FA520521R00030004_Atch3_Revised Specifications.pdf

PDF 895 KB Posted

Attached to
Project No. 1090686, Hospital Modernization Misawa Air Base, Japan
Solicitation number
FA520521R0003
Issued by

About this file

This solicitation is for a hospital modernization project at Misawa Air Base in Japan. The solicitation seeks construction services including demolition, hazardous material abatement, and renovation of medical facilities. The work will be performed in accordance with detailed specifications covering divisions 1 through 33 of the construction work. The specifications include requirements for environmental protection, handling of hazardous materials, and management of waste. Offerors must be able to obtain necessary licenses to transport and dispose of waste in Japan. The solicitation does not provide pricing or response deadline information.

View the file

Other files

File Type Posted
FA520521R00030004.pdf PDF
FA520521R00030004_Atch1_Consolidated List of Govt Response.pdf PDF
FA520521R00030004_Atch2_Addendum No 2.pdf PDF
FA520521R00030004_Atch5_Revised Soliciation Page 1 and 21.pdf PDF
FA520521R00030004_Atch4_Revised Drawing Sheets.pdf PDF
FA520521R00030003_Atch2_Revised Soliciation Page 1 and 21.pdf PDF
FA520521R00030003.pdf PDF
FA520521R00030002_Atch2_Revised Specifications.pdf PDF
FA520521R00030002_Atch7_Revised Soliciation Page 1 and 21.pdf PDF
FA520521R00030002_Atch5_Revised Cut Sheets for JSN S0442 and S0960.pdf PDF
FA520521R00030002_Atch6_Consolidated List of Govt Response.pdf PDF
FA520521R00030002_Atch3_Revised Drawing Sheets.pdf PDF
FA520521R00030002.pdf PDF
FA520521R00030002_Atch1_Addendum No 1.pdf PDF
FA520521R00030002_Atch4_Revised Submittal Register.pdf PDF
FA520521R00030001.pdf PDF
Atch2_Drawings_PDF3of10_Structural.pdf PDF
Atch2_Drawings_PDF8of10_Plumbing.pdf PDF
Atch7-2_Structural Interior Design Volume 1 thru 3.pdf PDF
Atch2_Drawings_PDF6of10_Equipment.pdf PDF
RFP FA520521R0003_Hospital Modernization.pdf PDF
Atch2_Drawings_PDF4of10_Architectural.pdf PDF
Atch6_List of Contractor Furnished US Material.pdf PDF
Atch7-3_Mobile Sterile Processing Department Trailer Information.pdf PDF
Atch9_Past Performance Questionnaire Cover Letter.pdf PDF
Atch1_Specifications_Volume 2 of 2.pdf PDF
Atch2_Drawings_PDF10of10_Electrical.pdf PDF
Atch2_Drawings_PDF7of10_FireProtection.pdf PDF
Atch4_Construction Timeline.pdf PDF
Atch1_Specifications_Volume 1 of 2.pdf PDF
Atch2_Drawings_PDF2of10_Civil.pdf PDF
Atch2_Drawings_PDF1of10_General.pdf PDF
Atch8_Hazardous Material Survey Report.pdf PDF
Atch2_Drawings_PDF9of10_Mechanical.pdf PDF
Atch7-1_Equipment Data and Cut Sheets Logistics Category A.pdf PDF
Atch3_Other Contract Requirements.pdf PDF
Atch2_Drawings_PDF5of10_Interiors.pdf PDF
Atch5_Submittal Register.pdf PDF
Atch10_Past Performance Questionnaire.docx DOCX document
Show all 39

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Hospital Modernization, Misawa AB Japan Addendum 02

Legacy Project #QKKA188003, Opportunity 1090686 13 May 2021

SPECIFICATIONS TABLE OF CONTENTS Page 1

SPECIFICATIONS TABLE OF CONTENTS

VOLUME 1: DIVISIONS 01 - 13

DIVISION 01 - GENERAL REQUIREMENTS

01 11 00 SUMMARY OF WORK (REVISED ADDENDUM 01)

ATTACHMENT: CONSTRUCTION SIGN

ATTACHMENT: MEMORANDUM: MAB MASK WEAR POLICY

01 33 00 SUBMITTAL PROCEDURES

ATTACHMENT: SUBMITTAL REGISTER (REVISED ADDENDUM 01)

01 42 00.00 33 JIS ACCEPTABLE ALTERNATIVES (REVISED ADDENDUM 01)

ATTACHMENT: JAPANESE PROFESSIONAL EXPERIENCE AND

REGISRATION EQUIVALENCIES

01 42 00 SOURCES FOR REFERENCE PUBLICATIONS

01 42 15 METRIC MEASUREMENTS

01 45 00.00 10 QUALITY CONTROL

01 45 35 SPECIAL INSPECTIONS

ATTACHMENT 1: STATEMENT OF SPECIAL INSPECTIONS

ATTACHMENT 2: SCHEDULE OF SPECIAL INSPECTIONS

01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS

01 57 20.00 10 ENVIRONMENTAL PROTECTION (REVISED ADDENDUM 02)

ATTACHMENT: MISAWA AB INFECTION PROGRAM (1 of 2)

ATTACHMENT: MISAWA AF INFECTION PROGRAM (2 of 2)

01 73 19 INSTALLATION OF GOVERNMENT-FURNISHED MEDICAL EQUIPMENT

01 74 19 CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT

01 78 00 CLOSEOUT SUBMITTALS

01 78 23 OPERATION AND MAINTENANCE DATA

01 91 00.15 TOTAL BUILDING COMMISSIONING

DIVISION 02 – EXISTING CONDITIONS

02 41 00 DEMOLITION AND DECONSTRUCTION

02 82 00 ASBESTOS REMEDIATION (REVISED ADDENDUM 02)

02 83 00 LEAD REMEDIATION

02 84 33 REMOVAL AND DISPOSAL OF POLYCHLORINATED BIPHENYLS (PCBs

(SECTION DELETED – ADDENDUM 02)

DIVISION 03 - CONCRETE

03 30 00 CAST-IN-PLACE CONCRETE

DIVISION 05 - METALS

05 12 00 STRUCTURAL STEEL

05 30 00 STEEL DECKS

05 40 00 COLD-FORMED METAL FRAMING

05 50 13 MISCELLANEOUS METAL FABRICATIONS

ATTACHMENT: BUILDING ENVELOPE INSPECTION CHECKLIST

DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES

06 10 00 ROUGH CARPENTRY

06 20 00 FINISH CARPENTRY

06 61 16 SOLID SURFACING FABRICATIONS

DLJames Polygon

DLJames Text Box

DLJames Cloud

DLJames Cloud

DLJames Polygon

DLJames Text Box

SPECIFICATIONS TABLE OF CONTENTS Page 2

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 13 53 ELASTOMERIC SHEET WATERPROOFING

