This request for information from the United States Air Force seeks industry input to provide future Global Prepositioned Materiel Services in the U.S. Indo-Pacific Command, U.S. European Command/U.S. Africa Command areas of responsibility, as well as limited continental U.S. support. Specifically, the services may include receipt, storage, inventory, accountability, preventive/corrective maintenance, outload and reconstitution of pre-positioned war reserve materiel assets supporting Pacific Air Forces and U.S. Air Forces in Europe-Air Forces Africa, as well as periodic support for Holloman Air Force Base assets. Responses are requested by January 17, 2019 to aid the Air Force's determination of industry's ability to provide these Enterprise war reserve materiel services.

USAFE DABS-DD Form 1391's

View the file

Other files for this federal contract opportunity

Other files attached to Global Prepositioned Materiel Services (GPMS), newest first.
File Type Posted
GPMS Pre-Proposal Conference Update.pdf PDF
PACAF GPMS Quality Assurance Surveillance Plan (QASP) Draft (30 Apr 2020.pdf PDF
USAFE GPMS Quality Assurance Surveillance Plan (QASP) Draft (30 Apr 2020).pdf PDF
Draft Section M GPMS 5May20.docx DOCX document
Draft Section L GPMS 5May20.docx DOCX document
USAFE GPMS - Appendix O - Authorizations.docx DOCX document
USAFE GPMS - Appendix D - Quality Management System (30 Apr 2020).doc DOC document
USAFE GPMS - Appendix J - Government-Furnished Facilities (30 Apr 2020).docx DOCX document
PACAF GPMS - Appendix D - Quality Management System (30 Apr 2020).doc DOC document
PACAF GPMS - Appendix B - Deliverables (30 Apr 2020).docx DOCX document
DD-254 - GPMS.pdf PDF
PACAF GPMS - Appendix J - Government-Furnished Facilities (30 Apr 2020).docx DOCX document
USAFE GPMS - Appendix A - Definitions Abbreviations and Acronyms (30 Apr 20).docx DOCX document
USAFE GPMS - Appendix F - Award Fee Plan (30 Apr 2020).docx DOCX document
USAFE GPMS - Appendix B - Deliverables (30 Apr 2020).docx DOCX document
USAFE GPMS Performance Work Statement (PWS) - Revised Draft (5 May 2020).docx DOCX document
PACAF GPMS Performance Work Statement (PWS) - Revised Draft (5 May 2020).docx DOCX document
USAFE GPMS - Appendix H - Special Requirements for Deployment Support (30 Apr 2020).docx DOCX document
Section L - Attachment 3 - GPMS PACAF Draft Pricing Template.xlsx XLSX spreadsheet
Section I - USAFE Provisions and Clauses DRAFT.pdf PDF
PACAF GPMS - Appendix G - Level of Effort (30 Apr 2020).docx DOCX document
Section J - USAFE List of Attachments (DRAFT).docx DOCX document
Section L - Attachment 3 - GPMS USAFE Draft Pricing Template.xlsx XLSX spreadsheet
PACAF GPMS - Appendix O - Authorizations.docx DOCX document
PACAF GPMS - Appendix F - Award Fee Plan (30 Apr 2020).docx DOCX document
Section I - PACAF Provisions and Clauses DRAFT.pdf PDF
GPMS Industry Feedback Template.docx DOCX document
USAFE GPMS - Appendix M - Certifications (30 Apr 2020).docx DOCX document
GPMS Site Visit Cancellation.pdf PDF
Industry Questions Template.docx DOCX document
GPMS Draft Sect L and M Post.pdf PDF
Section M GPMS (Draft 5 Mar 2020).docx DOCX document
Section L GPMS (Draft 5 Mar 2020).docx DOCX document
GPMS_Industry_Day_Attendees.docx DOCX document
GPMS_Industry_Day_Briefing_Final.pptx PPTX presentation
GPMS_Industry_Day_Questions_Final.docx DOCX document
GPMS_Industry_Day_Announcement_Rev_01.docx DOCX document
2.1._(FOUO)_PACAF_GPMS_(RBCP_plus_NSNs)_-_Draft_GPMS_PWS_Release.xlsx XLSX spreadsheet
1.1._(FOUO)_USAFE_DABS-FEV_MILCON_-_Draft_GPMS_PWS_Release.pdf PDF
2._(FOUO)_PACAF_GPMS_Performance_Work_Statement_(PWS)_-_Draft_GPMS_PWS_Release.docx DOCX document
3.2._(FOUO)_USAFCENT_WPARR_(1_Aug_2019)_-_Draft_GPMS_PWS_Release.xlsx XLSX spreadsheet
1.3._(FOUO)_USAFE_GPMS_(DABS_UTC_&_Sq_Ft)_-_Draft_GPMS_PWS_Release.xlsx XLSX spreadsheet
3.1._(FOUO)_USAFCENT_WRM_Service_Summary_-_Draft_GPMS_PWS_Release.pdf PDF
3._(FOUU)_USAFCENT_WRM_Performance_Work_Statement_(PWS)_-_Draft_GPMS_PWS_Release.pdf PDF
2.4._(FOUO)_Guam_RADR_Vehicles_&_Material_-_Draft_GPMS_PWS_Release.xlsx XLSX spreadsheet
1.4._(FOUO)_USAFE_GPMS_(DABS_Sq_Mtr_Comparison)_-_Draft_GPMS_PWS_Release.xlsx XLSX spreadsheet
2.2._(FOUO)_Guam_&_Philippines_UTCs_(Draft_GPMS_PWS_Release.pdf PDF
Atch_1-_E-WRM_Statement_of_Objective_(SOO).pdf PDF
Atch_2_-_E-WRM_Requested_Information.pdf PDF
RFI_-_Enterprise_WRM.pdf PDF
Show all 50

Global Prepositioned Materiel Services (GPMS) has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DD Form 1391, DEC 99 (E-Form) PREVIOUS EDITIONS MAY BE USED INTERNALLY PAGE NO. 1

1. COMPONENT

AIR FORCE FY 2019 MILITARY CONSTRUCTION PROJECT DATA

2. DATE

3. INSTALLATION AND LOCATION

RAF FAIRFORD, UNITED KINGDOM

4. PROJECT TITLE

EDI-CONSTRUCT DABS-FEV/EMEDS STORAGE

5. PROGRAM ELEMENT

27576

6. CATEGORY CODE

442 421

7. PROJECT NUMBER

8. PROJECT COST ($000)

87,000

9. COST ESTIMATES

ITEM U/M QUANTITY UNIT

COST

COST

($000)

PRIMARY FACILITIES

67,311

CONTROLLED HUMIDITY, GENERAL PURPOSE WAREHOUSE (442-421) SM 6,257 2,080.81 13,020 CONTROLLED HUMIDITY, GENERAL PURPOSE WAREHOUSE (442-421) SM 18,736 1,724.83 32,316 VEHICLE MAINTENANCE SHOP/SPECIAL VEHICLE STORAGE (214-425) SM 3,517 4,140.04 14,561

HAZMAT/POL STORAGE (441-257) SM 168 7,663.14 1,287

EMEDS WAR RESERVE MATERIEL STORAGE (442-515) SM 2,340 2,448.79 5,730

ENTRY CONTROL BUILDING (730-837) SM 74 5,369.69 397

SUPPORTING FACILITIES

10,355

UTILITIES LS -- -- 246

SITE IMPROVEMENTS LS -- -- 299

PAVEMENTS LS -- -- 4,955

COMMUNICATIONS LS -- -- 789

ENVIRONMENTAL MITIGATION LS -- -- 1,360

SUSTAINABLE DESIGN AND DEVELOPMENT LS -- -- 1,346

LOW IMPACT DEVELOPMENT LS -- -- 1,360

SUBTOTAL 77,667

CONTINGENCY (5%) 3,883

TOTAL CONTRACT COST 81,551

SUPERVISION, INSPECTION AND OVERHEAD (6.5%)

