Atch10_Past Performance Questionnaire.docx

DOCX document 42 KB Posted

Attached to
Project No. 1090686, Hospital Modernization Misawa Air Base, Japan
Solicitation number
FA520521R0003
Issued by

About this file

This document contains a past performance questionnaire template for evaluation of contractor performance on prior federal contracts. The questionnaire requests information on a specific prior contract, including the contractor and customer names, contract period and dollar value, work description, and respondent details. Performance is rated across categories of quality control, management effectiveness, timely performance, and compliance with labor and safety standards. An overall performance rating is provided along with any default or termination information. General comments on willingness to award to the contractor in the future are also requested.

The related federal contract opportunity is for Project No. 1090686 to modernize the hospital at Misawa Air Base in Japan. The solicitation is being conducted by the Department of the Air Force Pacific Air Forces. Response and award dates and pricing terms are not provided, as this appears to be a template for a past performance evaluation rather than a specific open solicitation.

View the file

Other files

File Type Posted
FA520521R00030004.pdf PDF
FA520521R00030004_Atch3_Revised Specifications.pdf PDF
FA520521R00030004_Atch1_Consolidated List of Govt Response.pdf PDF
FA520521R00030004_Atch2_Addendum No 2.pdf PDF
FA520521R00030004_Atch5_Revised Soliciation Page 1 and 21.pdf PDF
FA520521R00030004_Atch4_Revised Drawing Sheets.pdf PDF
FA520521R00030003_Atch2_Revised Soliciation Page 1 and 21.pdf PDF
FA520521R00030003.pdf PDF
FA520521R00030002_Atch2_Revised Specifications.pdf PDF
FA520521R00030002_Atch7_Revised Soliciation Page 1 and 21.pdf PDF
FA520521R00030002_Atch5_Revised Cut Sheets for JSN S0442 and S0960.pdf PDF
FA520521R00030002_Atch6_Consolidated List of Govt Response.pdf PDF
FA520521R00030002_Atch3_Revised Drawing Sheets.pdf PDF
FA520521R00030002.pdf PDF
FA520521R00030002_Atch1_Addendum No 1.pdf PDF
FA520521R00030002_Atch4_Revised Submittal Register.pdf PDF
FA520521R00030001.pdf PDF
Atch2_Drawings_PDF3of10_Structural.pdf PDF
Atch2_Drawings_PDF8of10_Plumbing.pdf PDF
Atch7-2_Structural Interior Design Volume 1 thru 3.pdf PDF
Atch2_Drawings_PDF6of10_Equipment.pdf PDF
RFP FA520521R0003_Hospital Modernization.pdf PDF
Atch2_Drawings_PDF4of10_Architectural.pdf PDF
Atch6_List of Contractor Furnished US Material.pdf PDF
Atch7-3_Mobile Sterile Processing Department Trailer Information.pdf PDF
Atch9_Past Performance Questionnaire Cover Letter.pdf PDF
Atch1_Specifications_Volume 2 of 2.pdf PDF
Atch2_Drawings_PDF10of10_Electrical.pdf PDF
Atch2_Drawings_PDF7of10_FireProtection.pdf PDF
Atch4_Construction Timeline.pdf PDF
Atch1_Specifications_Volume 1 of 2.pdf PDF
Atch2_Drawings_PDF2of10_Civil.pdf PDF
Atch2_Drawings_PDF1of10_General.pdf PDF
Atch8_Hazardous Material Survey Report.pdf PDF
Atch2_Drawings_PDF9of10_Mechanical.pdf PDF
Atch7-1_Equipment Data and Cut Sheets Logistics Category A.pdf PDF
Atch3_Other Contract Requirements.pdf PDF
Atch2_Drawings_PDF5of10_Interiors.pdf PDF
Atch5_Submittal Register.pdf PDF
Show all 39

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

For Official Use Only When completed, this document is Source Selection Information IAW FAR 2.101 and 3.104.

Section 1: Contract Identification

A. Contractor (Company/Division):

B. Contractor Cage Code:

C. Contract Number:

D. Contract Type (e.g., Firm-Fixed-Price (FFP), Fixed-Price-Incentive-Fee (FPIF), Cost-Plus-Incentive-Fee (CPIF), Cost-Plus-Fixed-Fee (CPFF), etc.):

E. Contract Title:

F. Period of Performance

1. Original Schedule (assuming all options exercised):

Beginning Date _________ through ____________

2. Current Schedule (assuming all options exercised):

Beginning Date _________ through ____________

3. Reason for difference (if applicable):

G. Contract Dollar Value (use FY21 budget rate of ¥107.9114 to $1.00 if conversion is necessary)

1. Original maximum contract dollar value (assuming all options exercised): $

2. Current maximum contract dollar value (assuming all options exercised): $

3. Reasons for difference (if applicable):

H Description of work performed:

I. Was this a competitively awarded contract? ☐ Yes ☐ No

J. Contractor’s Role: ☐ Prime Contractor ☐ Subcontractor ☐ Key Personnel

Section 2: Customer or Agency Identification

A. Customer or agency name:

B. Customer or agency description (if applicable):

C. Geographic description of services under this contract (i.e., local, nationwide, worldwide, other Commands):

Section 3: Respondent Identification

A. Respondent’s name:

B. Respondent’s title:

C. Respondent’s phone number / fax number / e-mail address:

D. Respondent’s position (e.g., Program Manager, PCO/ACO, etc.):

E. Length of time (number of years/months) respondent worked on subject contract and description of responsibility/position/role:

F. Other suggested points of contact:

Section 4: Performance Information

In the tables below, indicate your rating for the contractor’s performance by placing an “X” in the appropriate block to the right of each question. Provide supporting information for each response in the space provided. Attach additional pages if more space is needed. The performance rating scale is defined as follows:

Code Performance Rating

E EXCEPTIONAL – Performance meets contractual requirements and exceeds many requirements to the Government’s benefit. The contractual performance being assessed was accomplished with few minor problems for which corrective actions taken by the contractor were highly effective.

V VERY GOOD – Performance meets contractual requirements and exceeds some requirements to the Government’s benefit. The contractual performance being assessed was accomplished with some minor problems for which corrective actions taken by the contractor were effective.

S SATISFACTORY – Performance meets contractual requirements. The contractual performance being assessed contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.

M MARGINAL – Performance does not meet some contractual requirements. The contractual performance being assessed reflects a serious problem for which the contractor has not yet identified corrective actions or the contractor’s proposed actions appear only marginally effective or were not fully implemented.

U UNSATISFACTORY – Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance being assessed contains serious problem(s) for which the contractor’s corrective actions appear or were ineffective.

N/A NOT APPLICABLE – Unable to provide a rating. Contract did not include performance for this aspect, performance was not observed, or information was not available. Do not know.

Quality Control
E
VG
S
M
U
N/A

Q1. Workmanship and quality control.

Q2. Adequacy / Implementation of CQC plan.

Q3. Adequacy of materials.

Q4. Adequacy of submittals, including as-builts.

Q5. Identification / Correction of deficient work in timely manner.

Effectiveness of Management
E
VG
S
M
U
N/A

E1. Cooperation and responsiveness.

E2. Management of resources / Personnel.

E3. Coordination and control of subcontractors.

E4. Effectiveness of job-site supervision.

Timely Performance
E
VG
S
M
U
N/A

T1. Adequacy of initial progress schedule.

T2. Adherence to approved schedule.

T3. Resolution of Delays.

T4. Submission of required documentation.

Compliance with Labor/Safety Standards
E
VG
S
M
U
N/A

C1. Compliance with labor laws and regulations.

C2. Adequacy of Safety Plan.

C3. Implementation of Safety Plan.

Overall Rating
E
VG
S
M
U
N/A

O1. Based on the above, what is your overall assessment of the present/past performance for this contractor?

Government Contracts Only: Was this contract partially or completely terminated for default or convenience, or are there any pending terminations?

☐ Yes ☐ Default ☐ Convenience ☐ Pending Terminations ☐ No

If yes, please explain (e.g., inability to meet cost, performance, or delivery schedules).

SECTION 5: GENERAL COMMENT

Given what I know today about the contractor’s ability to execute what he promised in his proposal, I [ definitely would, probably would, might or might not, probably would not, definitely would not ] award to him today given that I had a choice.

REMARKS:

Please provide any additional comments concerning this contractor’s performance, as desired.

Respondent’s Signature Date

Thank you for your prompt response and assistance!

Please return this completed questionnaire to:

E-Mail:Ms Miyako Fujimoto (miyako.fujimoto.jp@us.af.mil)
Mr. Takafumi Nosaki (takafumi.nosaki.jp@us.af.mil)

Mailing Address:

35th Contracting Squadron Attn: Mr. Takafumi Nosaki Bldg. 656, Misawa Air Base, Hirahata, Misawa-shi, Aomori-ken, Japan 033-0012

FAX: 0176-52-4793 (Attn: Mr. Takafumi Nosaki) Attachment 10 to RFP No. FA520521R0003 Date: 3 Mar 2021