FA520521R00030002_Atch7_Revised Soliciation Page 1 and 21.pdf

PDF 253 KB Posted

Attached to
Project No. 1090686, Hospital Modernization Misawa Air Base, Japan
Solicitation number
FA520521R0003
Issued by

About this file

This solicitation package seeks proposals for Project No. 1090686, Hospital Modernization at Misawa Air Base in Japan. Key details include a project estimate between $10-25 million to modernize the base hospital, with work to begin within 30 calendar days of award and be completed within 180 calendar days. A pre-proposal conference is scheduled for April 5, 2021, with proposals due no later than June 1, 2021. The selected contractor must furnish performance and payment bonds within 30 days of award. The soliciting agency is the Department of the Air Force's Pacific Air Forces command. Relevant attachments provide specifications, drawings, contract requirements, timelines, submittal registers, and equipment data related to the hospital modernization scope of work.

View the file

Other files

File Type Posted
FA520521R00030004.pdf PDF
FA520521R00030004_Atch3_Revised Specifications.pdf PDF
FA520521R00030004_Atch1_Consolidated List of Govt Response.pdf PDF
FA520521R00030004_Atch2_Addendum No 2.pdf PDF
FA520521R00030004_Atch5_Revised Soliciation Page 1 and 21.pdf PDF
FA520521R00030004_Atch4_Revised Drawing Sheets.pdf PDF
FA520521R00030003_Atch2_Revised Soliciation Page 1 and 21.pdf PDF
FA520521R00030003.pdf PDF
FA520521R00030002_Atch2_Revised Specifications.pdf PDF
FA520521R00030002_Atch5_Revised Cut Sheets for JSN S0442 and S0960.pdf PDF
FA520521R00030002_Atch6_Consolidated List of Govt Response.pdf PDF
FA520521R00030002_Atch3_Revised Drawing Sheets.pdf PDF
FA520521R00030002.pdf PDF
FA520521R00030002_Atch1_Addendum No 1.pdf PDF
FA520521R00030002_Atch4_Revised Submittal Register.pdf PDF
FA520521R00030001.pdf PDF
Atch2_Drawings_PDF3of10_Structural.pdf PDF
Atch2_Drawings_PDF8of10_Plumbing.pdf PDF
Atch7-2_Structural Interior Design Volume 1 thru 3.pdf PDF
Atch2_Drawings_PDF6of10_Equipment.pdf PDF
RFP FA520521R0003_Hospital Modernization.pdf PDF
Atch2_Drawings_PDF4of10_Architectural.pdf PDF
Atch6_List of Contractor Furnished US Material.pdf PDF
Atch7-3_Mobile Sterile Processing Department Trailer Information.pdf PDF
Atch9_Past Performance Questionnaire Cover Letter.pdf PDF
Atch1_Specifications_Volume 2 of 2.pdf PDF
Atch2_Drawings_PDF10of10_Electrical.pdf PDF
Atch2_Drawings_PDF7of10_FireProtection.pdf PDF
Atch4_Construction Timeline.pdf PDF
Atch1_Specifications_Volume 1 of 2.pdf PDF
Atch2_Drawings_PDF2of10_Civil.pdf PDF
Atch2_Drawings_PDF1of10_General.pdf PDF
Atch8_Hazardous Material Survey Report.pdf PDF
Atch2_Drawings_PDF9of10_Mechanical.pdf PDF
Atch7-1_Equipment Data and Cut Sheets Logistics Category A.pdf PDF
Atch3_Other Contract Requirements.pdf PDF
Atch2_Drawings_PDF5of10_Interiors.pdf PDF
Atch5_Submittal Register.pdf PDF
Atch10_Past Performance Questionnaire.docx DOCX document
Show all 39

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

See Schedule.

Additional Information to Offerors:

1. Description of Work/Estimated Cost: This project is Hospital Modernization, Project No. 1090686, for Misawa Air Base, Japan. Refer to Section B for “Description”. The magnitude of the estimate construction is between $10,000,000.00 and $25,000,000.00.

2. Pre-proposal conference/job site visit will be held on 5 Apr 21 at 35th Contracting Squadron conference room. See Attachment 3, “Other Contract Requirements”, para. 9, L001, “Notice of Pre-Bid/Pre-Proposal Conference”, and FAR 52.236-27, “Site Visit (Construction)-Alternate I”, for more detail information.

3. Penal amount of performance bond: Refer to Attachment 3, "Other Contract Requirements", para. 6. H003, "Performance Bond", and Section I, FAR 52.228-15, “Performance and Payment Bonds-Construction”.

4. Funds are not presently available for this project. No award will be made under this solicitation until funds are available. The government reserves the right to cancel this solicitation, either before or after the closing date. In the event the government cancels this solicitation, the government has no obligation to reimburse an offeror for any costs.

5. Section K, L, and M will be physically removed from any resultant award, but will be deemed to be incorporated by reference in that award.

This solicitation includes clauses authorized for the purpose of construction effort in Japan: DFARS 252.225-7042-the offeror has been duly authorized to operate and to do business in the host nation country where the contract is to be performed, and FAR 52.236-7 (modified IAW AFFARS 5336.507)-The contractor shall be responsible for obtaining any necessary licenses and permits, and for complying with any host government and political subdivisions laws, codes, and regulations applicable.

This acquisition is unrestricted; no small business set aside.

BYRON MUHLENBERG DSN:315-226-2059 / COM:(81)0176-77-2059

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS

NEGOTIATED

18-Mar-2021

(RFP)

(IFB)

X

CALL:

Project Title: Hospital Modernization

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

See Item 7

2. TYPE OF SOLICITATION

SEALED BID

3. DATE ISSUED

9. FOR INFORMATION A. NAME

SOLICITATION

NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)

Prescribed by GSA FAR (48 CFR) 53.236-1(e)

11. The Contractor shall begin performance within __*____ calendar days and complete it within ___*____ calendar days after receiving award, X notice to proceed. This performance period is X mandatory, negotiable. (See *Attach. 3. Para. 4. F002______

12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

X YES NO

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and ______0____copies to perform the work required are due at the place specified in Item 8 by ___02:00 PM____ local time __1 Jun 21____________ (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.

shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

B. An offer guarantee is, X is not required.

C. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than _______ 180 calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

7. ISSUED BY CODE

FA5205 35 CONS/LGC

UNIT 5201

APO AP 96319-5201

United States Capt Byron Muhlenberg, Contracting Officer, Telephone:315-226-2502 Email:

byron.muhlenberg.2@us.af.mil Mr. Takafumi Nosaki, Contract Specialist, Telephone: 315-226-2059 Email:

takafumi.nosaki.jp@us.af.mil

FA5205

PAGE OF PAGES

1 OF

CODE

(Title, identifying no., date):

12B. CALENDAR DAYS

(hour)

Sealed envelopes containing offers

5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.

1090686

8. ADDRESS OFFER TO (If Other Than Item 7)

TEL: FAX:

FA520521R00030002 38

FA520521R0003

Section J – List of Documents, Exhibits and Other Attachments

DOCUMENT TYPE DESCRIPTION PAGE DATE

Attachment 1 Specifications Volume 1 of 2 1001 Rev. 15 Apr 2021

Specifications Volume 2 of 2 922 Rev. 15 Apr 2021 Attachment 2 Drawings – General 32 Rev. 15 Apr 2021

Drawings – Civil 7 23 Dec 2019 Drawings – Structural 7 23 Dec 2019 Drawings – Architectural 54 Rev. 15 Apr 2021 Drawings – Interiors 14 Rev. 15 Apr 2021 Drawings – Equipment 10 Rev. 15 Apr 2021 Drawings – Fire Protection 29 23 Dec 2019 Drawings – Plumbing 51 Rev. 15 Apr 2021 Drawings – Mechanical 84 Rev. 15 Apr 2021 Drawings – Electrical 98 Rev. 15 Apr 2021

Attachment 3 Other Contract Requirements 6 Rev. 15 Apr 2021 Attachment 4 Construction Timeline 14 4 Feb 2021 Attachment 5 Submittal Register 13 Rev. 15 Apr 2021 Attachment 6 List of Contractor Furnished U.S. Material (CFUSM) 2 1 Feb 2021 Attachment 7-1 Equipment Data and Cut Sheets – Logistics Category A 526 Rev. 15 Apr 2021 Attachment 7-2 Structural Interior Design (SID) Package Volume 1 thru 3 102 23 Dec 2019 Attachment 7-3 Mobile Sterile Processing Department (SPD) Trailer

Information 70 16 Jan 2020

Attachment 8 Hazardous Material Survey Report 47 Nov 2018 Attachment 9 Past Performance Questionnaire (PPQ) Cover Letter 1 3 Mar 2021 Attachment 10 Past/Present Performance Questionnaire (PPQ) 5 3 Mar 2021 Attachment 11 Consolidated List of the Government Response/Clarification 11 29 Apr 2021