2,039

DESIGN/BUILD – DESIGN COST

3,107

TOTAL REQUEST 86,696

TOTAL REQUEST (ROUNDED) 87,000

10. DESCRIPTION OF PROPOSED CONSTRUCTION:

Construct a DABS - FEV/EMEDS Storage complex using conventional design and construction methods to accommodate equipment storage and maintenance for equipment, to be drawn for immediate use in the event of contingency operations. This project is in support of the European Deterrence Initiative (EDI), formerly known as the European Reassurance Initiative. The complex includes humidity-controlled materiel and vehicle storage; humidity-controlled and ventilated refueler vehicle storage;

humidity-controlled and ventilated medical war reserve materiel (WRM) storage; climate-controlled administrative support; and petroleum oil lubricant (POL) and hazardous material storage. In addition, the facilities include loading docks, a bridge crane, fire protection, utility management and control, closed-circuit television (CCTV), and intrusion detection systems (IDS) are included.

Supporting facilities include site work (landscaping, grading, and paving), signage, security fencing, a manned gate and guard booth, and site utility systems (electrical, communications, geothermal, water, sanitary sewer, and stormwater). Low-impact development integrated management practices (LID-IMPs) are included..

The facility is intended to be compatible with applicable DoD, Air Force, and host-nation design standards. In addition, local materials and construction techniques shall be used where required and/or appropriate. Design and construction efforts will be executed in accordance with the host-nation agreements, including construction and environmental permits. The facilities will be designed as permanent construction in accordance with the DoD Unified Facilities Criteria (UFC) 1-202-01, Host Nation Facilities in Support of Military Operations. This project will comply with DoD antiterrorism requirements per UFC 4-010-01.

DD Form 1391, DEC 99 (E-Form) PREVIOUS EDITIONS MAY BE USED INTERNALLY PAGE NO. 2

4. PROJECT TITLE

EDI-CONSTRUCT DABS – FEV/EMEDS

5. PROJECT NUMBER

11. REQUIREMENT: 31,646 SM ADEQUATE: 0 SUBSTANDARD:0

PROJECT: Construct a DABS-FEV/EMEDS Campus at RAF Fairford, United Kingdom. (New Mission)

REQUIREMENT: This project is in support of the EDI This initiative includes military exercises and training on land, in the air, and at sea while sustaining a rotational presence throughout Europe. A key enabler for successful training and combat operations is the acquisition and maintenance of strategic assets at key locations throughout the theater. According to the United States Air Force Civil Engineer Center (AFCEC), information provided herein is unclassified and limited in scope to afford appropriate levels of security. The Government may provide clarification and additional information upon authorized request. The DABS - FEV/EMEDS Storage will directly improve mission readiness, providing critical contingency storage, distribution, and support capability to Aligned Forces and the ability to deliver a decisive response to tactical missions and contingency support operations within Europe, Africa, and the Middle East.

CURRENT SITUATION: An adequate storage area capable of supporting deployable air base materiel and expeditionary medical support operations is not available. Similar facilities in the region are fully utilized and no facilities are present at RAF Fairford that meet the requirement.

IMPACT IF NOT PROVIDED: If this project is not provided, the deployable air base materiel and expeditionary medical support equipment will have to be stored in varying, temporary facilities, subjected to weather and temperature changes that will degrade their operational readiness if or when contingencies arise. This would cause maintenance and storage to be performed under substandard conditions, resulting in increased maintenance costs and delayed issue and deployment time lines. Impacts will limit the ability of the DoD to achieve compliance with the EDI, part of the Consolidated and Further Continuing Appropriations Act of 2015 in support of EUCOM requirements. This limitation is detrimental to regional operations and will impair overall capability. It will directly limit theater presence and impair mission capability, readiness, deterrence, and contingency support to operations across the entire EUCOM AOR.

ADDITIONAL: This project meets the criteria/scope specified in Air Force Manual (AFMAN) 32-1084, Facility Requirements, COS Standard Design Criteria, USACE Fort Worth District, for the General-Purpose Warehouse (June 2012), and COS Standard Design Criteria, USACE Savannah District, for the Tactical Equipment Maintenance Facility (March 2015). A preliminary analysis of reasonable options for satisfying this requirement indicates only one option will meet mission needs. Therefore, a complete economic analysis was not performed and request for waiver will be submitted. The UFC 4-701-01, DoD Pricing Guide, PACES, and RS Means were used to develop the estimate for this project. Current NATO policy indicates that this item will continue to be a user responsibility. Force protection measures are considered IAW USAF Installation Protection Guide.

DABS-FEV/EMEDS Storage: 31,646 SM = 340,642 SF.

JOINT USE CERTIFICATION: This facility can be used by other components on an "as available" basis; however, the scope of the project is based on Air Force requirements.

DD Form 1391, DEC 99 (E-Form) PREVIOUS EDITIONS MAY BE USED INTERNALLY PAGE NO. 3

4. PROJECT TITLE

EDI-CONSTRUCT DEPLOYABLE AIR BASE SYSTEM (DABS)-

FEV/EMEDS

12. SUPPLEMENTAL DATA:

a. Estimated Design Data:

(1) Status:

(a) Date Design Started 1-NOV-18

(b) Parametric Cost Estimates used to develop costs YES

* (c) Percent Complete as of 01 APR 2019 15%

* (d) Date 35% Designed

(e) Date Design Complete 1-JUL-19

(f) Energy Study/Life-Cycle analysis was/will be performed YES

(2) Basis:

(a) Standard or Definitive Design – YES GENERAL PURPOSE STORAGE AND MAINTENANCE

(b) Where Design Was Most Recently Used – UNKNOWN

(3) Total Cost (c) = (a) + (b) or (d) + (e): ($000)

(a) Production of Plans and Specifications $0

(b) All Other Design Costs $0

(c) Total $0

(d) Contract $0

(e) In-house $0

(4) Construction Contract Award 20 FEB

(5) Construction Start 20 AUG

(6) Construction Completion 22 FEB

* Indicates completion of Project Definition with Parameter Cost Estimate which is comparable to traditional 35% design to ensure valid scope, cost and executability.

b. Equipment associated with this project provided from other appropriations:

EQUIPMENT NOMENCLATURE

PROCURING

APPROPRIATION

FISCAL YEAR

APPROPRIATED

OR REQUESTED

COST

($000)

DD Form 1391, DEC 99 (E-Form) PREVIOUS EDITIONS MAY BE USED INTERNALLY PAGE NO. 4

4. PROJECT TITLE

EDI-CONSTRUCT DEPLOYABLE AIR BASE SYSTEM (DABS)-

EXISTING FACILITIES/DEFICIENCY DETAIL DATA SHEET

a. Requirements and Assets

(1) Scope of this Request: 31,288 SM/336,766 SF

(2) Mission: European Deterrence Initiative

(3) Requirement: Provide a DABS-FEV/EMEDS Campus in support of the European Deterrence Initiative

Program.

