Selection_Criteria_Evaluation_of_SF330.xlsx
Standard Form XLSX spreadsheet 17 KB Posted
- Attached to
- A&E ID/IQ Services
- Solicitation number
- FA5575-16-AEIDIQ
About this file
Selection Criteria SF 330 Evaluation Form
View the file
Other versions and copies of SF 330
Show all 20
Who attaches SF 330
| State | Files |
|---|---|
| Florida | 98 |
| Maryland | 41 |
| Pennsylvania | 23 |
| Washington | 21 |
| Texas | 19 |
Other files
| File | Type | Posted |
|---|---|---|
| Amendment_0002.docx | DOCX document | |
| Attachment_2_-_Questiosn_and_Answers.docx | DOCX document | |
| Attachment_1_-_Revised_Synopsis.docx | DOCX document | |
| Amendment_0001.pdf | ||
| Revised_Selection_Criteria_Evaluation_of_SF330.xlsx | XLSX spreadsheet | |
| A E_IDIQ_Synopsis_Moron.docx | DOCX document | |
| SF_330.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| PROJECT DESCRIPTION: | ARCHITECT-ENGINEER DESIGN SERVICES IDIQ | DATE: |
| PROJECT NUMBER: |
| 496 ABS CIVIL ENGINEERING FLIGHT |
| Morón AB, Spain |
| EVALUATION OF ARCHITECT-ENGINEER QUALIFICATIONS (SF330) SUBMISSIONS |
| FIRM | CRITERIA # (see below) | TOTAL | COMMENTS | ||||||
| 1 | 2 | 3 | 4 | 5 | 6 | ||||
| 0 | |||||||||
| 0 | |||||||||
| 0 | |||||||||
| 0 | |||||||||
| 0 | |||||||||
| 0 | |||||||||
| 0 | |||||||||
| 0 | |||||||||
| Criteria #: | |||||||||
| 1. Proffessional qualifications of key personnel of the firm/teaming arrangement (25 points) [education, training, project experience, professional registration of key personnel, depth and experience of firm/team firms.] | |||||||||
| - Give 15 to 25 points for highly qualified staff. | |||||||||
| - Give 7 to 14 points for qualified staff. | |||||||||
| - Give 1 to 6 points where staff has limited qualifications. |
| 2, Specialized experience and technical competence (25 points) [Effectiveness of proposed design teams, coordination of disciplines, offices, and subcontractors for projects in the last five years] | |
| - Give 15 to 25 points for high excellence and quality of diverse and high complexity of projects directly related to Government specific factors (e.g.: AT/FP, fuels, airfield, etc.), and with high sustainable design factors incorporated to designs. | |
| - Give 7 to 14 points for medium excellence and quality of diverse and medium to high complexity of projects directly related to Government specific factors (e.g.: AT/FP, fuels, airfield, etc.), and with sustainable design factors incorporated to designs. | |
| - Give 1 to 6 points for low excellence and quality of non-diverse and low complexity of projects not directly related to Government specific factors (e.g.: AT/FP, fuels, airfield, etc.), and without sustainable design factors incorporated to designs. |
| 3. Past performance with Government agencies and private industry (15 points) [based on past performance in terms of cost control, quality of work and compliance with performance schedules) | |
| - Give 11 to 15 points for history of high quality, on time or ahead of schedule, and within cost. | |
| - Give 6 to 10 points for history of good quality, on schedule, and within cost. | |
| - Give 1 to 5 points for history of less than adequate quality, problems meeting schedules, or recurrent problems staying within cost. |
| 4. Location in the general geographical area of the project and knowledge of the locality of the project (15 points) [based on locations of the firm's main office and sub-consultants offices that will be directly involved with this contract, in order to provide timely response to request for on-site support] | |
| - Give 15 points for firms located within 100 km from Morón Air Base and with all design team members also located within that distance. | |
| - Give 10 points for firms located further than 100 km but within 500 km from Morón Air Base with some design team members located outside that distance but within Spain. | |
| - Give 5 points for firms located beyond 500 km from Morón Air Base and with some design team members located outside of Spain. | |
| - Give 0 points for firms located outside of Spain, even with design team members located in Spain. |
| 5. Capacity to accomplish the work in the required time (15 points) [based on amount of work currently being performed by the A-E and overall size of the firm] | |
| - Give 11 to 15 points for well-recognized ability to do the work on time. | |
| - Give 6 to 10 points for adequate ability to do the work on time. | |
| - Give 1 to 5 points for limited ability to do the work on time. |
| 6. Program management process/plan for handling Morón Air Base projects (5 points) [based on description of proposed lines of communications between the firm and the Government, roles and responsibilities and past experience in previous contracts, if applicable) | |
| - Give 5 points for clearly demonstrated communications capabilities, with clear definition of roles and responsabilities, and with sucessful handling of previous projects at Morón Air Base. | |
| - Give 3 to 4 points for clear enough demonstrated communications capabilities, with quite clear definition of roles and responsabilities, and with moderate success handling of previous projects at Morón Air Base. | |
| - Give 1 to 2 points for non-demonstrated communication capabilities, without a clear definition of roles and responsibilities, and with limited success in handling of previous projects at Morón Air Base. | |
| - Give 0 points for non-demonstrated communication capabilities, without a clear definition of roles and responsabilities, and without any successful handling of previous projects at Morón Air Base. | |
| Max Points Available: 100 Points |