7. ALCANCE DE LOS TRABAJOS Y PLANOS REV1.pdf

PDF 205 KB Posted

Attached to
RPR/ADD RADR VEHICLE MX, B121 Federal contract opportunity
Solicitation number
FA557525B0008
Issued by
Department of the Air Force United States Air Forces in Europe - Air Forces Africa

About this file

This document is a Statement of Work (SOW) for a construction project at Morón Air Base in Spain, focusing on expanding the vehicle maintenance facility (Building #121) to support the Runway Damage Rapid Recovery (RADR) Program. The project involves constructing a new approximately 608 m² building adjacent to the existing structure, which will include 4 vehicle maintenance bays, tool and parts storage areas, restrooms, and auxiliary service rooms. Additionally, the project will reorganize the existing building's first floor to create changing rooms, an accessible bathroom, and a reception area.

The scope of work encompasses comprehensive construction activities including civil, structural, architectural, plumbing, HVAC, sewage, electrical, fire protection, telecommunications, and furniture installation. The project requires providing all labor, equipment, and materials to design, fabricate, test, deliver, and install new equipment with all necessary auxiliary services and logistics. Demolition work includes removing interior fencing, exterior paving, and performing foundation and trench excavations. The contract is intended for local sources registered to conduct construction business in Spain, with an estimated project value between $1,000,000 and $5,000,000.

View the file

Other files for this federal contract opportunity

Other files attached to RPR/ADD RADR VEHICLE MX, B121, newest first.
File Type Posted
MFR QUUG 23-1001 Questions and Answers.pdf PDF
Solicitation Amendment FA557525B00080002 SF 30.pdf PDF
5b. Schedule of Materials (Spa) REV1.xlsx XLSX spreadsheet
10. HVAC AIR DISTRIBUTION REV1.pdf PDF
13. Drawing MH601-REV1.pdf PDF
14. Drawing MP601-REV1.pdf PDF
4. Cost Estimated Blank REV1.xlsx XLSX spreadsheet
6. SCOPE OF WORK AND DRAWINGS REV1.pdf PDF
12. Drawing MD601-REV1.pdf PDF
5a. Schedule of Materials (Eng) REV1.xlsx XLSX spreadsheet
Solicitation Amendment FA557525B00080001 SF 30.pdf PDF
8. SPECIAL CONDITIONS REV1.pdf PDF
9. CONDICIONES ESPECIALES REV1.pdf PDF
11. DISTRIBUCIÓN DE AIRE HVAC REV1.pdf PDF
3-Specifications (Spa) QUUG 23-1001.pdf PDF
2-Specifications (Eng) QUUG 23-1001.pdf PDF
Solicitation - FA557525B0008.pdf PDF
5A-Schedule of Materials (Eng).xlsx XLSX spreadsheet
4-Cost Estimated Blank QUUG 23-1001.xlsx XLSX spreadsheet
5B-Schedule of Materials (Spa).xlsx XLSX spreadsheet
Show all 20

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

QUUG 23-1001. EDI RPR/ADD RADR VEHICLE MX, B121

SECCIÓN 01 11 00 - 1

SECCIÓN 01 11 00

ALCANCE DE LOS TRABAJOS Y PLANOS

1 GENERAL

El trabajo cubierto por esta Declaración de Trabajo (SOW) consiste en la construcción del proyecto, realizando todos los viajes necesarios y suministrando todos los servicios profesionales, instalaciones, mano de obra, equipo, materiales, transporte, planos detallados para construir una instalación completa y usable bajo un contrato de precio fijo firme. Cualquier cambio de diseño sugerido por el Contratista al SOW requiere la aprobación del Oficial de Contrataciones antes de que se dé su aceptación. El Contratista será responsable de la señalización temporal, letreros, balizas y luces en el área afectada por la construcción y, si se requiere, proporcionará los banderilleros, escoltas y controladores de escombros y objetos extraños durante las horas de trabajo.

2 DESCRIPCIÓN DEL TRABAJO

Las obras de construcción consisten en, pero no se limitan a, los elementos indicados a continuación, incluyendo las pruebas que deben realizar laboratorios independientes para el control de calidad. Todos los elementos no limitan ni reducen la responsabilidad del Contratista de realizar todos los trabajos según lo requerido por el proyecto para proporcionar una instalación completa, operativa y de bajo mantenimiento.

Las obras de construcción incluidas en este conjunto de especificaciones corresponden al trabajo requerido para expandir la instalación de mantenimiento de vehículos, edificio #121 en la Base Aérea de Morón (España) para apoyar el mantenimiento de la flota de vehículos del Programa de Recuperación Rápida de Daños en Pistas (RADR).

La expansión consistirá en un nuevo edificio, adosado al edificio existente en su fachada oeste. El área construida de la expansión será de aproximadamente 608 m². En esta expansión, habrá 4 bahías para mantenimiento de vehículos, áreas de almacenamiento para herramientas y repuestos, baños y diferentes salas para servicios auxiliares.

Adicionalmente, el proyecto reorganizará el primer piso en el lado oeste del edificio existente para crear vestuarios para hombres y mujeres, baño accesible y área de recepción.

Las obras incluyen, pero no se limitan a, trabajos civiles, estructurales, arquitectónicos, fontanería, HVAC, alcantarillado, eléctrico, protección contra incendios, telecomunicaciones y mobiliario.

El trabajo bajo este proyecto incluye proporcionar toda la mano de obra, equipos y materiales, y realizar todas las operaciones necesarias para diseñar (cuando corresponda), fabricar, ensamblar, probar en fábrica, preparar para el envío y almacenamiento, entregar, instalar en el sitio y ensamblar todo el equipo nuevo requerido, incluyendo todos los servicios auxiliares, materiales, maquinaria y logística necesarios.

Proporcionar el equipo completo con todos los accesorios, repuestos y herramientas. Proporcionar el equipo completo y totalmente funcional.

2.1 Trabajos de demolición

Civil:

Valla interior y verja (fachada oeste).

Pavimentación exterior según se requiera (asfalto y hormigón).

Excavaciones de cimientos y zanjas.

SECCIÓN 01 11 00 - 2

Arquitectura, estructuras e interiores:

Planta baja, zona oeste:

◦ Carpintería interior y exterior.

◦ Mobiliario.

◦ Techos.

◦ Particiones interiores.

◦ Pisos.

◦ Apertura de huecos y zanjas.

Mecánica y fontanería:

Planta baja, zona oeste:

◦ Instalaciones sanitarias y grifos.

◦ Saneamiento y Ventilación.

◦ Tuberías de distribución de agua fría, caliente y de retorno.

◦ Radiadores y Fan-coils.

◦ Tuberías de radiadores y fan-coils.

Cubierta:

◦ Enfriadora de agua y accesorios.

Electricidad y Telecomunicaciones:

Cabinas de HV y LV del transformador.

Transformador de potencia de 160 kVA.

Planta baja, zona oeste:

◦ Sistema de distribución interior (eléctrico y telecomunicaciones).

◦ Sistema de iluminación interior.

2.2 Obra civil

Reemplazo de parte de la cerca perimetral.

Expansión del área pavimentada.

Modificación de la red de alcantarillado subterráneo.

Nueva arqueta separadora de aceite-agua.

2.3 Obras de arquitectura, estructuras e interiores

Construcción del nuevo edificio: Cimentación, Estructura, Cubierta, y Cerramientos.

Nuevas puertas de acceso peatonal y vehicular en el nuevo edificio.

SECCIÓN 01 11 00 - 3

Planta baja, zona oeste:

◦ Nuevas particiones interiores.

◦ Nuevos techos suspendidos.

◦ Nuevas puertas y ventanas.

◦ Nuevos acabados.

Nuevo equipamiento y mobiliario

2.4 Trabajos mecánicos y de fontanería

Modificación del sistema de suministro de agua potable en las áreas afectadas.

Modificación del sistema de alcantarillado sanitario en las áreas afectadas.

Modificación del sistema de aire acondicionado a base de agua en las áreas afectadas.

Nuevo sistema de aire comprimido.

Nueva enfriadora de agua y accesorios.

2.5 Trabajos de protección contra incendios

Expansión del sistema de alarma contra incendios en las áreas afectadas.

Expansión del sistema de rociadores para extinción de incendios.

Nuevo cuadro de control de alarma contra incendios (FACP).

2.6 Electricidad y Telecomunicaciones:

Reemplazo del transformador de la instalación, Celdas de alta tensión y cuadro de baja tensión en el centro de transformación.

Nuevo interruptor de transferencia manual (MTS) para la conexión del generador de emergencia.

Nueva acometida subterránea de baja tensión. Irá desde el centro de transformación existente nº 131 hasta el nuevo interruptor de transferencia manual (MTS).

Nueva conexión de servicio eléctrico para el edificio a la nueva sala eléctrica.

Nuevo cuadro de distribución (LP3) para el nuevo taller III.

Modificación del sistema de distribución interior.

Nuevo sistema de iluminación en las áreas afectadas.

Nuevo sistema de puesta a tierra.

Nuevo sistema de protección contra rayos (LPS) mediante terminales aéreos en cubierta.

Nuevo sistema de distribución de telecomunicaciones interior en las áreas afectadas.

3 PLANOS

A continuación se incluye la lista de dibujos:

Número de planos Hoja Título

R-853-1 GI001 1 DE 183 PORTADA

COVER SHEET

SECCIÓN 01 11 00 - 4

Número de planos Hoja Título

R-853-2 GI002 2 DE 183 RELACIÓN DE PLANOS

DRAWING SCHEDULE

R-853-3 GI003 3 DE 183 PLANO DE SITUACIÓN

LOCATION PLAN

R-853-4 GI004 4 DE 183 DISPOSICIÓN DE ESPACIOS. PLANTA BAJA. ESTADO EXISTENTE

ROOMS ARRANGEMENT. FIRST FLOOR. EXISTING CONDITION

R-853-5 GI005 5 DE 183 DISPOSICIÓN DE ESPACIOS. ENTREPLANTA. ESTADO EXISTENTE

ROOMS ARRANGEMENT. MEZZANINE. EXISTING CONDITION

R-853-6 GI006 6 DE 183 DISPOSICIÓN DE ESPACIOS. PLANTA BAJA. ESTADO PROYECTADO

ROOMS ARRANGEMENT. FIRST FLOOR. PROJECTED CONDITION

R-853-7 GI007 7 DE 183 NOTAS GENERALES I

GENERAL NOTES I

R-853-8 GI008 8 DE 183 NOTAS GENERALES II Y ABREVIATURAS

GENERAL NOTES II AND ABBREVIATIONS

R-853-9 GI009 9 DE 183 LEYENDAS

LEGENDS

R-853-10 GI010 10 DE 183 EVACUACIÓN. PLANTA BAJA. ESTADO PROYECTADO

EVACUATION. FIRST FLOOR. PROJECTED CONDITION

R-853-11 GI011 11 DE 183 EVACUACIÓN. ENTREPLANTA. ESTADO PROYECTADO

EVACUATION. MEZZANINE. PROJECTED CONDITION

R-853-12 GI012 12 DE 183 DISPOSICIÓN TEMPORAL DE ESPACIOS. ESTADO PROYECTADO

TEMPORARY ROOM LAYOUT. PROJECTED CONDITION

R-853-13 V-001 13 DE 183 LEVANTAMIENTO TOPOGRÁFICO. PUNTOS DE REFERENCIA

TOPOGRAPHIC SURVEY. BENCH MARKS

R-853-14 V-101 14 DE 183 LEVANTAMIENTO TOPOGRÁFICO. PLANO

GENERAL TOPOGRAPHIC SURVEY. GENERAL PLAN

R-853-15 B-101 15 DE 183 GEOTÉCNICO. PLANO DE SONDEOS

GEOTECHNICAL. BORING SITE PLAN

R-853-16 CD101 16 DE 183 CIVIL. PAVIMENTOS. PLANTA GENERAL. ESTADO EXISTENTE Y DEMOLICIÓN

CIVIL. PAVEMENTS. GENERAL LAYOUT. EXISTING CONDITION AND

DEMOLITION

R-853-17 CD102 17 DE 183 CIVIL. SERVICIOS PÚBLICOS. ESTADO EXISTENTE Y DEMOLICIÓN

CIVIL. UTILITIES PLAN. EXISTING CONDITION AND DEMOLITION

R-853-18 CD401 18 DE 183 CIVIL. PAVIMENTOS. AMPLIADO. ESTADO EXISTENTE Y DEMOLICIÓN

CIVIL. PAVEMENTS. ENLARGED. EXISTING CONDITION AND DEMOLITION

R-853-19 CD402 19 DE 183 CIVIL. AMPLIADO. SERVICIOS PÚBLICOS. ESTADO EXISTENTE Y DEMOLICIÓN

CIVIL. ENLARGED. UTILITIES PLAN. EXISTING CONDITION

R-853-20 CP101 20 DE 183 CIVIL. PAVIMENTOS. ESTADO PROYECTADO

CIVIL. PAVEMENTS. PROJECTED CONDITION

R-853-21 CP301 21 DE 183 CIVIL. SECCIÓN DE CARRETERA. ESTADO PROYECTADO

CIVIL. ROAD SECTION. PROJECTED CONDITION

R-853-22 CP401 22 DE 183 CIVIL. AMPLIADO. PAVIMENTOS. ESTADO PROYECTADO

CIVIL. ENLARGED. PAVEMENT. PROJECTED CONDITION

R-853-23 CP501 23 DE 183 CIVIL. DETALLES DE VALLA I

CIVIL. FENCE DETAIL I

R-853-24 CP502 24 DE 183 CIVIL. DETALLES DE VALLA II

CIVIL. FENCE DETAIL II

R-853-25 CP503 25 DE 183 CIVIL. DETALLES DE VALLA III

CIVIL. FENCE DETAIL III

R-853-26 CP901 26 DE 183 CIVIL. VISTAS 3D. ESTADO PROYECTADO

CIVIL. 3D VIEW. PROJECTED CONDITION

R-853-27 CU101 27 DE 183 CIVIL. SERVICIOS PÚBLICOS. ESTADO PROYECTADO

CIVIL. UTILITIES PLAN. PROJECTED CONDITION

R-853-28 CU401 28 DE 183 CIVIL. AMPLIADO. SERVICIOS PÚBLICOS. ESTADO PROYECTADO

CIVIL. ENLARGED. UTILITIES PLAN. PROJECTED CONDITION

R-853-29 CU501 29 DE 183 CIVIL. DETALLES I

CIVIL. DETAILS I

R-853-30 CU502 30 DE 183 CIVIL. DETALLES II

CIVIL. DETAILS II

R-853-31 SD101 31 DE 183 ESTRUCTURA. CIMENTACIÓN. ESTADO EXISTENTE

STRUCTURAL. FOUNDATION. EXISTING CONDITION

R-853-32 SD102 32 DE 183 ESTRUCTURA. ESTADO EXISTENTE

STRUCTURAL. EXISTING CONDITION

SECCIÓN 01 11 00 - 5

R-853-33 S-001 33 DE 183 ESTRUCTURA. SECCIÓN GENERAL DE NIVELES

STRUCTURAL. LEVELS. CONSTRUCION PHASING.

R-853-34 SB101 34 DE 183 ESTRUCTURA. PLANO DE CIMENTACIÓN. ESTADO PROYECTADO

STRUCTURAL. FOUNDATION PLAN. PROJECTED CONDITION

R-853-35 SB401 35 DE 183 ESTRUCTURA. PLANO DE CIMENTACIÓN. ESTADO PROYECTADO. AMPLIADO I

STRUCTURAL. FOUNDATION PLAN. PROJECTED CONDITION. ENLARGED I

R-853-36 SB402 36 DE 183 ESTRUCTURA. PLANO DE CIMENTACIÓN. ESTADO PROYECTADO. AMPLIADO II

STRUCTURAL. FOUNDATION PLAN. PROJECTED CONDITION. ENLARGED II

R-853-37 SB501 37 DE 183 ESTRUCTURA. ARMADO DE ZAPATA I

STRUCTURAL. FOOTING REINFORCEMENT I

R-853-38 SB502 38 DE 183 ESTRUCTURA. ARMADO DE ZAPATA II

STRUCTURAL. FOOTING REINFORCEMENT II

R-853-39 SB503 39 DE 183 ESTRUCTURA. ARMADO DE ZAPATA III

STRUCTURAL. FOOTING REINFORCEMENT III

R-853-40 SB504 40 DE 183 ESTRUCTURA. DETALLES. ACERO DE REFUERZO VIGAS I

STRUCTURAL. REINFORCING STEEL BEAMS I

R-853-41 SB505 41 DE 183 ESTRUCTURA. DETALLES. ACERO DE REFUERZO VIGAS II

STRUCTURAL. REINFORCING STEEL BEAMS II

R-853-42 SB506 42 DE 183 ESTRUCTURA. DETALLES CIMENTACIÓN DE FOSO

STRUCTURAL. PIT FOUNDATION DETAILS

R-853-43 SF101 43 DE 183 ESTRUCTURA. PLANO FORJADO COLABORANTE . ESTADO PROYECTADO

STRUCTURAL. COMPOSITE SLAB PLAN. PROJECTED CONDITION

R-853-44 SF401 44 DE 183 ESTRUCTURA METÁLICA. FORJADO COLABORANTE. AMPLIADO I

STEELWORK STRUCTURE. COMPOSITE SLAB. ENLARGED I

R-853-45 SF402 45 DE 183 ESTRUCTURA METÁLICA. FORJADO COLABORANTE. AMPLIADO II

STEELWORK STRUCTURE. COMPOSITE SLAB. ENLARGED II

R-853-46 SF403 46 DE 183 FORJADO COLABORANTE. REFUERZO DE POSITIVOS I

COMPOSITE SLAB. NEGATIVE REINFORCEMENT. ENLARGED I

R-853-47 SF404 47 DE 183 FORJADO COLABORANTE. REFUERZO DE POSITIVOS. AMPLIADO II

COMPOSITE SLAB. NEGATIVE REINFORCEMENT. ENLARGED II

R-853-48 SF102 48 DE 183 ESTRUCTURA.PLANO VIGA CARRILERA. ESTADO PROYECTADO

STRUCTURAL. RUNWAY PLAN. PROJECTED CONDITION

R-853-49 SF103 49 DE 183 ESTRUCTURA. PLANO DE CUBIERTA. ESTADO PROYECTADO

STRUCTURAL. ROOF PLAN. PROJECTED CONDITION

R-853-50 SF301 50 DE 183 ESTRUCTURA. PÓRTICOS I. ESTADO PROYECTADO

STRUCTURAL. FRAMES I. PROJECTED CONDITION

R-853-51 SF302 51 DE 183 ESTRUCTURA. PÓRTICOS II. ESTADO PROYECTADO

STRUCTURAL. FRAMES II. PROJECTED CONDITION

R-853-52 SF501 52 DE 183 ESTRUCTURA. REFERENCIAS DE UNIONES. VISTA 3D

STRUCTURAL. JOINTS REFERENCES. 3D VIEW

R-853-53 SF502 53 DE 183 ESTRUCTURA. SECCIONES DE REFERENCIAS DE UNIONES I

STRUCTURAL. JOINTS REFERENCES SECTIONS I

R-853-54 SF503 54 DE 183 ESTRUCTURA. SECCIONES DE REFERENCIAS DE UNIONES II

STRUCTURAL. JOINTS REFERENCES SECTIONS II

R-853-55 SF504 55 DE 183 ESTRUCTURA. DETALLES DE UNIONES SOLDADAS I

STRUCTURAL. WELDED JOINT DETAILS I

R-853-56 SF505 56 DE 183 ESTRUCTURA. DETALLES DE UNIONES SOLDADAS II

STRUCTURAL. WELDED JOINT DETAILS II

R-853-57 SF506 57 DE 183 ESTRUCTURA. DETALLES DE UNIONES SOLDADAS III

STRUCTURAL. WELDED JOINT DETAILS III

R-853-58 SF507 58 DE 183 ESTRUCTURA. DETALLES DE UNIONES SOLDADAS IV

STRUCTURAL. WELDED JOINT DETAILS IV

R-853-59 SF508 59 DE 183 ESTRUCTURA. DETALLES DE UNIONES SOLDADAS V

STRUCTURAL. WELDED JOINT DETAILS V

R-853-60 SF601 60 DE 183 ESTRUCTURA. TABLA DE UNIONES SOLDADAS I

STRUCTURAL. WELDED UNION SCHEDULE I

R-853-61 SF602 61 DE 183 ESTRUCTURA. TABLA DE UNIONES SOLDADAS II

STRUCTURAL. WELDED UNION SCHEDULE II

R-853-62 SB102 62 DE 183 ESTRUCTURA. PLANO DE LOSAS. ESTADO PROYECTADO

STRUCTURAL. FLOOR SLAB PLAN. PROJECTED CONDITION

R-853-63 SB103 63 DE 183 ESTRUCTURA. DISTRIBUCIÓN DE JUNTAS. ESTADO PROYECTADO

STRUCTURAL. JOINTS LAYOUT. PROJECTED CONDITION

SECCIÓN 01 11 00 - 6

R-853-64 SB403 64 DE 183 ESTRUCTURA. DISTRIBUCIÓN DE JUNTAS. ESTADO PROYECTADO. VISTA

AMPLIADA I

STRUCTURAL. JOINTS LAYOUT. PROJECTED CONDITION. ENLARGED VIEW I

R-853-65 SB404 65 DE 183 ESTRUCTURA. DISTRIBUCIÓN DE JUNTAS. ESTADO PROYECTADO. VISTA

AMPLIADA II

STRUCTURAL. JOINTS LAYOUT. PROJECTED CONDITION. ENLARGED VIEW II

R-853-66 SB507 66 DE 183 ESTRUCTURA. DETALLE DE JUNTAS

STRUCTURAL. JOINTS DETAILS

R-853-67 SB104 67 DE 183 ESTRUCTURA. CUARTO ELÉCTRICO. ESTADO PROYECTADO

STRUCTURAL. ELECTRIC ROOM. PROJECTED CONDITION

R-853-68 SB508 68 DE 183 ESTRUCTURA. CUARTO ELÉCTRICO. CIMENTACIÓN. ESTADO PROYECTADO

STRUCTURAL. ELECTRIC ROOM. FOUNDATION. PROJECTED CONDITION

R-853-69 SB509 69 DE 183 ESTRUCTURA. CUARTO ELÉCTRICO. PÓRTICOS CUBIERTA. ESTADO

PROYECTADO

STRUCTURAL. ELECTRIC ROOM. ROOF FRAMES. PROJECTED CONDITION

R-853-70 SB510 70 DE 183 ESTRUCTURA. CUARTO ELÉCTRICO. UNIDAD DE MAMPOSTERÍA DE

HORMIGÓN. ESTADO PROYECTADO

STRUCTURAL. ELECTRIC ROOM. CONCRETE MASONRY UNIT. PROJECTED

CONDITION

R-853-71 AD101 71 DE 183 ARQUITECTURA. PLANTA BAJA. ESTADO EXISTENTE Y DEMOLICIÓN

ARCHITECTURAL. FIRST FLOOR. EXISTING CONDITION AND DEMOLITION

R-853-72 A-101 72 DE 183 ARQUITECTURA. PLANTA BAJA. ESTADO PROYECTADO

ARCHITECTURAL. FIRST FLOOR. PROJECTED CONDITION

R-853-73 A-102 73 DE 183 ARQUITECTURA. ENTREPLANTA. ESTADO PROYECTADO

ARCHITECTURAL. MEZZANINE. PROJECTED CONDITION

R-853-74 A-103 74 DE 183 ARQUITECTURA. PLANO DE CUBIERTA. ESTADO PROYECTADO

ARCHITECTURAL. ROOF PLAN. PROJECTED CONDITION

R-853-75 A-104 75 DE 183 ARQUITECTURA. PLANTA BAJA. PLANO DE ACCESIBILIDAD

ARCHITECTURAL. FIRST FLOOR. ACCESSIBILITY PLAN VIEW.

R-853-76 A-201 76 DE 183 ARQUITECTURA. ALZADOS. ESTADO PROYECTADO

ARCHITECTURAL. ELEVATIONS. PROJECTED CONDITION

R-853-77 A-202 77 DE 183 ARQUITECTURA. REPLANTEO FACHADA PREFABRICADA. ESTADO

PROYECTADO

ARCHITECTURAL. PRECAST FACADE LAYOUT. PROJECTED CONDITION

R-853-78 A-301 78 DE 183 ARQUITECTURA. SECCIONES. ESTADO PROYECTADO ARCHITECTURAL.

SECTIONS. PROJECTED CONDITION

R-853-79 A-401 79 DE 183 ARQUITECTURA. AMPLIADO I. PLANO ACABADOS. ESTADO PROYECTADO

ARCHITECTURAL. ENLARGED I. FINISH PLAN. PROJECTED CONDITION

R-853-80 A-402 80 DE 183 ARQUITECTURA. AMPLIADO II. PLANO ACABADOS. ESTADO PROYECTADO

ARCHITECTURAL. ENLARGED II. FINISH PLAN. PROJECTED CONDITION

R-853-81 A-403 81 DE 183 ARQUITECTURA. AMPLIADO III. SALA ELÉCTRICA. ESTADO PROYECTADO

ARCHITECTURAL. ENLARGED III. ELECTRICAL ROOM. PROJECTED

CONDITION

R-853-82 A-501 82 DE 183 ARQUITECTURA. DETALLES DE ANCLAJE DE PANELES PREFABRICADOS.

ESTADO PROYECTADO

ARCHITECTURAL. PRECAST PANEL ANCHORS DETAILS. PROJECTED

CONDITION

R-853-83 A-502 83 DE 183 ARQUITECTURA. DETALLES CONSTRUCTIVOS I. ESTADO PROYECTADO

ARCHITECTURAL. CONSTRUCTION DETAILS I. PROJECTED CONDITION

R-853-84 A-503 84 DE 183 ARQUITECTURA. DETALLES CONSTRUCTIVOS II. ESTADO PROYECTADO

ARCHITECTURAL. CONSTRUCTION DETAILS II. PROJECTED CONDITION

R-853-85 A-504 85 DE 183 ARQUITECTURA.DETALLES CONSTRUCTIVOS III. ESTADO PROYECTADO

ARCHITECTURAL. CONSTRUCTION DETAILS III. PROJECTED CONDITION

R-853-86 A-505 86 DE 183 ARQUITECTURA. DETALLES DE MUROS I. ESTADO PROYECTADO

ARCHITECTURAL. WALLS DETAILS I. PROJECTED CONDITION

R-853-87 A-506 87 DE 183 ARQUITECTURA. DETALLES DE MUROS II. ESTADO PROYECTADO

ARCHITECTURAL. WALLS DETAILS II. PROJECTED CONDITION

R-853-88 A-507 88 DE 183 ARQUITECTURA. DESPIECE DE PANELES DE HORMIGÓN PREFABRICADO I

ARCHITECTURAL. PRECAST CONCRETE PANEL LAYOUT I

R-853-89 A-508 89 DE 183 ARQUITECTURA.DESPIECE DE PANELES DE HORMIGÓN PREFABRICADO II

ARCHITECTURAL. PRECAST CONCRETE PANEL LAYOUT II

R-853-90 A-509 90 DE 183 ARQUITECTURA. DETALLE DE FALSO TECHO

SECCIÓN 01 11 00 - 7

ARCHITECTURAL. SUSPENDED CEILING DETAIL

R-853-91 A-510 91 DE 183 ARQUITECTURA. SECCIONES ASEOS

ARCHITECTURAL. RESTROOM SECTIONS

R-853-92 A-511 92 DE 183 ARQUITECTURA. DETALLES TÍPICOS DE ASEOS

ARCHITECTURAL. TYPICAL RESTROOM DETAILS

R-853-93 A-512 93 DE 183 ARQUITECTURA.DETALLE DE CASETÓN PARA SERVICIOS EN CUBIERTA

ARCHITECTURAL. ROOF SERVICE CABINET DETAIL

R-853-94 A-513 94 DE 183 ARQUITECTURA. REMATES

ARCHITECTURAL. FLASHINGS

R-853-95 A-514 95 DE 183 ARQUITECTURA. DETALLES DE VENTANAS

ARCHITECTURAL. WINDOWS DETAILS

R-853-96 A-515 96 DE 183 ARQUITECTURA. DETALLES DE PUERTAS I

ARCHITECTURAL. DOOR DETAILS I

R-853-97 A-516 97 DE 183 ARQUITECTURA. DETALLES DE PUERTAS II

ARCHITECTURAL. DOOR DETAILS II

R-853-98 A-517 98 DE 183 ARQUITECTURA. DETALLES DE PUERTAS III

ARCHITECTURAL. DOOR DETAILS III

R-853-99 A-518 99 DE 183 ARQUITECTURA. DETALLES DE PUERTAS IV

ARCHITECTURAL. DOOR DETAILS IV

R-853-100 A-519 100 DE 183 ARQUITECTURA. TABLA DE PUERTAS

ARCHITECTURAL. DOORS SCHEDULE

R-853-101 A-901 101 DE 183 ARQUITECTURA. VISTAS 3D. ESTADO PROYECTADO

ARCHITECTURAL. 3D VIEWS . PROJECTED CONDITION

R-853-102 FD101 102 DE 183 ALARMA CONTRA INCENDIOS. PLANTA BAJA. ESTADO EXISTENTE Y

DEMOLICIÓN

FIRE ALARM. FIRST FLOOR. EXISTING CONDITION AND DEMOLITION

R-853-103 FD102 103 DE 183 EXTINCIÓN DE INCENDIOS. PLANTA BAJA. ESTADO EXISTENTE Y

DEMOLICIÓN

FIRE SUPPRESSION. FIRST FLOOR. EXISTING CONDITION AND DEMOLITION

R-853-104 FA101 104 DE 183 ALARMA CONTRA INCENDIOS. PLANTA BAJA. ESTADO PROYECTADO

FIRE ALARM. FIRST FLOOR. PROJECTED CONDITION

R-853-105 FA501 105 DE 183 ALARMA CONTRA INCENDIOS. DETALLES

FIRE ALARM. DETAILS

R-853-106 FA601 106 DE 183 ALARMA CONTRA INCENDIOS. DIAGRAMA UNIFILAR Y MATRIZ

FIRE ALARM. RISER DIAGRAM & MATRIX

R-853-107 FX101 107 DE 183 EXTINCIÓN DE INCENDIO. PLANTA BAJA. ESTADO PROYECTADO

FIRE SUPPRESSION. FIRST FLOOR. PROJECTED CONDITION

R-853-108 FX301 108 DE 183 EXTINCIÓN DE INCENDIOS. SECCIONES. ESTADO PROYECTADO

FIRE SUPPRESSION. SECTIONS. PROJECTED CONDITION

R-853-109 FX601 109 DE 183 EXTINCIÓN DE INCENDIOS. DIAGRAMA GENERAL DEL SISTEMA DE

ROCIADORES

FIRE SUPPRESSION. FIRE SPRINKLER SYSTEM DIAGRAM

R-853-110 FX901 110 DE 183 EXTINCIÓN DE INCENDIOS. VISTA ISOMÉTRICA I. ESTADO PROYECTADO

FIRE SUPPRESSION. ISOMETRIC VIEW I. PROJECTED CONDITION

R-853-111 FX902 111 DE 183 EXTINCIÓN DE INCENDIOS. VISTA ISOMÉTICA II. ESTADO PROYECTADO

FIRE SUPPRESSION. ISOMETRIC VIEW II. PROJECTED CONDITION

R-853-112 PD101 112 DE 183 FONTANERÍA. PLANTA BAJA. ESTADO EXISTENTE Y DEMOLICIÓN

PLUMBING. FIRST FLOOR. EXISTING CONDITION AND DEMOLITION

R-853-113 PD102 113 DE 183 SANEAMIENTO. PLANTA BAJA. ESTADO EXISTENTE Y DEMOLICIÓN

SANITARY SEWER. FIRST FLOOR. EXISTING CONDITION AND DEMOLITION

R-853-114 PP101 114 DE 183 FONTANERÍA. PLANTA BAJA. ESTADO PROYECTADO PLUMBING. FIRST FLOOR.

PROJECTED CONDITION

R-853-115 PP102 115 DE 183 SANEAMIENTO. PLANTA BAJA. ESTADO PROYECTADO SANITARY SEWER.

FIRST FLOOR. PROJECTED CONDITION

R-853-116 PP103 116 DE 183 SANEAMIENTO FOSO Y ARQUETAS. PLANTA BAJA. ESTADO PROYECTADO

SANITARY SEWER PIT AND HANDHOLE. FIRST FLOOR. PROJECTED CONDITION

R-853-117 PP104 117 DE 183 VENTILACIÓN SANITARIA. VISTA DE TECHO REFLEJADO. ESTADO

PROYECTADO

SANITARY VENTING. REFLECTED CEILING VIEW. PROJECTED CONDITION

R-853-118 PP105 118 DE 183 EVACUACIÓN DE AGUAS PLUVIALES .VISTA DE TECHO REFLEJADO. ESTADO

PROYECTADO

STORM DRAINAGE. REFLECTED CEILING VIEW. FLOOR PLAN

SECCIÓN 01 11 00 - 8

R-853-119 PP106 119 DE 183 AIRE COMPRIMIDO. VISTA DE TECHO REFLEJADO. ESTADO PROYECTADO

AIR COMPRESSED. REFLECTED CEILING VIEW. PROJECTED CONDITION

R-853-120 PP107 120 DE 183 DISTRIBUCIÓN DE FLUIDOS. VISTA DE TECHO REFLEJADO. ESTADO

PROYECTADO

FLUID DISTRIBUTION. REFLECTED CEILING VIEW. PROJECTED CONDITION

R-853-121 PP401 121 DE 183 FONTANERÍA. PLANTA BAJA. ESTADO PROYECTADO. AMPLIADO I

PLUMBING. FIRST FLOOR. PROJECTED CONDITION. ENLARGED I

R-853-122 PP402 122 DE 183 FONTANERÍA. PLANTA BAJA. ESTADO PROYECTADO. AMPLIADO II

PLUMBING. FIRST FLOOR. PROJECTED CONDITION. ENLARGED II

R-853-123 PP403 123 DE 183 SANEAMIENTO. PLANTA BAJA. ESTADO PROYECTADO. AMPLIADO I

SANITARY SEWER. FIRST FLOOR. PROJECTED CONDITION. ENLARGED I

R-853-124 PP404 124 DE 183 SANEAMIENTO. PLANTA BAJA. ESTADO PROYECTADO. AMPLIADO II

SANITARY SEWER. FIRST FLOOR. PROJECTED CONDITION. ENLARGED II

R-853-125 PP405 125 DE 183 SANEAMIENTO FOSO Y ARUQETAS. PLANTA BAJA. ESTADO PROYECTADO.

AMPLIADO I

SANITARY SEWER PIT AND HANDHOLE. FIRST FLOOR. PROJECTED

CONDITION. ENLARGED I

R-853-126 PP406 126 DE 183 SANEAMIENTO FOSO Y ARQUETAS. PLANTA BAJA. ESTADO PROYECTADO.

AMPLIADO II

SANITARY SEWER PIT AND HANDHOLE. FIRST FLOOR. PROJECTED

CONDITION. ENLARGED II

R-853-127 PP407 127 DE 183 VENTILACIÓN SANITARIA. VISTA DE TECHO REFLEJADO. ESTADO

PROYECTADO. AMPLIADO I

SANITARY VENTING. REFLECTED CEILING VIEW. PROJECTED CONDITION.

ENLARGED I

R-853-128 PP408 128 DE 183 VENTILACIÓN SANITARIA. VISTA DE TECHO REFLEJADO. ESTADO

PROYECTADO. AMPLIADO II

SANITARY VENTING. REFLECTED CEILING VIEW. PROJECTED CONDITION.

ENLARGED II

R-853-129 PP409 129 DE 183 EVACUACIÓN DE AGUAS PLUVIALES. VISTA DE TECHO REFLEJADO. ESTADO

PROYECTADO. AMPLIADO I

STORM DRAINAGE. REFLECTED CEILING VIEW. PROJECTED CONDITION.

ENLARGED I

R-853-130 PP410 130 DE 183 EVACUACIÓN DE AGUAS PLUVIALES. VISTA DE TECHO REFLEJADO. ESTADO

PROYECTADO. AMPLIADO II

STORM DRAINAGE. REFLECTED CEILING VIEW. PROJECTED CONDITION.

ENLARGED II

R-853-131 PP411 131 DE 183 AIRE COMPRIMIDO. PLANTA BAJA. ESTADO PROYECTADO. AMPLIADO I

AIR COMPRESSED. FIRST FLOOR. PROJECTED CONDITION. ENLARGED I

R-853-132 PP412 132 DE 183 AIRE COMPRIMIDO. PLANTA BAJA. ESTADO PROYECTADO. AMPLIADO II

AIR COMPRESSED.FIRST FLOOR. PROJECTED CONDITION. ENLARGED II

R-853-133 PP413 133 DE 183 AIRE COMPRIMIDO. PLANTA BAJA. ESTADO PROYECTADO. AMPLIADO III

AIR COMPRESSED. FIRST FLOOR. PROJECTED CONDITION. ENLARGED III

R-853-134 PP501 134 DE 183 DETALLES DE TUBERÍAS

PIPING DETAILS

R-853-135 PP901 135 DE 183 FONTANERÍA. VISTA ISOMÉTRICA. ESTADO PROYECTADO

PLUMBING. ISOMETRIC VIEW. PROJECTED CONDITION

R-853-136 PP902 136 DE 183 FONTANERÍA. VISTA ISOMÉTRICA. AMPLIADO I & II. ESTADO PROYECTADO

PLUMBING. ISOMETRIC VIEW. ENLARGED I & II. PROJECTED CONDITION

R-853-137 PP903 137 DE 183 SANEAMIENTO. VISTA ISOMÉTRICA. ESTADO PROYECTADO

SANITARY SEWER. ISOMETRIC VIEW. PROJECTED CONDITION

R-853-138 PP904 138 DE 183 SANEAMIENTO. VISTA ISOMÉTRICA. AMPLIADO I & II. ESTADO PROYECTADO

SANITARY SEWER. ISOMETRIC VIEW. ENLARGED I & II PROJECTED

CONDITION

R-853-139 PP905 139 DE 183 VENTILACIÓN SANITARIA. VISTA ISOMÉTRICA. AMPLIADO I & II. ESTADO

PROYECTADO

SANITARY VENTING. ISOMETRIC VIEW. ENLARGED I & II. PROJECTED

CONDITION

R-853-140 PP906 140 DE 183 AIRE COMPRIMIDO. VISTA ISOMÉTRICA. ESTADO PROYECTADO

AIR COMPRESSED. ISOMETRIC VIEW. PROJECTED CONDITION

R-853-141 PP907 141 DE 183 AIRE COMRPIMIDO. VISTA ISOMÉTRICA. AMPLIADO I & II. ESTADO

PROYECTADO

AIR COMPRESSED. ISOMETRIC VIEW. ENLARGED I & II. PROJECTED

CONDITION

SECCIÓN 01 11 00 - 9

R-853-142 PP908 142 DE 183 DISTRIBUCIÓN DE FLUIDOS. VISTA ISOMÉTRICA. ESTADO PROYECTADO

FLUID DISTRIBUTION. ISOMETRIC VIEW. PROJECTED CONDITION

R-853-143 MD101 143 DE 183 MECÁNICA. PLANTA BAJA. ESTADO EXISTENTE Y DEMOLICIÓN

MECHANICAL. FIRST FLOOR. EXISTING CONDITION AND DEMOLITION

R-853-144 MD601

REV1

144 DE 183 MECÁNICA. DIAGRAMA DE FLUJO DE TUBERÍAS. ESTADO EXISTENTE Y

DEMOLICIÓN MECHANICAL. PIPING FLOW DIAGRAM. EXISTING CONDITION

AND DEMOLITION

R-853-145 MH101 145 DE 183 MECÁNICA. CONDUCTOS. PLANTA BAJA. ESTADO PROYECTADO

MECHANICAL. DUCT. FIRST FLOOR. PROJECTED CONDITION

R-853-146 MH102 146 DE 183 MECÁNICA. EQUIPAMIENTO. PLANTA BAJA. ESTADO PROYECTADO

MECHANICAL. EQUIPMENT. FIRST FLOOR. PROJECTED CONDITION

R-853-147 MH401 147 DE 183 MECÁNICA. CONDUCTOS. PLANTA BAJA. ESTADO PROYECTADO. AMPLIADO I

MECHANICAL. DUCT. FIRST FLOOR. PROJECTED CONDITION. ENLARGED I

R-853-148 MH402 148 DE 183 MECÁNICA. CONDUCTOS. PLANTA BAJA. ESTADO PROYECTADO. AMPLIADO II

MECHANICAL. DUCT. FIRST FLOOR. PROJECTED CONDITION. ENLARGED II

R-853-149 MH501 149 DE 183 MECÁNICA. CONDUCTOS. DETALLES

MECHANICAL. DUCT. DETAILS

R-853-150 MH502 150 DE 183 MECÁNICA. CONDUCTOS. SOPORTES

MECHANICAL. DUCT. SUPPORTS

R-853-151 MH601

REV1

151 DE 183 MECÁNICA. CONDUCTOS. TABLAS

MECHANICAL. DUCT. SCHEDULES

R-853-152 MP101 152 DE 183 MECÁNICA. TUBERÍAS. PLANTA BAJA. ESTADO PROYECTADO

MECHANICAL. PIPING. FIRST FLOOR. PROJECTED CONDITION

R-853-153 MP401 153 DE 183 MECÁNICA. TUBERÍAS.PLANTA BAJA. ESTADO PROYECTADO. AMPLIADO I

MECHANICAL. PIPING. FIRST FLOOR. PROJECTED CONDITION. ENLARGED I

R-853-154 MP402 154 DE 183 MECÁNICA. TUBERÍAS. PLANTA BAJA. ESTADO PROYECTADO. AMPLIADO II

MECHANICAL. PIPING. FIRST FLOOR. PROJECTED CONDITION. ENLARGED II

R-853-155 MP601

REV1

155 DE 183 MECÁNICA. DIAGRAMA DE FLUJO DE TUBERÍAS. ESTADO PROYECTADO

MECHANICAL. PIPING FLOW DIAGRAM. PROJECTED CONDITION

R-853-156 MP901 156 DE 183 MECÁNICA. TUBERÍAS. VISTA ISOMÉTRICA. ESTADO PROYECTADO

MECHANICAL. PIPING. ISOMETRIC VIEW. PROJECTED CONDITION

R-853-157 ED101 157 DE 183 ELECTRICIDAD. ILUMINACIÓN. PLANTA BAJA. ESTADO EXISTENTE Y

DEMOLICIÓN

ELECTRICAL. LIGHTING. FIRST FLOOR. EXISTING CONDITION AND

DEMOLITION

R-853-158 ED102 158 DE 183 ELECTRICIDAD. FUERZA. PLANTA BAJA. ESTADO EXISTENTE Y DEMOLICIÓN

ELECTRICAL. POWER. FIRST FLOOR. EXISTING CONDITION AND DEMOLITION

R-853-159 ED103 159 DE 183 ELECTRICIDAD. PUESTA A TIERRA. PLANO DE PLANTA. ESTADO EXISTENTE Y

DEMOLICIÓN

ELECTRICAL. GROUNDING. FLOOR PLAN. EXISTING CONDITION AND

DEMOLITION

R-853-160 ED601 160 DE 183 ELECTRICIDAD. ESQUEMA UNIFILAR. ESTADO EXISTENTE Y DEMOLICIÓN

ELECTRICAL. SINGLE LINE DIAGRAM. EXISTING CONDITION AND

DEMOLITION

R-853-161 ED602 161 DE 183 ELECTRICIDAD. ESQUEMA UNIFILAR LP2. ESTADO EXISTENTE Y DEMOLICIÓN

ELECTRICAL. SINGLE LINE DIAGRAM LP2. EXISTING CONDITION AND

DEMOLITION

R-853-162 ED603 162 DE 183 ELECTRICIDAD. CENTRO DE TRANSFORMACIÓN. ESTADO EXISTENTE Y

DEMOLICIÓN.

ELECTRICAL. TRANSFORMER VAULT. EXISITING CONDITION AND

DEMOLITION.

R-853-163 EL101 163 DE 183 ELECTRICIDAD. ILUMINACIÓN. PLANTA BAJA. ESTADO PROYECTADO

ELECTRICAL. LIGHTING. FIRST FLOOR. PROJECTED CONDITION

R-853-164 EL501 164 DE 183 ELECTRICIDAD. ILUMINACIÓN. DETALLES ELECTRICAL. LIGHTING DETAILS

R-853-165 EL601 165 DE 183 ELECTRICIDAD. DIAGRAMA DE CONTROL Y TABLAS DE ILUMINACIÓN

ELECTRICAL. LIGHTING CONTROL DIAGRAM AND SCHEDULES

R-853-166 EP101 166 DE 183 ELECTRICIDAD. FUERZA. PLANTA BAJA. ESTADO PROYECTADO

ELECTRICAL.POWER. FIRST FLOOR. PROJECTED CONDITION

R-853-167 EP401 167 DE 183 ELECTRICIDAD. CENTRO DE TRANSFORMACIÓN Y SALA ELÉCTRICA. ESTADO

PROYECTADO

ELECTRICAL. TRANSFORMER VAULT AND ELECTRICAL ROOM. PROJECTED

CONDITION

R-853-168 EP402 168 DE 183 ELECTRICIDAD. CENTRO DE TRANSFORMACIÓN Y SALA ELÉCTRICA.

SECCIÓN 01 11 00 - 10

DETALLES. ESTADO PROYECTADO

ELECTRICAL. TRANSFORMER VAULT AND ELECTRICAL ROOM. DETAILS.

PROJECTED CONDITION

R-853-169 EP501 169 DE 183 ELECTRICIDAD. DETALLES DE CUADROS ELÉCTRICOS ELECTRICAL.

ELECTRICAL PANELBOARD DETAILS

R-853-170 EP502 170 DE 183 ELECTRICIDAD. DETALLES DE TOMAS DE CORRIENTE

ELECTRICAL. RECEPTACLES DETAILS

R-853-171 EP503 171 DE 183 ELECTRICIDAD. DETALLES

ELECTRICAL. DETAILS

R-853-172 EP601 172 DE 183 ELECTRICIDAD. ESQUEMA UNIFILAR. ESTADO PROYECTADO

ELECTRICAL. SINGLE LINE DIAGRAM. PROJECTED CONDITION

R-853-173 EP602 173 DE 183 ELECTRICIDAD. ESQUEMA UNIFILAR LP2. ESTADO PROYECTADO

ELECTRICAL. SINGLE LINE DIAGRAM LP2. PROJECTED CONDITION

R-853-174 EP603 174 DE 183 ELECTRICIDAD. ESQUEMA UNIFILAR LP3. ESTADO PROYECTADO

ELECTRICAL. SINGLE LINE DIAGRAM LP3. PROJECTED CONDITION

R-853-175 EP604 175 DE 183 ELECTRICIDAD. CUADROS ELÉCTRICOS. ESTADO PROYECTADO

ELECTRICAL. PANEL SCHEDULE. PROJECTED CONDITION

R-853-176 EP605 176 DE 183 ELECTRICIDAD. CUADROS ELÉCTRICOS. ESTADO PROYECTADO. LP3

ELECTRICAL. PANEL SCHEDULE. PROJECTED CONDITION. LP3

R-853-177 EP606 177 DE 183 ELECTRICIDAD. DIAGRAMAS DE CONTROL

ELECTRICAL. CONTROL DIAGRAMS

R-853-178 EG101 178 DE 183 ELECTRICIDAD. PUESTA A TIERRA. PLANO DE PLANTA. ESTADO PROYECTADO

ELECTRICAL. GROUNDING. FLOOR PLAN. PROJECTED CONDITION

R-853-179 EG102 179 DE 183 ELECTRICIDAD. PARARRAYOS. PLANO DE CUBIERTA. ESTADO PROYECTADO

ELECTRICAL. LIGHTNING PROTECTION. ROOF PLAN. PROJECTED CONDITION

R-853-180 EG501 180 DE 183 ELECTRICIDAD. DETALLES DE PUESTA A TIERRA

ELECTRICAL. GROUNDING DETAILS

R-853-181 TD101 181 DE 183 TELECOMUNICACIONES. PLANTA BAJA. ESTADO EXISTENTE Y DEMOLICIÓN

TELECOMMUNICATIONS. FIRST FLOOR. EXISTING CONDITION AND

DEMOLITION

R-853-182 T-101 182 DE 183 TELECOMUNICACIONES. PLANTA BAJA. ESTADO PROYECTADO

TELECOMMUNICATIONS. FIRST FLOOR. PROJECTED CONDITION

R-853-183 T-501 183 DE 183 TELECOMUNICACIONES. DETALLES

TELECOMMUNICATIONS. DETAILS

*** FIN DE LA SECCIÓN ***

File details come from the government source that posted it. Updated .