(4) Functional Breakout of Proposed Scope:

Function SM SF Container Warehouse 6,527 70,255 Rolling Stock Warehouse 18,736 201,676 Vehicle Maintenance Shop/Special Vehicle Storage 3,517 37,858 POL/HAZMAT Storage 168 1,800 EMEDS Medical War Reserve Storage 2,698 29,053

(5) Requirements/Assets:

SM SF

a. Total requirements 31,646 340,642

b. Existing Substandard 0 0

c. Existing Adequate 0 0

d. Funded, Not in Inventory 0 0

e. Adequate (c + d) 0 0

f. Included in FY15 Program 0 0

g. Deficiency (a – e – f) 31,646 340,642

Notes:

1. An adequate storage area capable of supporting deployable air base materiel and expeditionary medical support operations is not available. Similar facilities in the region are fully utilized and no facilities are present at RAF Fairford that meet the requirement.

DD Form 1391, DEC 99 (E-Form) PREVIOUS EDITIONS MAY BE USED INTERNALLY PAGE NO. 5

4. PROJECT TITLE

EDI-CONSTRUCT DEPLOYABLE AIR BASE SYSTEM (DABS)-

CERTIFICATE OF COMPLIANCE

I. INSTRUCTIONS:

Place one X in the most appropriate response for each topic area to show current status of compliance. When responding to a statement requiring additional data, fill in the blank with appropriate information. If none of the printed statements are appropriate, add or attach an appropriate comment. For MILCON projects, the BCE and installation commander must sign the certificate and submit it to the MAJCOM where it will be updated and readily available to HQ USAF.

II. PLANNING:

1. Environmental Impact Analysis Process (AFI 32-7061) N/A – Overseas/Outside USA Categorical exclusion (CATEX) number applies (date).

Environmental Assessment/Finding of No significant Impact signed (date).

Draft Environmental Impact Statement (EIS) started. Expected completion date is

(date).

Draft EIS filed on (date).

Final EIS filed on (date).

Record of Decision signed on (date).

Foreign nation or protected global resource exemption number applies.

X Environmental study (or review underway) under preparation. Expected completion date is

Environmental study (or review) completed on (date).

2. Wetlands (AFI 32-7064):

X Project is not sited in or adjacent to a wetland.

Project is adjacent to an ephemeral pond, coordinate with Bulgarian Ministry of Environment to comply with host nation process.

Requirements of Clean Water Act, Section 404 & 401 in progress. Estimated completion date is

Requirements of Clean Water Act, Section 404 & 401 completed on (date).

Section 404 & 401 Permits issued (date).

Finding of “No Practicable Alternative” signed (date).

3. Floodplains (AFI 32-7064):

X Project is not sited in a 100-year flood plain.

Requirements of EO 11988 in progress. Estimated completion date is .

Project is sited in a 100-year flood plain. Requirements of EO 11988 completed on

(date). Finding of “No Practicable Alternative” signed (date).

4. Coastal Zone Management (AFI 32-7064):

X Project does not directly affect a state coastal zone.

Consistency determination is being developed. Estimated completion date is .

Consistency determination completed on (date).

5. Coastal Barrier Resources (AFI 32-7064):

X Project is not sited within the Coastal Barrier Resources System.

Project exempt from the Coastal Barrier Resources Act (CBRA).

Consultation with the Regional Director, United States Fish and Wildlife Service (USFWS) and National

Marine Fisheries Service (NMFS) in progress. Estimated completion date is (date).

Consultation with the Regional Director, USFWS, concluded (date).

DD Form 1391, DEC 99 (E-Form) PREVIOUS EDITIONS MAY BE USED INTERNALLY PAGE NO. 6

4. PROJECT TITLE

EDI-CONSTRUCT DEPLOYABLE AIR BASE SYSTEM (DABS)-

6. Threatened and Endangered Species (AFI 32-7064):

X Project has no potential for affecting threatened or endangered species or critical habitats.

Based on consultation with USFWS/NMFS or host nation liaison on (date), threatened or endangered species in the vicinity of the project will not be affected.

Consultation with USFWS/NMFS underway in accordance with the Endangered Species Act.

Formal consultation with the Regional Director, USFWS completed on (date).

Biological Assessment is required. Estimated completion date is .

Biological opinion issued by USFWS on (date).

7. Cultural Resources Management (AFI 32-7065): N/A – Host nation indicated no cultural resources near the site.

Properties affected by project are addressed in a Programmatic Agreement that was fully executed with the State Historic Preservation Officer (SHPO) and the Advisory Council on Historic Preservation (ACHP) on (date).

Project area has not been surveyed for historic properties. Survey requirements are identified in the A-106 system and the estimated completion date is .

X Project area has been surveyed and no historic properties were identified; the SHPO was notified by letter dated

Survey identified historic properties but the project will have no effect on them; written concurrence by the SHPO is dated .

After consultation, SHPO concurred the project will have no adverse effect on historic properties by written correspondence dated .

Project will have an adverse effect on historic properties. A memorandum of agreement (MOA) mitigating the adverse effect was executed on (date).

Estimated date to execute the MOA is or no MOA was developed and the formal comments of the Council are being sought in a memo dated .

Project will affect a site or property of interest to Native Americans. Appropriate Native American Tribe or Group contacted on (date).

8. Interagency and Intergovernmental Coordination for Environmental Planning (AFI 32-7060):

X Coordination of proposed project with the state Single Point of Contact or other agencies is not required.

Coordination with the state Single Point of Contact is in progress. Expected date of completion is

(date).

Proposed project was coordinated with the state Single Point of Contact or other agencies on

(date). (Specify any other agencies.)

9. Environmental Permits (AFIs 32-7040, 7041, 7042, 7044): Coordinate with No permits are required.

X No permits required, but regulatory agency notification required prior to construction (e.g. underground storage tank removals) The following permits are required prior to construction: (List the construction and operating permits).

DD Form 1391, DEC 99 (E-Form) PREVIOUS EDITIONS MAY BE USED INTERNALLY PAGE NO. 7

4. PROJECT TITLE

EDI-CONSTRUCT DEPLOYABLE AIR BASE SYSTEM (DABS)-

10. Potentially Regulated Substances at Existing Sites (AFIs 32-1052, 7042):

a. Asbestos:

Not present X Survey /abatement prior to demo Present (Describe mitigation, or state why mitigation is not necessary.)

b. Lead-Based Paint:

X Not present Survey /abatement prior to demo.

Present (Describe mitigation, or state why mitigation is not necessary.)

c. Ozone depleting substance:

X Not present Survey /abatement prior to demo Present (Describe mitigation, or state why mitigation is not necessary.)

d. Polychlorinated biphenyls (PCBs):

X Not present Survey /abatement prior to demo Present (Describe mitigation, or state why mitigation is not necessary.)

e. Radon:

X Not present Survey /abatement prior to demo Present (Describe mitigation, or state why mitigation is not necessary.)

f. Other known hazardous or toxic substances and pollutants: (e.g. contaminated soils) X Not present Survey /abatement prior to demo Present (Describe mitigation, or state why mitigation is not necessary.)

11. Radon at New Construction Sites: N/A

X Not known. Survey prior to construction. Mitigate if necessary.

Present (Describe mitigation, or state why mitigation is not necessary.)

12. Installation Restoration Program:

X Facility is not sited on or near an IRP site.

Facility is sited near an IRP site approximately feet away.

Facility is on an IRP site. Site SS-39. (TCE Contaminated groundwater may be 20’ – 50’ Bgs.)

A Request for Waiver was submitted to MAJCOM on (date).

The site is projected to be remediated and/or closed out on (date), prior to commencement of construction activities.

The nature of the site contamination does not preclude the type of construction activity proposed.

There is a Compliance Agreement associated with this site.