ATTACHMENT: BUILDING ENVELOPE INSPECTION CHECKLIST

07 21 13 BOARD AND BLOCK INSULATION

07 21 16 MINERAL FIBER BLANKET INSULATION

ATTACHMENT: BUILDING ENVELOPE INSPECTION CHECKLIST

07 22 00 ROOF AND DECK INSULATION

ATTACHMENT: BUILDING ENVELOPE INSPECTION CHECKLIST

07 27 26 FLUID-APPLIED MEMBRANE AIR BARRIERS

07 41 13 METAL ROOF PANELS

ATTACHMENT: BUILDING ENVELOPE INSPECTION CHECKLIST

07 42 13 METAL WALL PANELS

ATTACHMENT: BUILDING ENVELOPE INSPECTION CHECKLIST

07 54 19 POLYVINYL-CHLORIDE ROOFING

ATTACHMENT: BUILDING ENVELOPE INSPECTION CHECKLIST

07 60 00 FLASHING AND SHEET METAL

ATTACHMENT: BUILDING ENVELOPE INSPECTION CHECKLIST

07 81 00 SPRAY-APPLIED FIREPROOFING

07 84 00 FIRESTOPPING

07 92 00 JOINT SEALANTS

ATTACHMENT: BUILDING ENVELOPE INSPECTION CHECKLIST

DIVISION 08 - OPENINGS

08 11 13 STEEL DOORS AND FRAMES

ATTACHMENT: BUILDING ENVELOPE INSPECTION CHECKLIST

08 14 00 WOOD DOORS

08 31 00 ACCESS DOORS AND PANELS

08 33 13 COILING COUNTER DOORS (ISSUED WITH ADDENDUM 01)

08 41 13 ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS

ATTACHMENT: BUILDING ENVELOPE INSPECTION CHECKLIST

08 71 00 DOOR HARDWARE

08 81 00 GLAZING

ATTACHMENT: BUILDING ENVELOPE INSPECTION CHECKLIST

08 91 00 METAL WALL LOUVERS

ATTACHMENT: BUILDING ENVELOPE INSPECTION CHECKLIST

DIVISION 09 - FINISHES

09 06 00 SCHEDULES FOR FINISHES

09 22 00 SUPPORTS FOR PLASTER AND GYPSUM BOARD

09 24 23 CEMENT STUCCO

ATTACHMENT: BUILDING ENVELOPE INSPECTION CHECKLIST

09 29 00 GYPSUM BOARD

09 30 10 CERAMIC, QUARRY, AND GLASS TILING

09 51 00 ACOUSTICAL CEILINGS

09 65 00 RESILIENT FLOORING

09 67 23.13 STANDARD RESINOUS FLOORING

09 68 00 CARPETING

09 72 00 DIGITALLY PRINTED WALL COVERING MURAL

09 90 00 PAINTS AND COATINGS

09 96 00 HIGH-PERFORMANCE COATINGS

SPECIFICATIONS TABLE OF CONTENTS Page 3

DIVISION 10 - SPECIALTIES

10 14 00.10 EXTERIOR SIGNAGE

10 14 00.20 INTERIOR SIGNAGE

10 26 00 WALL AND DOOR PROTECTION

10 28 13 TOILET ACCESSORIES

10 44 16 FIRE EXTINGUISHERS

DIVISION 11 - EQUIPMENT

11 70 00 GENERAL REQUIREMENTS FOR MEDICAL AND DENTAL EQUIPMENT

11 71 00 WARMING CABINETS, STERILIZERS, AND ASSOCIATED EQUIPMENT

11 72 13 MEDICAL EQUIPMENT, MISCELLANEOUS

11 74 00 DENTAL EQUIPMENT

DIVISION 12 - FURNISHINGS

12 24 13 ROLLER WINDOW SHADES

12 35 70 HEALTHCARE CASEWORK

12 36 00 COUNTERTOPS

12 48 13 ENTRANCE FLOOR MATS AND FRAMES

DIVISION 13 - SPECIAL CONSTRUCTION

13 48 00 SEISMIC BRACING FOR MISCELLANEOUS EQUIPMENT

13 49 10 X-RAY SHIELDING (REVISED ADDENDUM 01)

ATTACHMENTs: PHYSICIST REPORTS (3)

VOLUME 2: DIVISIONS 21 – 33

DIVISION 21 - FIRE SUPPRESSION

21 13 18.00 10 PREACTION AND DELUGE SPRINKLER SYSTEMS, FIRE PROTECTION

21 30 00 AUTOMATIC TRANSFER SWITCHES FOR FIRE PUMP CONTROL

DIVISION 22 - PLUMBING

22 00 70 PLUMBING, HEALTHCARE FACILITIES

ATTACHMENT A: DOMESTIC WATER PUMP PREFUNCTIONAL CHECKLIST

ATTACHMENT B: DOMESTIC WATER BOOSTER PUMP FUNCTIONAL

PERFORMANCE TEST

ATTACHMENT C: DOMESTIC WATER CIRCULATING PUMP PREFUNCTIONAL

CHECKLIST

22 31 00 WATER SOFTENERS, CATION-EXCHANGE (SODIUM CYCLE)

ATTACHMENT A: WATER SOFTENER PREFUNCTIONAL CHECKLIST

22 60 70 GAS AND VACUUM SYSTEMS FOR HEALTHCARE FACILITIES

DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)

23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS

ATTACHMENT A: MODULAR AIR-HANDLING UNIT PREFUNCTIONAL

CHECKLIST

ATTACHMENT B: MODULAR INDOOR CENTRAL STATION AIR HANDLING

UNIT FUNCTIONAL PERFORMANCE TEST

ATTACHMENT C: TERMINAL UNIT – HOT WATER HEAT PREFUNCTIONAL

CHECKLIST

ATTACHMENT D: VAV WITH REHEAT FUNCTIONAL PERFORMANCE TEST

SPECIFICATIONS TABLE OF CONTENTS Page 4

ATTACHMENT E: EXHAUST FAN PREFUNCTIONAL CHECKLIST

ATTACHMENT F: EXHAUST FAN FUNCTIONAL PERFORMANCE TEST

23 05 15 COMMON PIPING FOR HVAC

23 05 48.19 BRACING FOR HVAC AND PLUMBING

23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC

ATTACHMENT A: TESTING, ADJUSTING AND BALANCING PREFUNCTIONAL

CHECKLIST

23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS

23 09 00 INSTRUMENTATION AND CONTROL FOR HVAC (REVISED ADDENDUM 01)

