This document is a request form for a waiver to airfield and airspace criteria related to a proposed construction project at Moron Air Base in Spain. The project involves repairing runway edges and shoulders with a budget between $5 million and $10 million. A pre-proposal conference will be held on April 15, 2021 for interested contractors to visit the site and ask questions. Questions are due by April 20, 2021 and proposals are due by April 30, 2021. The form requires information on the type of waiver requested, description of the proposed facility and how it violates criteria, justification for the waiver, safety precautions, and signatures of coordination and approval. Attachments may include location plans, site plans, and elevation sketches.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Please wait...
If this message is not eventually replaced by the proper contents of the document, your PDF viewer may not be able to display this type of document.
You can upgrade to the latest version of Adobe Reader for Windows®, Mac, or Linux® by visiting http://www.adobe.com/go/reader_download.
For more assistance with Adobe Reader visit http://www.adobe.com/go/acrreader.
Windows is either a registered trademark or a trademark of Microsoft Corporation in the United States and/or other countries. Mac is a trademark of Apple Inc., registered in the United States and other countries. Linux is the registered trademark of Linus Torvalds in the U.S. and other countries.
REQUEST FOR WAIVER TO AIRFIELD AND AIRSPACE CRITERIA
TO BE COMPLETED BY THE BASE CIVIL ENGINEER
TO:
FROM:
DATE (YYYYMMDD)
HQ USAFE/A7P
UNIT 3050 BOX 10
APO AE 09094-5010
1. ACTION REQUESTED
TEMPORARY WAIVER
PERMANENT WAIVER
CANCELLATION OF WAIVER
OTHER
4. DATES (YYYYMMDD) FOR TEMPORARY WAIVER
2. WAIVER NUMBER
3. DESCRIPTION
FROM
TO
5. FISCAL YEAR AND FUNDING SOURCE
6. PROJECT NUMBER
7. PROJECT TITLE
8. CRITERIA TO BE WAIVED (State chapter, paragraph, table number, etc.)
USAFEI 32-1007
OTHER
HOST CRITERIA
9. DESCRIPTION OF THE PROPOSED FACILITY* (Specify how the proposed facility violates criteria. Include information on the size of the facility (length, width, height, diameter, etc.), type of construction (materials, permanency, etc.), and degree of frangibility, grid location and applicable Tab E map numbers. Attach a location plan and site plan. The site plan will show all existing waivers in the project area, elevations at the location of the proposed facility, elevations at the runway centerline at points perpendicular to the proposed facility, distances from the far and near edges of taxiways and aircraft parking aprons, etc. Attach an elevation sketch if the proposed facility penetrates an airspace control surface and state the degree of the violation. Continue on a separate sheet of paper if necessary and reference by item number.)
*NOTE: This information should be the same as reflected on USAFE Form 583, Approved Waivers to Airfield and Airspace Criteria.
10.
JUSTIFICATION FOR A WAIVER (Explain in detail why the proposed facility cannot be sited to meet airfield and airspace criteria. Include a brief description of alternatives considered. Continue on a separate sheet of paper if necessary and reference by item number.)
PREVIOUS EDITION IS OBSOLETE
(OVER)
USAFE FORM 582, 20100506
11. PRECAUTIONS FOR SAFETY (Describe the safety precautions that will be taken to minimize flight safety hazards if the waiver is approved. Precautions may include special painting or lighting of obstructions, briefing programs to flying personnel and/or construction crews on safety procedures for foreign object detection and control, etc. Continue on a separate sheet of paper if necessary and reference by item number.)
12. COORDINATION AND CONCURRENCE
PRINTED NAME, GRADE AND TITLE
SIGNATURE
a. BASE CIVIL ENGINEER
b. AIRFIELD MANAGER
d. CHIEF, AIR TRAFFIC CONTROL OPERATIONS
13. OPERATIONAL RISK MANAGEMENT (ORM) CERTIFICATION
I have reviewed the requirements for this Airfield/Airspace Waiver Request, and I have determined it to be the minimum acceptable risk.
a. INSTALLATION COMMANDER (Printed Name and Grade)
b. DATE (YYYYMMDD)
c. SIGNATURE
14. ATTACHMENTS
LOCATION PLAN
SITE PLAN
ELEVATION SKETCH
OTHER (Specify)
USAFE FORM 582, 20100506 (REVERSE)
CLICK HERE TO SIGN
CLICK HERE TO SIGN
CLICK HERE TO SIGN
CLICK HERE TO SIGN
CLICK HERE TO SIGN
DATE (YYYYMMDD)
c. BASE FLIGHT SAFETY OFFICER 8.2.1.3158.1.475346.466429
| Temporary: 0 |
| Permanent: 0 |
| Cancel: 0 |
| Oth_Act: 0 |
| Criteria_D: 0 |
| Criteria_A: 0 |
| Criteria_C: 0 |
| From: |
| Date_2: |
| Expl_Oth: |
| Waiv_Num: |
| Description: |
| Date_From: |
| Date_To: |
| Fund_Source: |
| Proj_Num: |
| Proj_Title: |
| CritA_expl: |
| CritC_expl: |
| CritD_expl: |
| Descrip_Fac: |
| Justiy: |
| Attach_C: 0 |
| Attach_D: 0 |
| Attach_B: 0 |
| Attach_A: 0 |
| Safety: |
| NAME_A: |
| Date_SigA: |
| Sig_A: |
| Name_B: |
| Date_SigB: |
| Sig_B: |
| Name_C: |
| Date_SigC: |
| Sig_C: |
| Name_D: |
| Date_SigD: |
| Sig_D: |
| Wing_Cmdr: |
| Dat_Cmdr_Sig: |
| Sig_Cmdr: |
| AttchD_Expl: |
File details come from the government source that posted it. Updated .