A Remedial Investigation Feasibility Study was completed on (date) to accurately delineate the extent of the contamination.

Cost of remedial action is included as part of MILCON project.

DD Form 1391, DEC 99 (E-Form) PREVIOUS EDITIONS MAY BE USED INTERNALLY PAGE NO. 8

4. PROJECT TITLE

EDI-CONSTRUCT DEPLOYABLE AIR BASE SYSTEM (DABS)-

13. Air Pollutants (AFI 32-7040):

a. Generation:

X Will not be generated by the operation or construction of this facility.

Will be generated by the operation or construction of this facility. Describe type and amount of substances expected to be generated, existing control systems, and the need for additional controls. Measures will be taken to control dust.

b. Conformity:

Conformity analysis required.

Conformity analysis not required.

14. Water Pollutants (AFI 32-7041):

Facility will not generate water pollutants.

Facility construction will not cause soil erosion.

Facility will generate water pollutants. Describe type and amount along with minimization, treatment, and disposal plan.

X Facility construction will cause erosion and require an erosion control plan.

15. Solid and Hazardous Wastes (AFI 32-7042, 32-7080):

Facility will not be used for managing solid or hazardous wastes.

X Facility will be for managing solid and hazardous wastes.

16. Underground Storage Tanks (AFI 32-7044) (Check all that apply):

X No underground storage tanks are involved.

New underground storage tanks will be installed.

Existing tanks on the project site will be removed.

Regulatory agency was notified on (date).

Contamination exists.

Cost of contamination clean up is included as part of MILCON project.

Contamination does not exist.

Contamination unknown.

Existing tanks on the project site will be retained.

Contamination exists.

Contamination does not exist.

Contamination unknown.

17. Air Installation Compatible Use Zone (AFI 32-7063):

X Facility is sited within acceptable noise level according to the Air Installation Compatible Use Zone Study. No noise level reduction is required.

Facility is not sited in compliance with Air Installation Compatible Use Zone Study. Noise level reduction of will be provided in design and construction.

18. Base General Plan (AFI 32-7062):

X Facility is sited in accordance with the General Plan and is within a compatible land use area.

Facility is not sited in accordance with the General Plan and is not within a compatible land use area for the following reason: .

DD Form 1391, DEC 99 (E-Form) PREVIOUS EDITIONS MAY BE USED INTERNALLY PAGE NO. 9

4. PROJECT TITLE

EDI-CONSTRUCT DEPLOYABLE AIR BASE SYSTEM (DABS)-

19. Airfield Clearance Criteria (UFC 03-260-01):

X Facility is in compliance with airfield criteria, including clear zone, accident potential zones, frangibility requirements, and airfield airspace (height obstruction) criteria and poses no potential threat to flight safety.

A request for waiver to airfield/airspace clearance criteria is being prepared. Expected completion date is .

A temporary waiver for construction activity in the airfield vicinity was approved on (date).

A permanent waiver of airfield/airspace clearance criteria was obtained on (date).

20. Air Space Use:

X Project does not affect air space use and does not require submittal of FAA Form 7460-1 to the Regional Office of the FAA.

Project sent to Regional FAA on (date). Obstruction marking and lighting recommendations are included in the project.

21. Explosives Quantity/Distance Siting and Safety Clearance Criteria:

a. Projects (new construction, facility modification or change in use) involving explosives storage or handling.

Explosives safety siting approval obtained on (date).

Request for explosives safety siting approval sent to MAJCOM on TBD (date).

Expected approval date is TBD (date).

Request for Waiver/Exemption sent to MAJCOM on _ (date). Expected approval date is .

b. Projects not involving explosives (new construction, facility modification or change in use).

X Project is not sited within explosives clear zones.

Explosives safety siting approval obtained on (date).

Request for explosives safety siting approval sent to MAJCOM on (date).

Expected approval date is .

Request for Waiver/Exemption sent to MAJCOM on _ (date). Expected approval date is .

22. Air Base Survivability, Conventional Hardening, Chemical Protection Levels and Priorities, Camouflage, Concealment and Deception:

X Project does not affect air base operability.

Facility is sited or constructed in compliance with criteria contained in WMP-1.

Waiver or exemption required; request submitted to MAJCOM Civil Engineering Readiness Office, in accordance with WMP-1 on (date).

Waiver or exemption granted on (date).

23. Allowance for the Physically Handicapped:

Project provides all design features for handicapped.

Project provides access and limited features.

Project provides access but no other features.

X Design features for handicapped are not required.

Design features will not be provided for the following reason:

24. Real Estate Requirements (AFI 32-9001):

X Project does not require acquisition of real estate interest.

Project requires acquisition of a real estate interest over $500,000.

Land interest is to be acquired through minor land authority.

Other (explain): .

DD Form 1391, DEC 99 (E-Form) PREVIOUS EDITIONS MAY BE USED INTERNALLY PAGE NO. 10

4. PROJECT TITLE

EDI-CONSTRUCT DEPLOYABLE AIR BASE SYSTEM (DABS)-

24. Antiterrorism/Force Protection:

Antiterrorism/force protection measures included in this project are based on a completed installation terrorist threat assessment and a completed Command or Joint Staff Installation Vulnerability Assessment.

Antiterrorism/force protection measures included in this project satisfy requirements established by a completed installation Physical Security and Force Protection Plan (DoD 2000.16.

Standard 15).

X Project meets or exceeds the requirements of DoD Antiterrorism Construction Standards.

25. Excess Space:

X Excess space is not available to satisfy requirement.

26. Temporary Facilities Incident to Construction:

X Temporary facilities are not required for this project.

Temporary facilities are required for this project and will be demolished or removed upon completion.

27. Communications and Information Support: N/A

X The communications equipment, information technology systems, prewiring costs and other requirements for this project have been identified and are included in the project cost estimate and all other applicable project documents.

28. Energy and Water Conservation:

X Project complies with the minimum energy and water conservation performance standards.

29. Seismic Considerations:

X Seismic planning and design complies with TI 809-04.

Seismic evaluations performed for existing facilities.

Seismic deficiencies identified by the seismic evaluation are mitigated by project completion.

30. Joint Use Certification (include selection on DD Form 1391):

X Mission Requirements, Operational considerations, and location are incompatible with use by other components.

This is an installation utility/infrastructure project, and does not qualify for joint use at this location.

However, all tenants on this installation are benefited by this project.

This facility can be used by other components on an “as available” basis; however, the scope of the project is based on Air Force requirements.

This facility is programmed for joint use with (identify the component the facility is jointly used with); however, it is fully funded by the Air Force.

The facility is programmed for joint use with (identify the component(s) the facility is jointly used with) and is conjunctively funded by (identify the participating component(s).

31. Sustainable Design and Development:

X Project included sustainable development concepts.

Project will qualify for LEED certification.

Project does not include sustainable development costs.