ATTACHMENT A: BUILDING AUTOMATION SYSTEM FUNCTIONAL

PERFORMANCE TEST

23 09 13 INSTRUMENTATION AND CONTROL DEVICES FOR HVAC (REVISED

ADDENDUM 01)

23 09 23.02 BACNET DIRECT DIGITAL CONTROL FOR HVAC AND OTHER BUILDING

CONTROL SYSTEMS (REVISED ADDENDUM 01)

23 11 25 FACILITY GAS PIPING

23 21 13.00 20 LOW TEMPERATURE WATER (LTW) HEATING SYSTEM

23 22 26.00 20 STEAM SYSTEM AND TERMINAL UNITS

23 64 26 CHILLED, CHILLED-HOT, AND CONDENSER WATER PIPING SYSTEMS

VOLUME 3: DIVISIONS 26 – 33

DIVISION 26 - ELECTRICAL

26 00 00.00 20 BASIC ELECTRICAL MATERIALS AND METHODS

26 05 48.00 10 SEISMIC PROTECTION FOR ELECTRICAL EQUIPMENT

26 12 19.10 THREE-PHASE PAD-MOUNTED TRANSFORMERS (Addendum 001)

26 20 00 INTERIOR DISTRIBUTION SYSTEM

26 29 23 VARIABLE FREQUENCY DRIVE SYSTEMS UNDER 600 VOLTS

26 51 00 INTERIOR LIGHTING

ATTACHMENT A: PREFUNCATIONAL CHECKLIST

ATTACHMENT B: FUNCTIONAL PERFORMANCE TEST

26 53 00.00 40 EXIT SIGNS

DIVISION 27 - COMMUNICATIONS

27 05 14.00 10 CABLE TELEVISION PREMISES DISTRIBUTION SYSTEM

27 05 28.36 40 CABLE TRAYS FOR COMMUNICATIONS SYSTEMS

27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM

27 13 23.00 40 COMMUNICATIONS OPTICAL BACKBONE CABLING

27 21 00.00 20 INTERCOMMUNICATION SYSTEM

27 51 16 PUBLIC ADDRESS AND SOUND MASKING SYSTEMS

27 52 24 NURSE CALL SYSTEM

DIVISION 28 - ELECTRONIC SAFETY AND SECURITY

28 05 26.00 40 GROUNDING AND BONDING FOR ELECTRONIC SAFETY AND SECURITY

28 08 10 ELECTRONIC SECURITY SYSTEM ACCEPTANCE TESTING

28 10 05 ELECTRONIC SECURITY SYSTEMS (ESS)

28 31 76 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM

DIVISION 31 - EARTHWORK

31 00 00 EARTHWORK

ATTACHMENT: GEOTECHNICAL REPORT

SPECIFICATIONS TABLE OF CONTENTS Page 5

DIVISION 32 - EXTERIOR IMPROVEMENTS

32 16 19 CONCRETE CURBS, GUTTERS AND SIDEWALKS

32 92 19 SEEDING

DIVISION 33 - UTILITIES

33 46 16 SUBDRAINAGE PIPING

33 71 01.00 40 OVERHEAD TRANSMISSION AND DISTRIBUTION

33 71 02 UNDERGROUND ELECTRICAL DISTRUBITION

-- End of Project Table of Contents --

FY 19 Hospital Modernization, Misawa AB, Japan Addendum 02

SECTION 01 57 20.00 10

ENVIRONMENTAL PROTECTION

PART 1 GENERAL

1.1 REFERENCE PUBLICATIONS

The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by basic designation only. The Contractor will comply with all applicable federal, JEGS, Government of Japan (GOJ), and Prefectural regulations, to include but not limited to the following:

JAPAN ENVIRONMENTAL GOVERNING STANDARDS (JEGS)(revised 2018, version 1.1 ) Comply with this standard in its entirety.

U.S. AIR FORCE (USAF)

AFI 32-1001 Civil Engineer Operations AFI 32-1053 Pest Management Program-2014 AFI 32-1067 Water Systems - 4 Feb 2015 AFI 32-7001 Environmental Management - 23 Aug 2019 AFI 32-7040 Air Quality Compliance & Resource Management - 04 Nov 2014 AFI 32-7042 Waste Management - 7 Nov 2014 AFI 32-7044 Storage Tank Environmental Compliance - 18 Aug 2015 AFI 32-7064 Integrated Cultural Resource Management - 18 Nov 2014 AFMAN 32-7002 Environmental Compliance & Pollution Prevention - 4 Feb 2020 AFI 32-7089 CE Refrigerant Management Program - 4 Nov 2016 AFI 48-144 Safe Drinking Water Surveillance Program - 20 OCT 2014 AFPD 32-70 Environmental Quality - 30 Jul 2018 HQ USAF/ILE Memorandum for ALMAJCOM/CE - Tracking and Reporting Solid Waste Disposal and Diversion from Landfills - 2001

U.S. ARMY (DA )

DA AR 200-5 (1999) Pest Management

U.S. ARMY CORPS OF ENGINEERS (USACE )

EM 385-1-1 (385-1-1) U.S. Army Corps on Engineers Safety and Health Requirements Manual, 2008

WETLAND MANUAL Corps of Engineers Wetlands Delineation Manual Technical Report Y-87-1

U.S. DEPARTMENT OF DEFENSE (DOD)

DOD I4715.4 (18 June 1996) Department of Defense Instruction regarding Pollution Prevention Administrative reissuance incorporating Change 1, July 6, 1998

EO 13423 Strengthening Federal Environmental, Energy, and Transportation Management

EO 13514 Federal Leadership in Environmental, Energy, and Economic Performance

SECTION 01 57 20.00 10 Page 1

FAR 32.610 (2005) Demand for Payment of Contract Debt

FAR 32.611 (2005) Routine Setoff

U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)

29 CFR 1910 Occupational Safety and Health Standards 29 CFR 1910.134 Respiratory Protection 29 CFR 1910.120 Hazardous Waste Operations and Emergency 29 CFR 1926 Safety and Health Regulations for Construction 29 CFR 1926.1101 Asbestos 29 CFR 1926.62 Lead 40 CFR 112 Response Oil Pollution Prevention 40 CFR 122.26 Storm Water Discharges (Applicable to State NPDES Programs, see section 123.25) 40 CFR 152 Pesticide Registration and Classification Procedures 40 CFR 152 - 186 Pesticide Programs 40 CFR 241 Guidelines for Disposal of Solid Waste 40 CFR 243 Guidelines for the Storage and Collection of Residential, Commercial, and Institutional Solid Waste 40 CFR 260 Hazardous Waste Management System: General 40 CFR 261 Identification and Listing of Hazardous Waste 40 CFR 261.7 Residues of Hazardous Waste in Empty Containers 40 CFR 262 Standards Applicable to Generators of Hazardous Waste 40 CFR 262.31 Standards Applicable to Generators of Hazardous Waste-Labeling 40 CFR 262.34 Standards Applicable to Generators of Hazardous Waste-Accumulation Time 40 CFR 263 Standards Applicable to Transporters of Hazardous Waste 40 CFR 264 Standards for Owners and Operators of Hazardous Waste Treatment, Storage, and Disposal Facilities 40 CFR 265 Interim Status Standards for Owners and Operators of Hazardous Waste Treatment, Storage, and Disposal Facilities 40 CFR 266 Standards for the Management of Specific Hazardous Wastes and Specific Types of Hazardous Waste Manaement Facilities 40 CFR 273 Standards For Universal Waste Management 40 CFR 273.2 Standards for Universal Waste Management - Batteries 40 CFR 273.3 Standards for Universal Waste Management - Pesticides 40 CFR 273.4 Standards for Universal Waste Management - Mercury Containing Equipment 40 CFR 273.5 Standards for Universal Waste Management - Lamps 40 CFR 279 Standards for the Management of Used Oil 40 CFR 355 Emergency Planning and Notification 40 CFR 403 General Pretreatment Regulations for Existing and New Sources of Pollution 40 CFR 50 National Primary and Secondary Ambient Air Quality Standards 40 CFR 60 Standards of Performance for New Stationary Sources 40 CFR 61 National Emission Standards for Hazardous Air Pollutants 40 CFR 63 National Emission Standards for Hazardous Air Pollutants for Source Categories 40 CFR 64 Compliance Assurance Monitoring 40 CFR 745 Lead-Based Paint Poisoning Prevention in Certain Residential Structures 49 CFR 171 General Information, Regulations, and Definitions

SECTION 01 57 20.00 10 Page 2

49 CFR 172 Hazardous Materials Table, Special Provisions, Hazardous Materials Communications, Emergency Response Information, and Training Requirements 49 CFR 172.101 Hazardous Material Regulation-Purpose and Use of Hazardous Material Table

Additional regulatory information referenced in this specification section will be provided by the following authorities:

INTERNATIONAL MARITIME DANGEROUS GOODS (IMDG) STANDARDS

JAPAN MINISTRY OF ENVIRONMENT

Air Pollution Prevention Law Solid Waste and Clean-up Laws Law for the Conservation of Endangered Species of Wild Fauna and Flora Law for the Protection of Cultural Properties Prevention of Ocean Water Pollution ands Incidents Japanese Waste Law

JAPAN MINISTRY OF LAND INFRASTRUCTURE AND TRANSPORT

AOMORI PREFECTURAL LAWS AND MUNICIPAL LAWS AS APPLICABLE

MISAWA AB (MAB) SUPPLEMENTS, STANDARDS, & MANAGEMENT PLANS

AMOP MAB Asbestos Management & Operations Plan HMMP MAB Hazardous Materials Management Plan HWMP MAB Hazardous Waste Management Plan ICRMP MAB Integrated Cultural Resources Management Plan INRMP MAB Integrated Natural Resources Management Plan ISWMP MAB Integrated Solid Waste Management Plan PCBMP 35 CES PCB Management Plan SPRP MAB Spill Prevention & Response Plan SWPPP MAB Storm Water Pollution Prevention Plan

1.2 DEFINITIONS

1.2.1 Environmental Pollution and Damage

Environmental pollution and damage is the presence of chemical, physical, or biological elements or agents which adversely affect human health or welfare; unfavorably alter ecological balances of importance to human life; affect other species of importance to humankind; or degrade the environment aesthetically, culturally and/or historically.

1.2.2 Environmental Protection

Environmental protection is the prevention/control of pollution and habitat disruption that may occur to the environment during construction.

The control of environmental pollution and damage requires consideration of land, water, and air; biological and cultural resources; and includes management of visual aesthetics; noise; solid, chemical, gaseous, and liquid waste; radiant energy and radioactive material as well as other pollutants.

1.2.3 Contractor Generated Hazardous Waste

Contractor generated hazardous waste means materials that, if abandoned or disposed of, will meet the definition of a hazardous waste. These waste streams typically consist of material brought on site by the Contractor to execute work, but are not fully consumed during the course of

SECTION 01 57 20.00 10 Page 3 construction. Examples include, but are not limited to, excess paint thinners (i.e. methyl ethyl ketone, toluene etc.), waste thinners, excess paints, excess solvents, waste solvents, and excess pesticides, and contaminated pesticide equipment rinse water.

1.2.4 Installation Pest Management Coordinator

Installation Pest Management Coordinator (IPMC) is the individual officially designated by the Installation Commander to oversee the Installation Pest Management Program and the Installation Pest Management Plan.

1.2.5 Project Pesticide Coordinator

The Project Pesticide Coordinator (PPC) is an individual that resides at a Civil Works Project office and that is responsible for oversight of pesticide application on Project grounds.

1.2.6 Land Application for Discharge Water

The term "Land Application" for discharge water implies that the Contractor must discharge water at a rate which allows the water to percolate into the soil. No sheeting action, soil erosion, discharge into storm sewers, discharge into defined drainage areas, or discharge into the "waters of the United States" must occur. Land Application must be in compliance with all applicable Government of Japan, Prefectural, and local laws and regulations and Misawa Air Base Stormwater Pollution Prevention Plan (SWPPP).

1.2.7 Pesticide

for preventing, destroying, repelling, or mitigating any pest, or intended for use as a plant regulator, defoliant or desiccant.

1.2.8 Pests

The term "pests" means arthropods, birds, rodents, nematodes, fungi, bacteria, viruses, algae, snails, marine borers, snakes, weeds and other organisms (except for human or animal disease-causing organisms) that adversely affect readiness, military operations, or the well-being of personnel and animals; attack or damage real property, supplies, equipment, or vegetation; or are otherwise undesirable.

1.2.9 Surface Discharge

The term "Surface Discharge" implies that the water is discharged with possible sheeting action and subsequent soil erosion may occur. Waters that are surface discharged may terminate in drainage ditches, storm sewers, and/or surface waters (streams, rivers, lakes, etc.) and would require a permit to discharge water from the governing agency.

1.2.10 Solid Waste

semi-solid, liquid, and contained gaseous materials resulting from industrial and commercial operations and from community activities. It does not include solids or dissolved material in domestic sewage or other significant pollutants in water resources, such as silt, dissolved or suspended solids in industrial wastewater effluent, dissolved materials in irrigation return flows or other common water pollutants.

SECTION 01 57 20.00 10 Page 4

1.2.11 Wetlands

Those areas that are inundated or saturated by surface or ground water at a frequency and duration sufficient to support, and that under normal circumstances do support, a prevalence of vegetation typically adapted for life in saturated soil conditions. Wetlands generally include swamps, marshes, and bogs. Official determination of whether or not an area is classified as a wetland must be done in accordance with WETLAND MANUAL.

1.2.11.1 Debris

Combustible and noncombustible wastes such as ashes and waste materials resulting from construction or maintenance and repair work, leaves, and tree trimmings.

1.2.11.2 Chemical Waste

This includes salts, acids, alkalis, herbicides, pesticides, organic chemicals, and spent products, which serve no purpose.

1.2.11.3 Sanitary Waste

1. Sewage: Wastes characterized as domestic sanitary sewage.

2. Garbage: Refuse and scraps resulting from preparation, cooking, dispensing, and consumption of food.

1.2.11.4 Hazardous Material (HazMat)

Any material that is capable of posing an unreasonable risk to health, safety, or environment if improperly handled, stored, issued, transported, labeled,or disposed as identified in JEGS Chapter 10 .

Hazardous Waste: A discarded material that may be solid, semi-solid, liquid, or contained gas as identified in JEGS Chapter 6, paragraphs 6-2.9 and 3.

1.2.11.5 Polychlorinated Biphenyls (PCBs)

A class of 209 discrete chemical compounds (congeners) in which one to ten chlorine atoms are attached to biphenyl. PCBs were commercially produced as complex mixtures for uses such as dielectric fluids in capacitors, oil switches and transformers, printing inks, paints, de-dusting agents, pesticides, etc.

1.2.11.6 PCB Containing

PCBs are designated as a first class specified chemical substance.

Waste oils containing PCBs are regulated as a specific hazardous industrial waste (SHIW) as a class of the specially controlled industrial waste (SCIW). Items with a PCB concentration of more than 0.5 mg/Kg (ppm), waste acids and alkali with concentrations of 0.03 mg/L or higher, and other waste liquids with a concentration of 0.003 mg/L or higher are considered to contain PCB and must be managed in accordance with JEGS.

1.2.11.7 Lead-Based Paint (LBP)

For paint in liquid form, LBP is defined as paint that contains more

SECTION 01 57 20.00 10 Page 5 than 0.06 percent lead by weight in the total non-volatile content of liquid paint. For paint in place, LBP is defined as lead content equal to or greater than 1.0 mg/cm2 when using X-ray Fluorescence (XRF) analyzer or

0.5 percent (5000 ppm) by weight when using Atomic Absorption Spectroscopic (AAS) analysis.

1.2.11.8 Asbestos-Containing Material (ACM)

Any materials containing more than 0.1 percent asbestos by weight.

1.2.12 Oily Waste

Waste products containing petroleum products and bituminous materials.

1.3 GENERAL REQUIREMENTS

The Contractor shall minimize environmental pollution and damage that may occur as the result of construction operations. The environmental resources within the project boundaries and those affected outside the limits of permanent work shall be protected during the entire duration of this contract. The Contractor shall comply with all applicable environmental laws and regulations including Base and local regulations.

The Contractor shall be responsible for any delays resulting from failure to comply with environmental laws and regulations.

1.3.1 Japanese Asbestos Standards

The Japanese Government has implemented a new asbestos standard. The Contractor must comply with the Japanese Ministry of the Environment (Kankyo Shou) (JMOE) Partial Amendment to the Orders of the Air Pollution Law to Protect Human Health from Asbestos Exposure (Heisei 18 nen Houritsu Dai 5 go, and all related and applicable Cabinet Orders (Seirei), Ministry Orders (Shourei), Notices (Kokuji), and Notification Letters (Tsuchi), as well as any other related Japanese Government asbestos rules and regulations under JMOE, the Japan Ministry of Health, Labour, and Welfare (Kousei Rodo Shou) and any other applicable government agencies.

1.4 SUBCONTRACTORS

Ensuring compliance with this section by subcontractors will be the sole responsibility of the Primary Contractor.

1.4.1 Training of Contractor Personnel

Contractor's personnel must be trained in all phases of environmental protection and pollution control. Conduct environmental protection/pollution control meetings for all personnel prior to commencing construction activities. Additional meetings must be conducted for new personnel and when site conditions change. Include in the training and meeting agenda: methods of detecting and avoiding pollution; familiarization with statutory and contractual pollution standards; installation and care of devices, vegetative covers, and instruments required for monitoring purposes to ensure adequate and continuous environmental protection/pollution control; anticipated hazardous or toxic chemicals or wastes, and other regulated contaminants;

recognition and protection of archaeological sites, artifacts, wetlands, and endangered species and their habitat that are known to be in the area.

SECTION 01 57 20.00 10 Page 6

1.5 PAYMENT

No separate payment will be made for work covered under this section.

Payment of fees associated with environmental permits, application, and/or notices obtained by the Contractor, and payment of all fines/fees for violation or non-compliance with applicable laws and regulations are the Contractor's responsibility. All costs associated with this section must be included in the contract price.

1.6 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SD-01 Preconstruction Submittals

Environmental Protection Plan; G

1.7 ENVIRONMENTAL PROTECTION PLAN

Provide and maintain, during the life of the contract, environmental protection as defined. Plan for and provide environmental protective measures to control pollution that develops during construction practice.

Plan for and provide environmental protective measures required to correct conditions that develop during the construction of permanent or temporary environmental features associated with the project. Protect the environmental resources within the project boundaries and those affected outside the limits of permanent work during the entire duration of this Contract. The Contractor is responsible for protection of the site from contamination and debris as a result of construction work. Submit an Environmental Protection Plan for review and approval by the Contracting Officer's Representative and 35 CES/CEIE. The purpose of the Environmental Protection Plan is to present a comprehensive overview of known or potential environmental issues which the Contractor must address during construction. Issues of concern must be defined within the Environmental Protection Plan as outlined in this section. Address each topic at a level of detail commensurate with the environmental issue and required construction task(s). Topics or issues which are not identified in this section, but are considered necessary, must be identified and discussed after those items formally identified in this section. Prior to submittal of the Environmental Protection Plan, meet with the Contracting Officer's Representative for the purpose of discussing the implementation of the initial Environmental Protection Plan; possible subsequent additions and revisions to the plan including any reporting requirements;

and methods for administration of the Contractor's Environmental Plans.

The Environmental Protection Plan must be current and maintained onsite by the Contractor.

1.7.1 Compliance

Comply with JEGS (current edition), MAB, and GOJ regulations pertaining to the environment, including but not limited to water, air, solid waste, hazardous waste and substances. Provide as required tests and procedures assessing whether construction operations comply with applicable environmental protection laws and regulations. During Construction, the Contractor will be responsible for identifying, implementing, and

SECTION 01 57 20.00 10 Page 7 submitting for approval any additional requirements to be included in the Environmental Protection Plan.

1.7.2 Contents

Include in the environmental protection plan, but not limit it to, the following:

a. Name(s) of person(s) within the Contractor's organization who is(are) responsible for ensuring adherence to the Environmental Protection Plan. Contractor must provide the name, telephone number, and address of a Primary and Alternate Environmental Representative. The Environmental Representative will be responsible for providing all environmental documentation (i.e., plans, permits, licenses, laboratory analysis, clearance results, weight tickets, delivery tickets, manifests, etc.) to the COR.

b. Name(s) and qualifications of person(s) responsible for training the Contractor's environmental protection personnel.

c. Description of the Contractor's environmental protection personnel training program.

d. An erosion and sediment control plan which identifies the type and location of the erosion and sediment controls to be provided. The plan must include the monitoring and reporting requirements. A SWPPP may be substituted for this plan but must meet or exceed the Misawa Air Base

SWPPP.

e. Drawings showing locations of proposed temporary excavations or embankments for haul roads, stream crossings, material storage areas, structures, sanitary facilities, and stockpiles of excess or spoil materials including methods to control runoff and to contain materials on the site.

f. Traffic control plans including measures to reduce erosion of temporary roadbeds by construction traffic, especially during wet weather. Plan shall include measures to minimize the amount of mud transported onto paved public roads by vehicles or runoff.

g. Work area plan showing the proposed activity in each portion of the area and identifying the areas of limited use or nonuse. Plan should include measures for marking the limits of use areas including methods for protection of features to be preserved within authorized work areas.

h. Drawing showing the location of borrow areas.

i. The Spill Control plan shall include the procedures, instructions, and reports to be used in the event of an unforeseen spill of a substance regulated by JEGS, and/or regulated under Government of Japan, Prefectural or Local laws and regulations. The Spill Control Plan supplements the requirements of EM 385-1-1 and Misawa Air Base SPRP. Contractor shall provide a contingency plan in both English and Japanese JEGS 6.3.6.2.2. Include in this plan, as a minimum:

(1) The name of the individual who will report any spills or hazardous substance releases and who will follow up with complete documentation. This individual will immediately notify the

SECTION 01 57 20.00 10 Page 8

Contracting Officer's Representative and Facility Environmental Office in addition to the legally required reporting channels if a reportable quantity is released to the environment. Include in the plan a list of the required reporting channels and telephone numbers.

(2) The name and qualifications of the individual who will be responsible for implementing and supervising the containment and cleanup.

(3) Training requirements for Contractor's personnel and methods of accomplishing the training.

(4) A list of materials and equipment to be immediately available at the job site, tailored to cleanup work of the potential hazard(s) identified.

(5) The names and locations of suppliers of containment materials and locations of additional fuel oil recovery, cleanup, restoration, and material-placement equipment available in case of an unforeseen spill emergency.

(6) The methods and procedures to be used for expeditious contaminant cleanup.

j. A non-hazardous solid waste disposal plan (Solid Waste Disposal Plan-See Paragraph 3.5.1) identifying methods and locations for solid waste disposal including clearing debris and schedules for disposal.

(1) Identify any subcontractors responsible for the transportation and disposal of solid waste. Submit licenses or permits for all solid waste disposal sites and transporters.

(2) Evidence of the disposal facility's acceptance of the solid waste must be attached to this plan during the construction.

Attach a copy of each of the Non-hazardous Solid Waste Diversion Reports to the disposal plan. Submit the report for the previous quarter on the first working day after the first quarter that non-hazardous solid waste has been disposed and/or diverted (e.g.

the first working day of January, April, July, and October).

Construction debris that has been recycled or otherwise disposed of shall be reported by weight. Report shall be submitted to the COR who will submit to 35 CES/CEIE within three (3) days.

(3) Indicate in the report the total amount of waste generated and total amount of waste diverted in tons along with the percent that was diverted. Indicate the weight as per AFI 32-7042 Paragraph 3.8.1.4

k. A recycling and solid waste minimization plan with a list of measures to reduce consumption of energy and natural resources. Detail in the plan the Contractor's actions to comply with and to participate in Government of Japan, Prefectural, and local government sponsored recycling programs to reduce the volume of solid waste at the source.

l. An air pollution control plan detailing provisions to assure that dust, debris, materials, trash, etc., do not become air borne and travel off the project site, including details specific to work to be completed above ceiling, with an emphasis on preventing dust, debris, SECTION 01 57 20.00 10 Page 9 materials, trash, etc from entering spaces below. Plans are to outline above ceiling containment strategy.

m. A contaminant prevention plan that: identifies potentially hazardous substances to be used on the job site; identifies the intended actions to prevent introduction of such materials into the air, water, or ground; and details provisions for compliance with Government of Japan, Prefectural, and local laws and regulations for storage and handling of these materials. In accordance with EM 385-1-1, a copy of the Material Safety Data Sheets (MSDS) and the maximum quantity of each hazardous material to be onsite at any given time must be included in the contaminant prevention plan. Update the plan as new hazardous materials are brought onsite or removed from the site.

n. A waste water management plan that identifies the methods and procedures for management and/or discharge of waste waters which are directly derived from construction activities, such as concrete curing water, clean-up water, dewatering of ground water, disinfection water, hydrostatic test water, and water used in flushing of lines. If a settling/retention pond is required, the plan must include the design of the pond including drawings, removal plan, and testing requirements for possible pollutants. If land application will be the method of disposal for the waste water, the plan must include a sketch showing the location for land application along with a description of the pretreatment methods to be implemented. If surface discharge will be the method of disposal, include a copy of the permit and associated documents as an attachment prior to discharging the waste water. If disposal is to a sanitary sewer, the plan must include documentation that the Waste Water Treatment Plant Operator has approved the flow rate, volume, and type of discharge.

o. A historical, archaeological, cultural resources biological resources and wetlands plan that defines procedures for identifying and protecting historical, archaeological, cultural resources, biological resources and wetlands known to be on the project site: and/or identifies procedures to be followed if historical archaeological, cultural resources, biological resources and wetlands not previously known to be onsite or in the area are discovered during construction. Include in the plan methods to assure the protection of known or discovered resources, identifying lines of communication between Contractor personnel and the Contracting Officer's Representative.

p. Include and update a pesticide treatment plan, as information becomes available. Include in the plan: sequence of treatment, dates, times, locations, pesticide trade name, EPA registration numbers, authorized uses, chemical composition, formulation, original and applied concentration, application rates of active ingredient (i.e. pounds of active ingredient applied), equipment used for application and calibration of equipment. Pest management record keeping and reporting requirements as well as any additional Installation Project Office specific requirements are the Contractor's responsibility in conformance with (DA AR 200-5 Pest Management, Chapter 2, Section III "Pest Management Records and Reports") (AFI 32-1053 Sections 3.4.13 and 3.4.14) for data required to be reported to the Installation.

1.7.2.1 Permits/Licenses/Notifications

Contractor will obtain all necessary licenses, permits, and notifications

SECTION 01 57 20.00 10 Page 10 required for the asbestos abatement, transportation, and disposal actions as required by federal, JEGS, GOJ, Prefectural, regional, and local authorities prior to the commencement of work. Contractor is responsible for the associated fees/costs for licenses, permits, and notifications.

Copies of all licenses, permits, and notifications will be provided by the Contractor to the COR a minimum of 45 days prior to the date approval is needed by the Contractor, who will provide a copy to 35 CES/CEIE within three days of receipt. In accordance with JEGS and the Japanese Waste Law, the Contractor must be both licensed to transport industrial waste and to dispose of industrial waste.

1.7.2.2 Certificates

1. Manufacturer's certificates in accordance with PART 2 PRODUCTS.

1.7.3 Submittal of Documents After Work Starts

Submit three days after inspection.

a. Construction and demolition debris disposal and recycling reports prepared in accordance with paragraph 3.5 and HQ USAF/ILE.

b. Ozone Depleting Substances Report prepared in accordance with paragraph 3.4 entitled "AIR RESOURCES" and JEGS Chapter 2.

c. Sampling and Analysis Reports: Sampling and analysis reports of all waste generated during the construction of the project broken out into separate reports for hazardous waste, asbestos, PCBs, etc., per JEGS Chapter 6, JEGS Chapter 5, JEGS Chapter 7, etc. To include but not limited to the following:

(1) Sampling and analysis reports used for characterization of waste.

(2) Exposure Assessment and Monitoring: Initial exposure assessments, negative exposure assessments, air-monitoring results, clearance sampling, and documentation.

(3) Local Exhaust System: Pressure differential recordings.

(4) Records of waste sampling and test data. The data includes the results of analyses performed, sample locations, the time of collection, and other pertinent data during the life of the contract.

d. Records: Contractor shall maintain records of all transportation, treatment, and disposal methods and dates; the quantities of wastes;

and the names and addresses of the transporter and the disposal facility. Contractor shall also keep the following documents and provide copies to the COR who will provide a copy to 35 CES/CEIE within three days of receipt.

(1) Signed copy of the turn-in document prepared by HWSA for hazardous waste. All hazardous waste including specialty waste (LBP) and specially controlled industrial waste contaminated with lead, cadmium, chromium, and mercury must be handled through DLA (JEGS Chapter 6).

(2) Signed copy of the initial manifest prepared by the Contractor for any asbestos waste created during project. The Contractor

SECTION 01 57 20.00 10 Page 11 shall ensure that a designated representative from 35 CES/CEIE signs the manifest prior to any waste leaving the installation.

The COR and the 35 CES/CEIE will maintain a copy of the manifest. A copy of the final manifest indicating final disposal must be provided within 60 days after issuance, to the COR who will provide a copy to 35 CES/CEIE within two days. If the manifest is not received within 60 days of issuance the installation will investigate the Contractors work and report findings to USFJ/J42E.

(3) Signed copy of the turn-in form for equipment containing greater than 0.5 mg/kg(ppm) of PCB. The form will be provided by 35 CES/CEIE. Those hazardous wastes must be handled through DLA.

(JEGS Chapter 7) .

(4) Waste analyses.

(5) Weight bills and delivery tickets.

(6) Scale weight measurement.

(7) Disposal certificate from TSD facility.

1.7.4 Appendix

Attach to the Environmental Protection Plan, as an appendix, copies of all environmental permits, permit application packages, approvals to construct, notifications, certifications, reports, and termination documents.

1.7.5 Waste Disposal

1.7.5.1 Disposal of Waste

All waste materials generated by any work under this contract performed on U.S. Military-controlled property shall be handled, transported, stored, and disposed of by the Contractor, and by his/her subcontractors in accordance with these specifications; all applicable Government, Prefecture, or city and local laws, ordinances, regulations, court orders;

or other types of rules or rulings having the same effect of law. This includes, but is not limited to, Japanese Federal regulations and JEGS latest version. All hazardous waste will be managed, segregated, stored, transported, and disposed of in accordance with the Base Hazardous Waste Management Plan. Contact Mr. Tsukuda at 226-5487 for more information regarding Contractor generated hazardous waste.

1.7.5.2 DLA Handling and Disposal Requirements

a. Asbestos demolition debris such as friable/non-friable is no longer being accepted by DLA.

b. Hazardous chemicals, dry or wet, if any, shall be placed in appropriate, properly labeled containers and turned in to DLA by the Contractor for disposal at no cost to the Government. Contact D LA at 226 3448 for more information, material disposal container types and sizes, and disposal procedures.

c. The contractor shall include in its proposal all disposal costs for the above items.

SECTION 01 57 20.00 10 Page 12

1.7.5.3 Trip Tickets

The Contractor shall submit to the COR who will submit to 35 CES/CEIE within 3 days legible copies, including English translation, of all delivery weight tickets from the industrial scavenger/legal landfill facility to show the gross and net metric tons of all debris delivered from Misawa AB that is being legally landfilled in accordance with all applicable regulations, and the weight of salvaged metals and/or other recyclable materials recovered and recycled from the gross metric tonnage of debris delivered to the facility from Misawa AB.

1.8 PROTECTION FEATURES

This paragraph supplements the Contract Clause PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT, UTILITIES, AND IMPROVEMENTS. Prior to start of any on-site construction activities, the Contractor and the Contracting Officer's Representative shall make a joint condition survey.

Immediately following the survey, the Contractor shall prepare a brief report including a plan describing the features requiring protection under the provisions of the Contract Clauses, which are not specifically identified on the drawings as environmental features requiring protection along with the condition of trees, shrubs and grassed areas immediately adjacent to the site of work and adjacent to the Contractor's assigned storage area and access route(s), as applicable. This survey report shall be signed by both the Contractor and the Contracting Officer's Representative upon mutual agreement as to its accuracy and completeness.

The Contractor shall protect those environmental features included in the survey report and any indicated on the drawings, regardless of interference which their preservation may cause to the Contractor's work under the contract.

1.9 ENVIRONMENTAL ASSESSMENT OF CONTRACT DEVIATIONS

Any deviations requested by the Contractor from the drawings, plans, and specifications which may have an environmental impact will be subject to approval by the Contracting Officer's Representative and may require an extended review, processing, and approval time. The Contracting Officer's Representative reserves the right to disapprove alternate methods, even if they are more cost effective, if the Contracting Officer's Representative determines that the proposed alternate method will have an adverse environmental impact.

1.10 NOTIFICATION

The Contracting Officer's Representative will notify the Contractor in writing of any observed noncompliance with Misawa Air Base or local environmental laws or regulations, permits, and other elements of the Contractor's Environmental Protection plan. The Contractor shall, after receipt of such notice, inform the Contracting Officer's Representative of the proposed corrective action and take such action when approved by the Contracting Officer's Representative. The Contracting Officer's Representative may issue an order stopping all or part of the work until satisfactory corrective action has been taken. No time extensions shall be granted or equitable adjustments allowed to the Contractor for any such suspensions. This is in addition to any other actions the Contracting Officer's Representative may take under the contract.

SECTION 01 57 20.00 10 Page 13

1.11 CONFLICTS

In case of a conflict or discrepancy between environmental regulations or laws and the contract specifications, the Contractor shall immediately submit the matter in writing to the COR for a determination. Without such determination any actions taken shall be at the Contractor's own risk and expense.

1.12 GREEN PROCUREMENT

Per EO 13423, the EPA requires that all government purchases of designated items shall contain at least the minimal amount of post-consumer and/or total recovered materials. EPA-designated items fall into the following categories:

a. Construction products;

b. Landscape products;

c. Miscellaneous products;

d. Non-paper office products;

e. Paper and paper products;

f. Park and recreation products;

g. Transportation products; and

h. Vehicular products.

Specific requirements can be found at the EPA's website:

http://www.epa.gov/waste/conserve/tools/cpg/products/index.htm

Per EO 13514, the USDA requires that all government purchases of designated biobased items shall meet the standards set forth therein.

Biobased items fall into the following categories:

a. Construction and Road Maintenance;

b. Furniture and Furnishings;

c. Housewares and Cleaning;

d. Industrial Supplies;

e. Landscaping and Agriculture;

f. Office Supplies;

g. Personal Care, Toiletries;

h. The Great Outdoors; and

i. Utilities.

Specific requirements can be found at the USDA's website:

http://www.biopreferred.gov

There are exceptions for buying green: Price, performance, and availability. The price exception is based on lifecycle cost analysis, not just the purchase price.

PART 2 PRODUCTS

2.1 PROHIBITED PRODUCTS

a. No Asbestos-Containing Materials (ACM)

Material that contains asbestos in amounts greater than 0.1 percent is prohibited from being used in construction, remodeling, or maintenance. Comply with JEGS Chapter 5 and Ministry of Environment, Air Pollution Prevention Law.

SECTION 01 57 20.00 10 Page 14

b. No Lead- or Chromate-Based Paints

Paint containing lead or chromate in any amounts is prohibited from being used in construction, remodeling, or maintenance.

Contractor must provide SDS that materials utilized are lead and chromate free (JEGS Chapter 6 and JEGS Chapter 16) .

c. No Polychlorinated Biphenyls (PCBs)

Materials (ballasts, capacitors, transformers, PILC, etc.) that contain a detectable quantity of PCBs. Contractor must provide a manufacturer's certification that the equipment contains no detectable PCB's at the time of shipment (JEGS Chapter 7) .

d. No Class I Ozone Depleting Chemicals (ODC) or Substances (ODS)

Those substances listed in JEGS Chapter 2, Table C2.T1 are prohibited from being used in construction, remodeling, or maintenance.

Contractor must provide certifications that materials utilized do not contain Class I ODC/ODS. Class II ODCs listed in Table C2.T1 must first be approved by 35 CES/CEIE prior to use.

e. No Lead Drinking Water Pipes, Solders, Flux, or Fittings

Materials that contain amounts greater than 0.2 percent lead for solder and flux and 8.0 percent lead for pipes and fittings is prohibited from being used in construction, remodeling, or maintenance. Contractor must provide certifications that materials utilized do not contain lead in excess of the specified amounts.

f. Lead-containing paint in articles intended for use by children.

PART 3 EXECUTION

3.1 ENVIRONMENTAL PERMITS AND COMMITMENTS

The Contractor shall be responsible for obtaining and complying with all environmental permits and commitments required by regional and local environmental laws and regulations. The Contractor will allow a minimum of a 45 day government review period prior to starting any work which requires environmental permits and commitments.

3.2 LAND RESOURCES

The Contractor shall confine all activities to areas defined by the drawings and specifications. Prior to the beginning of any construction, the Contractor shall identify any land resources to be preserved within the work area. Except in areas indicated on the drawings or specified to be cleared, the Contractor shall not remove, cut, deface, injure, or destroy land resources including trees, shrubs, vines, grasses, topsoil, and land forms without approval. No ropes, cables, or guys shall be fastened to or attached to any trees for anchorage unless specifically authorized. The Contractor shall provide effective protection for land and vegetation resources at all times as defined in the following subparagraphs. Stone, soil, or other materials displaced into uncleared areas shall be removed by the Contractor.

SECTION 01 57 20.00 10 Page 15

3.2.1 Work Area Limits

Prior to commencing construction activities, the Contractor shall mark the areas that need not be disturbed under this contract. Isolated areas within the general work area which are not to be disturbed shall be marked or fenced. Monuments and markers shall be protected before construction operations commence. Where construction operations are to be conducted during darkness, any markers shall be visible in the dark. The Contractor's personnel shall be knowledgeable of the purpose for marking and/or protecting particular objects.

3.2.2 Protection of Natural Resources

Preserve the natural resources within the project boundaries and outside the limits of permanent work. Restore to an equivalent or improved condition upon completion of work. The Contractor shall confine activities to areas defined by the drawings and specifications.

Environmental protections shall be as stated in the following subparagraphs:

a. Protect existing trees that are to remain and which may be injured, bruised, defaced, or otherwise damaged by construction operations.

Remove displaced rocks from uncleared areas. Remove trees with 30 percent or more of their root systems destroyed.

b. Replacement. Remove trees and other landscape features scarred or damaged by equipment operations, and replace with equivalent, undamaged trees and landscape features including reseeding. Obtain COR approval before replacement.

c. All earthwork shall be planned and conducted to minimize the duration of exposure of unprotected soils. Side and back slopes shall be protected as soon as practicable upon completion of rough grading.

Earthwork brought to final grade shall be finished as indicated.

d. The Contractor's field offices, staging areas, stockpile storage, and temporary buildings shall be placed in areas designated on the drawings or as directed by the COR. Temporary movement or relocation of Contractor facilities shall be made only when approved. Borrow areas shall be managed to minimize erosion and to prevent sediment from entering nearby waters.