This document is a Construction Cost Estimate Breakdown for a project at Moron Air Base, Spain, involving repair and addition of RADR Vehicle Maintenance facilities (Project QUUG 23-1001). The comprehensive estimate covers multiple construction work categories including demolition, civil works, structural works, architectural modifications, fire protection, plumbing, mechanical systems, electrical infrastructure, telecommunications, and equipment installation for two primary scopes: existing building west wing first floor modernization and building expansion for Workshop III.
The project is solicited by the Department of the Air Force United States Air Forces in Europe - Air Forces Africa, with a project magnitude between $1,000,000 and $5,000,000. Key solicitation details include a pre-proposal conference/site visit on 11 July 2025, with questions due by 18 July 2025 and bids required by 30 July 2025 at 10:00 hours local time. The solicitation is specifically intended for local sources in Spain, with requirements that contractors be authorized to carry out government works under Spanish legislation. Notably, the government indicates funds are not currently available, and the bid acceptance period should remain valid through 31 December 2025.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| MFR QUUG 23-1001 Questions and Answers.pdf | ||
| Solicitation Amendment FA557525B00080002 SF 30.pdf | ||
| 5a. Schedule of Materials (Eng) REV1.xlsx | XLSX spreadsheet | |
| 7. ALCANCE DE LOS TRABAJOS Y PLANOS REV1.pdf | ||
| Solicitation Amendment FA557525B00080001 SF 30.pdf | ||
| 5b. Schedule of Materials (Spa) REV1.xlsx | XLSX spreadsheet | |
| 10. HVAC AIR DISTRIBUTION REV1.pdf | ||
| 13. Drawing MH601-REV1.pdf | ||
| 14. Drawing MP601-REV1.pdf | ||
| 4. Cost Estimated Blank REV1.xlsx | XLSX spreadsheet | |
| 6. SCOPE OF WORK AND DRAWINGS REV1.pdf | ||
| 12. Drawing MD601-REV1.pdf | ||
| 8. SPECIAL CONDITIONS REV1.pdf | ||
| 9. CONDICIONES ESPECIALES REV1.pdf | ||
| 11. DISTRIBUCIÓN DE AIRE HVAC REV1.pdf | ||
| Solicitation - FA557525B0008.pdf | ||
| 5A-Schedule of Materials (Eng).xlsx | XLSX spreadsheet | |
| 3-Specifications (Spa) QUUG 23-1001.pdf | ||
| 2-Specifications (Eng) QUUG 23-1001.pdf | ||
| 5B-Schedule of Materials (Spa).xlsx | XLSX spreadsheet |
Show all 20
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SUMMARY
| CONSTRUCTION COST ESTIMATE BREAKDOWN | |||||||
| CONTRACTOR | ADDRESS | ||||||
| MORÓN AIR BASE, SPAIN | |||||||
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | ||||||
| EDI RPR/ADD RADR VEHICLE MX, B121 | SUMMARY | EUROS | 0.00 € | ||||
| US$ DOLLARS | $0.00 | ||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION | |||||
| QUUG 23-1001 | MORÓN AIR BASE, SPAIN | ||||||
| TOTAL EUROS | TOTAL EUROS | TOTAL USD $ | TOTAL USD $ | ||||
| LIN | ITEM | ||||||
| NO. | QUANTI. | UNIT | TOTAL | MH/MD | AV.RAT | TOTAL | |
| (3) | (4) | (5) | (6) | (7) | (8) | ||
| SUMMARY | |||||||
| RESUMEN | |||||||
| 1 | EXISTING BUILDING WEST WING FIRST FLOOR MODERNIZATION | 0.00 € | $0.00 | ||||
| MODERNIZACIÓN DE PLANTA BAJA DE ALA OESTE DE EDIFICIO EXISTENTE | |||||||
| 2 | BUILDING EXPANSION FOR WORKSHOP III | 0.00 € | $0.00 | ||||
| AMPLIACIÓN DE EDIFICIO PARA TALLER III | |||||||
| 3 | PROJECT TOTAL | 0.00 € | $0.00 | ||||
| TOTAL PROYECTO |
FY2025 $1 0.9249 euros
DATE: 7th May 2025 FIRM NAME:
These costs and overhead and profit percentages will be applied in any possible future modifications
&"Times New Roman,Normal"&9 CONSTRUCTION COST ESTIMATE BREAKDOWN &"Times New Roman,Normal"&9&K000000 CONTROLLED UNCLASSIFIED INFORMATION (CUI) &"Times New Roman,Normal"&9Page &P of &N
MODERNIZATION
| CONSTRUCTION COST ESTIMATE BREAKDOWN | incluso carga sobre camión de residuos, transporte y entrega a gestor autorizado de vertidos. | |||||||||
| CONTRACTOR | ADDRESS | |||||||||
| MORÓN AIR BASE, SPAIN | ||||||||||
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | |||||||||
| EDI RPR/ADD RADR VEHICLE MX, B121 | 0.00 € | $0.00 | ||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION | ||||||||
| QUUG 23-1001 | MORÓN AIR BASE, SPAIN | |||||||||
| UNIT | MATERIAL COST | LABOR COSTS | OTHER | |||||||
| LIN | ITEM | OF | DIRECT | LINE | ||||||
| NO. | EXISTING BUILDING WEST WING FIRST FLOOR MODERNIZATION | MEAS. | QUANTI. | UNIT | TOTAL | MH/MD | AV.RAT | TOTAL | COSTS | TOTAL |
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) | |
| Preliminary Works | ||||||||||
| Trabajos Previos | ||||||||||
| 1 | Non affected equipment disassembly, protection and storage. | |||||||||
| Desmontaje de equipamiento no afectado, protección y almacenamiento. | JOB | 0.00 | 0.00 | 0.00 | ||||||
| 2 | Temporary facilities for vehicle maintenance personnel, including shipping, installation, utilities and all required accesories por their proper installation and work. | |||||||||
| Instalaciones temporales para personal de mantenimiento de vehículos, incluso transporte, instalación, servicios públicos y todos los accesorios necesarios para su correcta instalación y funcionamiento. | JOB | 0.00 | 0.00 | 0.00 | ||||||
| Total Preliminary Works | ||||||||||
| Total Trabajos Previos | 0.00 | 0.00 | 0.00 | 0.00 |
| Demolition Works | ||||||
| Trabajos de Demolición | ||||||
| 3 | Interior demolitions, including waste loading on container, container rent, transport to an authorised waste manager and landfill fee. (finishes, partitions, sanitaries, low voltage interior distribution, etc.). | |||||
| Demoliciones interiores, incluso carga de residuos sobre contenedor, alquiler del contenedor, transporte a gestor autorizado de residuos y canon de vertido (acabados, particiones, sanitarios, instalación de distribución interior de BT, etc.). | JOB | 0.00 | 0.00 | 0.00 | ||
| Total Demolition Works | ||||||
| Total Trabajos de Demolición | 0.00 | 0.00 | 0.00 | 0.00 |
| Sanitary Sewer Works | ||||||
| Trabajos de Saneamiento | ||||||
| 4 | Trench excavations, including waste loading on container, container rent, transport to an authorised waste manager and landfill fee. | |||||
| Excavación de zanjas, incluso carga de residuos sobre contenedor, alquiler del contenedor, transporte a gestor autorizado de residuos y canon de vertido. | m3 | 0.00 | 0.00 | 0.00 | ||
| 5 | PVC conduit Ø125 mm, including all required accesories for its proper installation. | |||||
| Colector de PVC Ø125 mm, incluso todos los accesorios necesario para su correcta instalación. | m | 0.00 | 0.00 | 0.00 | ||
| 6 | PVC conduit Ø110 mm, including all required accesories for its proper installation. | |||||
| Colector de PVC Ø110 mm, incluso todos los accesorios necesario para su correcta instalación. | m | 0.00 | 0.00 | 0.00 | ||
| 7 | PVC conduit Ø63 mm, including all required accesories for its proper installation. | |||||
| Colector de PVC Ø63 mm, incluso todos los accesorios necesario para su correcta instalación. | m | 0.00 | 0.00 | 0.00 | ||
| 8 | PVC conduit Ø50 mm, including all required accesories for its proper installation. | |||||
| Colector de PVC Ø50 mm, incluso todos los accesorios necesario para su correcta instalación. | m | 0.00 | 0.00 | 0.00 | ||
| 9 | PVC conduit Ø40 mm, including all required accesories for its proper installation. | |||||
| Colector de PVC Ø40 mm, incluso todos los accesorios necesario para su correcta instalación. | m | 0.00 | 0.00 | 0.00 | ||
| 10 | PVC conduit Ø32 mm, including all required accesories for its proper installation. | |||||
| Colector de PVC Ø32 mm, incluso todos los accesorios necesario para su correcta instalación. | m | 0.00 | 0.00 | 0.00 | ||
| 11 | Sanitary Sewer, including all required accesories for its proper installation. | |||||
| Pozo de registro, incluso todos los accesorios necesario para su correcta instalación. | ea | 0.00 | 0.00 | 0.00 | ||
| 12 | Concrete slab reconstruction, including all required accesories for its proper installation. | |||||
| Reconstrucción de solera de hormigón, incluso todos los accesorios necesario para su correcta instalación. | m2 | 0.00 | 0.00 | 0.00 | ||
| Total Sanitary Sewer Works | ||||||
| Total Trabajos de Saneamiento | 0.00 | 0.00 | 0.00 | 0.00 |
| Architectural Works and coatings | ||||||
| Trabajos de Arquitectura y revestimientos | ||||||
| 13 | Gypsum drywall partitions and cladding, including insulation, joints, sealings, accesories and all required items necessary to ensure the success of the complete installation, waste loading on container, container rent, transport to an authorised waste manager and landfill fee. | |||||
| Particiones y trasdosado de yeso laminado, incluso aislamiento, juntas, sellados, accesorios y todos los elementos necesarios para garantizar el éxito de la instalación completa, carga de residuos en contenedor, alquiler de contenedor, transporte a un gestor de residuos autorizado y canon de vertido. | m2 | 0.00 | 0.00 | 0.00 | ||
| 14 | Partitions and doors in 13 mm HPL phenolic laminate with stainless steel hardware, including all required accesories for its proper installation. | |||||
| Particiones y puertas de laminado fenólico HPL de 13 mm con herrajes de acero inoxidable, incluso todos los accesorios necesarios para su correcta instalación. | m2 | 0.00 | 0.00 | 0.00 | ||
| 15 | Suspended ceiling system, including insulation, joints, sealings, accesories and all required items necessary to ensure the success of the complete installation, waste loading on container, container rent, transport to an authorised waste manager and landfill fee. | |||||
| Sistema de falso techo, incluso aislamiento, juntas, sellados, accesorios y todos los elementos necesarios para garantizar el éxito de la instalación completa, carga de residuos en contenedor, alquiler de contenedor, transporte a un gestor de residuos autorizado y canon de vertido. | m2 | 0.00 | 0.00 | 0.00 | ||
| 16 | Ceramic tile tiling, including all required accesories for the proper installation. | |||||
| Alicatado de azulejo cerámico, incluso todos los accesorios necesarios para su correcta instalación. | m2 | 0.00 | 0.00 | 0.00 | ||
| 17 | Gypsum plaster coating over existing masonry surfaces. | |||||
| Revestimiento de yeso sobre superficies de mampostería existentes. | m2 | 0.00 | 0.00 | 0.00 | ||
| 18 | Porcelanic tile pavement, including thin layer leveling mortar, base, threshold and all required accesories for the proper installation. | |||||
| Pavimento de baldosas cerámicas, incluso mortero autonivelante en capa fina, rodapié, umbral y todos los acceorios necesarios para su correcta instalación. | m2 | 0.00 | 0.00 | 0.00 | ||
| 19 | Interior high performance, resistance and coverage power vinyl copolymer based paint with fungicide additives, with previous coat of universal fixing primer for porous surfaces where required, including auxiliary resources. | |||||
| Pintura interior de alto rendimiento, resistencia y poder cubriente a base de copolímero vinílico con aditivos fungicidas, con capa previa de imprimación fijadora universal para superficies porosas donde se requiera, incluso medios auxiliares. | m2 | 0.00 | 0.00 | 0.00 | ||
| Total Architectural Works and coatings | ||||||
| Total Trabajos de Arquitectura y revestimientos | 0.00 | 0.00 | 0.00 | 0.00 |
| FIRE PROTECTION WORKS | ||||||
| TRABAJOS DE PROTECCIÓN DE INCENDIO | ||||||
| Fire Suppression Works | ||||||
| Trabajos de extinción de incendios | ||||||
| 20 | Automatic Sprinkers, including required accesories for its proper installation. | |||||
| Rociadores automáticos, incluso los accesorios necesarios para su correcta instalación. | ea | 0.00 | 0.00 | 0.00 | ||
| 21 | Ø2" steel conduit, including required accesories for its proper installation and auxiliary resources. | |||||
| Canalización de acero de Ø2", incluso los accesorios necesarios para su correcta instalación y medios auxiliares. | m | 0.00 | 0.00 | 0.00 | ||
| 22 | Ø1 1/2" steel conduit, including required accesories for its proper installation and auxiliary resources. | |||||
| Canalización de acero de Ø1 1/2", incluso los accesorios necesarios para su correcta instalación y medios auxiliares. | m | 0.00 | 0.00 | 0.00 | ||
| 23 | Ø1 1/4" steel conduit, including required accesories for its proper installation and auxiliary resources. | |||||
| Canalización de acero de Ø1 1/4", incluso los accesorios necesarios para su correcta instalación y medios auxiliares. | m | 0.00 | 0.00 | 0.00 | ||
| Total Fire Suppression Works | ||||||
| Total Trabajos de extinción de incendios | 0.00 | 0.00 | 0.00 | 0.00 |
| Fire Alarm System | ||||||
| Sistema de Alarma de Incencio | ||||||
| 24 | Fire Alarm Control Unit (FACU), including all required accesories for its proper installation. | |||||
| Sistema de Control de Alarma de Incendio (FACU), incluso todos los accesorios necesarios para su correcta instalación. | ea | 0.00 | 0.00 | 0.00 | ||
| 25 | Initiating & Signaling devices, including required accesories for its proper installation and auxiliary resources. | |||||
| Dispositivos de iniciación y señalización, incluso los accesorios necesarios para su correcta instalación y medios auxiliares. | ea | 0.00 | 0.00 | 0.00 | ||
| 26 | Wiring & Conduits, including required accesories for its proper installation and auxiliary resources. | |||||
| Cableado y canalizaciones, incluso los accesorios necesarios para su correcta instalación y medios auxiliares. | JOB | 0.00 | 0.00 | 0.00 | ||
| 27 | Engineering support. | |||||
| Soporte de ingeniería. | JOB | 0.00 | 0.00 | 0.00 | ||
| Total Fire Protection Works | ||||||
| Total Trabajos de protección de incendio | 0.00 | 0.00 | 0.00 | 0.00 | ||
| TOTAL FIRE PROTECTION WORKS | ||||||
| TOTAL TRABAJOS DE PROTECCIÓN DE INCENDIO | 0.00 | 0.00 | 0.00 | 0.00 |
| Plumbing Works | ||||||
| Trabajos de Fontanería | ||||||
| 28 | PPR Ø20 mm piping + insulation, including accesories. | |||||
| Tubería PPR Ø20 mm + aislamiento, incluso accesorios. | m | 0.00 | 0.00 | 0.00 | ||
| 29 | PPR Ø25 mm piping + insulation, including accesories. | |||||
| Tubería PPR Ø25 mm + aislamiento, incluso accesorios. | m | 0.00 | 0.00 | 0.00 | ||
| 30 | PPR Ø32 mm piping + insulation, including accesories. | |||||
| Tubería PPR Ø32 mm + aislamiento, incluso accesorios. | m | 0.00 | 0.00 | 0.00 | ||
| 31 | PPR Ø40 mm piping + insulation, including accesories. | |||||
| Tubería PPR Ø40 mm + aislamiento, incluso accesorios. | m | 0.00 | 0.00 | 0.00 | ||
| 32 | PPR Ø50 mm piping + insulation, including accesories. | |||||
| Tubería PPR Ø50 mm + aislamiento, incluso accesorios. | m | 0.00 | 0.00 | 0.00 | ||
| 33 | PPR Ø63 mm piping + insulation, including accesories. | |||||
| Tubería PPR Ø63 mm + aislamiento, incluso accesorios. | m | 0.00 | 0.00 | 0.00 | ||
| 34 | Drinking water fountain, including required accesories for its proper installation. | |||||
| Fuente de agua potable, incluso los accesorios necesarios para su correcta instalación. | ea | 0.00 | 0.00 | 0.00 | ||
| Total Plumbing Works | ||||||
| Total Trabajos de Fontanería | 0.00 | 0.00 | 0.00 | 0.00 |
| Plumbing fixtures | ||||||
| Equipamiento de fontanería. | ||||||
| 35 | Fixtures for accesible restroom, including all required accesories. | |||||
| Dispositivos para aseo accesible, incluso todos los accesorios requeridos. | JOB | 0.00 | 0.00 | 0.00 | ||
| 36 | Fixtures for male and female restrooms and room 116, including all required accesories. | |||||
| Dispositivos para aseo masculino y femenino y sala 116, incluso todos los accesorios requeridos. | JOB | 0.00 | 0.00 | 0.00 | ||
| Total Plumbing fixtures | ||||||
| Total Equipamiento de fontanería | 0.00 | 0.00 | 0.00 | 0.00 |
| Mechanical Works | ||||||
| Trabajos de mecánica. | ||||||
| 37 | Ventilation/extraction, including grilles, flashings, joints, sealings, auxiliary resources and all required accesories for its proper installation. | |||||
| Ventilación/Extracción, inclusorejillas, remates, juntas, sellados, medios auxiliares y todos los accesorios necesarios para su correcta instalación. | JOB | 0.00 | 0.00 | 0.00 | ||
| 38 | Fancoils, including flashings, joints, sealings, auxiliary resources and all required accesories for its proper installation. | |||||
| Fancoils, incluso remates, juntas, sellados, medios auxiliares y todos los accesorios necesarios para su correcta instalación. | ea | 0.00 | 0.00 | 0.00 | ||
| Total Mechanical Works | ||||||
| Total Trabajos de mecánica. | 0.00 | 0.00 | 0.00 | 0.00 |
| ELECTRICAL WORKS | ||||||
| TRABAJOS DE ELECTRICIDAD | ||||||
| Electrical Works. Wiring & Conduits | ||||||
| Trabajos de electricidad. Cableado y canalizaciones | ||||||
| 39 | Wiring 1 x 4 mm² H07Z1-K (AS) 450/750V. | |||||
| Cableado 1x4 mm² H07Z1-K (AS) 450/750V. | m | 0.00 | 0.00 | 0.00 | ||
| 40 | Wiring 1 x 4 mm² RZ1-K (AS) 0,6/1 kV. | |||||
| Cableado 1 x 4 mm² RZ1-K (AS) 0,6/1 kV. | m | 0.00 | 0.00 | 0.00 | ||
| 41 | Wiring 1 x 6 mm² RZ1-K (AS) 0,6/1 kV. | |||||
| Cableado 1 x 6 mm² RZ1-K (AS) 0,6/1 kV. | m | 0.00 | 0.00 | 0.00 | ||
| 42 | Wiring 1 x 10 mm² RZ1-K (AS) 0,6/1 kV. | |||||
| Cableado 1 x 10 mm² RZ1-K (AS) 0,6/1 kV. | m | 0.00 | 0.00 | 0.00 | ||
| 43 | RMC Conduit Ø20 mm, including all required accesories. | |||||
| Canalización RMC Ø20 mm, incluso todos los accesorios necesarios. | m | 0.00 | 0.00 | 0.00 | ||
| 44 | RMC Conduit Ø25 mm, including all required accesories. | |||||
| Canalización RMC Ø25 mm, incluso todos los accesorios necesarios. | m | 0.00 | 0.00 | 0.00 | ||
| Total Electrical Works. Wiring & Conduits. | ||||||
| Total Trabajos de electricidad. Cableado y canalizaciones. | 0.00 | 0.00 | 0.00 | 0.00 |
| Electrical Works. Receptacles | ||||||
| Trabajos de electricidad. Mecanismos | ||||||
| 45 | T3 2 x NEMA 5-20R GFI. | |||||
| T3 2 x NEMA 5-20R GFI. | ea | 0.00 | 0.00 | 0.00 | ||
| 46 | T6 2 x NEMA 5-20R. | |||||
| T6 2 x NEMA 5-20R. | ea | 0.00 | 0.00 | 0.00 | ||
| 47 | T7 2 x NEMA 6-20R. | |||||
| T7 2 x NEMA 6-20R. | ea | 0.00 | 0.00 | 0.00 | ||
| 48 | T8 2 x RJ45. | |||||
| T8 2 x RJ45. | ea | 0.00 | 0.00 | 0.00 | ||
| Total Electrical Works. Receptacles | ||||||
| Total Trabajos de electricidad. Mecanismos | 0.00 | 0.00 | 0.00 | 0.00 |
| Electrical Works. Luminaries. | ||||||
| Trabajos de electricidad. Luminarias. | ||||||
| 49 | L3 type, including installation and all required accesories. | |||||
| Tipo L3, incluso instalación y todos los accesorios necesarios. | ea | 0.00 | 0.00 | 0.00 | ||
| 50 | L4 type, including installation and all required accesories. | |||||
| Tipo L4, incluso instalación y todos los accesorios necesarios. | ea | 0.00 | 0.00 | 0.00 | ||
| 51 | L4 type (emergency), including installation and all required accesories. | |||||
| Tipo L4 (emergencia), incluso instalación y todos los accesorios necesarios. | ea | 0.00 | 0.00 | 0.00 | ||
| Total Electrical Works. Luminaries. | ||||||
| Total Trabajos de electricidad. Luminarias. | 0.00 | 0.00 | 0.00 | 0.00 | ||
| TOTAL ELECTRICAL WORKS. | ||||||
| TOTAL TRABAJOS DE ELECTRICIDAD. | 0.00 | 0.00 | 0.00 | 0.00 |
| Openings | ||||||
| Carpinterías | ||||||
| 52 | D3A & D3B door, including sealings, flashins and all required accesories. | |||||
| Puerta D3, incluso sellados, remates y todos los accesorios necesarios. | ea | 0.00 | 0.00 | 0.00 | ||
| 53 | D4 door, including sealings, flashins and all required accesories. | |||||
| Puerta D4, incluso sellados, remates y todos los accesorios necesarios. | ea | 0.00 | 0.00 | 0.00 | ||
| 54 | V2 window (indoor use), including sealings, flashins and all required accesories. | |||||
| Ventana V2 (usoo interior), incluso sellados, remates y todos los accesorios necesarios. | ea | 0.00 | 0.00 | 0.00 | ||
| 55 | Disassembly and reinstallation of existing anodized aluminum window, including accesories and sealings. | |||||
| Desmontaje y reinstalación de la ventana existente de aluminio anodizado, incluyendo accesorios y sellados. | ea | 0.00 | 0.00 | 0.00 | ||
| 56 | Disassembly and reinstallation of existing anodized aluminum access door (D2), including accesories and sealings. | |||||
| Desmontaje y reinstalación de la puerta de acceso existente de aluminio anodizado, incluyendo accesorios y sellados. | ea | 0.00 | 0.00 | 0.00 | ||
| Total Openings | ||||||
| Total Carpinterías | 0.00 | 0.00 | 0.00 | 0.00 |
| Telecomunications works | ||||||
| Trabajos de telecomunicaciones | ||||||
| 57 | Telecomunications modifications, includig all required accesories. | |||||
| Modificaciones de Telecomunicaciones, incluso todos los accesorios necesarios. | JOB | 0.00 | 0.00 | 0.00 | ||
| Total Telecomunications works | ||||||
| Total Trabajos de telecomunicaciones | 0.00 | 0.00 | 0.00 | 0.00 |
| WORK SUMMARY | ||||
| RESUMEN TRABAJOS | ||||
| TOTAL PRELIMINARY WORKS | ||||
| TOTAL TRABAJOS PREVIOS | 0.00 | 0.00 | 0.00 | 0.00 |
| TOTAL DEMOLITION WORKS | ||||
| TOTAL TRABAJOS DE DEMOLICIÓN | 0.00 | 0.00 | 0.00 | 0.00 |
| TOTAL SANITARY SEWER WORKS | ||||
| TOTAL TRABAJOS DE SANEAMIENTO | 0.00 | 0.00 | 0.00 | 0.00 |
| TOTAL ARCHITECTURAL WORKS AND COATINGS | ||||
| TOTAL TRABAJOS DE ARQUITECTURA Y REVESTIMIENTOS | 0.00 | 0.00 | 0.00 | 0.00 |
| TOTAL FIRE PROTECTION WORKS | ||||
| TOTAL TRABAJOS DE PROTECCIÓN DE INCENDIO | 0.00 | 0.00 | 0.00 | 0.00 |
| TOTAL PLUMBING WORKS | ||||
| TOTAL TRABAJOS DE FONTANERÍA | 0.00 | 0.00 | 0.00 | 0.00 |
| TOTAL PLUMBINGFIXTURES | ||||
| TOTAL EQUIPAMIENTO DE FONTANERÍA | 0.00 | 0.00 | 0.00 | 0.00 |
| TOTAL MECHANICAL WORKS | ||||
| TOTAL TRABAJOS DE MECÁNICA. | 0.00 | 0.00 | 0.00 | 0.00 |
| TOTAL ELECTRICAL WORKS. | ||||
| TOTAL TRABAJOS DE ELECTRICIDAD. | 0.00 | 0.00 | 0.00 | 0.00 |
| TOTAL OPENINGS | ||||
| TOTAL CARPINTERÍAS | 0.00 | 0.00 | 0.00 | 0.00 |
| TOTAL TELECOMUNICATIONS WORKS | ||||
| TOTAL TRABAJOS DE TELECOMUNICACIONES | 0.00 | 0.00 | 0.00 | 0.00 |
| TOTAL ITEM 1 | ||||
| TOTAL ÍTEM 1 | 0.00 | 0.00 | 0.00 | 0.00 |
TOTAL MATERIAL COSTS 0.00
TOTAL LABOR COSTS 0.00
TOTAL OTHER DIRECT COSTS 0.00
TOTAL DIRECT COSTS 0.00
OVERHEAD 15.00 % 0.00
PROFIT 10.00 % 0.00
| TOTAL PROJECT EUROS | 0.00 | |||
| 0.00 | $1 | 0.9249 | euros | |
| TOTAL PROJECT US$ | 0.00 |
DATE: 7th May 2025 FIRM NAME:
These costs and overhead and profit percentages will be applied in any possible future modifications
&"Times New Roman,Normal"&9 CONSTRUCTION COST ESTIMATE BREAKDOWN &"Times New Roman,Normal"&9&K000000 CONTROLLED UNCLASSIFIED INFORMATION (CUI) &"Times New Roman,Normal"&9Page &P of &N
EXPANSION
| CONSTRUCTION COST ESTIMATE BREAKDOWN | incluso carga sobre camión de residuos, transporte y entrega a gestor autorizado de vertidos. | |||||||||
| CONTRACTOR | ADDRESS | |||||||||
| MORÓN AIR BASE, SPAIN | ||||||||||
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | |||||||||
| EDI RPR/ADD RADR VEHICLE MX, B121 | 0.00 € | $0.00 | ||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION | ||||||||
| QUUG 23-1001 | MORÓN AIR BASE, SPAIN | |||||||||
| UNIT | MATERIAL COST | LABOR COSTS | OTHER | |||||||
| LIN | ITEM | OF | DIRECT | LINE | ||||||
| NO. | BUILDING EXPANSION FOR WORKSHOP III | MEAS. | QUANTI. | UNIT | TOTAL | MH/MD | AV.RAT | TOTAL | COSTS | TOTAL |
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) | |
| Demolition Works | ||||||||||
| Trabajos de Demolición | ||||||||||
| 1 | Asphalt pavement demolition, including waste loading on container, container rent, transport to an authorised waste manager and landfill fee. | |||||||||
| Demolición de pavimento asfáltico, incluso carga de residuos sobre contenedor, alquiler del contenedor, transporte a gestor autorizado de residuos y canon de vertido. | m2 | 0.00 | 0.00 | 0.00 | ||||||
| 2 | Concrete pavement demolition,including waste loading on container, container rent, transport to an authorised waste manager and landfill fee. | |||||||||
| Demolición de pavimento de hormigón, incluso carga de residuos sobre contenedor, alquiler del contenedor, transporte a gestor autorizado de residuos y canon de vertido. | m2 | 0.00 | 0.00 | 0.00 | ||||||
| 3 | Security Fence and vehicle access door demolition, including waste loading on container, container rent, transport to an authorised waste manager and landfill fee. | |||||||||
| Demolición de valla metálica y puerta de acceso de vehículos, incluso carga de residuos sobre contenedor, alquiler del contenedor, transporte a gestor autorizado de residuos y canon de vertido. | m | 0.00 | 0.00 | 0.00 | ||||||
| 4 | Concrete Sidewalk demolition, including waste loading on container, container rent, transport to an authorised waste manager and landfill fee. | |||||||||
| Demolición de acerado de hormigón, incluso carga de residuos sobre contenedor, alquiler del contenedor, transporte a gestor autorizado de residuos y canon de vertido. | m2 | 0.00 | 0.00 | 0.00 | ||||||
| 5 | Transformer and HV switchgear demolition, including waste loading on container, container rent, transport to an authorised waste manager and landfill fee. | |||||||||
| Demolición de transformador y celdas de AT, incluso carga de residuos sobre contenedor, alquiler del contenedor, transporte a gestor autorizado de residuos y canon de vertido. | JOB | 0.00 | 0.00 | 0.00 | ||||||
| 6 | Miscellaneous exterior demolitions, including waste loading on container, container rent, transport to an authorised waste manager and landfill fee. | |||||||||
| Demoliciones exteriores varias incluso carga de residuos sobre contenedor, alquiler del contenedor, transporte a gestor autorizado de residuos y canon de vertido. | JOB | 0.00 | 0.00 | 0.00 | ||||||
| Total Demolition Works | ||||||||||
| Total Trabajos de Demolición | 0.00 | 0.00 | 0.00 | 0.00 |
| Civil Works | ||||||
| Trabajos de Civil | ||||||
| 7 | Excavations and subgrade compaction, including Modified Proctor test, shoring if required, waste loading on container, container rent, transport to an authorised waste manager and landfill fee. | |||||
| Excavaciones y compactación de fondo de excavación, incluso ensayo Proctor Modificado, entibación si se requiere, carga sobre contenedor de residuos, alquiler de contenedor, transporte a gestor autorizado de residuos y canon de vertido. | m3 | 0.00 | 0.00 | 0.00 | ||
| 8 | Selected soil filling and compaction for interior floor slab base, including Modified Proctor test, shoring if required, waste loading on container, container rent, transport to an authorised waste manager and landfill fee. | |||||
| Relleno de material seleccionado y compactación para base de solera, incluso ensayo Proctor Modificado, entibación si se requiere, carga sobre contenedor de residuos, alquiler de contenedor, transporte a gestor autorizado de residuos y canon de vertido. | m3 | 0.00 | 0.00 | 0.00 | ||
| 9 | Exterior asphalt pavement for heavy traffic T32 according to PG-3 and Standard 6.1 IC, including regulation's required tests, waste loading on container, container rent, transport to an authorised waste manager and landfill fee. | |||||
| Pavimento asfáltico exterior para tráfico pesado T32 según PG-3 y Norma 6.1 IC, incluso ensayos requeridos por normativa, carga sobre contenedor de residuos, alquiler de contenedor, transporte a gestor autorizado de residuos y canon de vertido. | m2 | 0.00 | 0.00 | 0.00 | ||
| 10 | Footing foundations on mass concrete footing, including formwork, reinforcement & concrete tests, accesories, waste loading on container, container rent, transport to an authorised waste manager and landfill fee. | |||||
| Zapatas de cimentación sobre pozos de hormigón en masa, incluso encofrado, ensayos de refuerzos y hormigón, accesorios, carga de residuos sobre contenedor, alquiler de contenedor, transporte a gestor autorizado de residuos y canon de vertido. | m3 | 0.00 | 0.00 | 0.00 | ||
| 11 | Foundation beams, including formwork, reinforcement & concrete tests, accesories, waste loading on container, container rent, transport to an authorised waste manager and landfill fee. | |||||
| Vigas de cimentación, incluso encofrado, ensayos de refuerzos y hormigón, accesorios, carga de residuos sobre contenedor, alquiler de contenedor, transporte a gestor autorizado de residuos y canon de vertido. | m3 | 0.00 | 0.00 | 0.00 | ||
| 12 | Interior floor slab and access ramp, including IPE 220, dry shake hardener, pit slab, joints, formwork, waterproofing, lean concrete, reinforcement & concrete tests, accesories, waste loading on container, container rent, transport to an authorised waste manager and landfill fee. | |||||
| Solera interior y rampa de acceso, incluso IPE 220, endurecedor superficial, losa de foso, juntas, encofrado, impermeabilización, hormigón de limpieza, ensayos de refuerzos y hormigón, accesorios, carga de residuos sobre contenedor, alquiler de contenedor, transporte a gestor autorizado de residuos y canon de vertido. | m2 | 0.00 | 0.00 | 0.00 | ||
| 13 | Pit concrete walls, including, formwork, waterproofing, lean concrete, reinforcement & concrete tests, accesories, waste loading on container, container rent, transport to an authorised waste manager and landfill fee. | |||||
| Muros de hormigón de foso, incluso encofrado, impermeabilización, hormigón de limpieza, ensayos de refuerzos y hormigón, accesorios, carga de residuos sobre contenedor, alquiler de contenedor, transporte a gestor autorizado de residuos y canon de vertido. | m3 | 0.00 | 0.00 | 0.00 | ||
| 14 | Concrete sidewalk, including curbs, joints, formwork, polyetylene sheet & geotextile where required, accesories, waste loading on container, container rent, transport to an authorised waste manager and landfill fee. | |||||
| Acerado de hormigón, incluso bordillos, juntas, encofrado, lámina de polietileno y geotextil donde se requiera, accesorios, carga de residuos en contenedor, alquiler de contenedor, transporte a un gestor de residuos autorizado y canon de vertido. | m2 | 0.00 | 0.00 | 0.00 | ||
| 15 | Security fence, including earthworks, accesories, waste loading on container, container rent, transport to an authorised waste manager and landfill fee. | |||||
| Vallado de seguridad, incluso movimientos de tierra, accesorios, carga de residuos en contenedor, alquiler de contenedor, transporte a un gestor de residuos autorizado y canon de vertido. | m | 0.00 | 0.00 | 0.00 | ||
| 16 | Concrete ditch, including earthworks, waste loading on container, container rent, transport to an authorised waste manager and landfill fee. | |||||
| Cuneta revestida de hormigón, incluso movimientos de tierra, carga de residuos en contenedor, alquiler de contenedor, transporte a un gestor de residuos autorizado y canon de vertido. | m | 0.00 | 0.00 | 0.00 | ||
| 17 | Concrete slab foundation (electric room), including polyetylene sheet, mud slab, formwork, reinforcement & concrete tests, accesories, waste loading on container, container rent, transport to an authorised waste manager and landfill fee. | |||||
| Losa de cimentación de hormigón armado (cuarto eléctrico), incluso lámina de polietileno, hormigón de limpieza, encofrado, ensayos de refuerzos y hormigón, accesorios, carga de residuos sobre contenedor, alquiler de contenedor, transporte a gestor autorizado de residuos y canon de vertido. | m3 | 0.00 | 0.00 | 0.00 | ||
| Total Civil Works | ||||||
| Total Trabajos de Civil | 0.00 | 0.00 | 0.00 | 0.00 |
| Structural Works | |
| Trabajos de Estructuras | |
| 18 | UNE-EN 10025 S275JR pillars, including cut-offs, accesories, joints, shop primer, auxiliary resources, waste loading on container, container rent, transport to an authorised waste manager and landfill fee. |
| Pilares acero UNE-EN 10025 S275JR, incluso despuntes, accesorios, uniones, imprimación anticorrosión, medios auxiliares, carga de residuos en contenedor, alquiler de contenedor, transporte a un gestor de residuos autorizado y canon de vertido. |
| kg | 0.00 | 0.00 | 0.00 | |||||
| 19 | UNE-EN 10025 S275JR beams, including cut-offs, accesories, joints, shop primer, auxiliary resources, waste loading on container, container rent, transport to an authorised waste manager and landfill fee. | |||||||
| Vigas acero UNE-EN 10025 S275JR, incluso despuntes, accesorios, uniones, imprimación anticorrosión, medios auxiliares, carga de residuos en contenedor, alquiler de contenedor, transporte a un gestor de residuos autorizado y canon de vertido. | kg | 0.00 | 0.00 | 0.00 | ||||
| 20 | UNE-EN 10025 S275JR purlins, including cut-offs, accesories, joints, shop primer, auxiliary resources, waste loading on container, container rent, transport to an authorised waste manager and landfill fee. | |||||||
| Correas acero UNE-EN 10025 S275JR, incluso despuntes, accesorios, uniones, imprimación anticorrosión, medios auxiliares, carga de residuos en contenedor, alquiler de contenedor, transporte a un gestor de residuos autorizado y canon de vertido. | kg | 0.00 | 0.00 | 0.00 | ||||
| 21 | UNE-EN 10025 S275JR tie rods, including cut-offs, accesories, joints, shop primer, auxiliary resources, waste loading on container, container rent, transport to an authorised waste manager and landfill fee. | |||||||
| Tirantes acero UNE-EN 10025 S275JR, incluso despuntes, accesorios, uniones, imprimación anticorrosión, medios auxiliares, carga de residuos en contenedor, alquiler de contenedor, transporte a un gestor de residuos autorizado y canon de vertido. | kg | 0.00 | 0.00 | 0.00 | ||||
| 22 | UNE-EN 10025 S275JR type 1 baseplates, including accesories, joints, shop primer, auxiliary resources, waste loading on container, container rent, transport to an authorised waste manager and landfill fee. | |||||||
| Placas de anclaje tipo 1 de acero UNE-EN 10025 S275JR, incluso accesorios, uniones, imprimación anticorrosión, medios auxiliares, carga de residuos en contenedor, alquiler de contenedor, transporte a un gestor de residuos autorizado y canon de vertido. | ea | 0.00 | 0.00 | 0.00 | ||||
| 23 | UNE-EN 10025 S275JR type 2 baseplates, including accesories, joints, shop primer, auxiliary resources, waste loading on container, container rent, transport to an authorised waste manager and landfill fee. | |||||||
| Placas de anclaje tipo 2 de acero UNE-EN 10025 S275JR, incluso accesorios, uniones, imprimación anticorrosión, medios auxiliares, carga de residuos en contenedor, alquiler de contenedor, transporte a un gestor de residuos autorizado y canon de vertido. | ea | 0.00 | 0.00 | 0.00 | ||||
| 24 | UNE-EN 10025 S275JR type 4 baseplates, including accesories, joints, shop primer, auxiliary resources, waste loading on container, container rent, transport to an authorised waste manager and landfill fee. | |||||||
| Placas de anclaje tipo 4 de acero UNE-EN 10025 S275JR, incluso accesorios, uniones, imprimación anticorrosión, medios auxiliares, carga de residuos en contenedor, alquiler de contenedor, transporte a un gestor de residuos autorizado y canon de vertido. | ea | 0.00 | 0.00 | 0.00 | ||||
| 25 | UNE-EN 10025 S275JR type 20 baseplates, including accesories, joints, shop primer, auxiliary resources, waste loading on container, container rent, transport to an authorised waste manager and landfill fee. | |||||||
| Placas de anclaje tipo 20 de acero UNE-EN 10025 S275JR, incluso accesorios, uniones, imprimación anticorrosión, medios auxiliares, carga de residuos en contenedor, alquiler de contenedor, transporte a un gestor de residuos autorizado y canon de vertido. | ea | 0.00 | 0.00 | 0.00 | ||||
| 26 | Grout mortar SIKA Grout 340 or equivalent, for baseplates support and protection and precast concrete panels base, including formwork, accesories, waste loading on container, container rent, transport to an authorised waste manager and landfill fee. | |||||||
| Mortero grout SIKA Grout 340 o equivalente, para apoyo y protección de placas de anclaje y base de paneles prefabricados de hormigón, incluyendo encofrado, accesorios, carga de residuos en contenedor, alquiler de contenedor, transporte a un gestor de residuos autorizado y canon de vertido. | m3 | 0.00 | 0.00 | 0.00 | ||||
| 27 | Composite Slab, including reinforcements, cut-offs, accesories, joints, auxiliary resources, waste loading on container, container rent, transport to an authorised waste manager and landfill fee. | |||||||
| Forjado de Chapa colaborante, incluso refuerzos, despuntes, accesorios, uniones, recursos auxiliares, carga de residuos en contenedor, alquiler de contenedor, transporte a un gestor de residuos autorizado y canon de vertido. | m2 | 0.00 | 0.00 | 0.00 | ||||
| 28 | Pre-Engineered supports, including auxiliary resources. | |||||||
| Soportes prefabricados, incluso medios auxiliares. | JOB | 0.00 | 0.00 | 0.00 | ||||
| Total Structural Works | ||||||||
| Totla Trabajos de Estructuras | 0.00 | 0.00 | 0.00 | 0.00 |
| Architectural Works | ||||||
| Trabajos de Arquitectura | ||||||
| 29 | Precast concrete facade, including auxiliary resources, accesories, sealings & joints, shoring, flashings, special items, connections, non-shrink mortar and other related accesories. | |||||
| Fachada de hormigón prefabricado incluso medios auxiliares, accesorios, sellados y juntas, apeos, remates, elementos especiales, conexiones, mortero sin retracción y otros accesorios relacionados. | m2 | 0.00 | 0.00 | 0.00 | ||
| 30 | Gypsum drywall partitions, including insulation, joints, sealings, accesories and all required items necessary to ensure the success of the complete installation, waste loading on container, container rent, transport to an authorised waste manager and landfill fee. | |||||
| Particiones de yeso laminado, incluso aislamiento, juntas, sellados, accesorios y todos los elementos necesarios para garantizar el éxito de la instalación completa, carga de residuos en contenedor, alquiler de contenedor, transporte a un gestor de residuos autorizado y canon de vertido. | m2 | 0.00 | 0.00 | 0.00 | ||
| 31 | Perforated brick wall 12 cm thickness, including lintels, elastic bands, sealings, waste loading on container, container rent, transport to an authorised waste manager and landfill fee. | |||||
| Fábrica de ladrillo perforado de 12 cm de espesor, incluso dinteles, bandas elásticas, sellados, carga de residuos en contenedor, alquiler de contenedor, transporte a un gestor de residuos autorizado y canon de vertido. | m2 | 0.00 | 0.00 | 0.00 | ||
| 32 | Interior cement mortar coating, including joints, corners, screeds with a spacing of no more than one meter, edges, reveals, jambs, lintels, finishes at intersections with walls, coatings, or other elements attached to their surface, waste loading on container, container rent, transport to an authorised waste manager and landfill fee. | |||||
| Revestimiento de mortero de cemento en interiores, incluso, formación de juntas, rincones, maestras con separación entre ellas no superior a un metro, aristas, mochetas, jambas, dinteles, remates en los encuentros con paramentos, revestimientos u otros elementos recibidos en su superficie, carga de residuos en contenedor, alquiler de contenedor, transporte a un gestor de residuos autorizado y canon de vertido | m2 | 0.00 | 0.00 | 0.00 | ||
| 33 | Exterior cement mortar coating, screeded & troweled finish, including PVC trim strips for joint formation and anti-alkali fiberglass mesh at material transitions and at the edges of slabs, to prevent cracks, waste loading on container, container rent, transport to an authorised waste manager and landfill fee. | |||||
| Revestimiento de mortero de cemento en exteriores ,maestreado y fratasado, incluso junquillos de PVC para formación de juntas y malla de fibra de vidrio antiálcalis en los cambios de material y en los frentes de forjado, para evitar fisuras, carga de residuos en contenedor, alquiler de contenedor, transporte a un gestor de residuos autorizado y canon de vertido. | m2 | 0.00 | 0.00 | 0.00 | ||
| 34 | Concrete Masonry Unit bearing wall, including reinforcements, lintels, special units, joints, concrete filling, jambs, all required items for the proper installation, waste loading on container, container rent, transport to an authorised waste manager and landfill fee. | |||||
| Muro de carga de Bloques de hormigón (CMU), incluso refuerzos, dinteles, unidades especiales, juntas, relleno de hormigón, jambas, todos los elementos necesarios para una correcta instalación, carga de residuos en contenedor, alquiler de contenedor, transporte a un gestor de residuos autorizado y canon de vertido. | m2 | 0.00 | 0.00 | 0.00 | ||
| Total Architectural Works | ||||||
| Total Trabajos de Arquitectura | 0.00 | 0.00 | 0.00 | 0.00 |
| Openings and miscellaneous | ||||||
| Carpinterías y varios | ||||||
| 35 | Motorized anodized aluminium windows, including flashings, sealings, accesories, auxiliary resources, waste loading on container, container rent, transport to an authorised waste manager and landfill fee. | |||||
| Ventanas motorizadas de aluminio anodizado, incluso remates, sellados, accesorios, medios auxiliares, carga de residuos en contenedor, alquiler de contenedor, transporte a un gestor de residuos autorizado y canon de vertido. | ea | 0.00 | 0.00 | 0.00 | ||
| 36 | FRD-1 Door, including with heavy-duty door closers, a closing selector to ensure proper door closure, panic push, key, flashings, joints, sealings and all required items for its proper work and installation. | |||||
| Puerta FRD-1, incluso cierrapuertas de uso intensivo, selector de cierre para asegurar el adecuado cierre de las puertas, barra antipánico, llave, remates, juntas, sellados y todos los elementos necesarios para su correcto funcionamiento e instalación. | ea | 0.00 | 0.00 | 0.00 | ||
| 37 | FRD-2 Door, including with heavy-duty door closers, a closing selector to ensure proper door closure, panic push, key, flashings, joints, sealings and all required items for its proper work and installation. | |||||
| Puerta FRD-2, incluso cierrapuertas de uso intensivo, selector de cierre para asegurar el adecuado cierre de las puertas, barra antipánico, llave, remates, juntas, sellados y todos los elementos necesarios para su correcto funcionamiento e instalación. | ea | 0.00 | 0.00 | 0.00 | ||
| 38 | FRD-3 Door, including with heavy-duty door closers, a closing selector to ensure proper door closure, panic push, key, flashings, joints, sealings and all required items for its proper work and installation. | |||||
| Puerta FRD-3, incluso cierrapuertas de uso intensivo, selector de cierre para asegurar el adecuado cierre de las puertas, barra antipánico, llave, remates, juntas, sellados y todos los elementos necesarios para su correcto funcionamiento e instalación. | ea | 0.00 | 0.00 | 0.00 | ||
| 39 | D-1 Door (roller shutter), including flashings, sealings, accesories, auxiliary resources, waste loading on container, container rent, transport to an authorised waste manager and landfill fee. | |||||
| Puerta D-1 (enrollable), incluso remates, sellados, accesorios, medios auxiliares, carga de residuos en contenedor, alquiler de contenedor, transporte a un gestor de residuos autorizado y canon de vertido. | ea | 0.00 | 0.00 | 0.00 | ||
| 40 | Extendable motorized arm awning, including flashings, sealings, accesories, auxiliary resources, waste loading on container, container rent, transport to an authorised waste manager and landfill fee. | |||||
| Toldo de brazo extensible motorizado, incluso remates, sellados, accesorios, medios auxiliares, carga de residuos en contenedor, alquiler de contenedor, transporte a un gestor de residuos autorizado y canon de vertido. | ea | 0.00 | 0.00 | 0.00 | ||
| 41 | Metallic stairs for pit access, including flashings, sealings, accesories, auxiliary resources, waste loading on container, container rent, transport to an authorised waste manager and landfill fee. | |||||
| Escalera metálica de acceso a foso, incluso remates, sellados, accesorios, medios auxiliares, carga de residuos en contenedor, alquiler de contenedor, transporte a un gestor de residuos autorizado y canon de vertido. | ea | 0.00 | 0.00 | 0.00 | ||
| 42 | Pit falling protect, including flashings, sealings, accesories, auxiliary resources, waste loading on container, container rent, transport to an authorised waste manager and landfill fee. | |||||
| Protección contra caídas en foso, incluso remates, sellados, accesorios, medios auxiliares, carga de residuos en contenedor, alquiler de contenedor, transporte a un gestor de residuos autorizado y canon de vertido. | ea | 0.00 | 0.00 | 0.00 | ||
| 43 | Electrowelded mesh partitions, including door, sealings, accesories, auxiliary resources, waste loading on container, container rent, transport to an authorised waste manager and landfill fee. | |||||
| Particiones de malla electrosoldada, incluso puerta, remates, sellados, accesorios, medios auxiliares, carga de residuos en contenedor, alquiler de contenedor, transporte a un gestor de residuos autorizado y canon de vertido. | m | 0.00 | 0.00 | 0.00 | ||
| Total Openings and miscellaneous | ||||||
| Total Carpinterías y varios | 0.00 | 0.00 | 0.00 | 0.00 |
| Roofing Systems | ||||||
| Sistemas de Cubierta | ||||||
| 44 | Gabled Roof made of Insulated metal panels (100 mm thickness), including accesories, penetrations, flashings, waterproofins, sealings, joints, auxiliary resources, all required items for its proper installation, waste loading on container, container rent, transport to an authorised waste manager and landfill fee. | |||||
| Cubierta inclinada de paneles aislantes (100 mm de espesor), incluso accesorios, pasos, remates, impermeabilización, sellados, juntas, recursos auxiliares, todos los elementos necesarios para su correcta instalación, carga de residuos en contenedor, alquiler de contenedor, transporte a un gestor de residuos autorizado y canon de vertido. | m2 | 0.00 | 0.00 | 0.00 | ||
| 45 | Low slope roof system finished with concrete insulated tiles, including accesories, penetrations, flashings, waterproofins, sealings, joints, auxiliary resources, all required items for its proper installation, waste loading on container, container rent, transport to an authorised waste manager and landfill fee. | |||||
| Sistema de cubierta plana acabada con baldosas de hormigón aisladas, incluso accesorios, pasos, remates, impermeabilización, sellados, juntas, recursos auxiliares, todos los elementos necesarios para su correcta instalación, carga de residuos en contenedor, alquiler de contenedor, transporte a un gestor de residuos autorizado y canon de vertido. | m2 | 0.00 | 0.00 | 0.00 | ||
| Total Roofing Systems | ||||||
| Total Sistemas de Cubierta | 0.00 | 0.00 | 0.00 | 0.00 |
| Finish Works | |||||
| Trabajos de Acabados | |||||
| 46 | Interior high performance, resistance and coverage power vinyl copolymer based paint with fungicide additives and base board epoxy paint, with previous coat of universal fixing primer for porous surfaces where required, including auxiliary resources. | ||||
| Pintura interior de alto rendimiento, resistencia y poder cubriente a base de copolímero vinílico con aditivos fungicidas y zócalo de pintura epoxi, con capa previa de imprimación fijadora universal para superficies porosas donde se requiera, incluso medios auxiliares. | m2 | 0.00 | 0.00 | 0.00 | |
| 47 | Metalllic surfaces painting, including previous clean and rust removing if required, auxiliary resources included. Paint shall be compatible with intumescent paint where required. | ||||
| Pintura de superficies metálicas, incluyendo limpieza previa y eliminación de óxido si es necesario, con medios auxiliares incluidos. La pintura debe ser compatible con la pintura intumescente donde se requiera. |
| m2 | 0.00 | 0.00 | 0.00 | |||||
| 48 | Exterior high performance, resistance and coverage power vinyl copolymer based paint with fungicide additives where required, with previous coat of universal fixing primer for porous surfaces where required, including auxiliary resources. | |||||||
| Pintura exterior de alto rendimiento, resistencia y poder cubriente a base de copolímero vinílico con aditivos fungicidas donde se requiera, con capa previa de imprimación fijadora universal para superficies porosas donde se requiera, incluso medios auxiliares. | m2 | 0.00 | 0.00 | 0.00 | ||||
| Total Finish Works | ||||||||
| Total Trabajos de Acabados | 0.00 | 0.00 | 0.00 | 0.00 |
| FIRE PROTECTION WORKS | ||||||
| TRABAJOS DE PROTECCIÓN DE INCENDIO | ||||||
| Fire suppression system. | ||||||
| Sistema de extinción de incendio. | ||||||
| 49 | Automatic Sprinkers, including required accesories for its proper installation and auxiliary resources. | |||||
| Rociadores automáticos, incluso los accesorios necesarios para su correcta instalación y medios auxiliares. | ea | 0.00 | 0.00 | 0.00 | ||
| 50 | Ø6" steel conduit, including required accesories for its proper installation and auxiliary resources. | |||||
| Canalización de acero de Ø6", incluso los accesorios necesarios para su correcta instalación y medios auxiliares. | m | 0.00 | 0.00 | 0.00 | ||
| 51 | Ø4" steel conduit, including required accesories for its proper installation and auxiliary resources. | |||||
| Canalización de acero de Ø4", incluso los accesorios necesarios para su correcta instalación y medios auxiliares. | m | 0.00 | 0.00 | 0.00 | ||
| 52 | Ø3" steel conduit, including required accesories for its proper installation and auxiliary resources. | |||||
| Canalización de acero de Ø3", incluso los accesorios necesarios para su correcta instalación y medios auxiliares. | m | 0.00 | 0.00 | 0.00 | ||
| 53 | Ø2" steel conduit, including required accesories for its proper installation and auxiliary resources. | |||||
| Canalización de acero de Ø2", incluso los accesorios necesarios para su correcta instalación y medios auxiliares. | m | 0.00 | 0.00 | 0.00 | ||
| 54 | Ø1 1/2" steel conduit, including required accesories for its proper installation and auxiliary resources. | |||||
| Canalización de acero de Ø1 1/2", incluso los accesorios necesarios para su correcta instalación y medios auxiliares. | m | 0.00 | 0.00 | 0.00 | ||
| 55 | Ø1 1/4" steel conduit, including required accesories for its proper installation and auxiliary resources. | |||||
| Canalización de acero de Ø1 1/4", incluso los accesorios necesarios para su correcta instalación y medios auxiliares. | m | 0.00 | 0.00 | 0.00 | ||
| 56 | Valves and all required accesories for the proper installation, including auxiliary resources. | |||||
| Válvulas todos los accesorios requeridos para la correcta instalación, incluso medios auxiliares. | JOB | 0.00 | 0.00 | 0.00 | ||
| Total Fire suppression system. | ||||||
| Total Sistema de extinción de incendio. | 0.00 | 0.00 | 0.00 | 0.00 |
| Fire Alarm System | ||||||
| Sistema de Alarma de Incencio | ||||||
| 57 | Initiating & Signaling devices, including required accesories for its proper installation and auxiliary resources. | |||||
| Dispositivos de iniciación y señalización, incluso los accesorios necesarios para su correcta instalación y medios auxiliares. | ea | 0.00 | 0.00 | 0.00 | ||
| 58 | Wiring & Conduits, including required accesories for its proper installation and auxiliary resources. | |||||
| Cableado y canalizaciones, incluso los accesorios necesarios para su correcta instalación y medios auxiliares. | JOB | 0.00 | 0.00 | 0.00 | ||
| 59 | Engineering support. | |||||
| Soporte de ingeniería. | JOB | 0.00 | 0.00 | 0.00 | ||
| Total Fire Protection Works | ||||||
| Total Trabajos de protección de incendio | 0.00 | 0.00 | 0.00 | 0.00 |
| Passive Fire Protections | ||||||
| Protecciones pasivas contra incendio | ||||||
| 60 | R-30 Intumescent Paint for Strucure, including auxiliary resources. | |||||
| Pintura Intumescente R-30 para estructura, incluso medios auxiliares. | JOB | 0.00 | 0.00 | 0.00 | ||
| 61 | Gypsum drywall firewall strip EI60, including required accesories for its proper installation and auxiliary resources. | |||||
| Franja cortafuegos de placas de yeso laminado EI60, incluso los accesorios necesarios para su correcta instalación y medios auxiliares. | m2 | 0.00 | 0.00 | 0.00 | ||
| Tota Passive Fire Protections | ||||||
| Total Protecciones pasivas contra incendio | 0.00 | 0.00 | 0.00 | 0.00 | ||
| TOTAL FIRE PROTECTION WORKS | ||||||
| TOTAL TRABAJOS DE PROTECCIÓN DE INCENDIO | 0.00 | 0.00 | 0.00 | 0.00 |
| PLUMBING WORKS | ||||||
| TRABAJOS DE FONTANERÍA | ||||||
| Plumbing Works | ||||||
| Trabajos de Fontanería | ||||||
| 62 | Drinking water fountain, including required accesories for its proper installation. | |||||
| Fuente de agua potable, incluso los accesorios necesarios para su correcta instalación. | ea | 0.00 | 0.00 | 0.00 | ||
| 63 | Non potable water (NPW) service entrance (connection, handhole and PE Ø63mm), including earthworks, accesories and waste management. | |||||
| Acometida de agua no potable (ANP) (conexión, arqueta y PE Ø63 mm), incluso movimiento de tierras, accesorios y gestión de residuos. | m | 0.00 | 0.00 | 0.00 | ||
| 64 | PPR Ø40 mm piping + insulation + protective aluminium sheet, including accesories and auxiliary resources. | |||||
| Tubería PPR Ø40 mm + aislamiento + chapa de protección de aluminio, incluso accesorios y medios auxiliares. | m | 0.00 | 0.00 | 0.00 | ||
| 65 | PPR Ø20 mm piping + insulation + protective aluminium sheet, including accesories and auxiliary resources. | |||||
| Tubería PPR Ø20 mm + aislamiento + chapa de protección de aluminio, incluso accesorios y medios auxiliares. | m | 0.00 | 0.00 | 0.00 | ||
| 66 | PPR Ø25 mm piping + insulation + protective aluminium sheet, including accesories and auxiliary resources. | |||||
| Tubería PPR Ø25 mm + aislamiento + chapa de protección de aluminio, incluso accesorios y medios auxiliares. | m | 0.00 | 0.00 | 0.00 | ||
| 67 | PPR Ø32 mm piping + insulation + protective aluminium sheet, including accesories and auxiliary resources. | |||||
| Tubería PPR Ø32 mm + aislamiento + chapa de protección de aluminio, incluso accesorios y medios auxiliares. | m | 0.00 | 0.00 | 0.00 | ||
| 68 | PPR Ø40 mm piping + insulation + protective aluminium sheet, including accesories and auxiliary resources. | |||||
| Tubería PPR Ø40 mm + aislamiento + chapa de protección de aluminio, incluso accesorios y medios auxiliares. | m | 0.00 | 0.00 | 0.00 | ||
| 69 | Plumbing Fixtures (lavatory, handryer, emergency eyewash and shower, water closet, etc.) including all required accesories for its proper installation. | |||||
| Accesorios de Fontanería, (Lavabo, secamanos, ducha y lavaojos de emergencia, inodoro, etc.), incluyendo todos los accesorios necesarios para su correcta instalación. | JOB | 0.00 | 0.00 | 0.00 | ||
| Total Plumbing Works | ||||||
| Total Trabajos de Fontanería | 0.00 | 0.00 | 0.00 | 0.00 |
| Sanitary Sewer Works | ||||||
| Trabajos de Saneamiento | ||||||
| 70 | Downspouts, including all required accesories for its proper installation. | |||||
| Bajantes, incluso todos los accesorios requeridos para su correcta instalación. | m | 0.00 | 0.00 | 0.00 | ||
| 71 | Gutters, including all required accesories for its proper installation. | |||||
| Canalones, incluso todos los accesorios requeridos para su correcta instalación. | m | 0.00 | 0.00 | 0.00 | ||
| 72 | PVC conduit Ø200 mm, including all required accesories for its proper installation. | |||||
| Colector de PVC Ø200 mm, incluso todos los accesorios requeridos para su correcta instalación. | m | 0.00 | 0.00 | 0.00 | ||
| 73 | PVC conduit Ø160 mm, including all required accesories for its proper installation. | |||||
| Colector de PVC Ø160 mm, incluso todos los accesorios requeridos para su correcta instalación. | m | 0.00 | 0.00 | 0.00 | ||
| 74 | PVC conduit Ø125 mm, including all required accesories for its proper installation. | |||||
| Colector de PVC Ø125 mm, incluso todos los accesorios requeridos para su correcta instalación. | m | 0.00 | 0.00 | 0.00 | ||
| 75 | PVC conduit Ø110 mm, including all required accesories for its proper installation. | |||||
| Colector de PVC Ø110 mm, incluso todos los accesorios requeridos para su correcta instalación. | m | 0.00 | 0.00 | 0.00 | ||
| 76 | PVC conduit Ø75 mm, including all required accesories for its proper installation. | |||||
| Colector de PVC Ø75 mm, incluso todos los accesorios requeridos para su correcta instalación. | m | 0.00 | 0.00 | 0.00 | ||
| 77 | PVC conduit Ø50 mm, including all required accesories for its proper installation. | |||||
| Colector de PVC Ø50 mm, incluso todos los accesorios requeridos para su correcta instalación. | m | 0.00 | 0.00 | 0.00 | ||
| 78 | PVC conduit Ø40 mm, including all required accesories for its proper installation. | |||||
| Colector de PVC Ø40 mm, incluso todos los accesorios requeridos para su correcta instalación. | m | 0.00 | 0.00 | 0.00 |