DD Form 1391, DEC 99 (E-Form) PREVIOUS EDITIONS MAY BE USED INTERNALLY PAGE NO. 11

4. PROJECT TITLE

EDI-CONSTRUCT DEPLOYABLE AIR BASE SYSTEM (DABS)-

AIRFIELD LOCATION MAP

DD Form 1391, DEC 99 (E-Form) PREVIOUS EDITIONS MAY BE USED INTERNALLY PAGE NO. 12

4. PROJECT TITLE

EDI-CONSTRUCT DEPLOYABLE AIR BASE SYSTEM (DABS)-

SITE CONSTRAINTS AND RELATED PROJECTS MAP

DD Form 1391, DEC 99 (E-Form) PREVIOUS EDITIONS MAY BE USED INTERNALLY PAGE NO. 13

4. PROJECT TITLE

EDI-CONSTRUCT DEPLOYABLE AIR BASE SYSTEM (DABS)-

SITE DEVELOPMENT MAP

DD Form 1391, DEC 99 (E-Form) PREVIOUS EDITIONS MAY BE USED INTERNALLY PAGE NO. 14

4. PROJECT TITLE

EDI-CONSTRUCT DEPLOYABLE AIR BASE SYSTEM (DABS)-

SITE UTILITIES MAP

DD Form 1391, DEC 99 (E-Form) PREVIOUS EDITIONS MAY BE USED INTERNALLY PAGE NO. 15

4. PROJECT TITLE

EDI-CONSTRUCT DEPLOYABLE AIR BASE SYSTEM (DABS)-

NATO ELIGIBILITY AND DATA SHEET

1. Prefinancing is not planned for this project as:

a. It is no required for use by, or ins support of, a US committed to NATO.

b. It is not within an established NATO infrastructure category for common funding, nor is it expected to become eligible for reasons stated.

Current NATO policy indicates that this item will continue to be a user responsibility.

c. It exceeds in its entirety the scope as described in the approved NATO criteria and standards for the applicable

2. Prefinancing is planned for this project, thus initially requiring US unilateral authorization and funding:

X a. Although not eligible for infrastructure common funding, a precautionary prefinance statement will be filed for this project to allow possible future recoupment if eligibility is established.

b. Although not eligible for infrastructure common funding under present NATO rules and ultimate financing of the project by NATO through the infrastructure program is uncertain, eligibility for common funding is being sought in a NATO forum. If the project is determined to be eligible for NATO common funding, recoupment of funds will be sought from NATO.

c. This project is partially eligible for NATO infrastructure common funding and to that extent has been or will be proposed for inclusion in infrastructure slice no. _________. NATO criteria preclude inclusion of complete project in Infrastructure. Prefinancing is for the NATO-eligible portion of the project, and recoupment of funds will be sought from

NATO.

d. The project is fully eligible for NATO infrastructure common funding. The scope does not exceed NATO criteria, allowances, and the project has been or will be proposed for infrastructure slice no. _________.

However, the acceptable beneficial occupancy date cannot be met within the timeframe required for NATO programming and funding and/or host country design and construction. Prefinancing is for the entire project and recoupment of funds will be sought from NATO.

3. If categories 1c, 2b, 2c, or 2d apply, the following additional information will be provided on a separate DD Form

1391c:

a. Title of NATO criteria document on which the determination is based.

b. Criteria item number and title.

c. Slice, serial number, and scope if the project has been approved either partially or entirely by the Defense Planning Committee.

d. Joint Formal Acceptance Inspection (JFAI) references for the installation as may be related to the project.

e. Computations and rationale if the project is determined to be only partially eligible (2c above).

f. For installations in Germany, the scope of related Deutsch-Mark financed facilities that are considered available to NATO.

DD Form 1391, DEC 99 (E-Form) PREVIOUS EDITIONS MAY BE USED INTERNALLY PAGE NO. 16

FSA:

Program: RAF Fairford DABS-EFV/EMEDS Project Detail Report 13 Nov 2017 Project: RAF DABS-EFV/EMEDS 03:49 PM

ASSEMBLY Quantity UOM Unit Cost Material Labor Equipment SubBid Total Cost

Facility: CH Container Warehouse Type: PRIMARY FACILITIES

BUILDING SHELL Size: 6,688.83 m2

ASSEMBLY Quantity UOM Unit Cost Material Labor Equipment SubBid Total Cost A1010010103 1'0" X 3'0" Strip Footing 3000 PSI 565.69 m $206.74 $70,208.98 $44,461.95 $2,277.11 $0.00 $116,948 A1010010112 0.38 m X 0.762 m(1'3" X 2'6") Grade Beam 27,579 kPa(4000 PSI) 565.69 m $440.38 $121,000.68 $125,038.31 $3,077.32 $0.00 $249,116 A1010010121 Frost Depth Modification To Foundation Wall 2,036.47 m $170.34 $101,742.51 $233,571.13 $11,584.23 $0.00 $346,898 A1010020201 Spread Footing 42.23 m3 $459.59 $12,432.64 $6,444.25 $529.76 $0.00 $19,407 A1010020212 Column Piers 0.61 m X 0.61 m X 0.91 m(2'0" X 2'0" X 3'0") High 80 EA $596.18 $21,838.54 $25,112.53 $743.43 $0.00 $47,695 A1010020241 Spread Footing, Reinforcing Steel 1.27 Mg $3,829.40 $2,724.38 $2,139.21 $0.00 $0.00 $4,864 A1010020277 Spread Footing Column Bolts 368 EA $35.61 $6,945.62 $6,158.56 $0.00 $0.00 $13,104 A1030010115 Loading Dock Apron 498.70 m2 $274.72 $93,829.07 $40,843.10 $2,333.99 $0.00 $137,006 A1030010301 203.2 mm(8") Inclined Slab On Grade 27,579 kPa(4000 PSI) 504.03 m2 $274.72 $94,830.77 $41,279.13 $2,358.90 $0.00 $138,469 A1030020202 304.8 mm(12") Structural Slab On Grade 6,689.26 m2 $254.14 $1,116,807.06 $570,521.57 $12,675.35 $0.00 $1,700,004 A1030030401 152.4 mm(6") Thick Trench Slab 1.12 m(3'8") Wide 14.70 m $167.55 $1,477.38 $914.70 $71.55 $0.00 $2,464 B1020010115 Med Span, Lt Ld, Stl Frm, Mtl Joist 185.42 Mg $10,796.53 $1,415,378.91 $501,563.69 $84,956.47 $0.00 $2,001,899 B1020010136 Structural Steel, Lt Load, Columns 26.98 Mg $6,964.92 $155,574.22 $24,557.12 $7,781.14 $0.00 $187,912 B1020030306 1-1/2" Galv. Metal Roof Deck, Open Type, F.P. 7,625.70 m2 $56.84 $305,731.69 $123,666.51 $4,038.02 $0.00 $433,436 B2010010112 Metal Siding W/Vinyl Backed Ins (Typical Metal Bldg) 1,571.42 m2 $132.81 $127,419.16 $81,285.19 $0.00 $0.00 $208,704 B2010020303 3/4" Mtl Furring Strip 1,571.42 m2 $31.93 $10,972.21 $39,198.21 $0.00 $0.00 $50,170 B2010020310 5/8" Gypsum Board/Installed/Taped & Finished 1,571.42 m2 $23.79 $11,326.15 $26,060.71 $0.00 $0.00 $37,387 B2010020311 Paint to Gypsum Board Walls Using Roller 1,571.42 m2 $11.46 $6,724.90 $11,283.08 $0.00 $0.00 $18,008 B2010050501 Fixed Blade Exterior Louver With Baked Enamel Finish 7.67 m2 $814.61 $4,144.57 $2,101.10 $0.00 $0.00 $6,246 B2020010104 Aluminum Frm Fixed Type Window - 9.53 mm(3/8") Bronze 5.57 m2 $1,125.82 $5,195.48 $1,079.82 $0.00 $0.00 $6,275 B2030010202 910 mm X 2130 mm(3'0" X 7'0") Hollow Metal Door W/Frame 8 EA $4,924.58 $33,303.55 $6,093.06 $0.00 $0.00 $39,397 B2030010204 1830 mm X 2130 mm(6'0" X 7'0") Pair Hollow Metal Doors W/Frame and Panic Handles

3 EA $8,938.44 $22,604.82 $4,210.51 $0.00 $0.00 $26,815

B2030040101 2440 mm X 2740 mm(8'0" X 9'0") Steel Overhead Door 1 EA $11,240.07 $5,671.46 $5,271.71 $296.89 $0.00 $11,240 B2030040102 3660 mm X 3660 mm(12'0" X 12'0") Heavy Duty Steel Overhead

Door

5 EA $14,167.83 $50,099.71 $18,903.35 $1,836.10 $0.00 $70,839

B3010020108 Standing Seam Metal Roof 7,625.70 m2 $133.43 $719,671.78 $297,787.51 $0.00 $0.00 $1,017,459 B3010030302 Rigid Insulation 1-1/2" Thick 7,625.70 m2 $20.12 $113,361.19 $40,075.63 $0.00 $0.00 $153,437 B3010040406 Misc. Roofing Items - 304.8(12") Coping 645 m $77.34 $22,549.36 $27,337.72 $0.00 $0.00 $49,887 B3010050601 5" Box Gutters With Downspouts 71.13 m $54.80 $1,605.70 $2,292.18 $0.00 $0.00 $3,898 D2020010101 Copper Pipe & Fittings (1/2" to 4" Dia. Piping) 11 EA $4,219.11 $28,177.14 $18,233.02 $0.00 $0.00 $46,410 D2020020201 Valves & Hydrants 28 EA $565.76 $14,214.16 $1,627.00 $0.00 $0.00 $15,841 D2020030101 Domestic Water Supply Equip - 75.7 L(20 Gal.) Elec. Hot Water 3 EA $1,629.64 $3,609.49 $1,279.42 $0.00 $0.00 $4,889 D2020040401 Fiberglass 1-1/2" Pipe Insulation With Vapor Barrier 11 EA $356.95 $1,418.22 $2,508.24 $0.00 $0.00 $3,926 D2030010101 Waste Pipe & Fittings 20 EA $2,194.37 $20,821.68 $23,065.66 $0.00 $0.00 $43,887 D2030020201 C.I. No Hub Vent Pipe Systm 20 EA $205.50 $1,848.07 $2,261.89 $0.00 $0.00 $4,110 D2030030305 Heavy Duty Cast Iron Floor Drains 9 EA $1,198.97 $9,321.90 $1,468.83 $0.00 $0.00 $10,791 D3010020227 585.62 kW (2000 MBH) Natural Gas Supply 1 EA $14,055.45 $9,727.21 $4,328.25 $0.00 $0.00 $14,055 D3020020304 Make Up Air Unit, 87.82 kW(300 MBH) 1 EA $60,575.54 $57,136.64 $3,438.89 $0.00 $0.00 $60,576 D3020020313 Gas Furnace, 58.61 kW (200 MBH) 4 EA $10,781.45 $32,604.67 $10,521.13 $0.00 $0.00 $43,126 D3030011104 140.67 kW (40 Ton) Air Cooled Packaged Scroll Chiller W/Mech.

Room Piping

1 EA $175,820.80 $132,161.19 $43,326.97 $332.64 $0.00 $175,821

D3040011152 Ductwork Supply Stack Insulation 399.18 m2 $115.83 $6,320.72 $39,917.44 $0.00 $0.00 $46,238 D3040011153 Floor Ductwork (Supply at 1500FPM) 7,903.90 kg $24.72 $24,064.60 $171,318.77 $0.00 $0.00 $195,383 D3040011154 Floor Ductwork (Return at 2500FPM) 4,041.77 kg $24.72 $12,305.76 $87,606.20 $0.00 $0.00 $99,912 D3040011155 Floor Ductwork (Exhaust at 2500FPM) 2,665.93 kg $24.72 $8,116.83 $57,784.71 $0.00 $0.00 $65,902 D3040011161 Ductwork Stack (Supply at 1500FPM) Commercial Building 2,380.97 kg $24.72 $7,249.21 $51,607.97 $0.00 $0.00 $58,857 D3040011162 Ductwork Stack (Return at 2500FPM) Commercial Building 2,380.97 kg $24.72 $7,249.21 $51,607.97 $0.00 $0.00 $58,857 D3040011163 Ductwork Stack (Exhaust at 2500FPM) Commercial Building 1,959.64 kg $24.72 $5,966.43 $42,475.73 $0.00 $0.00 $48,442 D3040031322 Piping Risers - Hot Water for Heating Supply & Return Piping

(Medium Load)

669.34 m $442.10 $174,197.84 $119,871.37 $1,843.89 $0.00 $295,913

D3040031323 Piping Risers - Hot Water for Heating Floor Connection (Medium Load)

24.38 m $830.69 $11,574.37 $8,614.03 $67.17 $0.00 $20,256

D3040070702 Bathroom Exhaust Fan 0.9 m3/s(200 CFM) 2 EA $1,271.36 $1,363.28 $1,179.44 $0.00 $0.00 $2,543 D3040070733 0.24 m3/s(500 CFM) Exhaust Fan, Cent 2 EA $3,219.61 $4,536.66 $1,902.56 $0.00 $0.00 $6,439 D3040070782 1.37 m3/s(2900 CFM) Supply Fan, Propeller Type 2 EA $6,725.50 $12,293.19 $1,157.82 $0.00 $0.00 $13,451 D3050020239 Horizontal Unit Heater, Hot Water, 14.64 kW (50 MBH) 2 EA $5,176.98 $7,429.44 $2,924.52 $0.00 $0.00 $10,354 D3060011102 Controls, Commercial HVAC Systems 1 EA $56,253.20 $35,476.57 $15,941.34 $0.00 $4,835.29 $56,253 D3060011108 Controls, Chillers and Pumps 1 EA $8,835.88 $5,590.00 $3,245.88 $0.00 $0.00 $8,836 D3070020201 Test & Balance, Cent Fan/Utility Set 1 EA $416.84 $0.00 $0.00 $0.00 $416.84 $417 D3070020203 Test & Balance Propeller/Wall Fan 1 EA $178.41 $0.00 $0.00 $0.00 $178.41 $178 D309090u1 Dehumidifier, 30,000 CFM 1 EA $332,750.17 $330,608.29 $2,141.89 $0.00 $0.00 $332,750 D4010010102 Fire Alarm System - Rate Of Rise Heat Detectors 83 OUT $1,290.85 $32,423.37 $74,717.03 $0.00 $0.00 $107,140 D4010010104 Fire Alarm Duct Smoke Detector 6 EA $1,783.55 $5,155.10 $5,546.20 $0.00 $0.00 $10,701 D4010010118 12 Zone FACP With Annun And Transmitter 3 EA $9,493.62 $17,959.56 $10,521.30 $0.00 $0.00 $28,481 D4020010102 Fire Protection Wtr Supply, Ord Hazard Fac 152.40mm (6" Pipe) 627 EA $463.79 $246,181.49 $44,054.54 $559.43 $0.00 $290,795 D4040010102 Concealed Sprinkler Heads, Pipes & Fittings - Ord. Haz. 627 EA $1,522.60 $549,332.30 $404,746.92 $591.18 $0.00 $954,670 D5010010152 MV/LV 300 kVA Main Transformer, 400A Distribution 1 EA $51,335.21 $42,048.35 $8,200.21 $1,086.65 $0.00 $51,335 D5010010255 Underground 400 Amp Secondary - 3 Phase 4 Wire 1 EA $21,341.61 $15,362.82 $5,930.46 $48.33 $0.00 $21,342 D5010030401 25 KVA Dry Type Transformer (Single Phase) 2 EA $5,343.31 $7,218.98 $3,467.64 $0.00 $0.00 $10,687 D5010030402 37.5 KVA Dry Type Transformer 2 EA $6,822.99 $9,311.44 $4,334.55 $0.00 $0.00 $13,646 D5010040581 Panel board 120/208V 100A Mlo 24 Cir W/Bkr 2 EA $6,547.82 $7,085.06 $6,010.57 $0.00 $0.00 $13,096 D5010040582 Panel board 120/208V 225A Mlo 36 Cir W/Bkr 1 EA $11,312.90 $6,674.94 $4,637.96 $0.00 $0.00 $11,313

