Attachment H Deliberate Risk Assessment Worksheet.pdf

PDF 2 MB Posted

Attached to
Repair Runway Edges & Shoulders Federal contract opportunity
Solicitation number
FA557521R0001
Issued by
Department of the Air Force United States Air Forces in Europe - Air Forces Africa

About this file

This deliberate risk assessment worksheet template provides guidance for documenting a risk assessment for a federal agency event or task. The form includes sections for describing the event and preparer, identifying hazards and controls for sub-tasks, obtaining risk acceptance authority approval, and conducting reviews. If completed with specific event details, this template can be used to develop and document a risk assessment plan.

The federal contract solicitation is for runway edge and shoulder repair work at Moron Air Base in Spain with an estimated value between $5 million to $10 million. Interested contractors must attend a pre-proposal site visit on April 15, 2021 and submit any questions by April 20. Proposals are due by April 30. In accordance with the defense cooperation agreement between the US and Spain, Spanish labor, material and equipment must be utilized when feasible and consistent with requirements. The solicitation notes that funds are not presently available and no award will be made until funding is obtained, and the government reserves the right to cancel the solicitation before or after the closing date without obligation.

View the file

Other files for this federal contract opportunity

Other files attached to Repair Runway Edges & Shoulders, newest first.
File Type Posted
FA5575-21-R-0001 Questions and Answers - 2.pdf PDF
Solicitation Amendment FA557521R00010003.pdf PDF
Solicitation Amendment FA557521R00010003 SF30.pdf PDF
FA5575-21-R-0001 Questions and Answers.pdf PDF
Solicitation Amendment FA557521R00010002 SF30.pdf PDF
Solicitation Amendment FA557521R00010002.pdf PDF
Solicitation Amendment FA557521R00010001.pdf PDF
Attachment D Concept Drawings Dated 15 Dec 20.pdf PDF
Attachment F Construction Cost Estimate Breakdown Form Dated 10 Feb 21.xlsx XLSX spreadsheet
Solicitation Amendment FA557521R00010001 SF30.pdf PDF
Attachment J Schedule of Material Submittals Form.xlsx XLSX spreadsheet
Attachment B Integrated Natural Resources Management Plan for Moron Air Base Jun 2015.pdf PDF
Attachment A Asphalt Coring Report of Runway Edges and Shoulders.pdf PDF
Statement of Work English.pdf PDF
Attachment F Construction Cost Estimate Breakdown Form.xlsx XLSX spreadsheet
Attachment E Record Drawings.pdf PDF
Attachment D Concept Drawings.pdf PDF
Attachment I Airfield Construction Requirements Checklist Form.pdf PDF
Attachment G Request for Waiver to Airfield and Airspace Criteria Form.pdf PDF
Attachment C Environmental Final Governing Standards for Spain May 2014.pdf PDF
Solicitation FA557521R0001.pdf PDF
Show all 21

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

The document you are trying to load requires Adobe Reader 8 or higher. You may not have the Adobe Reader installed or your viewing environment may not be properly configured to use Adobe Reader.

For information on how to install Adobe Reader and configure your viewing environment please see http://www.adobe.com/go/pdf_forms_configure.

Page of

DELIBERATE RISK ASSESSMENT WORKSHEET

AGENCY DISCLOSURE NOTICE: Voluntary, however, failure to use may have a negative effect on mission effectiveness at all levels and lead to failure of preserving assets and safeguarding health and welfare.

AUTHORITY: DoDI 6055.01, AFPD 90-8 and AFI 90-802. PRINCIPAL PURPOSE: Conduct a formal risk assessment and ensure the assessment is properly documented for future evaluation and reference. ROUTINE USES: Used to develop and enhance awareness and understanding of at-risk activities and behavior of personnel both on- and off-duty. SYSTEM OF RECORDS NOTICE: Not applicable.

1. EVENT/MISSION/TASK OF RISK ASSESSMENT:

2. PREPARED BY:

O:\SEG\SEGS - Stnds - Reference Materials Only\[02] Forms\Prescribed by 90-802\AF Form 4437, Deliberate Risk Assessment Worksheet\Supporting Docs\Risk Assessment Matrix.png O:\SEG\SEGS - Stnds - Reference Materials Only\[02] Forms\Prescribed by 90-802\AF Form 4437, Deliberate Risk Assessment Worksheet\Supporting Docs\RM 5-STEP WHEEL.JPG

3. SUB-TASK/SUB-STEP AND RISK ASSESSMENT (Fields expand as needed, Add, Remove and Move Sub-Task/Steps with left side controls)

A. SUB-TASK/SUB-STEP

B. HAZARD

C. INITIAL RISK LEVEL

D. CONTROL

E. HOW TO IMPLEMENT WHO WILL IMPLEMENT

F. RESIDUAL RISK LEVEL

4. ATTACHMENTS (Once the preparer has signed files can be viewed only) ADD ATTACHMENTS (Include supporting files and/or photos to create a complete electronic file)

5. RISK ACCEPTANCE AUTHORITY (Once the approver has signed, the form will lock except "Risk Assessment Review" and "Feedback and Lessons Learned")

6. "RELEASABILITY: Access to this form is restricted: this form is classified/FOUO; requests for accessibility must be approved."

6. RISK ASSESSMENT REVIEW (To be conducted when Risk Assessment applies to on-going Operations/Activities)

7. FEEDBACK AND LESSONS LEARNED

INSTRUCTIONS FOR COMPLETING WORKSHEET

This form has been designed to be completed digitally, fields will expand automatically to allow for more room, in addition some sections will allow instances as they are needed.

1. Event/Mission/Task of Risk Assessment:

A. Event Description: Briefly describe overall Mission, or Task that the Risk Assessment is being conducted for.

B. Event Date (YYYY/MM/DD):

2. Prepared By: This section shall be filled out by the individual completing the Deliberate Risk Assessment Worksheet:

A. Preparer’s Name:

B. Preparer’s Rank or Grade:

C. Preparer’s Duty Title or Position:

D. Preparer’s Work Email:

E. Preparer’s Phone (DSN or Commercial):

F. Preparer’s Unit/Squadron:

G. Preparer’s Unit Identification Code (UIC) or Course ID Number (CIN):

H. Required Training Support/Lesson Plan(s) or OPORD:

3. Sub-Task/Sub-Step and Risk Assessment: Buttons on the left control the instances of Tasks/Steps, add, remove move around as needed. Numbering will reorganize when clicking away from controls area.

A. Sub-Task/Sub-Step of Mission/Task: Briefly describe any Sub-Tasks associated with Primary Task that warrant risk mitigation consideration.

B. Hazard: Enter specific hazards related to the Sub-Task.

C. Initial Risk Level: Using the Risk Assessment Matrix, determine probability, severity and associated Risk Level; enter level into column.

D. Control: Enter risk mitigation resources/controls identified to abate or reduce risk relevant to the hazard identified in block C.

E. How to Implement/Who Will Control: Provide brief description of sub-task means of employment (e.g., OPORD, Briefing, and Rehearsal) and the name of the individual, unit or office that has primary responsibility for control implementation.

F. Residual Risk Level: After controls are implemented, determine resulting probability, severity and revised Risk Level.

G. Course of Action (COA): Identify specific tasks/ levels of responsibility for supervisory personnel and provide the decision authority with a recommend COA for approval or disapproval based upon the overall risk assessment and impact to mission and personnel. "Risk vs. Reward" consideration based on real-time issues.

H. Overall Risk after Controls are Implemented: Assign an overall Risk Assessment Level. This is the highest Residual Risk Level (Block F) I. Signature of Preparer:

4. Add/View Attachments:

5. Risk Acceptance Authority:

A. Approval/Disapproval of Event/Mission:

B. Approver’s Name:

C. Approver’s Rank/Grade:

D. Additional Information/Approver Comments: Any comments or information the Decision Authorities desires to add including additional guidance.

E. Approver’s Duty Title/Position:

F. Approver’s Signature:

6. Risk Assessment Review: Should be conducted on a regular basis. Reviewers should have sufficient oversight of the mission/activity and controls to make valid remarks and inputs regarding needed changes or adjustments (as necessary). In the event “Residual Risk” rises above the level already approved, operations should cease until the appropriate approval authority is contacted and approves continued operations.

A. Date Reviewed:

B. Reviewer’s Name:

C. Reviewer’ Rank/Grade D. Reviewer’s Duty Title/Position:

E. Reviewer’s Comments:

7. Feedback and Lessons Learned: Provide specific inputs on the effectiveness of risk controls and their contribution to mission success or failure. Feedback-recommendations for new/revised controls, actionable solutions or alternate actions is essential for effective RM. Ensure valid lessons learned are submitted and briefed as necessary to affected personnel.

11.0.1.20130826.2.901444.899636

TextField2:
CurrentPage:
PageCount:
InstrButton:
EventDescription:
EventDate:
NamePrepare:
PrepareRank:
PrepareTitle:
PrepareEmail:
PreparePhone:
PrepareUnit:
UIC_CIN:
OPORD:
Move this item up:
Insert an item:
Remove this item:
Move this item down:
StepCount:
SubTask:
Hazard:
RiskLevel:
Control:
Implement:
NewRisk:
COA:
OverallRisk:
PreparerSig:
NumericField1:
List of attached files:
AddFile:
RemoveFile:
OpenFile:
Approved:
ApproverName:
ApproverGrade:
ApprovComments:
GenText:
RevDate:
RevName:
RevGrade:
RevTitle:
ReviewerComments:
Button1:
GeneralText:

File details come from the government source that posted it. Updated .