Attachment J Schedule of Material Submittals Form.xlsx
XLSX spreadsheet 28 KB Posted
- Attached to
- Repair Runway Edges & Shoulders Federal contract opportunity
- Solicitation number
- FA557521R0001
About this file
This document contains a schedule of material submittals form and details for a federal contract opportunity to repair runway edges and shoulders at Moron Air Base in Spain. The form lists over a dozen required submittals grouped under general conditions and small project design-build categories, including a warranty letter, construction schedule, progress schedule, work plan, mobility plan, project sign, quality control plan, environmental protection plan, waste management plan, as-built drawings, key staff, and health and safety plan. The opportunity notice seeks proposals for the $5-10 million runway repair project to be received by 1300 hours local time on April 30, 2021. The work will be governed by specifications and drawings from a pre-proposal site visit on April 15, 2021, and Spanish materials, labor, and equipment must be used where feasible and consistent with requirements. No award will be made until funds are available, and the government reserves the right to cancel the solicitation.
View the file
Other files for this federal contract opportunity
Show all 21
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Material Submittals Schedule
| SCHEDULE OF MATERIAL SUBMITTALS | PROJECT NUMBER | ||
| QUUG 19-1006 | PROJECT TITLE |
RPR RUNWAY EDGES & SHOULDERS, MULTI
SOLICITATION / CONTRACT NO.
| (To be completed by Project Engineer) | (To be completed by Contract Administrator) | ||||||||||||||
| NUMBER OF COPIES REQUIRED | |||||||||||||||
| LINE NUMBER | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | CERTIFICATION OF COMPLIANCE | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S RECOMMENDATION | MANUFACTURER'S WARRANTY | CATALOG DATA | OPERATING INSTRUCTIONS | SCHEDULES, LISTINGS, REPORTS, PLANS | TECHNICAL DATA | TEST REPORTS | FIELD REPORTS | REQUIRED SUBMISSION DATE |
fergusog: Enter the due date from the Contractor (MM/DD/YY)
DATE RECEIVED IN CONTRACTING
fergusog: Enter the date received from the Contractor. (MM/DD/YY)
DATE TO CIVIL ENGINEERING
fergusog: Enter the date submittal was given to CE for review. (MM/DD/YY)
RETURN SUSPENSE DATE
fergusog: Enter the date the submittal is due back from CE
(MM/DD/YY)
SUBMITTAL NUMBERS
fergusog: Enter the Submittal Number
DATE CONTRACTOR NOTIFIED CONTRACTOR RESUBMITTAL
fergusog: Enter Resubmittal Number
FINAL APPROVAL
fergusog: Enter the submittal final approval date
(MM/DD/YY)
REMARKS
fergusog: Enter any comments pertaining to the submittal
APPROVED
fergusog: Enter date the Contractor was notified of submittal approval
(MM/DD/YY)
fergusog: Enter Resubmittal Number
DISAPPROVED
fergusog: Enter date the Contractor was notified of submittal disapproval
(MM/DD/YY)
fergusog: Enter the submittal final approval date
(MM/DD/YY)
fergusog: Enter any comments pertaining to the submittal
| PART 12 - GENERAL CONDITIONS | |||
| 01 | Warranty Letter | 1 | Acceptance+15 |
| 02 | Construction Schedule | CNTP+7 | |
| 03 | Progress Schedule | 1 | CNTP+10 |
| 04 | Work Plan | CNTP+7 | |
| 05 | Mobility Plan | 1 | CNTP+15 |
| 06 | Project Sign | CNTP+15 | |
| 07 | Quality Control Plan | 1 | CNTP+15 |
| 08 | Environmental Protection Plan | 1 | CNTP+15 |
| 09 | Waste & Debris Certificate | 1 | CNTP+15 |
| 10 | As-Built Drawings | 1 | Acceptance+15 |
| 11 | DD Form 1354 | 1 | Acceptance+15 |
| 12 | As-Built Spatial Data | 1 | As Built Drawings+10 |
| 13 | Key Staff | 1 | DNTP+15 |
| 14 | Health and Safety Plan | 1 | CNTP +15 |
| PART 13 - SMALL PROJECT DESIGN-BUILD PROGRESS SCHEDULES | |||
| 15 | Design-Build Schedule | 1 | DNTP+10 |
| 16 | Monthly Updates | 1 | Every 1st of month |
| A-E firm shall complete list of submittals when developing final construction specifications, including those outlined in the Performance Technical Specifications provided with the SOW |