This file is a comprehensive Construction Cost Estimate Breakdown spreadsheet for a vehicle maintenance facility renovation and expansion project at Moron Air Base in Spain. The project, identified as QUUG 23-1001, involves two primary components: modernizing the existing building's west wing first floor and expanding the facility for Workshop III. The estimated project cost range is between $1,000,000 and $5,000,000, with work scheduled for fiscal year 2025.

The detailed cost estimate covers extensive construction categories including demolition, civil works, structural modifications, architectural updates, fire protection, plumbing, mechanical systems, electrical infrastructure, telecommunications, and equipment installation. Key elements include installing new electrical systems, fire suppression equipment, plumbing fixtures, mechanical ventilation, overhead cranes, and site infrastructure improvements. The solicitation is specifically targeted at local Spanish contractors, with a pre-proposal conference on 11 July 2025, bid submission deadline of 30 July 2025, and a bid acceptance period valid through 31 December 2025. The project is being executed by the Department of the Air Force, United States Air Forces in Europe - Air Forces Africa.

View the file

Other files for this federal contract opportunity

Other files attached to RPR/ADD RADR VEHICLE MX, B121, newest first.
File Type Posted
MFR QUUG 23-1001 Questions and Answers.pdf PDF
Solicitation Amendment FA557525B00080002 SF 30.pdf PDF
5b. Schedule of Materials (Spa) REV1.xlsx XLSX spreadsheet
10. HVAC AIR DISTRIBUTION REV1.pdf PDF
13. Drawing MH601-REV1.pdf PDF
14. Drawing MP601-REV1.pdf PDF
5a. Schedule of Materials (Eng) REV1.xlsx XLSX spreadsheet
7. ALCANCE DE LOS TRABAJOS Y PLANOS REV1.pdf PDF
Solicitation Amendment FA557525B00080001 SF 30.pdf PDF
8. SPECIAL CONDITIONS REV1.pdf PDF
9. CONDICIONES ESPECIALES REV1.pdf PDF
11. DISTRIBUCIÓN DE AIRE HVAC REV1.pdf PDF
6. SCOPE OF WORK AND DRAWINGS REV1.pdf PDF
12. Drawing MD601-REV1.pdf PDF
3-Specifications (Spa) QUUG 23-1001.pdf PDF
Solicitation - FA557525B0008.pdf PDF
5A-Schedule of Materials (Eng).xlsx XLSX spreadsheet
4-Cost Estimated Blank QUUG 23-1001.xlsx XLSX spreadsheet
5B-Schedule of Materials (Spa).xlsx XLSX spreadsheet
2-Specifications (Eng) QUUG 23-1001.pdf PDF
Show all 20

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUMMARY

CONSTRUCTION COST ESTIMATE BREAKDOWN
CONTRACTORADDRESS
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
EDI RPR/ADD RADR VEHICLE MX, B121SUMMARYEUROS0.00 €
US$ DOLLARS$0.00
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION
QUUG 23-1001MORÓN AIR BASE, SPAIN
TOTAL EUROSTOTAL EUROSTOTAL USD $TOTAL USD $
LINITEM
NO.QUANTI.UNITTOTALMH/MDAV.RATTOTAL
(3)(4)(5)(6)(7)(8)
SUMMARY
RESUMEN
1EXISTING BUILDING WEST WING FIRST FLOOR MODERNIZATION0.00 €$0.00
MODERNIZACIÓN DE PLANTA BAJA DE ALA OESTE DE EDIFICIO EXISTENTE
2BUILDING EXPANSION FOR WORKSHOP III0.00 €$0.00
AMPLIACIÓN DE EDIFICIO PARA TALLER III
3PROJECT TOTAL0.00 €$0.00
TOTAL PROYECTO

FY2025 $1 0.9249 euros

DATE: 7th May 2025 FIRM NAME:

These costs and overhead and profit percentages will be applied in any possible future modifications

&"Times New Roman,Normal"&9 CONSTRUCTION COST ESTIMATE BREAKDOWN &"Times New Roman,Normal"&9&K000000 CONTROLLED UNCLASSIFIED INFORMATION (CUI) &"Times New Roman,Normal"&9Page &P of &N

MODERNIZATION

CONSTRUCTION COST ESTIMATE BREAKDOWNincluso carga sobre camión de residuos, transporte y entrega a gestor autorizado de vertidos.
CONTRACTORADDRESS
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
EDI RPR/ADD RADR VEHICLE MX, B1210.00 €$0.00
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION
QUUG 23-1001MORÓN AIR BASE, SPAIN
UNITMATERIAL COSTLABOR COSTSOTHER
LINITEMOFDIRECTLINE
NO.EXISTING BUILDING WEST WING FIRST FLOOR MODERNIZATIONMEAS.QUANTI.UNITTOTALMH/MDAV.RATTOTALCOSTSTOTAL
(1)(2)(3)(4)(5)(6)(7)(8)(9)(10)
Preliminary Works
Trabajos Previos
1Non affected equipment disassembly, protection and storage.
Desmontaje de equipamiento no afectado, protección y almacenamiento.JOB0.000.000.00
2Temporary facilities for vehicle maintenance personnel, including shipping, installation, utilities and all required accesories por their proper installation and work.
Instalaciones temporales para personal de mantenimiento de vehículos, incluso transporte, instalación, servicios públicos y todos los accesorios necesarios para su correcta instalación y funcionamiento.JOB0.000.000.00
Total Preliminary Works
Total Trabajos Previos0.000.000.000.00
Demolition Works
Trabajos de Demolición
3Interior demolitions, including waste loading on container, container rent, transport to an authorised waste manager and landfill fee. (finishes, partitions, sanitaries, low voltage interior distribution, chiller, etc.).
Demoliciones interiores, incluso carga de residuos sobre contenedor, alquiler del contenedor, transporte a gestor autorizado de residuos y canon de vertido (acabados, particiones, sanitarios, instalación de distribución interior de BT, enfriadora, etc.).JOB0.000.000.00
Total Demolition Works
Total Trabajos de Demolición0.000.000.000.00
Sanitary Sewer Works
Trabajos de Saneamiento
4Trench excavations, including waste loading on container, container rent, transport to an authorised waste manager and landfill fee.
Excavación de zanjas, incluso carga de residuos sobre contenedor, alquiler del contenedor, transporte a gestor autorizado de residuos y canon de vertido.m30.000.000.00
5PVC conduit Ø125 mm, including all required accesories for its proper installation.
Colector de PVC Ø125 mm, incluso todos los accesorios necesario para su correcta instalación.m0.000.000.00
6PVC conduit Ø110 mm, including all required accesories for its proper installation.
Colector de PVC Ø110 mm, incluso todos los accesorios necesario para su correcta instalación.m0.000.000.00
7PVC conduit Ø63 mm, including all required accesories for its proper installation.
Colector de PVC Ø63 mm, incluso todos los accesorios necesario para su correcta instalación.m0.000.000.00
8PVC conduit Ø50 mm, including all required accesories for its proper installation.
Colector de PVC Ø50 mm, incluso todos los accesorios necesario para su correcta instalación.m0.000.000.00
9PVC conduit Ø40 mm, including all required accesories for its proper installation.
Colector de PVC Ø40 mm, incluso todos los accesorios necesario para su correcta instalación.m0.000.000.00
10PVC conduit Ø32 mm, including all required accesories for its proper installation.
Colector de PVC Ø32 mm, incluso todos los accesorios necesario para su correcta instalación.m0.000.000.00
11Sanitary Sewer, including all required accesories for its proper installation.
Pozo de registro, incluso todos los accesorios necesario para su correcta instalación.ea0.000.000.00
12Concrete slab reconstruction, including all required accesories for its proper installation.
Reconstrucción de solera de hormigón, incluso todos los accesorios necesario para su correcta instalación.m20.000.000.00
Total Sanitary Sewer Works
Total Trabajos de Saneamiento0.000.000.000.00
Architectural Works and coatings
Trabajos de Arquitectura y revestimientos
13Gypsum drywall partitions and cladding, including insulation, joints, sealings, accesories and all required items necessary to ensure the success of the complete installation, waste loading on container, container rent, transport to an authorised waste manager and landfill fee.
Particiones y trasdosado de yeso laminado, incluso aislamiento, juntas, sellados, accesorios y todos los elementos necesarios para garantizar el éxito de la instalación completa, carga de residuos en contenedor, alquiler de contenedor, transporte a un gestor de residuos autorizado y canon de vertido.m20.000.000.00
14Partitions and doors in 13 mm HPL phenolic laminate with stainless steel hardware, including all required accesories for its proper installation.
Particiones y puertas de laminado fenólico HPL de 13 mm con herrajes de acero inoxidable, incluso todos los accesorios necesarios para su correcta instalación.m20.000.000.00
15Suspended ceiling system, including insulation, joints, sealings, accesories and all required items necessary to ensure the success of the complete installation, waste loading on container, container rent, transport to an authorised waste manager and landfill fee.
Sistema de falso techo, incluso aislamiento, juntas, sellados, accesorios y todos los elementos necesarios para garantizar el éxito de la instalación completa, carga de residuos en contenedor, alquiler de contenedor, transporte a un gestor de residuos autorizado y canon de vertido.m20.000.000.00
16Ceramic tile tiling, including all required accesories for the proper installation.
Alicatado de azulejo cerámico, incluso todos los accesorios necesarios para su correcta instalación.m20.000.000.00
17Gypsum plaster coating over existing masonry surfaces.
Revestimiento de yeso sobre superficies de mampostería existentes.m20.000.000.00
18Porcelanic tile pavement, including thin layer leveling mortar, base, threshold and all required accesories for the proper installation.
Pavimento de baldosas cerámicas, incluso mortero autonivelante en capa fina, rodapié, umbral y todos los acceorios necesarios para su correcta instalación.m20.000.000.00
19Interior high performance, resistance and coverage power vinyl copolymer based paint with fungicide additives, with previous coat of universal fixing primer for porous surfaces where required, including auxiliary resources.
Pintura interior de alto rendimiento, resistencia y poder cubriente a base de copolímero vinílico con aditivos fungicidas, con capa previa de imprimación fijadora universal para superficies porosas donde se requiera, incluso medios auxiliares.m20.000.000.00
Total Architectural Works and coatings
Total Trabajos de Arquitectura y revestimientos0.000.000.000.00
FIRE PROTECTION WORKS
TRABAJOS DE PROTECCIÓN DE INCENDIO
Fire Suppression Works
Trabajos de extinción de incendios
20Automatic Sprinkers, including required accesories for its proper installation.
Rociadores automáticos, incluso los accesorios necesarios para su correcta instalación.ea0.000.000.00
21Ø2" steel conduit, including required accesories for its proper installation and auxiliary resources.
Canalización de acero de Ø2", incluso los accesorios necesarios para su correcta instalación y medios auxiliares.m0.000.000.00
22Ø1 1/2" steel conduit, including required accesories for its proper installation and auxiliary resources.
Canalización de acero de Ø1 1/2", incluso los accesorios necesarios para su correcta instalación y medios auxiliares.m0.000.000.00
23Ø1 1/4" steel conduit, including required accesories for its proper installation and auxiliary resources.
Canalización de acero de Ø1 1/4", incluso los accesorios necesarios para su correcta instalación y medios auxiliares.m0.000.000.00
Total Fire Suppression Works
Total Trabajos de extinción de incendios0.000.000.000.00
Fire Alarm System
Sistema de Alarma de Incencio
24Fire Alarm Control Unit (FACU), including all required accesories for its proper installation.
Sistema de Control de Alarma de Incendio (FACU), incluso todos los accesorios necesarios para su correcta instalación.ea0.000.000.00
25Initiating & Signaling devices, including required accesories for its proper installation and auxiliary resources.
Dispositivos de iniciación y señalización, incluso los accesorios necesarios para su correcta instalación y medios auxiliares.ea0.000.000.00
26Wiring & Conduits, including required accesories for its proper installation and auxiliary resources.
Cableado y canalizaciones, incluso los accesorios necesarios para su correcta instalación y medios auxiliares.JOB0.000.000.00
27Engineering support.
Soporte de ingeniería.JOB0.000.000.00
Total Fire Protection Works
Total Trabajos de protección de incendio0.000.000.000.00
TOTAL FIRE PROTECTION WORKS
TOTAL TRABAJOS DE PROTECCIÓN DE INCENDIO0.000.000.000.00
Plumbing Works
Trabajos de Fontanería
28PPR Ø20 mm piping + insulation, including accesories.
Tubería PPR Ø20 mm + aislamiento, incluso accesorios.m0.000.000.00
29PPR Ø25 mm piping + insulation, including accesories.
Tubería PPR Ø25 mm + aislamiento, incluso accesorios.m0.000.000.00
30PPR Ø32 mm piping + insulation, including accesories.
Tubería PPR Ø32 mm + aislamiento, incluso accesorios.m0.000.000.00
31PPR Ø40 mm piping + insulation, including accesories.
Tubería PPR Ø40 mm + aislamiento, incluso accesorios.m0.000.000.00
32PPR Ø50 mm piping + insulation, including accesories.
Tubería PPR Ø50 mm + aislamiento, incluso accesorios.m0.000.000.00
33PPR Ø63 mm piping + insulation, including accesories.
Tubería PPR Ø63 mm + aislamiento, incluso accesorios.m0.000.000.00
34Drinking water fountain, including required accesories for its proper installation.
Fuente de agua potable, incluso los accesorios necesarios para su correcta instalación.ea0.000.000.00
Total Plumbing Works
Total Trabajos de Fontanería0.000.000.000.00
Plumbing fixtures
Equipamiento de fontanería.
35Fixtures for accesible restroom, including all required accesories.
Dispositivos para aseo accesible, incluso todos los accesorios requeridos.JOB0.000.000.00
36Fixtures for male and female restrooms and room 116, including all required accesories.
Dispositivos para aseo masculino y femenino y sala 116, incluso todos los accesorios requeridos.JOB0.000.000.00
Total Plumbing fixtures
Total Equipamiento de fontanería0.000.000.000.00
Mechanical Works
Trabajos de mecánica.
37Ventilation/extraction, including grilles, flashings, joints, sealings, auxiliary resources and all required accesories for its proper installation.
Ventilación/Extracción, inclusorejillas, remates, juntas, sellados, medios auxiliares y todos los accesorios necesarios para su correcta instalación.JOB0.000.000.00
38Fancoils, including flashings, joints, sealings, auxiliary resources and all required accesories for its proper installation.
Fancoils, incluso remates, juntas, sellados, medios auxiliares y todos los accesorios necesarios para su correcta instalación.ea0.000.000.00
39Chiller and accessories, hydraulic balancing and system start-up.
Enfriadora de agua y accesorios, equilibrado hidráulico y puesta en marcha.ea0.000.000.00
Total Mechanical Works
Total Trabajos de mecánica.0.000.000.000.00
ELECTRICAL WORKS
TRABAJOS DE ELECTRICIDAD
Electrical Works. Wiring & Conduits
Trabajos de electricidad. Cableado y canalizaciones
40Wiring 1 x 4 mm² H07Z1-K (AS) 450/750V.
Cableado 1x4 mm² H07Z1-K (AS) 450/750V.m0.000.000.00
41Wiring 1 x 4 mm² RZ1-K (AS) 0,6/1 kV.
Cableado 1 x 4 mm² RZ1-K (AS) 0,6/1 kV.m0.000.000.00
42Wiring 1 x 6 mm² RZ1-K (AS) 0,6/1 kV.
Cableado 1 x 6 mm² RZ1-K (AS) 0,6/1 kV.m0.000.000.00
43Wiring 1 x 10 mm² RZ1-K (AS) 0,6/1 kV.
Cableado 1 x 10 mm² RZ1-K (AS) 0,6/1 kV.m0.000.000.00
44RMC Conduit Ø20 mm, including all required accesories.
Canalización RMC Ø20 mm, incluso todos los accesorios necesarios.m0.000.000.00
45RMC Conduit Ø25 mm, including all required accesories.
Canalización RMC Ø25 mm, incluso todos los accesorios necesarios.m0.000.000.00
Total Electrical Works. Wiring & Conduits.
Total Trabajos de electricidad. Cableado y canalizaciones.0.000.000.000.00
Electrical Works. Receptacles
Trabajos de electricidad. Mecanismos
46T3 2 x NEMA 5-20R GFI.
T3 2 x NEMA 5-20R GFI.ea0.000.000.00
47T6 2 x NEMA 5-20R.
T6 2 x NEMA 5-20R.ea0.000.000.00
48T7 2 x NEMA 6-20R.
T7 2 x NEMA 6-20R.ea0.000.000.00
49T8 2 x RJ45.
T8 2 x RJ45.ea0.000.000.00
Total Electrical Works. Receptacles
Total Trabajos de electricidad. Mecanismos0.000.000.000.00
Electrical Works. Luminaries.
Trabajos de electricidad. Luminarias.
50L3 type, including installation and all required accesories.
Tipo L3, incluso instalación y todos los accesorios necesarios.ea0.000.000.00
51L4 type, including installation and all required accesories.
Tipo L4, incluso instalación y todos los accesorios necesarios.ea0.000.000.00
52L4 type (emergency), including installation and all required accesories.
Tipo L4 (emergencia), incluso instalación y todos los accesorios necesarios.ea0.000.000.00
Total Electrical Works. Luminaries.
Total Trabajos de electricidad. Luminarias.0.000.000.000.00
TOTAL ELECTRICAL WORKS.
TOTAL TRABAJOS DE ELECTRICIDAD.0.000.000.000.00
Openings
Carpinterías
53D3A & D3B door, including sealings, flashins and all required accesories.
Puerta D3, incluso sellados, remates y todos los accesorios necesarios.ea0.000.000.00
54D4 door, including sealings, flashins and all required accesories.
Puerta D4, incluso sellados, remates y todos los accesorios necesarios.ea0.000.000.00
55V2 window (indoor use), including sealings, flashins and all required accesories.
Ventana V2 (usoo interior), incluso sellados, remates y todos los accesorios necesarios.ea0.000.000.00
56Disassembly and reinstallation of existing anodized aluminum window, including accesories and sealings.
Desmontaje y reinstalación de la ventana existente de aluminio anodizado, incluyendo accesorios y sellados.ea0.000.000.00
57Disassembly and reinstallation of existing anodized aluminum access door (D2), including accesories and sealings.
Desmontaje y reinstalación de la puerta de acceso existente de aluminio anodizado, incluyendo accesorios y sellados.ea0.000.000.00
Total Openings
Total Carpinterías0.000.000.000.00
Telecomunications works
Trabajos de telecomunicaciones
58Telecomunications modifications, includig all required accesories.
Modificaciones de Telecomunicaciones, incluso todos los accesorios necesarios.JOB0.000.000.00
Total Telecomunications works
Total Trabajos de telecomunicaciones0.000.000.000.00
WORK SUMMARY
RESUMEN TRABAJOS
TOTAL PRELIMINARY WORKS
TOTAL TRABAJOS PREVIOS0.000.000.000.00
TOTAL DEMOLITION WORKS
TOTAL TRABAJOS DE DEMOLICIÓN0.000.000.000.00
TOTAL SANITARY SEWER WORKS
TOTAL TRABAJOS DE SANEAMIENTO0.000.000.000.00
TOTAL ARCHITECTURAL WORKS AND COATINGS
TOTAL TRABAJOS DE ARQUITECTURA Y REVESTIMIENTOS0.000.000.000.00
TOTAL FIRE PROTECTION WORKS
TOTAL TRABAJOS DE PROTECCIÓN DE INCENDIO0.000.000.000.00
TOTAL PLUMBING WORKS
TOTAL TRABAJOS DE FONTANERÍA0.000.000.000.00
TOTAL PLUMBINGFIXTURES
TOTAL EQUIPAMIENTO DE FONTANERÍA0.000.000.000.00
TOTAL MECHANICAL WORKS
TOTAL TRABAJOS DE MECÁNICA.0.000.000.000.00
TOTAL ELECTRICAL WORKS.
TOTAL TRABAJOS DE ELECTRICIDAD.0.000.000.000.00
TOTAL OPENINGS
TOTAL CARPINTERÍAS0.000.000.000.00
TOTAL TELECOMUNICATIONS WORKS
TOTAL TRABAJOS DE TELECOMUNICACIONES0.000.000.000.00
TOTAL ITEM 1
TOTAL ÍTEM 10.000.000.000.00

TOTAL MATERIAL COSTS 0.00

TOTAL LABOR COSTS 0.00

TOTAL OTHER DIRECT COSTS 0.00

TOTAL DIRECT COSTS 0.00

OVERHEAD 15.00 % 0.00

PROFIT 10.00 % 0.00

TOTAL PROJECT EUROS0.00
0.00$10.9249euros
TOTAL PROJECT US$0.00

DATE: 7th May 2025 FIRM NAME:

These costs and overhead and profit percentages will be applied in any possible future modifications

&"Times New Roman,Normal"&9 CONSTRUCTION COST ESTIMATE BREAKDOWN &"Times New Roman,Normal"&9&K000000 CONTROLLED UNCLASSIFIED INFORMATION (CUI) &"Times New Roman,Normal"&9Page &P of &N

EXPANSION

CONSTRUCTION COST ESTIMATE BREAKDOWNincluso carga sobre camión de residuos, transporte y entrega a gestor autorizado de vertidos.
CONTRACTORADDRESS
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
EDI RPR/ADD RADR VEHICLE MX, B1210.00 €$0.00
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION
QUUG 23-1001MORÓN AIR BASE, SPAIN
UNITMATERIAL COSTLABOR COSTSOTHER
LINITEMOFDIRECTLINE
NO.BUILDING EXPANSION FOR WORKSHOP IIIMEAS.QUANTI.UNITTOTALMH/MDAV.RATTOTALCOSTSTOTAL
(1)(2)(3)(4)(5)(6)(7)(8)(9)(10)
Demolition Works
Trabajos de Demolición
1Asphalt pavement demolition, including waste loading on container, container rent, transport to an authorised waste manager and landfill fee.
Demolición de pavimento asfáltico, incluso carga de residuos sobre contenedor, alquiler del contenedor, transporte a gestor autorizado de residuos y canon de vertido.m20.000.000.00
2Concrete pavement demolition,including waste loading on container, container rent, transport to an authorised waste manager and landfill fee.
Demolición de pavimento de hormigón, incluso carga de residuos sobre contenedor, alquiler del contenedor, transporte a gestor autorizado de residuos y canon de vertido.m20.000.000.00
3Security Fence and vehicle access door demolition, including waste loading on container, container rent, transport to an authorised waste manager and landfill fee.
Demolición de valla metálica y puerta de acceso de vehículos, incluso carga de residuos sobre contenedor, alquiler del contenedor, transporte a gestor autorizado de residuos y canon de vertido.m0.000.000.00
4Concrete Sidewalk demolition, including waste loading on container, container rent, transport to an authorised waste manager and landfill fee.
Demolición de acerado de hormigón, incluso carga de residuos sobre contenedor, alquiler del contenedor, transporte a gestor autorizado de residuos y canon de vertido.m20.000.000.00
5Transformer and HV switchgear demolition, including waste loading on container, container rent, transport to an authorised waste manager and landfill fee.
Demolición de transformador y celdas de AT, incluso carga de residuos sobre contenedor, alquiler del contenedor, transporte a gestor autorizado de residuos y canon de vertido.JOB0.000.000.00
6Miscellaneous exterior demolitions, including waste loading on container, container rent, transport to an authorised waste manager and landfill fee.
Demoliciones exteriores varias incluso carga de residuos sobre contenedor, alquiler del contenedor, transporte a gestor autorizado de residuos y canon de vertido.JOB0.000.000.00
Total Demolition Works
Total Trabajos de Demolición0.000.000.000.00
Civil Works
Trabajos de Civil
7Excavations and subgrade compaction, including Modified Proctor test, shoring if required, waste loading on container, container rent, transport to an authorised waste manager and landfill fee.
Excavaciones y compactación de fondo de excavación, incluso ensayo Proctor Modificado, entibación si se requiere, carga sobre contenedor de residuos, alquiler de contenedor, transporte a gestor autorizado de residuos y canon de vertido.m30.000.000.00
8Selected soil filling and compaction for interior floor slab base, including Modified Proctor test, shoring if required, waste loading on container, container rent, transport to an authorised waste manager and landfill fee.
Relleno de material seleccionado y compactación para base de solera, incluso ensayo Proctor Modificado, entibación si se requiere, carga sobre contenedor de residuos, alquiler de contenedor, transporte a gestor autorizado de residuos y canon de vertido.m30.000.000.00
9Exterior asphalt pavement for heavy traffic T32 according to PG-3 and Standard 6.1 IC, including regulation's required tests, waste loading on container, container rent, transport to an authorised waste manager and landfill fee.
Pavimento asfáltico exterior para tráfico pesado T32 según PG-3 y Norma 6.1 IC, incluso ensayos requeridos por normativa, carga sobre contenedor de residuos, alquiler de contenedor, transporte a gestor autorizado de residuos y canon de vertido.m20.000.000.00
10Footing foundations on mass concrete footing, including formwork, reinforcement & concrete tests, accesories, waste loading on container, container rent, transport to an authorised waste manager and landfill fee.
Zapatas de cimentación sobre pozos de hormigón en masa, incluso encofrado, ensayos de refuerzos y hormigón, accesorios, carga de residuos sobre contenedor, alquiler de contenedor, transporte a gestor autorizado de residuos y canon de vertido.m30.000.000.00
11Foundation beams, including formwork, reinforcement & concrete tests, accesories, waste loading on container, container rent, transport to an authorised waste manager and landfill fee.
Vigas de cimentación, incluso encofrado, ensayos de refuerzos y hormigón, accesorios, carga de residuos sobre contenedor, alquiler de contenedor, transporte a gestor autorizado de residuos y canon de vertido.m30.000.000.00
12Interior floor slab and access ramp, including IPE 220, dry shake hardener, pit slab, joints, formwork, waterproofing, lean concrete, reinforcement & concrete tests, accesories, waste loading on container, container rent, transport to an authorised waste manager and landfill fee.
Solera interior y rampa de acceso, incluso IPE 220, endurecedor superficial, losa de foso, juntas, encofrado, impermeabilización, hormigón de limpieza, ensayos de refuerzos y hormigón, accesorios, carga de residuos sobre contenedor, alquiler de contenedor, transporte a gestor autorizado de residuos y canon de vertido.m20.000.000.00
13Pit concrete walls, including, formwork, waterproofing, lean concrete, reinforcement & concrete tests, accesories, waste loading on container, container rent, transport to an authorised waste manager and landfill fee.
Muros de hormigón de foso, incluso encofrado, impermeabilización, hormigón de limpieza, ensayos de refuerzos y hormigón, accesorios, carga de residuos sobre contenedor, alquiler de contenedor, transporte a gestor autorizado de residuos y canon de vertido.m30.000.000.00
14Concrete sidewalk, including curbs, joints, formwork, polyetylene sheet & geotextile where required, accesories, waste loading on container, container rent, transport to an authorised waste manager and landfill fee.
Acerado de hormigón, incluso bordillos, juntas, encofrado, lámina de polietileno y geotextil donde se requiera, accesorios, carga de residuos en contenedor, alquiler de contenedor, transporte a un gestor de residuos autorizado y canon de vertido.m20.000.000.00
15Security fence, including earthworks, accesories, waste loading on container, container rent, transport to an authorised waste manager and landfill fee.
Vallado de seguridad, incluso movimientos de tierra, accesorios, carga de residuos en contenedor, alquiler de contenedor, transporte a un gestor de residuos autorizado y canon de vertido.m0.000.000.00
16Concrete ditch, including earthworks, waste loading on container, container rent, transport to an authorised waste manager and landfill fee.
Cuneta revestida de hormigón, incluso movimientos de tierra, carga de residuos en contenedor, alquiler de contenedor, transporte a un gestor de residuos autorizado y canon de vertido.m0.000.000.00
17Concrete slab foundation (electric room), including polyetylene sheet, mud slab, formwork, reinforcement & concrete tests, accesories, waste loading on container, container rent, transport to an authorised waste manager and landfill fee.
Losa de cimentación de hormigón armado (cuarto eléctrico), incluso lámina de polietileno, hormigón de limpieza, encofrado, ensayos de refuerzos y hormigón, accesorios, carga de residuos sobre contenedor, alquiler de contenedor, transporte a gestor autorizado de residuos y canon de vertido.m30.000.000.00
Total Civil Works
Total Trabajos de Civil0.000.000.000.00
Structural Works
Trabajos de Estructuras
18UNE-EN 10025 S275JR pillars, including cut-offs, accesories, joints, shop primer, auxiliary resources, waste loading on container, container rent, transport to an authorised waste manager and landfill fee.
Pilares acero UNE-EN 10025 S275JR, incluso despuntes, accesorios, uniones, imprimación anticorrosión, medios auxiliares, carga de residuos en contenedor, alquiler de contenedor, transporte a un gestor de residuos autorizado y canon de vertido.
kg0.000.000.00
19UNE-EN 10025 S275JR beams, including cut-offs, accesories, joints, shop primer, auxiliary resources, waste loading on container, container rent, transport to an authorised waste manager and landfill fee.
Vigas acero UNE-EN 10025 S275JR, incluso despuntes, accesorios, uniones, imprimación anticorrosión, medios auxiliares, carga de residuos en contenedor, alquiler de contenedor, transporte a un gestor de residuos autorizado y canon de vertido.kg0.000.000.00
20UNE-EN 10025 S275JR purlins, including cut-offs, accesories, joints, shop primer, auxiliary resources, waste loading on container, container rent, transport to an authorised waste manager and landfill fee.
Correas acero UNE-EN 10025 S275JR, incluso despuntes, accesorios, uniones, imprimación anticorrosión, medios auxiliares, carga de residuos en contenedor, alquiler de contenedor, transporte a un gestor de residuos autorizado y canon de vertido.kg0.000.000.00
21UNE-EN 10025 S275JR tie rods, including cut-offs, accesories, joints, shop primer, auxiliary resources, waste loading on container, container rent, transport to an authorised waste manager and landfill fee.
Tirantes acero UNE-EN 10025 S275JR, incluso despuntes, accesorios, uniones, imprimación anticorrosión, medios auxiliares, carga de residuos en contenedor, alquiler de contenedor, transporte a un gestor de residuos autorizado y canon de vertido.kg0.000.000.00
22UNE-EN 10025 S275JR type 1 baseplates, including accesories, joints, shop primer, auxiliary resources, waste loading on container, container rent, transport to an authorised waste manager and landfill fee.
Placas de anclaje tipo 1 de acero UNE-EN 10025 S275JR, incluso accesorios, uniones, imprimación anticorrosión, medios auxiliares, carga de residuos en contenedor, alquiler de contenedor, transporte a un gestor de residuos autorizado y canon de vertido.ea0.000.000.00
23UNE-EN 10025 S275JR type 2 baseplates, including accesories, joints, shop primer, auxiliary resources, waste loading on container, container rent, transport to an authorised waste manager and landfill fee.
Placas de anclaje tipo 2 de acero UNE-EN 10025 S275JR, incluso accesorios, uniones, imprimación anticorrosión, medios auxiliares, carga de residuos en contenedor, alquiler de contenedor, transporte a un gestor de residuos autorizado y canon de vertido.ea0.000.000.00
24UNE-EN 10025 S275JR type 4 baseplates, including accesories, joints, shop primer, auxiliary resources, waste loading on container, container rent, transport to an authorised waste manager and landfill fee.
Placas de anclaje tipo 4 de acero UNE-EN 10025 S275JR, incluso accesorios, uniones, imprimación anticorrosión, medios auxiliares, carga de residuos en contenedor, alquiler de contenedor, transporte a un gestor de residuos autorizado y canon de vertido.ea0.000.000.00
25UNE-EN 10025 S275JR type 20 baseplates, including accesories, joints, shop primer, auxiliary resources, waste loading on container, container rent, transport to an authorised waste manager and landfill fee.
Placas de anclaje tipo 20 de acero UNE-EN 10025 S275JR, incluso accesorios, uniones, imprimación anticorrosión, medios auxiliares, carga de residuos en contenedor, alquiler de contenedor, transporte a un gestor de residuos autorizado y canon de vertido.ea0.000.000.00
26Grout mortar SIKA Grout 340 or equivalent, for baseplates support and protection and precast concrete panels base, including formwork, accesories, waste loading on container, container rent, transport to an authorised waste manager and landfill fee.
Mortero grout SIKA Grout 340 o equivalente, para apoyo y protección de placas de anclaje y base de paneles prefabricados de hormigón, incluyendo encofrado, accesorios, carga de residuos en contenedor, alquiler de contenedor, transporte a un gestor de residuos autorizado y canon de vertido.m30.000.000.00
27Composite Slab, including reinforcements, cut-offs, accesories, joints, auxiliary resources, waste loading on container, container rent, transport to an authorised waste manager and landfill fee.
Forjado de Chapa colaborante, incluso refuerzos, despuntes, accesorios, uniones, recursos auxiliares, carga de residuos en contenedor, alquiler de contenedor, transporte a un gestor de residuos autorizado y canon de vertido.m20.000.000.00
28Pre-Engineered supports, including auxiliary resources.
Soportes prefabricados, incluso medios auxiliares.JOB0.000.000.00
Total Structural Works
Totla Trabajos de Estructuras0.000.000.000.00
Architectural Works
Trabajos de Arquitectura
29Precast concrete facade, including auxiliary resources, accesories, sealings & joints, shoring, flashings, special items, connections, non-shrink mortar and other related accesories.
Fachada de hormigón prefabricado incluso medios auxiliares, accesorios, sellados y juntas, apeos, remates, elementos especiales, conexiones, mortero sin retracción y otros accesorios relacionados.m20.000.000.00
30Gypsum drywall partitions, including insulation, joints, sealings, accesories and all required items necessary to ensure the success of the complete installation, waste loading on container, container rent, transport to an authorised waste manager and landfill fee.
Particiones de yeso laminado, incluso aislamiento, juntas, sellados, accesorios y todos los elementos necesarios para garantizar el éxito de la instalación completa, carga de residuos en contenedor, alquiler de contenedor, transporte a un gestor de residuos autorizado y canon de vertido.m20.000.000.00
31Perforated brick wall 12 cm thickness, including lintels, elastic bands, sealings, waste loading on container, container rent, transport to an authorised waste manager and landfill fee.
Fábrica de ladrillo perforado de 12 cm de espesor, incluso dinteles, bandas elásticas, sellados, carga de residuos en contenedor, alquiler de contenedor, transporte a un gestor de residuos autorizado y canon de vertido.m20.000.000.00
32Interior cement mortar coating, including joints, corners, screeds with a spacing of no more than one meter, edges, reveals, jambs, lintels, finishes at intersections with walls, coatings, or other elements attached to their surface, waste loading on container, container rent, transport to an authorised waste manager and landfill fee.
Revestimiento de mortero de cemento en interiores, incluso, formación de juntas, rincones, maestras con separación entre ellas no superior a un metro, aristas, mochetas, jambas, dinteles, remates en los encuentros con paramentos, revestimientos u otros elementos recibidos en su superficie, carga de residuos en contenedor, alquiler de contenedor, transporte a un gestor de residuos autorizado y canon de vertidom20.000.000.00
33Exterior cement mortar coating, screeded & troweled finish, including PVC trim strips for joint formation and anti-alkali fiberglass mesh at material transitions and at the edges of slabs, to prevent cracks, waste loading on container, container rent, transport to an authorised waste manager and landfill fee.
Revestimiento de mortero de cemento en exteriores ,maestreado y fratasado, incluso junquillos de PVC para formación de juntas y malla de fibra de vidrio antiálcalis en los cambios de material y en los frentes de forjado, para evitar fisuras, carga de residuos en contenedor, alquiler de contenedor, transporte a un gestor de residuos autorizado y canon de vertido.m20.000.000.00
34Concrete Masonry Unit bearing wall, including reinforcements, lintels, special units, joints, concrete filling, jambs, all required items for the proper installation, waste loading on container, container rent, transport to an authorised waste manager and landfill fee.
Muro de carga de Bloques de hormigón (CMU), incluso refuerzos, dinteles, unidades especiales, juntas, relleno de hormigón, jambas, todos los elementos necesarios para una correcta instalación, carga de residuos en contenedor, alquiler de contenedor, transporte a un gestor de residuos autorizado y canon de vertido.m20.000.000.00
Total Architectural Works
Total Trabajos de Arquitectura0.000.000.000.00
Openings and miscellaneous
Carpinterías y varios
35Motorized anodized aluminium windows, including flashings, sealings, accesories, auxiliary resources, waste loading on container, container rent, transport to an authorised waste manager and landfill fee.
Ventanas motorizadas de aluminio anodizado, incluso remates, sellados, accesorios, medios auxiliares, carga de residuos en contenedor, alquiler de contenedor, transporte a un gestor de residuos autorizado y canon de vertido.ea0.000.000.00
36FRD-1 Door, including with heavy-duty door closers, a closing selector to ensure proper door closure, panic push, key, flashings, joints, sealings and all required items for its proper work and installation.
Puerta FRD-1, incluso cierrapuertas de uso intensivo, selector de cierre para asegurar el adecuado cierre de las puertas, barra antipánico, llave, remates, juntas, sellados y todos los elementos necesarios para su correcto funcionamiento e instalación.ea0.000.000.00
37FRD-2 Door, including with heavy-duty door closers, a closing selector to ensure proper door closure, panic push, key, flashings, joints, sealings and all required items for its proper work and installation.
Puerta FRD-2, incluso cierrapuertas de uso intensivo, selector de cierre para asegurar el adecuado cierre de las puertas, barra antipánico, llave, remates, juntas, sellados y todos los elementos necesarios para su correcto funcionamiento e instalación.ea0.000.000.00
38FRD-3 Door, including with heavy-duty door closers, a closing selector to ensure proper door closure, panic push, key, flashings, joints, sealings and all required items for its proper work and installation.
Puerta FRD-3, incluso cierrapuertas de uso intensivo, selector de cierre para asegurar el adecuado cierre de las puertas, barra antipánico, llave, remates, juntas, sellados y todos los elementos necesarios para su correcto funcionamiento e instalación.ea0.000.000.00
39D-1 Door (roller shutter), including flashings, sealings, accesories, auxiliary resources, waste loading on container, container rent, transport to an authorised waste manager and landfill fee.
Puerta D-1 (enrollable), incluso remates, sellados, accesorios, medios auxiliares, carga de residuos en contenedor, alquiler de contenedor, transporte a un gestor de residuos autorizado y canon de vertido.ea0.000.000.00
40Extendable motorized arm awning, including flashings, sealings, accesories, auxiliary resources, waste loading on container, container rent, transport to an authorised waste manager and landfill fee.
Toldo de brazo extensible motorizado, incluso remates, sellados, accesorios, medios auxiliares, carga de residuos en contenedor, alquiler de contenedor, transporte a un gestor de residuos autorizado y canon de vertido.ea0.000.000.00
41Metallic stairs for pit access, including flashings, sealings, accesories, auxiliary resources, waste loading on container, container rent, transport to an authorised waste manager and landfill fee.
Escalera metálica de acceso a foso, incluso remates, sellados, accesorios, medios auxiliares, carga de residuos en contenedor, alquiler de contenedor, transporte a un gestor de residuos autorizado y canon de vertido.ea0.000.000.00
42Pit falling protect, including flashings, sealings, accesories, auxiliary resources, waste loading on container, container rent, transport to an authorised waste manager and landfill fee.
Protección contra caídas en foso, incluso remates, sellados, accesorios, medios auxiliares, carga de residuos en contenedor, alquiler de contenedor, transporte a un gestor de residuos autorizado y canon de vertido.ea0.000.000.00
43Electrowelded mesh partitions, including door, sealings, accesories, auxiliary resources, waste loading on container, container rent, transport to an authorised waste manager and landfill fee.
Particiones de malla electrosoldada, incluso puerta, remates, sellados, accesorios, medios auxiliares, carga de residuos en contenedor, alquiler de contenedor, transporte a un gestor de residuos autorizado y canon de vertido.m0.000.000.00
Total Openings and miscellaneous
Total Carpinterías y varios0.000.000.000.00
Roofing Systems
Sistemas de Cubierta
44Gabled Roof made of Insulated metal panels (100 mm thickness), including accesories, penetrations, flashings, waterproofins, sealings, joints, auxiliary resources, all required items for its proper installation, waste loading on container, container rent, transport to an authorised waste manager and landfill fee.
Cubierta inclinada de paneles aislantes (100 mm de espesor), incluso accesorios, pasos, remates, impermeabilización, sellados, juntas, recursos auxiliares, todos los elementos necesarios para su correcta instalación, carga de residuos en contenedor, alquiler de contenedor, transporte a un gestor de residuos autorizado y canon de vertido.m20.000.000.00
45Low slope roof system finished with concrete insulated tiles, including accesories, penetrations, flashings, waterproofins, sealings, joints, auxiliary resources, all required items for its proper installation, waste loading on container, container rent, transport to an authorised waste manager and landfill fee.
Sistema de cubierta plana acabada con baldosas de hormigón aisladas, incluso accesorios, pasos, remates, impermeabilización, sellados, juntas, recursos auxiliares, todos los elementos necesarios para su correcta instalación, carga de residuos en contenedor, alquiler de contenedor, transporte a un gestor de residuos autorizado y canon de vertido.m20.000.000.00
Total Roofing Systems
Total Sistemas de Cubierta0.000.000.000.00
Finish Works
Trabajos de Acabados
46Interior high performance, resistance and coverage power vinyl copolymer based paint with fungicide additives and base board epoxy paint, with previous coat of universal fixing primer for porous surfaces where required, including auxiliary resources.
Pintura interior de alto rendimiento, resistencia y poder cubriente a base de copolímero vinílico con aditivos fungicidas y zócalo de pintura epoxi, con capa previa de imprimación fijadora universal para superficies porosas donde se requiera, incluso medios auxiliares.m20.000.000.00
47Metalllic surfaces painting, including previous clean and rust removing if required, auxiliary resources included. Paint shall be compatible with intumescent paint where required.
Pintura de superficies metálicas, incluyendo limpieza previa y eliminación de óxido si es necesario, con medios auxiliares incluidos. La pintura debe ser compatible con la pintura intumescente donde se requiera.
m20.000.000.00
48Exterior high performance, resistance and coverage power vinyl copolymer based paint with fungicide additives where required, with previous coat of universal fixing primer for porous surfaces where required, including auxiliary resources.
Pintura exterior de alto rendimiento, resistencia y poder cubriente a base de copolímero vinílico con aditivos fungicidas donde se requiera, con capa previa de imprimación fijadora universal para superficies porosas donde se requiera, incluso medios auxiliares.m20.000.000.00
Total Finish Works
Total Trabajos de Acabados0.000.000.000.00
FIRE PROTECTION WORKS
TRABAJOS DE PROTECCIÓN DE INCENDIO
Fire suppression system.
Sistema de extinción de incendio.
49Automatic Sprinkers, including required accesories for its proper installation and auxiliary resources.
Rociadores automáticos, incluso los accesorios necesarios para su correcta instalación y medios auxiliares.ea0.000.000.00
50Ø6" steel conduit, including required accesories for its proper installation and auxiliary resources.
Canalización de acero de Ø6", incluso los accesorios necesarios para su correcta instalación y medios auxiliares.m0.000.000.00
51Ø4" steel conduit, including required accesories for its proper installation and auxiliary resources.
Canalización de acero de Ø4", incluso los accesorios necesarios para su correcta instalación y medios auxiliares.m0.000.000.00
52Ø3" steel conduit, including required accesories for its proper installation and auxiliary resources.
Canalización de acero de Ø3", incluso los accesorios necesarios para su correcta instalación y medios auxiliares.m0.000.000.00
53Ø2" steel conduit, including required accesories for its proper installation and auxiliary resources.
Canalización de acero de Ø2", incluso los accesorios necesarios para su correcta instalación y medios auxiliares.m0.000.000.00
54Ø1 1/2" steel conduit, including required accesories for its proper installation and auxiliary resources.
Canalización de acero de Ø1 1/2", incluso los accesorios necesarios para su correcta instalación y medios auxiliares.m0.000.000.00
55Ø1 1/4" steel conduit, including required accesories for its proper installation and auxiliary resources.
Canalización de acero de Ø1 1/4", incluso los accesorios necesarios para su correcta instalación y medios auxiliares.m0.000.000.00
56Valves and all required accesories for the proper installation, including auxiliary resources.
Válvulas todos los accesorios requeridos para la correcta instalación, incluso medios auxiliares.JOB0.000.000.00
Total Fire suppression system.
Total Sistema de extinción de incendio.0.000.000.000.00
Fire Alarm System
Sistema de Alarma de Incencio
57Initiating & Signaling devices, including required accesories for its proper installation and auxiliary resources.
Dispositivos de iniciación y señalización, incluso los accesorios necesarios para su correcta instalación y medios auxiliares.ea0.000.000.00
58Wiring & Conduits, including required accesories for its proper installation and auxiliary resources.
Cableado y canalizaciones, incluso los accesorios necesarios para su correcta instalación y medios auxiliares.JOB0.000.000.00
59Engineering support.
Soporte de ingeniería.JOB0.000.000.00
Total Fire Protection Works
Total Trabajos de protección de incendio0.000.000.000.00
Passive Fire Protections
Protecciones pasivas contra incendio
60R-30 Intumescent Paint for Strucure, including auxiliary resources.
Pintura Intumescente R-30 para estructura, incluso medios auxiliares.JOB0.000.000.00
61Gypsum drywall firewall strip EI60, including required accesories for its proper installation and auxiliary resources.
Franja cortafuegos de placas de yeso laminado EI60, incluso los accesorios necesarios para su correcta instalación y medios auxiliares.m20.000.000.00
Tota Passive Fire Protections
Total Protecciones pasivas contra incendio0.000.000.000.00
TOTAL FIRE PROTECTION WORKS
TOTAL TRABAJOS DE PROTECCIÓN DE INCENDIO0.000.000.000.00
PLUMBING WORKS
TRABAJOS DE FONTANERÍA
Plumbing Works
Trabajos de Fontanería
62Drinking water fountain, including required accesories for its proper installation.
Fuente de agua potable, incluso los accesorios necesarios para su correcta instalación.ea0.000.000.00
63Non potable water (NPW) service entrance (connection, handhole and PE Ø63mm), including earthworks, accesories and waste management.
Acometida de agua no potable (ANP) (conexión, arqueta y PE Ø63 mm), incluso movimiento de tierras, accesorios y gestión de residuos.m0.000.000.00
64PPR Ø40 mm piping + insulation + protective aluminium sheet, including accesories and auxiliary resources.
Tubería PPR Ø40 mm + aislamiento + chapa de protección de aluminio, incluso accesorios y medios auxiliares.m0.000.000.00
65PPR Ø20 mm piping + insulation + protective aluminium sheet, including accesories and auxiliary resources.
Tubería PPR Ø20 mm + aislamiento + chapa de protección de aluminio, incluso accesorios y medios auxiliares.m0.000.000.00
66PPR Ø25 mm piping + insulation + protective aluminium sheet, including accesories and auxiliary resources.
Tubería PPR Ø25 mm + aislamiento + chapa de protección de aluminio, incluso accesorios y medios auxiliares.m0.000.000.00
67PPR Ø32 mm piping + insulation + protective aluminium sheet, including accesories and auxiliary resources.
Tubería PPR Ø32 mm + aislamiento + chapa de protección de aluminio, incluso accesorios y medios auxiliares.m0.000.000.00
68PPR Ø40 mm piping + insulation + protective aluminium sheet, including accesories and auxiliary resources.
Tubería PPR Ø40 mm + aislamiento + chapa de protección de aluminio, incluso accesorios y medios auxiliares.m0.000.000.00
69Plumbing Fixtures (lavatory, handryer, emergency eyewash and shower, water closet, etc.) including all required accesories for its proper installation.
Accesorios de Fontanería, (Lavabo, secamanos, ducha y lavaojos de emergencia, inodoro, etc.), incluyendo todos los accesorios necesarios para su correcta instalación.JOB0.000.000.00
Total Plumbing Works
Total Trabajos de Fontanería0.000.000.000.00
Sanitary Sewer Works
Trabajos de Saneamiento
70Downspouts, including all required accesories for its proper installation.
Bajantes, incluso todos los accesorios requeridos para su correcta instalación.m0.000.000.00
71Gutters, including all required accesories for its proper installation.
Canalones, incluso todos los accesorios requeridos para su correcta instalación.m0.000.000.00
72PVC conduit Ø200 mm, including all required accesories for its proper installation.
Colector de PVC Ø200 mm, incluso todos los accesorios requeridos para su correcta instalación.m0.000.000.00
73PVC conduit Ø160 mm, including all required accesories for its proper installation.
Colector de PVC Ø160 mm, incluso todos los accesorios requeridos para su correcta instalación.m0.000.000.00
74PVC conduit Ø125 mm, including all required accesories for its proper installation.
Colector de PVC Ø125 mm, incluso todos los accesorios requeridos para su correcta instalación.m0.000.000.00
75PVC conduit Ø110 mm, including all required accesories for its proper installation.
Colector de PVC Ø110 mm, incluso todos los accesorios requeridos para su correcta instalación.m0.000.000.00
76PVC conduit Ø75 mm, including all required accesories for its proper installation.
Colector de PVC Ø75 mm, incluso todos los accesorios requeridos para su correcta instalación.m0.000.000.00
77PVC conduit Ø50 mm, including all required accesories for its proper installation.
Colector de PVC Ø50 mm, incluso todos los accesorios requeridos para su correcta instalación.m0.000.000.00
78PVC conduit Ø40 mm, including all required accesories for its proper installation.
Colector de PVC Ø40 mm, incluso todos los accesorios requeridos para su correcta instalación.m0.000.000.00

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .