Atch5_Submittal Register.pdf

PDF 367 KB Posted

Attached to
Project No. 1090686, Hospital Modernization Misawa Air Base, Japan
Solicitation number
FA520521R0003
Issued by

About this file

This document contains a submittal register for a hospital modernization project at Misawa Air Base in Japan. The submittal register lists over 1,000 line items for products, shop drawings, test reports, certificates, manufacturer instructions, and closeout documents required from the contractor. Key areas of work covered in the submittal register include structural, architectural, mechanical, plumbing and fire protection systems. The solicitation number is listed as FA520521R0003 and is being conducted by the Department of the Air Force Pacific Air Forces. The incumbent contractor is to provide all submittals in accordance with the dates specified in the submittal register.

View the file

Other files

File Type Posted
FA520521R00030004.pdf PDF
FA520521R00030004_Atch3_Revised Specifications.pdf PDF
FA520521R00030004_Atch1_Consolidated List of Govt Response.pdf PDF
FA520521R00030004_Atch2_Addendum No 2.pdf PDF
FA520521R00030004_Atch5_Revised Soliciation Page 1 and 21.pdf PDF
FA520521R00030004_Atch4_Revised Drawing Sheets.pdf PDF
FA520521R00030003_Atch2_Revised Soliciation Page 1 and 21.pdf PDF
FA520521R00030003.pdf PDF
FA520521R00030002_Atch2_Revised Specifications.pdf PDF
FA520521R00030002_Atch7_Revised Soliciation Page 1 and 21.pdf PDF
FA520521R00030002_Atch5_Revised Cut Sheets for JSN S0442 and S0960.pdf PDF
FA520521R00030002_Atch6_Consolidated List of Govt Response.pdf PDF
FA520521R00030002_Atch3_Revised Drawing Sheets.pdf PDF
FA520521R00030002.pdf PDF
FA520521R00030002_Atch1_Addendum No 1.pdf PDF
FA520521R00030002_Atch4_Revised Submittal Register.pdf PDF
FA520521R00030001.pdf PDF
Atch2_Drawings_PDF3of10_Structural.pdf PDF
Atch2_Drawings_PDF8of10_Plumbing.pdf PDF
Atch7-2_Structural Interior Design Volume 1 thru 3.pdf PDF
Atch2_Drawings_PDF6of10_Equipment.pdf PDF
RFP FA520521R0003_Hospital Modernization.pdf PDF
Atch2_Drawings_PDF4of10_Architectural.pdf PDF
Atch6_List of Contractor Furnished US Material.pdf PDF
Atch7-3_Mobile Sterile Processing Department Trailer Information.pdf PDF
Atch9_Past Performance Questionnaire Cover Letter.pdf PDF
Atch1_Specifications_Volume 2 of 2.pdf PDF
Atch2_Drawings_PDF10of10_Electrical.pdf PDF
Atch2_Drawings_PDF7of10_FireProtection.pdf PDF
Atch4_Construction Timeline.pdf PDF
Atch1_Specifications_Volume 1 of 2.pdf PDF
Atch2_Drawings_PDF2of10_Civil.pdf PDF
Atch2_Drawings_PDF1of10_General.pdf PDF
Atch8_Hazardous Material Survey Report.pdf PDF
Atch2_Drawings_PDF9of10_Mechanical.pdf PDF
Atch7-1_Equipment Data and Cut Sheets Logistics Category A.pdf PDF
Atch3_Other Contract Requirements.pdf PDF
Atch2_Drawings_PDF5of10_Interiors.pdf PDF
Atch10_Past Performance Questionnaire.docx DOCX document
Show all 39

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(a) (b) (c) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

Line

Acti vity

Trans-mittal #

Specification

Section

SD

# Submittal Description Item Submitted

Paragraph

Classificati on: GOVT or A/E

Revwr Submit

Approval

Needed

By

Material

Needed

By

Action

Code

Date Of

Action

Date FWD to APPR /

Auth Date

RCD From

CONTR

Date

FWD To

Other

Revwr

Date

RCD

From

Other

Revwr

Action

Code

Date Of

Action

Mailed To

CONTR/

Date RCD

From

APPR

Authority Remarks

1 01 11 00 01 Preconstruction Submittals Salvage Plan G

2 01 33 00 01 Preconstruction Submittals Submittal Register 1.7 G

3 01 45 00.00 10 01 Preconstruction Submittals Contractor Quality Control (CQC) Plan 3.2 G

4 01 45 00.00 10 06 Test Reports Verification Statement 3.9.2

5 01 45 35 01 Preconstruction Submittals SIOR Letter of Acceptance 3.1.1 G

6 01 45 35 01 Preconstruction Submittals Project Manual 3.1.1 G

7 01 45 35 01 Preconstruction Submittals Project Manual 3.1.1 G

8 01 45 35 06 Test Reports Daily Reports 3.1.1

9 01 45 35 06 Test Reports Daily Reports 3.1.3

10 01 45 35 06 Test Reports Biweekly Reports 3.1.1

11 01 45 35 07 Certificates Fabrication Plant 2.1

12 01 45 35 07 Certificates Certificate of Compliance 2.1

13 01 45 35 07 Certificates Special Inspector of Record 1.5.10 G

14 01 45 35 07 Certificates Special Inspector 1.5 G

15 01 45 35 11 Closeout Submittals Comprehensive Final Report 3.1.1 G

16 01 50 00 01 Preconstruction Submittals Construction Site Plan 1.3 G

17 01 50 00 01 Preconstruction Submittals Traffic Control Plan 3.4.1 G

18 01 50 00 01 Preconstruction Submittals Haul Road Plan 2.2.1 G

19 01 50 00 06 Test Reports Backflow Preventer Tests

20 01 50 00 07 Certificates Backflow Tester 1.4.1

21 01 50 00 07 Certificates Backflow Preventers 1.4

22 01 57 20.00 10 01 Preconstruction Submittals Environmental Protection Plan 1.7 G

23 01 73 19 06 Test Reports Equipment inspection 3.4.1 G

24 01 74 19 01 Preconstruction Submittals Waste Management Plan 1.6 G

25 01 74 19 11 Closeout Submittals Records 1.7

26 01 78 00 03 Product Data Warranty Tags 1.6.2

27 01 78 00 03 Product Data Spare Parts Data 1.5

28 01 78 00 08 Manufacturer’s Instructions Instructions

29 01 78 00 10 Operation and Maintenance Data Operation and Maintenance Manuals 3.3 G

30 01 78 00 11 Closeout Submittals As-Built Drawings 3.1 G

31 01 78 00 11 Closeout Submittals Record Drawings 3.2 G

32 01 78 00 11 Closeout Submittals As-Built Record of Equipment and

Materials

33 01 78 00 11 Closeout Submittals Final Approved Shop Drawings

34 01 78 00 11 Closeout Submittals Construction Contract Specifications

APPROVING AUTHORITY

(d)

CONTRACTOR SCHEDULE

DATES

CONTRACTOR

ACTION

TITLE: Issued for Construction

SUBMITTAL REGISTER

JOB NAME: Hospital Modernization LOCATION: Misawa Air Base, Japan

CONTRACT NO: FA 8903-15-D-0004 TO: 18-F-0072 | Legacy project #QKKA188003, Opportunity 1090686

CONTRACTOR:

1392090220U Text Box Attachment 5 to RFP No. FA520521R0003 Date: 22 Feb 2021

Acti vity

Trans-mittal #

Specification

Section

SD

# Submittal Description Item Submitted

Paragraph

Classificati on: GOVT or A/E

Revwr Submit

Approval

Needed

By

Material

Needed

By

Action

Code

Date Of

Action

Date FWD to APPR /

Auth Date

RCD From

CONTR

Date

FWD To

Other

Revwr

Date

RCD

From

Other

Revwr

Action

Code

Date Of

Action

Mailed To

CONTR/

Date RCD

From

APPR

Authority Remarks

APPROVING AUTHORITY

(d)

CONTRACTOR SCHEDULE

DATES

CONTRACTOR

ACTION

TITLE: Issued for Construction

SUBMITTAL REGISTER

JOB NAME: Hospital Modernization LOCATION: Misawa Air Base, Japan

CONTRACT NO: FA 8903-15-D-0004 TO: 18-F-0072 | Legacy project #QKKA188003, Opportunity 1090686

CONTRACTOR:

35 01 78 00 11 Closeout Submittals Certification of EPA Designated Items 2.1 G

36 01 78 23 10 Operation and Maintenance Data O&M Database 1.4 G

37 01 78 23 10 Operation and Maintenance Data Training Plan 3.1.1 G

38 01 78 23 10 Operation and Maintenance Data Training Outline 3.1.3 G

39 01 78 23 10 Operation and Maintenance Data Training Content 3.1.2 G

40 01 78 23 11 Closeout Submittals Training Video Recording 3.1.4 G

41 01 78 23 11 Closeout Submittals Validation of Training Completion 3.1.6 G

42 01 91 00.00 15 06 Test Reports Building Envelope Inspection Checklist G

43 01 91 00.00 15 06 Test Reports Prefunctional Checklists G

44 01 91 00.00 15 06 Test Reports Post-Construction Trend Log Report G

45 01 91 00.00 15 07 Certificates Certificate of Readiness G

46 01 91 00.00 15 10 Operation and Maintenance Data Training Plan G

47 01 91 00.00 15 10 Operation and Maintenance Data Training Attendance Report G

48 02 41 00 01 Preconstruction Submittals Demolition and DeconstructionPlan 1.2.1 G DOR

49 02 82 00 03 Product Data Safety Data Sheets G

50 02 82 00 03 Product Data Encapsulants G

51 02 82 00 03 Product Data Respirators G

52 02 82 00 03 Product Data Local Exhaust Equipment G

53 02 82 00 03 Product Data Pressure Differential Automatic

Recording Instrument G

54 02 82 00 03 Product Data Vacuums G

55 02 82 00 03 Product Data Glovebags G

56 02 82 00 06 Test Reports Air Sampling Results G

57 02 82 00 06 Test Reports Pressure Differential Recordings for

Local Exhaust System G

58 02 82 00 06 Test Reports Clearance Sampling G

59 02 82 00 06 Test Reports Asbestos Disposal Report G

60 02 82 00 07 Certificates Employee Training G

61 02 82 00 07 Certificates Respiratory Protection Program G

62 02 82 00 07 Certificates Asbestos Hazard Abatement Plan G

63 02 82 00 07 Certificates Testing Laboratory G

64 02 82 00 07 Certificates Landfill Approval G

65 02 82 00 07 Certificates Delivery Tickets G

66 02 82 00 07 Certificates Waste Shipment Records G

Acti vity

Trans-mittal #

Specification

Section

SD

# Submittal Description Item Submitted

Paragraph

Classificati on: GOVT or A/E

Revwr Submit

Approval

Needed

By

Material

Needed

By

Action

Code

Date Of

Action

Date FWD to APPR /

Auth Date

RCD From

CONTR

Date

FWD To

Other

Revwr

Date

RCD

From

Other

Revwr

Action

Code

Date Of

Action

Mailed To

CONTR/

Date RCD

From

APPR

Authority Remarks

APPROVING AUTHORITY

(d)

CONTRACTOR SCHEDULE

DATES

CONTRACTOR

ACTION

TITLE: Issued for Construction

SUBMITTAL REGISTER

JOB NAME: Hospital Modernization LOCATION: Misawa Air Base, Japan

CONTRACT NO: FA 8903-15-D-0004 TO: 18-F-0072 | Legacy project #QKKA188003, Opportunity 1090686

CONTRACTOR:

67 02 82 00 07 Certificates Transporter Certification G

68 02 82 00 07 Certificates Medical Certification G

69 02 82 00 07 Certificates Private Qualified Person

Documentation G

70 02 82 00 07 Certificates Competent Person G

71 02 82 00 07 Certificates Worker's License G

72 02 82 00 07 Certificates Contractor's License G

73 02 82 00 07 Certificates Encapsulants G

74 02 82 00 07 Certificates Equipment Used to Contain Airborne

Asbestos Fibers G

75 02 82 00 07 Certificates Water Filtration Equipment G

76 02 82 00 07 Certificates Vacuums G

77 02 82 00 07 Certificates Ventilation Systems G

78 02 82 00 11 Closeout Submittals Permits G

79 02 83 00 01 Preconstruction Submittals Competent Person Qualifications G

80 02 83 00 01 Preconstruction Submittals Training Certificate G

81 02 83 00 01 Preconstruction Submittals Occupational and Environmental

Assessment Data Report G

82 02 83 00 01 Preconstruction Submittals Medical Examinations G

83 02 83 00 01 Preconstruction Submittals Lead Waste Management Plan G

84 02 83 00 01 Preconstruction Submittals Licenses, Permits and Notifications G

85 02 83 00 01 Preconstruction Submittals Lead Compliance Plan G

86 02 83 00 03 Product Data Respirators

87 02 83 00 03 Product Data Vacuum Filters

88 02 83 00 03 Product Data Negative Air Pressure System

89 02 83 00 03 Product Data Materials and Equipment

90 02 83 00 03 Product Data Local Exhaust Equipment

91 02 83 00 03 Product Data Pressure Differential Automatic

Recording Instrument G

92 02 83 00 03 Product Data Pressure Differential Log G

93 02 83 00 06 Test Reports Sampling and Analysis G

94 02 83 00 06 Test Reports Sampling Results G

95 02 83 00 06 Test Reports Pressure Differential Recordings for

Local Exhaust System G

96 02 83 00 07 Certificates Testing Laboratory G

97 02 83 00 07 Certificates Third Party Consultant Qualifications G

98 02 83 00 07 Certificates Clearance Certification G

99 02 83 00 11 Closeout Submittals Hazardous Waste Manifest G

Acti vity

Trans-mittal #

Specification

Section

SD

# Submittal Description Item Submitted

Paragraph

Classificati on: GOVT or A/E

Revwr Submit

Approval

Needed

By

Material

Needed

By

Action

Code

Date Of

Action

Date FWD to APPR /

Auth Date

RCD From

CONTR

Date

FWD To

Other

Revwr

Date

RCD

From

Other

Revwr

Action

Code

Date Of

Action

Mailed To

CONTR/

Date RCD

From

APPR

Authority Remarks

APPROVING AUTHORITY

(d)

CONTRACTOR SCHEDULE

DATES

CONTRACTOR

ACTION

TITLE: Issued for Construction

SUBMITTAL REGISTER

JOB NAME: Hospital Modernization LOCATION: Misawa Air Base, Japan

CONTRACT NO: FA 8903-15-D-0004 TO: 18-F-0072 | Legacy project #QKKA188003, Opportunity 1090686

CONTRACTOR:

100 02 84 33 07 Certificates Training certification 1.7.1

101 02 84 33 07 Certificates Qualifications of CIH 1.7.2

102 02 84 33 07 Certificates PCB removal work plan 1.7.3

103 02 84 33 07 Certificates PCB disposal plan 1.7.4

104 02 84 33 07 Certificates Notification 1.7.5

105 02 84 33 07 Certificates Transporter certification 3.7

106 02 84 33 07 Certificates Certificate of disposal 3.7.1

107 03 30 00 01 Preconstruction Submittals Concrete Curing Plan 1.6.3.1

108 03 30 00 01 Preconstruction Submittals Quality Control Plan 1.6.5 G

109 03 30 00 01 Preconstruction Submittals Quality Control Personnel Certifications 1.6.6 G

110 03 30 00 01 Preconstruction Submittals Quality Control Organizational Chart 1.6.6

111 03 30 00 01 Preconstruction Submittals Laboratory Accreditation 1.6.8 G

112 03 30 00 01 Preconstruction Submittals Maturity Method Data 3.3.10

113 03 30 00 02 Shop Drawings Reinforcing Steel 1.6.2.1 G AE

114 03 30 00 03 Product Data Formwork Materials 2.1

115 03 30 00 03 Product Data Vapor Retarder and Vapor Barrier 2.4.6

116 03 30 00 03 Product Data Concrete Curing Materials 2.4.1

117 03 30 00 03 Product Data Reinforcement 2.6

118 03 30 00 03 Product Data Liquid Chemical Floor Hardeners and

Sealers 2.4.3.1

119 03 30 00 03 Product Data Admixtures 2.3.4

120 03 30 00 03 Product Data Mechanical Reinforcing Bar

Connectors 2.6.2

121 03 30 00 03 Product Data Waterstops 2.2.2

122 03 30 00 03 Product Data Biodegradable Form Release Agent 2.2.3

123 03 30 00 05 Design Data Concrete Mix Design 1.6.1.1 G AE

124 03 30 00 06 Test Reports Concrete Mix Design 1.6.1.1 G AE

125 03 30 00 06 Test Reports Fly Ash 1.6.4.1

126 03 30 00 06 Test Reports Pozzolan 1.6.4.1

127 03 30 00 06 Test Reports Slag Cement 1.6.4.2

128 03 30 00 06 Test Reports Aggregates 1.6.4.3

129 03 30 00 06 Test Reports Tolerance Report 3.10.2.1

130 03 30 00 06 Test Reports Compressive Strength Tests 3.13.2.3 G

131 03 30 00 06 Test Reports Slump Tests 3.13.2.1

132 03 30 00 06 Test Reports Water 2.3.2

133 03 30 00 07 Certificates Reinforcing Bars 2.6.1

Acti vity

Trans-mittal #

Specification

Section

SD

# Submittal Description Item Submitted

Paragraph

Classificati on: GOVT or A/E

Revwr Submit

Approval

Needed

By

Material

Needed

By

Action

Code

Date Of

Action

Date FWD to APPR /

Auth Date

RCD From

CONTR

Date

FWD To

Other

Revwr

Date

RCD

From

Other

Revwr

Action

Code

Date Of

Action

Mailed To

CONTR/

Date RCD

From

APPR

Authority Remarks

APPROVING AUTHORITY

(d)

CONTRACTOR SCHEDULE

DATES

CONTRACTOR

ACTION

TITLE: Issued for Construction

SUBMITTAL REGISTER

JOB NAME: Hospital Modernization LOCATION: Misawa Air Base, Japan

CONTRACT NO: FA 8903-15-D-0004 TO: 18-F-0072 | Legacy project #QKKA188003, Opportunity 1090686

CONTRACTOR:

134 03 30 00 07 Certificates Safety Data Sheets 1.6.3.2

135 03 30 00 07 Certificates Field Testing Technician and Testing

Agency 1.6.6.2

136 03 30 00 08 Manufacturer’s Instructions Curing Compound 2.4.1

137 05 12 00 01 Preconstruction Submittals Erection and Erection Bracing

Drawings

1.4.1.1 G AE

138 05 12 00 02 Shop Drawings Fabrication Drawings 1.4.2 G AE

139 05 12 00 03 Product Data Shop Primer 2.6.2

140 05 12 00 03 Product Data Welding Electrodes and Rods 2.4.1

141 05 12 00 03 Product Data Non-Shrink Grout 2.4.2

142 05 12 00 03 Product Data Tension Control Bolts 2.3.3

143 05 12 00 06 Test Reports Bolts, Nuts, and Washers 2.3

144 05 12 00 06 Test Reports Bolt Testing Reports 3.7.2.1

145 05 12 00 07 Certificates Steel 2.2

146 05 12 00 07 Certificates Bolts, Nuts, and Washers 2.3

147 05 12 00 07 Certificates Galvanizing 2.5

148 05 12 00 07 Certificates AISC Structural Steel Fabricator

Quality Certification 1.3

149 05 12 00 07 Certificates AISC Structural Steel Erector Quality

Certification 1.3

150 05 12 00 07 Certificates Welding Procedures and Qualifications 1.4.3.1

151 05 12 00 07 Certificates Welding Electrodes and Rods 2.4.1

152 05 12 00 07 Certificates Certified Welding Inspector 3.7.1.1

153 05 12 00 07 Certificates Welding Procedure Specifications

(WPS)

3.4

154 05 30 00 02 Shop Drawings Fabrication Drawings 1.3.5 G AE

155 05 30 00 03 Product Data Accessories 2.2

156 05 30 00 03 Product Data Deck Units 2.1

157 05 30 00 03 Product Data Galvanizing Repair Paint 2.1.4

158 05 30 00 03 Product Data Mechanical Fasteners 2.2.15

159 05 30 00 03 Product Data Touch-Up Paint 2.1.4

160 05 30 00 03 Product Data Welding Equipment 1.3.3

161 05 30 00 03 Product Data Welding Rods and Accessories 1.3.3

162 05 30 00 04 Samples Metal Roof Deck Units

163 05 30 00 05 Design Data Deck Units 2.1 G

164 05 30 00 07 Certificates Powder-Actuated Tool Operator 1.3.2

165 05 30 00 07 Certificates Welder Qualifications 1.3.3

166 05 30 00 07 Certificates Welding Procedures 1.3.3

Acti vity

Trans-mittal #

Specification

Section

SD

# Submittal Description Item Submitted

Paragraph

Classificati on: GOVT or A/E

Revwr Submit

Approval

Needed

By

Material

Needed

By

Action

Code

Date Of

Action

Date FWD to APPR /

Auth Date

RCD From

CONTR

Date

FWD To

Other

Revwr

Date

RCD

From

Other

Revwr

Action

Code

Date Of

Action

Mailed To

CONTR/

Date RCD

From

APPR

Authority Remarks

APPROVING AUTHORITY

(d)

CONTRACTOR SCHEDULE

DATES

CONTRACTOR

ACTION

TITLE: Issued for Construction

SUBMITTAL REGISTER

JOB NAME: Hospital Modernization LOCATION: Misawa Air Base, Japan

CONTRACT NO: FA 8903-15-D-0004 TO: 18-F-0072 | Legacy project #QKKA188003, Opportunity 1090686

CONTRACTOR:

167 05 30 00 07 Certificates Fire Safety 1.3.4.1

168 05 30 00 07 Certificates Manufacturer's Certificate 1.3.1

169 05 30 00 07 Certificates Stud Manufacture's Certification 2.2.11

170 05 30 00 07 Certificates Stud Manufacture's Test Reports 2.2.11

171 05 40 00 02 Shop Drawings Framing Components 1.6.1 G

172 05 40 00 03 Product Data Studs, Joists 2.1

173 05 40 00 03 Product Data Recycled Content of Steel Products 2.1 S

174 05 40 00 05 Design Data Metal Framing Calculations 1.6.2 G

175 05 40 00 07 Certificates Load-Bearing Cold-Formed Metal

Framing 1.4

176 05 40 00 07 Certificates Welds 3.1.1

177 05 50 13 02 Shop Drawings Catwalk Framing 2.4 G DOR

178 05 50 13 02 Shop Drawings Floor Gratings 2.4 G DOR

179 05 50 13 02 Shop Drawings Bollards/Pipe Guards 2.5 G

180 05 50 13 02 Shop Drawings Angles and Plates 2.6 G

181 05 50 13 03 Product Data Expansion Joint Covers 2.3 G

182 05 50 13 03 Product Data Floor Gratings 2.4 G

183 05 50 13 04 Samples Expansion Joint Covers 2.3 G

184 06 10 00 03 Product Data Underlayment

185 06 10 00 03 Product Data Fire-retardant Treatment 1.8

186 06 10 00 03 Product Data Oriented Strand Board 2.2

187 06 10 00 03 Product Data Adhesives 2.3.2

188 06 10 00 06 Test Reports Preservative-treated 1.4.3

189 06 20 00 03 Product Data Wood Products 2.1 G

190 06 20 00 03 Product Data Countertops 2.2 G DOR

191 06 61 16 02 Shop Drawings Detail Drawings 1.4.2 G DOR

192 06 61 16 02 Shop Drawings Installation 3.1 G DOR

193 06 61 16 03 Product Data Solid Polymer Material 2.1

194 06 61 16 03 Product Data Qualifications 1.4.1

195 06 61 16 03 Product Data Fabrications 2.3

196 06 61 16 03 Product Data Indoor air quality for solid surface seam and sealant products 2.2.4

197 06 61 16 04 Samples Material 2.1 G DOR

198 06 61 16 04 Samples Window Sill 1.2 G DOR

199 06 61 16 04 Samples Window Sill 1.4.2 G DOR

200 06 61 16 06 Test Reports Solid Polymer Material 2.1

201 06 61 16 07 Certificates Fabrications 2.3

Acti vity

Trans-mittal #

Specification

Section

SD

# Submittal Description Item Submitted

Paragraph

Classificati on: GOVT or A/E

Revwr Submit

Approval

Needed

By

Material

Needed

By

Action

Code

Date Of

Action

Date FWD to APPR /

Auth Date

RCD From

CONTR

Date

FWD To

Other

Revwr

Date

RCD

From

Other

Revwr

Action

Code

Date Of

Action

Mailed To

CONTR/

Date RCD

From

APPR

Authority Remarks

APPROVING AUTHORITY

(d)

CONTRACTOR SCHEDULE

DATES

CONTRACTOR

ACTION

TITLE: Issued for Construction

SUBMITTAL REGISTER

JOB NAME: Hospital Modernization LOCATION: Misawa Air Base, Japan

CONTRACT NO: FA 8903-15-D-0004 TO: 18-F-0072 | Legacy project #QKKA188003, Opportunity 1090686

CONTRACTOR:

202 06 61 16 07 Certificates Qualifications 1.4.1

203 06 61 16 07 Certificates Indoor Air Quality for solid surface fabrication products 2.1

204 06 61 16 10 Operation and Maintenance Data Clean-up 3.2

205 07 13 53 03 Product Data Manufacturer's Standard Details 1.3 G

206 07 13 53 03 Product Data Elastomeric Waterproofing Sheet

Material

2.1 G

207 07 13 53 03 Product Data Protection Board 2.5 G

208 07 13 53 03 Product Data Primers, Adhesives, and Mastics 1.4 G

209 07 13 53 03 Product Data Primers, Adhesives, and Mastics 2.1 G

210 07 13 53 06 Test Reports Elastomeric Waterproofing Sheet

Material

2.1 G

211 07 13 53 06 Test Reports Field Quality Control 3.6 G

212 07 13 53 06 Test Reports Protective Covering 3.7 G

213 07 13 53 07 Certificates Elastomeric Waterproofing Sheet

Material 2.1

214 07 13 53 07 Certificates Primers, Adhesives, and Mastics 1.4 G

215 07 13 53 07 Certificates Primers, Adhesives, and Mastics 2.1 G

216 07 13 53 07 Certificates Protective Coverings 1.4 G

217 07 13 53 07 Certificates Special Warranties 1.8 G

218 07 13 53 07 Certificates Special Warranties 1.8 G

219 07 13 53 08 Manufacturer’s Instructions Primers, Adhesives, and Mastics 1.4 G

220 07 13 53 08 Manufacturer’s Instructions Primers, Adhesives, and Mastics 2.1 G

221 07 21 13 03 Product Data Manufacturer's Standard Details 1.3 G

222 07 21 13 03 Product Data Block or Board Insulation 2.1 G

223 07 21 13 03 Product Data Vapor Retarder 2.2 G

224 07 21 13 03 Product Data Pressure Sensitive Tape 2.3 G

225 07 21 13 03 Product Data Protection Board or Coatings 1.4 G

226 07 21 13 03 Product Data Accessories 2.5 G

227 07 21 13 07 Certificates Block or Board Insulation 2.1 G

228 07 21 13 07 Certificates Vapor Retarder 2.2 G

229 07 21 13 07 Certificates Protection Board or Coating 2.4 G

230 07 21 13 07 Certificates Protection Board or Coating 3.4.4 G

231 07 21 13 07 Certificates Special Warranties 1.7 G

232 07 21 13 07 Certificates Special Warranties 1.7 G

233 07 21 13 08 Manufacturer’s Instructions Block or Board Insulation 2.1

234 07 21 13 08 Manufacturer’s Instructions Adhesive 2.5.1

235 07 21 16 03 Product Data Blanket Insulation 2.1

Acti vity

Trans-mittal #

Specification

Section

SD

# Submittal Description Item Submitted

Paragraph

Classificati on: GOVT or A/E

Revwr Submit

Approval

Needed

By

Material

Needed

By

Action

Code

Date Of

Action

Date FWD to APPR /

Auth Date

RCD From

CONTR

Date

FWD To

Other

Revwr

Date

RCD

From

Other

Revwr

Action

Code

Date Of

Action

Mailed To

CONTR/

Date RCD

From

APPR

Authority Remarks

APPROVING AUTHORITY

(d)

CONTRACTOR SCHEDULE

DATES

CONTRACTOR

ACTION

TITLE: Issued for Construction

SUBMITTAL REGISTER

JOB NAME: Hospital Modernization LOCATION: Misawa Air Base, Japan

CONTRACT NO: FA 8903-15-D-0004 TO: 18-F-0072 | Legacy project #QKKA188003, Opportunity 1090686

CONTRACTOR:

236 07 21 16 03 Product Data Accessories 2.2

237 07 21 16 08 Manufacturer’s Instructions Insulation 3.3.1

238 07 22 00 02 Shop Drawings Insulation Board Layout 1.3 G

239 07 22 00 02 Shop Drawings Verification of Existing Conditions 1.3 G

240 07 22 00 03 Product Data Insulation 2.1 G

241 07 22 00 03 Product Data Cover Board 1.4 G

242 07 22 00 03 Product Data Fasteners 2.3 G

243 07 22 00 03 Product Data Moisture Control G

244 07 22 00 06 Test Reports Flame Spread Rating 1.7.1 G

245 07 22 00 07 Certificates Installer Qualifications 1.6 G

246 07 22 00 07 Certificates Certificates Of Compliance For Felt

Materials

1.6 G

247 07 22 00 08 Manufacturer’s Instructions Fasteners 2.3 G

248 07 22 00 08 Manufacturer’s Instructions Insulation 2.1 G

249 07 27 26 01 Preconstruction Submittals Qualifications of Manufacturer 1.8.1 G

250 07 27 26 01 Preconstruction Submittals Qualifications of Installer 1.8.2 G

251 07 27 26 02 Shop Drawings Fluid-Applied Membrane Air Barrier 1.4 G

252 07 27 26 03 Product Data Fluid-Applied Membrane Air Barrier 1.4 G

253 07 27 26 03 Product Data Transition Membrane 2.3 G

254 07 27 26 03 Product Data Primers, Adhesives, and Mastics 2.2 G

255 07 27 26 03 Product Data Reinforcement 2.6 G

256 07 27 26 03 Product Data Safety Data Sheets 1.4.2 G

257 07 27 26 06 Test Reports Field Peel Adhesion Test 1.4.3 G

258 07 27 26 06 Test Reports Site Inspections 3.4.1 G

259 07 27 26 07 Certificates Fluid-Applied Membrane Air Barrier 1.4 G

260 07 27 26 08 Manufacturer’s Instructions Fluid-Applied Membrane Air Barrier 1.4 G

261 07 41 13 02 Shop Drawings Roofing Panels 1.4.5 G

262 07 41 13 02 Shop Drawings Flashing and Accessories 1.4.5 G

263 07 41 13 02 Shop Drawings Gutter/Downspout Assembly 1.4.5 G

264 07 41 13 03 Product Data Roof Panels 2.1 G

265 07 41 13 03 Product Data Factory-Applied Color Finish 1.4.5 G

266 07 41 13 03 Product Data Accessories 2.4

267 07 41 13 03 Product Data Fasteners 1.4.5

268 07 41 13 03 Product Data Pressure Sensitive Tape 1.4.5

269 07 41 13 03 Product Data Underlayments 2.6

270 07 41 13 03 Product Data Gaskets and Sealing/Insulating

Compounds 2.7

Acti vity

Trans-mittal #

Specification

Section

SD

# Submittal Description Item Submitted

Paragraph

Classificati on: GOVT or A/E

Revwr Submit

Approval

Needed

By

Material

Needed

By

Action

Code

Date Of

Action

Date FWD to APPR /

Auth Date

RCD From

CONTR

Date

FWD To

Other

Revwr

Date

RCD

From

Other

Revwr

Action

Code

Date Of

Action

Mailed To

CONTR/

Date RCD

From

APPR

Authority Remarks

APPROVING AUTHORITY

(d)

CONTRACTOR SCHEDULE

DATES

CONTRACTOR

ACTION

TITLE: Issued for Construction

SUBMITTAL REGISTER

JOB NAME: Hospital Modernization LOCATION: Misawa Air Base, Japan

CONTRACT NO: FA 8903-15-D-0004 TO: 18-F-0072 | Legacy project #QKKA188003, Opportunity 1090686

CONTRACTOR:

271 07 41 13 03 Product Data Aluminized Steel Repair Paint 1.4.5

272 07 41 13 04 Samples Roof Panels 2.1 G

273 07 41 13 04 Samples Factory-applied Color Finish 1.4.5 G

274 07 41 13 04 Samples Accessories 2.4

275 07 41 13 04 Samples Fasteners 1.4.5

276 07 41 13 04 Samples Gaskets and Sealant/Insulating

Compounds 1.4.5

277 07 41 13 05 Design Data Wind Uplift Resistance 1.2.1.2 G

278 07 41 13 06 Test Reports Leakage Test Report 1.2.1.1 G

279 07 41 13 06 Test Reports Wind Uplift Test Report 1.2.1.2 G

280 07 41 13 06 Test Reports Factory Finish and Color Performance

Requirements

2.2 G

281 07 41 13 07 Certificates Roof Panels 2.1 G

282 07 41 13 07 Certificates Coil Stock Compatibility 1.4.5 G

283 07 41 13 07 Certificates Self-Adhering Modified Bitumen

Underlayment 2.6.1

284 07 41 13 07 Certificates Qualification of Manufacturer 1.4.1 G

285 07 41 13 07 Certificates Qualification of Applicator 1.4.2 G

286 07 41 13 08 Manufacturer’s Instructions Installation Manual 1.4.5 G

287 07 41 13 09 Manufacturer’s Field Reports Manufacturer's Field Inspection

Reports

3.9.1 G

288 07 41 13 11 Closeout Submittals Warranties 1.8 G

289 07 42 13 01 Preconstruction Submittals Qualification of Manufacturer 1.5.3 G

290 07 42 13 01 Preconstruction Submittals Qualification of Installation Contractor 1.5.4 G

291 07 42 13 01 Preconstruction Submittals Warranty 1.8 G

292 07 42 13 02 Shop Drawings Installation Drawings 1.5.1.1 G

293 07 42 13 03 Product Data Wall Panels 2.2.1 G

294 07 42 13 03 Product Data Factory Color Finish 2.2.2

295 07 42 13 03 Product Data Closure Materials 1.5.5

296 07 42 13 03 Product Data Pressure Sensitive Tape 2.5.4.4

297 07 42 13 03 Product Data Sealants and Caulking 2.5.4.1

298 07 42 13 03 Product Data Enamel Repair Paint 1.5.3.1

299 07 42 13 03 Product Data Accessories 1.5.5

300 07 42 13 03 Product Data Accessories 2.5

301 07 42 13 04 Samples Wall Panels 2.2.1 G

302 07 42 13 04 Samples Fasteners 1.5.3.1 G

303 07 42 13 04 Samples Metal Closure Strips 2.5.3 G

304 07 42 13 04 Samples Color chart G

Acti vity

Trans-mittal #

Specification

Section

SD

# Submittal Description Item Submitted

Paragraph

Classificati on: GOVT or A/E

Revwr Submit

Approval

Needed

By

Material

Needed

By

Action

Code

Date Of

Action

Date FWD to APPR /

Auth Date

RCD From

CONTR

Date

FWD To

Other

Revwr

Date

RCD

From

Other

Revwr

Action

Code

Date Of

Action

Mailed To

CONTR/

Date RCD

From

APPR

Authority Remarks

APPROVING AUTHORITY

(d)

CONTRACTOR SCHEDULE

DATES

CONTRACTOR

ACTION

TITLE: Issued for Construction

SUBMITTAL REGISTER

JOB NAME: Hospital Modernization LOCATION: Misawa Air Base, Japan

CONTRACT NO: FA 8903-15-D-0004 TO: 18-F-0072 | Legacy project #QKKA188003, Opportunity 1090686

CONTRACTOR:

305 07 42 13 05 Design Data Wind load design analysis 1.5.1.2 G

306 07 42 13 06 Test Reports Leakage Tests 3.7.2 G

307 07 42 13 06 Test Reports Wind Load Tests 1.3.2 G

308 07 42 13 06 Test Reports Coating 2.2.2.6 G

309 07 42 13 06 Test Reports Chalking 2.2.2.6 G

310 07 42 13 06 Test Reports Seismic Tests 1.3.2 G

311 07 42 13 07 Certificates Coil Stock 1.5.3.1 G

312 07 42 13 07 Certificates Fasteners 1.5.3.1 G

313 07 42 13 07 Certificates Enamel Repair Paint 1.5.3.1 G

314 07 42 13 08 Manufacturer’s Instructions Installation 3.3 G

315 07 42 13 09 Manufacturer’s Field Reports Manufacturer's Field Reports 3.8.1 G

316 07 42 13 11 Closeout Submittals Warranty 1.8 G

317 07 42 13 11 Closeout Submittals Maintenance Instructions 1.5.6 G

318 07 42 13 11 Closeout Submittals 20 year 'No Dollar Limit' warranty for labor and material 1.8.1

319 07 54 19 02 Shop Drawings Detail Drawings 1.6 G

320 07 54 19 02 Shop Drawings Roof Plan 1.6 G

321 07 54 19 03 Product Data PVC Roofing Membrane 3.3.2 G

322 07 54 19 03 Product Data Bonding Adhesive 2.1.3

323 07 54 19 03 Product Data Flashing 1.5.5

324 07 54 19 03 Product Data Flashing 3.3.2.2

325 07 54 19 03 Product Data Membrane Fasteners and Plates 2.1.6

326 07 54 19 03 Product Data Roof Insulation 2.1.9

327 07 54 19 03 Product Data Pre-Manufactured Accessories 2.1.7

328 07 54 19 03 Product Data Information Card 2.1.1

329 07 54 19 05 Design Data Wind Uplift Resistance 1.3.2 G

330 07 54 19 07 Certificates Qualification of Manufacturer 1.5.1

331 07 54 19 07 Certificates Qualifications of Applicator 1.5.2

332 07 54 19 07 Certificates Qualification of Engineer of Record 1.5.4

333 07 54 19 07 Certificates Wind Uplift Resistance 1.3.2

334 07 54 19 07 Certificates Fire Resistance 1.3.1

335 07 54 19 07 Certificates Minimum Polymer Thickness 2.1.1

336 07 54 19 07 Certificates Minimum Polymer Thickness 2.1.5

337 07 54 19 07 Certificates Sample 1.10 G

338 07 54 19 08 Manufacturer’s Instructions Application Method 3.3 G

339 07 54 19 08 Manufacturer’s Instructions Membrane Flashing 2.1.5 G

Acti vity

Trans-mittal #

Specification

Section

SD

# Submittal Description Item Submitted

Paragraph

Classificati on: GOVT or A/E

Revwr Submit

Approval

Needed

By

Material

Needed

By

Action

Code

Date Of

Action

Date FWD to APPR /

Auth Date

RCD From

CONTR

Date

FWD To

Other

Revwr

Date

RCD

From

Other

Revwr

Action

Code

Date Of

Action

Mailed To

CONTR/

Date RCD

From

APPR

Authority Remarks

APPROVING AUTHORITY

(d)

CONTRACTOR SCHEDULE

DATES

CONTRACTOR

ACTION

TITLE: Issued for Construction

SUBMITTAL REGISTER

JOB NAME: Hospital Modernization LOCATION: Misawa Air Base, Japan

CONTRACT NO: FA 8903-15-D-0004 TO: 18-F-0072 | Legacy project #QKKA188003, Opportunity 1090686

CONTRACTOR:

340 07 54 19 08 Manufacturer’s Instructions Membrane Flashing 3.4.2 G

341 07 54 19 08 Manufacturer’s Instructions Perimeter Attachment 3.3.4

342 07 54 19 08 Manufacturer’s Instructions Auxiliary Fasteners 2.1.6.2

343 07 54 19 08 Manufacturer’s Instructions Pre-Manufactured Accessories 2.1.7

344 07 54 19 08 Manufacturer’s Instructions Cold Weather 1.8 G

345 07 54 19 11 Closeout Submittals Warranty 1.10 G

346 07 54 19 11 Closeout Submittals Information Card 2.1.1 G

347 07 54 19 11 Closeout Submittals Instructions to Government Personnel 3.9 G

348 07 60 00 02 Shop Drawings Exposed Sheet Metal 2.1.1 G

349 07 60 00 02 Shop Drawings Expansion Joints 3.1.20 G

350 07 60 00 02 Shop Drawings Gravel Stops and Fasciae 2.1.1 G

351 07 60 00 02 Shop Drawings Base Flashing 3.1.11 G

352 07 60 00 02 Shop Drawings Counterflashing 3.1.12 G

353 07 60 00 02 Shop Drawings Flashing at Roof Penetrations and

Equipment Supports

3.1.21 G

354 07 60 00 02 Shop Drawings Reglets 2.1.9 G

355 07 60 00 02 Shop Drawings Scuppers 3.1.16 G

356 07 60 00 02 Shop Drawings Copings 3.1.23 G

357 07 60 00 02 Shop Drawings Drip Edges 3.1.15 G

358 07 60 00 04 Samples Finish Samples 1.4.2 G

359 07 60 00 08 Manufacturer’s Instructions Instructions for Installation 1.4.3 G

360 07 60 00 08 Manufacturer’s Instructions Quality Control Plan 3.5 G

361 07 60 00 10 Operation and Maintenance Data Cleaning and Maintenance 1.4.3 G

362 07 81 00 03 Product Data Fireproofing Material 3.3 G

363 07 81 00 04 Samples Spray-Applied Fireproofing 2.1 G

364 07 81 00 06 Test Reports Fire Resistance Rating 1.2.2 G

365 07 81 00 06 Test Reports Field Tests 3.5 G

366 07 81 00 06 Test Reports Evaluation Reports 1.2.3 G

367 07 81 00 07 Certificates Installer Qualifications 1.4.1 G

368 07 81 00 07 Certificates Surface Preparation Report 3.1 G

369 07 84 00 02 Shop Drawings Firestopping System 2.1 G

370 07 84 00 03 Product Data Firestopping Materials 2.2 G

371 07 84 00 06 Test Reports Inspection 3.3 G

372 07 84 00 07 Certificates Inspector Qualifications 1.5.2

373 07 84 00 07 Certificates Firestopping Materials 2.2

Acti vity

Trans-mittal #

Specification

Section

SD

# Submittal Description Item Submitted

Paragraph

Classificati on: GOVT or A/E

Revwr Submit

Approval

Needed

By

Material

Needed

By

Action

Code

Date Of

Action

Date FWD to APPR /

Auth Date

RCD From

CONTR

Date

FWD To

Other

Revwr

Date

RCD

From

Other

Revwr

Action

Code

Date Of

Action

Mailed To

CONTR/

Date RCD

From

APPR

Authority Remarks

APPROVING AUTHORITY

(d)

CONTRACTOR SCHEDULE

DATES

CONTRACTOR

ACTION

TITLE: Issued for Construction

SUBMITTAL REGISTER

JOB NAME: Hospital Modernization LOCATION: Misawa Air Base, Japan

CONTRACT NO: FA 8903-15-D-0004 TO: 18-F-0072 | Legacy project #QKKA188003, Opportunity 1090686

CONTRACTOR:

374 07 84 00 07 Certificates Installer Qualifications 1.5.1 G

375 07 92 00 03 Product Data Sealants 2.1 G

376 07 92 00 03 Product Data Primers 2.2 G

377 07 92 00 03 Product Data Bond Breakers 2.3 G

378 07 92 00 03 Product Data Backstops 2.4 G

379 07 92 00 03 Product Data Field Adhesion 3.1 G

380 08 11 13 02 Shop Drawings Doors 2.1 G DOR

381 08 11 13 02 Shop Drawings Doors 2.1 G DOR

382 08 11 13 02 Shop Drawings Frames 2.7 G DOR

383 08 11 13 02 Shop Drawings Frames 2.7 G DOR

384 08 11 13 02 Shop Drawings Accessories 2.5

385 08 11 13 03 Product Data Doors 2.1 G DOR

386 08 11 13 03 Product Data Frames 2.7 G DOR

387 08 11 13 03 Product Data Accessories 2.5

388 08 14 00 02 Shop Drawings Doors 2.1 G DOR

389 08 14 00 03 Product Data Doors 2.1 G DOR

390 08 14 00 03 Product Data Accessories 2.2 G DOR

391 08 14 00 03 Product Data Water-resistant Sealer 2.3.7

392 08 14 00 03 Product Data Warranty 1.5 G DOR

393 08 14 00 03 Product Data Sound Transmission Class Rating 2.1.3 G DOR

394 08 14 00 03 Product Data Fire Resistance Rating 2.1.4 G DOR

395 08 14 00 04 Samples Door Finish Colors 2.3.6.2 G DOR

396 08 14 00 06 Test Reports Cycle-Slam 2.4

397 08 14 00 06 Test Reports Hinge Loading Resistance 2.4

398 08 14 00 07 Certificates Certificates of Grade 1.3.1 G DOR

399 08 14 00 11 Closeout Submittals Warranty 1.5 G DOR

400 08 31 00 02 Shop Drawings Access Doors And Panels 1.3 G DOR

401 08 31 00 03 Product Data Access Doors And Panels 1.3 G DOR

402 08 31 00 03 Product Data Hardware 1.3.2 G DOR

403 08 31 00 03 Product Data Accessories 2.1.7 G DOR

404 08 41 13 02 Shop Drawings Installation Drawings 3.3 G DOR

405 08 41 13 02 Shop Drawings Fabrication Drawings 2.2 G DOR

406 08 41 13 03 Product Data Manufacturer's Catalog Data G DOR

407 08 41 13 03 Product Data Finish 2.2.3 G DOR

408 08 41 13 04 Samples Finish and Color Samples G

Acti vity

Trans-mittal #

Specification

Section

SD

# Submittal Description Item Submitted

Paragraph

Classificati on: GOVT or A/E

Revwr Submit

Approval

Needed

By

Material

Needed

By

Action

Code

Date Of

Action

Date FWD to APPR /

Auth Date

RCD From

CONTR

Date

FWD To

Other

Revwr

Date

RCD

From

Other

Revwr

Action

Code

Date Of

Action

Mailed To

CONTR/

Date RCD

From

APPR

Authority Remarks

APPROVING AUTHORITY

(d)

CONTRACTOR SCHEDULE

DATES

CONTRACTOR

ACTION

TITLE: Issued for Construction

SUBMITTAL REGISTER

JOB NAME: Hospital Modernization LOCATION: Misawa Air Base, Japan

CONTRACT NO: FA 8903-15-D-0004 TO: 18-F-0072 | Legacy project #QKKA188003, Opportunity 1090686

CONTRACTOR:

409 08 41 13 08 Manufacturer’s Instructions Manufacturer's Instructions 3.3 G DOR

410 08 41 13 11 Closeout Submittals Manufacturer's Product Warranty G DOR

411 08 71 00 02 Shop Drawings Manufacturer's Detail Drawings 1.3 G DOR

412 08 71 00 02 Shop Drawings Verification of Existing Conditions 1.3 G DOR

413 08 71 00 02 Shop Drawings Hardware Schedule 1.5 G DOR

414 08 71 00 02 Shop Drawings Keying System 2.3.7 G DOR

415 08 71 00 03 Product Data Hardware Items 2.3 G DOR

416 08 71 00 08 Manufacturer’s Instructions Installation 3.1 G DOR

417 08 71 00 10 Operation and Maintenance Data Hardware Schedule 1.5 G DOR

418 08 71 00 11 Closeout Submittals Key Bitting 1.6.1 G DOR

419 08 81 00 02 Shop Drawings Installation G DOR

420 08 81 00 03 Product Data Insulating Glass 1.6.1 G DOR

421 08 81 00 03 Product Data Insulating Glass 2.2 G DOR

422 08 81 00 03 Product Data Glazing Accessories 1.3 G DOR

423 08 91 00 02 Shop Drawings Wall louvers 1.4 G DOR

424 08 91 00 02 Shop Drawings Wall louvers 1.5 G DOR

425 08 91 00 03 Product Data Metal Wall Louvers 2.2 G DOR

426 09 22 00 02 Shop Drawings Metal Support Systems 2.1 G

427 09 22 00 03 Product Data Metal Support Systems 2.1

428 09 24 23 02 Shop Drawings Lath 3.3 G

429 09 24 23 03 Product Data Proportions and Mixing 3.5 G DOR

430 09 24 23 04 Samples Sample Panel 1.3 G

431 09 24 23 04 Samples Colored Stucco Finish Coat 2.2

432 09 29 00 03 Product Data Cementitious Backer Units 2.1.4

433 09 29 00 03 Product Data Glass Mat Covered or Reinforced

Gypsum Sheathing 2.1.3

434 09 29 00 03 Product Data Glass Mat Covered or Reinforced

Gypsum Sheathing Sealant 2.1.3.1

435 09 29 00 03 Product Data Accessories 2.1.10

436 09 29 00 03 Product Data Gypsum Board 2.1.1

437 09 29 00 07 Certificates Asbestos Free Materials 2.1 G

438 09 29 00 08 Manufacturer’s Instructions Safety Data Sheets

439 09 29 00 10 Operation and Maintenance Data Manufacturer Maintenance Instructions

440 09 30 10 02 Shop Drawings Detail Drawings 3.2 G DOR

441 09 30 10 03 Product Data Porcelain Tile 2.1.1 G

442 09 30 10 03 Product Data Setting-Bed 2.2 G

Acti vity

Trans-mittal #

Specification

Section

SD

# Submittal Description Item Submitted

Paragraph

Classificati on: GOVT or A/E

Revwr Submit

Approval

Needed

By

Material

Needed

By

Action

Code

Date Of

Action

Date FWD to APPR /

Auth Date

RCD From

CONTR

Date

FWD To

Other

Revwr

Date

RCD

From

Other

Revwr

Action

Code

Date Of

Action

Mailed To

CONTR/

Date RCD

From

APPR

Authority Remarks

APPROVING AUTHORITY

(d)

CONTRACTOR SCHEDULE

DATES

CONTRACTOR

ACTION

TITLE: Issued for Construction

SUBMITTAL REGISTER

JOB NAME: Hospital Modernization LOCATION: Misawa Air Base, Japan

CONTRACT NO: FA 8903-15-D-0004 TO: 18-F-0072 | Legacy project #QKKA188003, Opportunity 1090686

CONTRACTOR:

443 09 30 10 03 Product Data Mortar, Grout, and Adhesive 2.4 G

444 09 30 10 04 Samples Tile 2.1 G DOR

445 09 30 10 04 Samples Accessories 2.1 G DOR

446 09 30 10 04 Samples Transition Strips 2.1 G DOR

447 09 30 10 04 Samples Transition Strips 2.6 G DOR

448 09 30 10 04 Samples Grout 2.4.2 G DOR

449 09 30 10 07 Certificates Indoor Air Quality 1.3.1

450 09 30 10 07 Certificates Indoor Air Quality 2.4

451 09 30 10 08 Manufacturer’s Instructions Maintenance Instructions 3.7

452 09 30 10 10 Operation and Maintenance Data Installation 3.2 G

453 09 51 00 02 Shop Drawings Approved Detail Drawings 2.1 G

454 09 51 00 03 Product Data Acoustical Ceiling Systems G

455 09 51 00 04 Samples Acoustical Units 2.2 G

456 09 51 00 04 Samples Acoustical Ceiling Tiles G

457 09 51 00 06 Test Reports Ceiling Attenuation Class and Test 2.1.1 G

458 09 51 00 07 Certificates Indoor Air Quality 2.6

459 09 51 00 07 Certificates Indoor Air Quality 2.9

460 09 65 00 02 Shop Drawings Resilient Flooring and Accessories 2.10 G

461 09 65 00 03 Product Data Resilient Flooring and Accessories 2.10 G

462 09 65 00 03 Product Data Adhesives 2.6

463 09 65 00 04 Samples Resilient Flooring and Accessories 2.10 G DOR

464 09 65 00 06 Test Reports Moisture, Alkalinity and Bond Tests 3.3 G

465 09 65 00 07 Certificates Indoor Air Quality for Rubber Tile 2.1 S

466 09 65 00 07 Certificates Indoor Air Quality for Rubber Sheet

Flooring

2.2 S

467 09 65 00 07 Certificates Indoor Air Quality for Wall Base 2.3 S

468 09 65 00 07 Certificates Indoor Air Quality for Adhesives 2.6 S

469 09 65 00 08 Manufacturer’s Instructions Surface Preparation 3.2 G

470 09 65 00 08 Manufacturer’s Instructions Installation 3.1 G

471 09 65 00 10 Operation and Maintenance Data Resilient Flooring and Accessories 2.10 G

472 09 67 23.13 02 Shop Drawings Installation Drawings 2.1 G DOR

473 09 67 23.13 02 Shop Drawings Fabrication Drawings G DOR

474 09 67 23.13 03 Product Data Manufacturer's Catalog Data 1.2.1 G

475 09 67 23.13 04 Samples Hardboard Mounted Epoxy Flooring 1.5.2 G DOR

476 09 67 23.13 04 Samples Floor Topping 3.1.4 G DOR

Acti vity

Trans-mittal #

Specification

Section

SD

# Submittal Description Item Submitted

Paragraph

Classificati on: GOVT or A/E

Revwr Submit

Approval

Needed

By

Material

Needed

By

Action

Code

Date Of

Action

Date FWD to APPR /

Auth Date

RCD From

CONTR

Date

FWD To

Other

Revwr

Date

RCD

From

Other

Revwr

Action

Code

Date Of

Action

Mailed To

CONTR/

Date RCD

From

APPR

Authority Remarks

APPROVING AUTHORITY

(d)

CONTRACTOR SCHEDULE

DATES

CONTRACTOR

ACTION

TITLE: Issued for Construction

SUBMITTAL REGISTER

JOB NAME: Hospital Modernization LOCATION: Misawa Air Base, Japan

CONTRACT NO: FA 8903-15-D-0004 TO: 18-F-0072 | Legacy project #QKKA188003, Opportunity 1090686

CONTRACTOR:

477 09 67 23.13 05 Design Data Design Mix Data 1.2.2 G

478 09 67 23.13 07 Certificates Listing of Product Installations 1.5.1 G

479 09 67 23.13 07 Certificates Referenced Standards Certificates 1.5 G

480 09 67 23.13 11 Closeout Submittals Warranty 1.6 G

481 09 68 00 02 Shop Drawings Installation Drawings 3.4 G DOR

482 09 68 00 03 Product Data Carpet 2.1 G

483 09 68 00 04 Samples Carpet 2.1 G DOR

484 09 68 00 06 Test Reports Moisture and Alkalinity Tests 3.2 G

485 09 68 00 07 Certificates Indoor Air Quality 1.3.1

486 09 68 00 07 Certificates Indoor Air Quality 2.1.1

487 09 68 00 07 Certificates Indoor Air Quality 2.1.2

488 09 68 00 07 Certificates Indoor Air Quality 2.3

489 09 68 00 07 Certificates Indoor Air Quality 2.3

490 09 68 00 07 Certificates Indoor Air Quality 2.3

491 09 68 00 08 Manufacturer’s Instructions Surface Preparation 3.1

492 09 68 00 10 Operation and Maintenance Data Cleaning and Protection 3.5

493 09 68 00 10 Operation and Maintenance Data Maintenance Service

494 09 68 00 11 Closeout Submittals Warranty 1.6

495 09 72 00 03 Product Data Wallcoverings and Accessories 2.1 G DOR

496 09 72 00 03 Product Data Primer and Adhesive 2.3 F DOR

497 09 72 00 04 Samples Wallcoverings and Accessories 2.1 G DOR

498 09 72 00 07 Certificates Indoor Air Quality 1.3.1 F DOR

499 09 72 00 08 Manufacturer’s Instructions Wallcoverings and Accessories 2.1 F DOR

500 09 72 00 10 Operation and Maintenance Data Wallcoverings and Accessories 2.1 G DOR

501 09 90 00 02 Shop Drawings Piping identification 3.10 G DOR

502 09 90 00 02 Shop Drawings stencil 3.10 G DOR

503 09 90 00 03 Product Data Certification G DOR

504 09 90 00 03 Product Data Coating 2.1 G DOR

505 09 90 00 03 Product Data Manufacturer's Technical Data Sheets 2.1 G DOR

506 09 90 00 03 Product Data Sealant G DOR

507 09 90 00 04 Samples Color 1.11 G DOR

508 09 90 00 07 Certificates Applicator's qualifications 1.3 G DOR

509 09 90 00 07 Certificates Qualification Testing 1.4.1.2 G DOR

510 09 90 00 07 Certificates Environmental Data 1.9.2

Acti vity

Trans-mittal #

Specification

Section

SD

# Submittal Description Item Submitted

Paragraph

Classificati on: GOVT or A/E

Revwr Submit

Approval

Needed

By

Material

Needed

By

Action

Code

Date Of

Action

Date FWD to APPR /

Auth Date

RCD From

CONTR

Date

FWD To

Other

Revwr

Date

RCD

From

Other

Revwr

Action

Code

Date Of

Action

Mailed To

CONTR/

Date RCD

From

APPR

Authority Remarks

APPROVING AUTHORITY

(d)

CONTRACTOR SCHEDULE

DATES

CONTRACTOR

ACTION

TITLE: Issued for Construction

SUBMITTAL REGISTER

JOB NAME: Hospital Modernization LOCATION: Misawa Air Base, Japan

CONTRACT NO: FA 8903-15-D-0004 TO: 18-F-0072 | Legacy project #QKKA188003, Opportunity 1090686

CONTRACTOR:

511 09 90 00 08 Manufacturer’s Instructions Application instructions 3.2.1 G DOR

512 09 90 00 08 Manufacturer’s Instructions Mixing 3.6.2 G DOR

513 09 90 00 08 Manufacturer’s Instructions Manufacturer's Safety Data Sheets 1.7.2 G DOR

514 09 90 00 10 Operation and Maintenance Data Coatings 2.1 G DOR

515 09 96 00 03 Product Data Epoxy Coatings 2.2.1 G DOR

516 09 96 00 04 Samples Color Chips 1.3 G DOR

517 09 96 00 07 Certificates Epoxy Coatings 2.2.1 G DOR

518 09 96 00 07 Certificates Manufacturer's Printed Instructions 3.1.5 G DOR

519 10 14 00.10 02 Shop Drawings Approved Detail Drawings 3.1 G

520 10 14 00.10 03 Product Data Installation 3.1

521 10 14 00.10 03 Product Data Exterior Signage 1.2 G

522 10 14 00.10 03 Product Data Wind Load Requirements 1.2.1

523 10 14 00.10 04 Samples Exterior Signage 1.2 G

524 10 14 00.10 10 Operation and Maintenance Data Protection and Cleaning 3.1.2 G

525 10 14 00.20 02 Shop Drawings Detail Drawings 1.4.2 G DOR

526 10 14 00.20 03 Product Data Installation 3.1 G DOR

527 10 14 00.20 03 Product Data Warranty 1.6 G DOR

528 10 14 00.20 04 Samples Interior Signage 1.4.1 G DOR

529 10 14 00.20 04 Samples Software 1.3 G DOR

530 10 14 00.20 10 Operation and Maintenance Data Approved Manufacturer's Instructions 3.1 G DOR

531 10 14 00.20 10 Operation and Maintenance Data Protection and Cleaning 3.1.2 G DOR

532 10 26 00 02 Shop Drawings Corner Guards 2.2 G DOR

533 10 26 00 03 Product Data Corner Guards 2.2 G DOR

534 10 26 00 03 Product Data Wall Covering/Panels 2.3 G DOR

535 10 26 00 04 Samples Finish 2.5 G DOR

536 10 26 00 06 Test Reports Corner Guards 2.2 G DOR

537 10 26 00 07 Certificates Corner Guards 2.2 G DOR

538 10 26 00 07 Certificates Indoor Air Quality 1.3.1 G DOR

539 10 26 00 07 Certificates Indoor Air Quality 2.6 G DOR

540 10 28 13 03 Product Data Finishes 2.1.2 G

541 10 28 13 03 Product Data Accessory Items 2.2 G

542 10 28 13 04 Samples Finishes 2.1.2 G

543 10 28 13 04 Samples Accessory Items 2.2

544 10 28 13 07 Certificates Accessory Items 2.2

Acti vity

Trans-mittal #

Specification

Section

SD

# Submittal Description Item Submitted

Paragraph

Classificati on: GOVT or A/E

Revwr Submit

Approval

Needed

By

Material

Needed

By

Action

Code

Date Of

Action

Date FWD to APPR /

Auth Date

RCD From

CONTR

Date

FWD To

Other

Revwr

Date

RCD

From

Other

Revwr

Action

Code

Date Of

Action

Mailed To

CONTR/

Date RCD

From

APPR

Authority Remarks

APPROVING AUTHORITY

(d)

CONTRACTOR SCHEDULE

DATES

CONTRACTOR

ACTION

TITLE: Issued for Construction

SUBMITTAL REGISTER

JOB NAME: Hospital Modernization LOCATION: Misawa Air Base, Japan

CONTRACT NO: FA 8903-15-D-0004 TO: 18-F-0072 | Legacy project #QKKA188003, Opportunity 1090686

CONTRACTOR:

545 10 28 13 07 Certificates Baby Changing Stations 1.3.1

546 10 28 13 10 Operation and Maintenance Data Electric Hand Dryer 2.2.9 G

547 10 44 16 01 Preconstruction Submittals Manufacturer's Data G

548 10 44 16 02 Shop Drawings Fire Extinguishers 2.1 G

549 10 44 16 02 Shop Drawings Accessories 1.3.1 G

550 10 44 16 02 Shop Drawings Cabinets Part 2 G

551 10 44 16 02 Shop Drawings Wall Brackets 1.3.1 G

552 10 44 16 03 Product Data Fire Extinguishers 2.1 G

553 10 44 16 03 Product Data Accessories 1.3.1 G

554 10 44 16 03 Product Data Cabinets Part 2 G

555 10 44 16 03 Product Data Wall Brackets 1.3.1 G

556 10 44 16 03 Product Data Replacement Parts List 3.2.1 G

557 10 44 16 04 Samples Fire Extinguisher G

558 10 44 16 04 Samples Cabinet 1.3.1 G

559 10 44 16 04 Samples Wall Brackets 1.3.1 G

560 10 44 16 04 Samples Accessories 1.3.1 G

561 10 44 16 07 Certificates Fire Extinguishers 2.1 G

562 10 44 16 07 Certificates Manufacturer's Warranty with

Inspection Tag G

563 11 70 00 02 Shop Drawings INSTALLATION 3.3

564 11 70 00 02 Shop Drawings equipment 2.2

565 11 70 00 03 Product Data materials and equipment 1.4.1

566 11 70 00 04 Samples equipment 2.2 G

567 11 70 00 06 Test Reports Factory inspection 1.4.5

568 11 70 00 07 Certificates deviations 1.6

569 11 70 00 07 Certificates substitutions 1.7

570 11 70 00 07 Certificates Backflow preventers 2.2.4 G

571 11 71 00 02 Shop Drawings Approved Detail Drawings 3.2 G

572 11 71 00 03 Product Data ASME Form U-1 2.5.1

573 11 71 00 03 Product Data Materials and Equipment 2.1

574 11 71 00 03 Product Data Spare Parts 1.4

575 11 71 00 10 Operation and Maintenance Data Operations and Maintenance

Instructions

3.8.1 G

576 11 71 00 10 Operation and Maintenance Data Training 3.8 G

577 11 72 13 02 Shop Drawings Specimen Cabinet 2.2.1 G

578 11 72 13 03 Product Data items 2.2 G

Acti vity

Trans-mittal #

Specification

Section

SD

# Submittal Description Item Submitted

Paragraph

Classificati on: GOVT or A/E

Revwr Submit

Approval

Needed

By

Material

Needed

By

Action

Code

Date Of

Action

Date FWD to APPR /

Auth Date

RCD From

CONTR

Date

FWD To

Other

Revwr

Date

RCD

From

Other

Revwr

Action

Code

Date Of

Action

Mailed To

CONTR/

Date RCD

From

APPR

Authority Remarks

APPROVING AUTHORITY

(d)

CONTRACTOR SCHEDULE

DATES

CONTRACTOR

ACTION

TITLE: Issued for Construction

SUBMITTAL REGISTER

JOB NAME: Hospital Modernization LOCATION: Misawa Air Base, Japan

CONTRACT NO: FA 8903-15-D-0004 TO: 18-F-0072 | Legacy project #QKKA188003, Opportunity 1090686

CONTRACTOR:

579 11 74 00 02 Shop Drawings items 2.2

580 11 74 00 03 Product Data Light 2.2.1 G

581 12 24 13 02 Shop Drawings Installation 3.3 G DOR

582 12 24 13 03 Product Data Window Shades 2.1

583 12 24 13 04 Samples Window Shades 2.1 G DOR

584 12 24 13 06 Test Reports Window Shades 2.1

585 12 24 13 07 Certificates Indoor Air Quality 1.4.1

586 12 24 13 07 Certificates Indoor Air Quality 2.1

587 12 24 13 08 Manufacturer’s Instructions Window Shades 2.1

588 12 24 13 10 Operation and Maintenance Data Window Shades 2.1

589 12 24 13 11 Closeout Submittals Warranty 1.7

590 12 35 70 02 Shop Drawings Detail Drawings 2.1 G DOR

591 12 35 70 03 Product Data Casework 2.1

592 12 35 70 03 Product Data Recycled Content for Baked Enamel

Carbon Steel Medical Casework

2.1.1.1 S

593 12 35 70 03 Product Data Recycled Content for Corrosion

Resisting Steel Medical Casework

2.1.1.1 S

594 12 35 70 03 Product Data Recycled Content for Wood Core

Medical Casework

2.1.1.1 S

595 12 35 70 03 Product Data Recycled Content for Carbon Steel

Medical Casework

2.1.1.1 S

596 12 35 70 03 Product Data Recycled Content for Wood Core

Dental Casework

2.1.2 S

597 12 35 70 03 Product Data Recycled Content for Carbon Steel

Dental Casework

2.1.2 S

598 12 35 70 03 Product Data

Recycled Content for Baked Enamel

Carbon Steel Dental Prosthetics

Casework

2.1.3 S

599 12 35 70 03 Product Data

Recycled Content for Corrosion

Resisting Steel Dental Prosthetics

Casework

2.1.3 S

600 12 35 70 03 Product Data Recycled Content for Corrosion

Resisting Steel Countertops

2.1.4.1 S

601 12 35 70 04 Samples Casework 2.1 G DOR

602 12 35 70 04 Samples Wall Hung Cabinets 3.1.1 G DOR

603 12 35 70 04 Samples Floor Mounted Cabinets 3.1.2 G DOR

604 12 35 70 04 Samples Countertops 3.1.3 G DOR

605 12 35 70 04 Samples Laminated Plastic Sheets 2.1.2 G DOR

606 12 35 70 07 Certificates Certified Sustainably Harvested Wood for Medical Casework

2.1.1.2 S

607 12 35 70 07 Certificates Certified Sustainably Harvested Wood for Countertops

2.1.4.2 S

Acti vity

Trans-mittal #

Specification

Section

SD

# Submittal Description Item Submitted

Paragraph

Classificati on: GOVT or A/E

Revwr Submit

Approval

Needed

By

Material

Needed

By

Action

Code

Date Of

Action

Date FWD to APPR /

Auth Date

RCD From

CONTR

Date

FWD To

Other

Revwr

Date

RCD

From

Other

Revwr

Action

Code

Date Of

Action

Mailed To

CONTR/

Date RCD

From

APPR

Authority Remarks

APPROVING AUTHORITY

(d)

CONTRACTOR SCHEDULE

DATES

CONTRACTOR

ACTION

TITLE: Issued for Construction

SUBMITTAL REGISTER

JOB NAME: Hospital Modernization LOCATION: Misawa Air Base, Japan

CONTRACT NO: FA 8903-15-D-0004 TO: 18-F-0072 | Legacy project #QKKA188003, Opportunity 1090686

CONTRACTOR:

608 12 35 70 07 Certificates

Indoor Air Quality for Composite Wood and Agrifiber Products Used In

Countertops

2.1.4.3 S

609 12 35 70 08 Manufacturer’s Instructions Installation 2.1

610 12 36 00 02 Shop Drawings Fabrication 2.2 G DOR

611 12 36 00 02 Shop Drawings Installation Drawings 3.1 G DOR

612 12 36 00 03 Product Data Plywood 2.3 G

613 12 36 00 03 Product Data Hardwood 2.3 G

614 12 36 00 03 Product Data Synthetic Resin G

615 12 36 00 03 Product Data Stainless Steel 2.2.1 G

616 12 36 00 03 Product Data Recycled Content for Stainless Steel

Countertops

2.3 S

617 12 36 00 03 Product Data Adhesives G

618 12 36 00 03 Product Data Filler Material 2.3 G

619 12 36 00 03 Product Data Turpentine 2.3 G

620 12 36 00 03 Product Data Fasteners 2.3 G

621 12 36 00 03 Product Data Stainless Steel Sinks 2.3 G

622 12 36 00 03 Product Data Service Fixtures 2.3 G

623 12 36 00 03 Product Data Joint Sealants 2.4.2 G

624 12 36 00 03 Product Data Softwoods 2.3 G

625 12 36 00 03 Product Data Indoor Air Quality for Joint Sealants 2.4.2 S

626 12 36 00 04 Samples Countertop 2.2.1 G DOR

627 12 36 00 04 Samples Backsplash 2.2.1 G DOR

628 12 36 00 04 Samples Color 2.1 G DOR

629 12 36 00 07 Certificates Certified Sustainably Harvested Wood 1.3.1 S

630 12 36 00 07 Certificates Indoor Air Quality for Countertop

Products

2.1 S

631 12 36 00 08 Manufacturer’s Instructions Manufacturer's Instructions 2.1

632 12 48 13 02 Shop Drawings Installation Drawings 3.2 G

633 12 48 13 02 Shop Drawings Detail Drawings 3.2 G

634 12 48 13 02 Shop Drawings Custom Graphics Drawings 3.2 G

635 12 48 13 03 Product Data Entrance Floor Mats and Frames 2.1.1 G

636 12 48 13 03 Product Data Adhesives and Concrete Primers 2.1.2 G

637 12 48 13 04 Samples Entrance Floor Mats and Frames 2.1.1 G

638 12 48 13 04 Samples Custom Graphics 2.1.1 G

639 12 48 13 08 Manufacturer’s Instructions Manufacturer's Instructions 3.2

640 12 48 13 10 Operation and Maintenance Data Protection, Maintenance, and Repair

Information 3.2

Acti vity

Trans-mittal #

Specification

Section

SD

# Submittal Description Item Submitted

Paragraph

Classificati on: GOVT or A/E

Revwr Submit

Approval

Needed

By

Material

Needed

By

Action

Code

Date Of

Action

Date FWD to APPR /

Auth Date

RCD From

CONTR

Date

FWD To

Other

Revwr

Date

RCD

From

Other

Revwr

Action

Code

Date Of

Action

Mailed To

CONTR/

Date RCD

From

APPR

Authority Remarks

APPROVING AUTHORITY

(d)

CONTRACTOR SCHEDULE

DATES

CONTRACTOR

ACTION

TITLE: Issued for Construction

SUBMITTAL REGISTER

JOB NAME: Hospital Modernization LOCATION: Misawa Air Base, Japan

CONTRACT NO: FA 8903-15-D-0004 TO: 18-F-0072 | Legacy project #QKKA188003, Opportunity 1090686

CONTRACTOR…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .