About this file

This document contains questions and answers regarding a solicitation for repair of runway edges and shoulders at Moron Air Base in Spain. The project value is estimated between $5-10 million USD. Questions addressed logistics of operating during runway use, including potential flight schedules and interruptions, as well as permission to establish temporary asphalt and concrete plants on base. Responses indicated specific details would be determined with the awarded contractor, and temporary plant approval requires Spanish Air Force authorization. The solicitation number is provided along with a pre-proposal meeting date of April 15, 2021 and proposal submission deadline of April 30, 2021. The involved agency is the United States Air Force in Europe and Africa. Funding is not guaranteed and the solicitation may be cancelled with no obligation to reimburse offerors.

View the file

Other files for this federal contract opportunity

Other files attached to Repair Runway Edges & Shoulders, newest first.
File Type Posted
Solicitation Amendment FA557521R00010003.pdf PDF
Solicitation Amendment FA557521R00010003 SF30.pdf PDF
FA5575-21-R-0001 Questions and Answers.pdf PDF
Solicitation Amendment FA557521R00010002 SF30.pdf PDF
Solicitation Amendment FA557521R00010002.pdf PDF
Solicitation Amendment FA557521R00010001.pdf PDF
Attachment D Concept Drawings Dated 15 Dec 20.pdf PDF
Solicitation Amendment FA557521R00010001 SF30.pdf PDF
Attachment F Construction Cost Estimate Breakdown Form Dated 10 Feb 21.xlsx XLSX spreadsheet
Attachment J Schedule of Material Submittals Form.xlsx XLSX spreadsheet
Attachment B Integrated Natural Resources Management Plan for Moron Air Base Jun 2015.pdf PDF
Attachment A Asphalt Coring Report of Runway Edges and Shoulders.pdf PDF
Statement of Work English.pdf PDF
Attachment F Construction Cost Estimate Breakdown Form.xlsx XLSX spreadsheet
Attachment E Record Drawings.pdf PDF
Attachment D Concept Drawings.pdf PDF
Solicitation FA557521R0001.pdf PDF
Attachment I Airfield Construction Requirements Checklist Form.pdf PDF
Attachment G Request for Waiver to Airfield and Airspace Criteria Form.pdf PDF
Attachment C Environmental Final Governing Standards for Spain May 2014.pdf PDF
Attachment H Deliberate Risk Assessment Worksheet.pdf PDF
Show all 21

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

QUESTIONS AND ANSWERS - 2

19-1006 RPR RWY Edges & Shoulders

Solicitation: FA5575-21-R-0001

Reference: Proposal Submittal per E-Mail.

Question 1: What is the size limitation (in MB) per E-Mail that Offerors should consider?

Answer 1: Our email limitation is 10MB.

Reference: Runway Operational During Project Works

Question 2: Could the Government please provide a rough schedule of the flights per day.

Answer 2: No. This will be discuss with the contractor who is awarded the contract.

Question 3: Could the Government please provide an estimation of the average number of interruptions to the construction works due to the flights per day?

Answer 3: No. This will be discuss with the contractor who is awarded the contract.

Question 4: Could the Government please provide how long (how many minutes) would each interruption normally last?

Answer 4: No. This will be discuss with the contractor who is awarded the contract.

Question 5: Could the Government please provide historical data on the number of flights per day for the airport at Moron Air Base?

Answer 5: No. This will be discuss with the contractor who is awarded the contract.

Reference: Site Mobilization

Question 6: Will the Government allow the contractor to mobilize an asphalt plant and a concrete batch plant at a safe distance from the jobsite (at an area designated by USAFE or the airport authorities)?

Answer 6: The Spanish Air Force has authorized the installation of mobile concrete plants on

Base in the past. There is no record of any request for the installation of mobile asphalt plants on Base in the past. The request for the installation of mobile concrete/asphalt plants on Base has to be submitted by the contractor during the design phase. The Spanish Air Force is the approval authority for that request. USAF cannot guarantee that the Spanish Air Force will authorize the installation of the mobile plant on Base.

Reference: Bonding

Question 7: Will Government accept insurance in lieu of a bank letter of guarantee and a contract bond, still equal to 10% of the awarded amount?

Answer 7: The Government will accept a letter of guarantee or bond backed by an insurance company for the same amount and characteristics as required by the contract.

Question 8: Could the GOV specify the minimum runway long needed to operate the airfield?

Answer 8: No, the required runway length depends on the aircraft to take-off or land and its weight. Which aircraft will operate during the runway repair is not known as of today.