for installation of High Voltage electrical installations1
270HV Switchgear11
271Transformer1
272Manufacturer’s Instructions for installation and start-up and testing procedures1
273Protective Device Coordination Study for Interconnection Point Relay Settings1
274Protective Device Settings1
275Transformer Routine Test1
276Switchgear Routine Tests1
277Field Quality Control1
SECTION 26 20 00
278Panelboards111
279Conduits and Fittings1
280Cable Trays1
281Transfer Switch1
282Outlet Boxes and Covers1
283Wires and Cables1
284Circuit Breakers1
285Network Analyzer1
286Receptacles1
287Toggle Switches1
288Safety Switches1
289Manual Transfer Switch1
290Ground Bus1
291Cable Tags1
292Transformer1
293Single line diagram of the “as-built” building electrical system1
294Schematic diagram of electrical control system1
295Manufacturers’ operating and maintenance on active electrical equipment1
296Devices Subject to Manual Operation1
297Resistance to Ground Test1
298Wiring Test1
299Acceptance Checks and Tests1
300Field Quality Control1
SECTION 26 41 00
301Air terminals1
302Conductors1
303Lightning strike counter1
304Field Quality Control1
SECTION 26 51 00
305Lighting Fixture Type L1111
306Lighting Fixture Type L2111
307Lighting Fixture Type L3111
308Lighting Fixture Type L4111
309Lighting Fixture Type L5111
310Lighting Fixture Type L6111
311Spares Luminaires Delivery1
312Light Occupancy Sensor11
313Photocell Switch11
314Photometric Plan1
SECTION 28 31 70
315Verification of Compliant Installation1
316Wiring Diagrams1
317System Layout1
318Notification Appliances1
319Initiating devices1
320Battery Power Calculations1
321Voltage Drop Calculations1
322Fire Alarm Control Unit (FACU)11
323Manual Stations11
324Detectors11
325Notification Appliances11
326Batteries11
327Battery Chargers11
328Surge Protective Devices11
329Interface Addressable Module (IAM)11
330Alarm Wiring1
331Back Boxes and Conduit1
332Operation and Maintenance (O&M) Instructions1
333Instruction of Government Employees1
334Battery Power Calculations1
335Voltage Drop Calculations1
336Testing1
SECTION 31 00 00
337Structural Fill1
338Common Fill1
339Excavation and Trenching Plan1
340Compaction Density Tests1
SECTION 32 03 30
340Selected soil acceptance control (embankment core)1111
SECTION 32 04 22
341Geotextile11
SECTION 32 05 30
342Prime coat origin control1
343Coverage aggregate origin control1
344Qualifications1
345Prime coat application rate to be applied1
346Coverage aggregate application rate to be placed1
347Existing surface1
348Execution control1
SECTION 32 05 31
349Tack coat origin control1
350Coverage aggregate origin control1
351Qualifications1
352Tack coat application rate to be applied1
353Coverage aggregate application rate to be placed1
354Existing surface1
355Execution control1
SECTION 32 05 32
356Curing coat origin control1
357Coverage aggregate origin control1
358Qualifications1
359Curing coat application rate to be applied1
360Coverage aggregate application rate to be placed1
361Existing surface1
362Execution control1
SECTION 32 05 42
363Bitumen origin control:1
364Aggregates origin control:1
365Filler origin control:1
366Job mix formula:1
367Production plant:1
368Paving plan:1
369Placement and compaction control:1
370Acceptance control:1
SECTION 32 11 23
371Aggregates origin control:1
372Job mix formula:1
373Aggregates plan:1
374Aggregates:1
SECTION 32 11 33.13
375Cement origin control:1
376Soil origin control:1
377Job Mix Formula:1
378Cement-Stabilized Base Course plan:1
379Test section:1
380Execution control:1
381Acceptance control:1
SECTION 32 17 23
382CE certification of the painting.1
383CE certification of the glass microspheres1
384Qualifications.1
385Signing system1
SECTION 32 31 13
386Fence Fabric;1
387Barbed Wire;1
388Barbed Wire Supporting Arms;1
389Ground Rods;1
390Ground Wires;1
391Exothermic Welding;1
392Acceptance Checks and Tests1
SECTION 33 30 00
393Manholes11
394Frames and Covers11
395Gravity Pipe anf Fittings11
396Plan and topographic profile1
397Tests1
SECTION 33 71 02
398Handholes111
399Handhole covers111
400Low voltage distribution conduits and fittings1
401Underground low voltage cables1
402Buried Warning and Identification Tape1
403Grounding Test/Bar Wells1
404Grounding bars1
405Ground rods1
406Ground wires1
407Exothermic welding11
408Acceptance Checks and Tests1
SECTION 41 22 13.15
409Wire Rope1
410Crane Runway1
411Loss of Power Test1
412Overload Test1
413Brake Adjustment Record1
414Software and Services1
415Overhead Electric Crane System1
416Complete Schematic Wiring Diagram1
417Control System and Network Drawings1
418Hoist Brakes1
419Travel Brakes1
420Load Block and Hook1
421Hoist and Trolley Units1
422Hoisting Rope1
423Hoisting Chain1
424Insulated Lifting Link1
425Travel Reducer1
426Wheels1
427Bridge End Trucks1
428Crane Bridge Girder1
429End Stops1
430Bumpers1
431Crane Runway System1
432Motors1
433Enclosures1
434Circuit Breakers1
435Disconnect Switch1
436Contactors and Relays1
437Fuses1
438Variable Frequency Drives1
439Control System1
440Crane Controllers1
441Warning Devices1
442Runway Conductor System1
443Bridge Conductor System1
444Overload Protection1
445Painting System1
446Control System and Network1
447Operation and Maintenance Manuals1
448Load and Sizing Calculations1
449Post-Erection Inspection1
450Operational Tests1
451Hook Tram Measurement1
452Load Tests1
SECTION 46 25 14
453Separator111
454Alarm system1
455In-Service Tests1

File details come from the government source that posted it. Updated .