DD Form 1391, DEC 99 (E-Form) PREVIOUS EDITIONS MAY BE USED INTERNALLY PAGE NO. 17

FSA:

$0.00 Total/SF Material/SF Labor/SF Eqp/SF Sub/SF

181.62 m2 $2,147.61 $1,163.71 $983.89 $0.00

$52.18 $0.00 $0.00 $529

FSA: ADMINISTRATIVE SUPPORT 390,047

$0.00 $0.00 $0.00 $17,165 E2010020301 Horizontal Blinds 3.85 m2 $137.44 $476.57

$1,222.73 $0.00 $0.00 $2,262 E1020061502 Book Shelving - 42" High 28.92 m $593.55 $17,165.11

$1,784.84 $0.00 $0.00 $2,967 D5020020272 Exit Light With Battery Backup 2 EA $1,131.18 $1,039.63

$21,418.12 $0.00 $0.00 $35,600 D5020020207 2' X 4' Lay-In Fluorescent Fixture With Emergency Unit 3 EA $988.90 $1,181.86

$5,891.04 $0.00 $0.00 $11,455 D5020020202 2' X 4' Lay-In Fluorescent Fixture 36 EA $988.90 $14,182.27

$1,324.05 $0.00 $0.00 $1,798 D5020010137 Equipment Connections For Up To 10 HP 4 EA $2,863.81 $5,564.18

$1,490.45 $0.00 $0.00 $2,518 D5020010116 120 Volt, 30 Amp Twistlock Receptacle 2 EA $899.06 $474.07

$18,233.58 $0.00 $0.00 $28,831 D5020010109 120 Volt, 20 Amp Duplex Ground Fault Receptacle 3 EA $839.33 $1,027.54

$2,108.14 $0.00 $0.00 $6,774 D5020010102 120 Volt, 20 Amp Duplex Receptacle - Masonry Partition 42 EA $686.44 $10,596.96

$2,235.67 $0.00 $0.00 $5,795 D2010040403 S.S. Kitchen Sink, Single Bowl 25 X 22 2 EA $3,387.16 $4,666.18

$2,064.69 $0.00 $0.00 $5,552 C3030050702 T-Bar Ceiling Suspension System 2' X 2' Grid 181.62 m2 $31.91 $3,558.96

$1,866.70 $0.00 $0.00 $8,589 C3030010402 2' X 2' Or 2' X 4' Fiberglass Acoustical Ceiling Tiles 181.62 m2 $30.57 $3,487.37

$2,529.37 $0.00 $0.00 $8,197 C3020050502 Commercial Grade 35 Oz. Nylon 115.86 m2 $74.13 $6,722.65

$12,963.97 $0.00 $0.00 $20,691 C3020040404 Sheet Vinyl Resilient Flooring 65.70 m2 $124.76 $5,667.90

$26,596.34 $0.00 $0.00 $36,349 C3010900501 Paint To Gypsum Board Walls Using Roller 1,805.52 m2 $11.46 $7,726.73

$9,672.43 $0.00 $0.00 $16,752 C3010030310 1/2" Gypsum Board/Installed/Taped & Finished 1,603.71 m2 $22.67 $9,752.85

$29.04 $0.00 $0.00 $115 C3010030303 Two Layers Of 5/8" Fire Resistant Gypsum Board 302.23 m2 $55.43 $7,079.54

$854.85 $0.00 $0.00 $7,761 C1030909001 Wall Corner Guard 5 EA $22.97 $85.79

$6,752.53 $0.00 $0.00 $30,893 C1030090228 Plastic Laminated Reception Desk With Counter 2.45 m $3,163.06 $6,906.16

$3,305.40 $0.00 $0.00 $16,564 C1030090222 Plastic Laminated Base Cabinet - 24" Deep 13.84 m $2,231.47 $24,140.01

$1,125.67 $0.00 $0.00 $2,062 C1030090220 Plastic Laminated Wall Cabinet - 30" High, 12" Deep 10.17 m $1,629.53 $13,258.86

$193.34 $0.00 $0.00 $660 C1030080101 Plastic Laminate Countertop With Backsplash 13.85 m $148.91 $936.34

$113.83 $0.00 $0.00 $780 C1030070702 Fire Extinguisher Cabinet, 8" X 16" X 38" 1 EA $659.96 $466.62

$42.73 $0.00 $0.00 $219 C1030040401 Door Sign, 4" X 8" 7 EA $111.47 $666.45

$160.29 $0.00 $0.00 $1,063 C1030030305 Manual Projection Screen 1.33 m2 $163.77 $175.90

$74.33 $0.00 $0.00 $558 C1030030304 Liquid Marker Boards 2.56 m2 $414.45 $902.37

$74.33 $0.00 $0.00 $754 C1030020215 Paper Towel Dispenser (Recessed) 1 EA $557.69 $483.36

$557.51 $0.00 $0.00 $3,069 C1030020203 Paper Towel Dispenser And Waste Receptacle 1 EA $754.38 $680.05

$1,784.04 $0.00 $0.00 $6,644 C1020010119 6'0" X 7'0" Pair Wood Doors, H.M. Frm 1 EA $3,069.22 $2,511.70

$5,437.60 $0.00 $0.00 $29,071 C1020010116 3'0" X 7'0" S.C. Wood Door W/H.M. Frame W/Passage Set 6 EA $1,107.29 $4,859.69

$32,755.07 $0.00 $0.00 $55,562 C1010050502 Fixed Type Window With Aluminum Frm - 1/4" Clear Glass 28.07 m2 $1,035.72 $23,633.84

$8,321.91 $0.00 $0.00 $13,962 C1010010113 Non-Load Brg Partition Of 8 X 8 X 16 Concrete 322.82 m2 $172.12 $22,807.00

$5,657.45 $0.00 $0.00 $8,486 C1010010109 Mtl Stud Partition, 3-5/8", Batt Insulation 368.27 m2 $37.91 $5,640.45

Labor Equipment SubBid Total Cost C1010010101 Mtl Stud Partition, 3-5/8" 339.36 m2 $25.00 $2,828.19

$0.00

ADMINISTRATIVE SUPPORT Size: 181.62 m2

ASSEMBLY Quantity UOM Unit Cost Material

Total/SF Material/SF Labor/SF Eqp/SF Sub/SF

27.87 m2 $5,322.72 $2,939.92 $2,382.80 $0.00

$3,238.09 $0.00 $0.00 $8,109

FSA: 1/2 BATH 148,344

$1,841.70 $0.00 $0.00 $3,229 D5020020286 Residential Bath Exhaust Fan/Light 12 EA $675.78 $4,871.24

$13,058.73 $0.00 $0.00 $34,695 D5020010183 120 Volt Residential GFI Receptacle 12 EA $269.08 $1,387.30

$3,387.24 $0.00 $0.00 $9,072 D2010030301 Wall Hung 16" By 14" White Single Bowl Lavatory 11 EA $3,154.07 $21,636.01

$200.11 $0.00 $0.00 $319 D2010010101 Floor Mounted Water Closet 11 EA $824.77 $5,685.21

$583.01 $0.00 $0.00 $784 C3030900601 Painting To Drywall Or Plaster Using Rollers, 2 Coats 27.87 m2 $11.46 $119.27

$1,072.92 $0.00 $0.00 $3,477 C3030020301 5/8" Gypsum Wallboard Ceiling, 1 Layer, Fire Rated 27.87 m2 $28.13 $200.88

$6,050.83 $0.00 $0.00 $9,657 C3020040404 Sheet Vinyl Resilient Flooring 27.87 m2 $124.76 $2,404.23

$13,975.70 $0.00 $0.00 $20,050 C3010900501 Paint To Gypsum Board Walls Using Roller 842.71 m2 $11.46 $3,606.39

$1,380.54 $0.00 $0.00 $9,968 C3010030305 5/8" WP Gypsum Board/Installed/Taped & Finished 842.71 m2 $23.79 $6,073.93

$5,043.48 $0.00 $0.00 $21,755 C1030090202 Custom Bathrm Vanity - Prefinished W/Plastic Lam Top 7.32 m $1,362.64 $8,587.45

$1,978.69 $0.00 $0.00 $3,104 C1030020213 Accessories For Typical Bath Unit 12 EA $1,812.93 $16,711.62

$14,597.60 $0.00 $0.00 $24,124 C1020010126 2'6" X 6'8" Hollow Core Interior Door And Frame 11 EA $282.20 $1,125.53

Labor Equipment SubBid Total Cost C1010010120 2"x4" Wood Stud Partition, 16" O.C. W/Insulation 421.35 m2 $57.25 $9,526.45

$0.87

1/2 BATH Size: 27.87 m2

ASSEMBLY Quantity UOM Unit Cost Material

Total/SF Material/SF Labor/SF Eqp/SF Sub/SF 6,688.83 m2 $155.33 $99.36 $53.12 $1.98

$3,780.88 $0.00 $415,937

FSA: BUILDING SHELL 11,184,430

$0.00 $57,118.89 $74,511 E103003u1 Overhead bridge crane, under hung hoist, electric operating, 2 girder, 25 ton, 50'''' span

2 EA $207,968.58 $387,104.64 $25,051.64

$0.00 $0.00 $24,565 D5090060601 Energy Management Control System 56 PTS $1,330.55 $15,099.80 $2,292.05

$0.00 $0.00 $12,683 D5090040401 Lightning Protection System 29 EA $847.08 $11,341.94 $13,223.37

$0.00 $0.00 $18,680 D5090030302 Building Grounding 10 EA $1,268.35 $6,411.29 $6,272.20

$0.00 $0.00 $27,521 D5030070601 Clock System 15 EA $1,245.35 $9,095.29 $9,585.03

$0.00 $0.00 $37,748 D5030050807 Light Control System 4 OUT $6,880.23 $16,980.27 $10,540.64

$0.00 $0.00 $49,411 D5030050803 Intrusion Detection System 8 OUT $4,718.49 $11,201.05 $26,546.87

$0.00 $0.00 $153,809 D5030050801 Card Reader Security System 25 OUT $1,976.43 $32,829.95 $16,580.92

$0.00 $0.00 $951 D5030020401 Sound And Public Address 6,689.26 m2 $22.99 $97,376.34 $56,432.92

$0.00 $0.00 $12,009 D5030010303 4-Pair Telephone Outlet 1 EA $950.63 $341.41 $609.23 D5010040583 Panel board 120/208V 225A Mlo 42 Cir W/Bkr 1 EA $12,009.23 $6,988.81 $5,020.42

DD Form 1391, DEC 99 (E-Form) PREVIOUS EDITIONS MAY BE USED INTERNALLY PAGE NO. 18

FSA:

FSA:

FSA:

$1,836.10 $0.00 $70,839 $296.89 $0.00 $11,240

B2030040102 3660 mm X 3660 mm(12'0" X 12'0") Heavy Duty Steel Overhead Door

5 EA $14,167.83 $50,099.71 $18,903.35

$0.00 $0.00 $26,815

B2030040101 2440 mm X 2740 mm(8'0" X 9'0") Steel Overhead Door 1 EA $11,240.07 $5,671.46 $5,271.71

$0.00 $0.00 $39,397 B2030010204 1830 mm X 2130 mm(6'0" X 7'0") Pair Hollow Metal Doors W/Frame and Panic Handles

3 EA $8,938.44 $22,604.82 $4,210.51

$0.00 $0.00 $3,347 B2030010202 910 mm X 2130 mm(3'0" X 7'0") Hollow Metal Door W/Frame 8 EA $4,924.58 $33,303.55 $6,093.06

$0.00 $0.00 $3,326 B2020010104 Aluminum Frm Fixed Type Window - 9.53 mm(3/8") Bronze 2.97 m2 $1,125.82 $2,770.92 $575.90

$0.00 $0.00 $9,590 B2010050501 Fixed Blade Exterior Louver With Baked Enamel Finish 4.08 m2 $814.61 $2,207.12 $1,118.91

$0.00 $0.00 $19,909 B2010020311 Paint to Gypsum Board Walls Using Roller 836.81 m2 $11.46 $3,581.16 $6,008.49

$0.00 $0.00 $26,717 B2010020310 5/8" Gypsum Board/Installed/Taped & Finished 836.81 m2 $23.79 $6,031.42 $13,877.90

$0.00 $0.00 $111,140 B2010020303 3/4" Mtl Furring Strip 836.81 m2 $31.93 $5,842.94 $20,873.90

$5,654.95 $0.00 $606,996 B2010010112 Metal Siding W/Vinyl Backed Ins (Typical Metal Bldg) 836.81 m2 $132.81 $67,853.48 $43,286.13

$10,894.64 $0.00 $263,103 B1020030306 1-1/2" Galv. Metal Roof Deck, Open Type, F.P. 10,679.23 m2 $56.84 $428,154.72 $173,185.84

$118,978.12 $0.00 $2,803,579 B1020010136 Structural Steel, Lt Load, Columns 37.78 Mg $6,964.92 $217,824.83 $34,383.26

$100.21 $0.00 $3,450 B1020010115 Med Span, Lt Ld, Stl Frm, Mtl Joist 259.67 Mg $10,796.53 $1,982,181.42 $702,419.83

$17,750.95 $0.00 $2,380,737 A1030030401 152.4 mm(6") Thick Trench Slab 1.12 m(3'8") Wide 20.59 m $167.55 $2,069.07 $1,281.04

$3,303.48 $0.00 $193,916 A1030020202 304.8 mm(12") Structural Slab On Grade 9,367.85 m2 $254.14 $1,564,010.70 $798,975.83

$3,268.58 $0.00 $191,867 A1030010301 203.2 mm(8") Inclined Slab On Grade 27,579 kPa(4000 PSI) 705.86 m2 $274.72 $132,803.98 $57,808.59

$0.00 $0.00 $18,339 A1030010115 Loading Dock Apron 698.40 m2 $274.72 $131,400.97 $57,197.87

$0.00 $0.00 $6,844 A1010020277 Spread Footing Column Bolts 515 EA $35.61 $9,720.09 $8,618.64

$1,040.81 $0.00 $66,772 A1010020241 Spread Footing, Reinforcing Steel 1.79 Mg $3,829.40 $3,833.59 $3,010.17

$741.84 $0.00 $27,176 A1010020212 Column Piers 0.61 m X 0.61 m X 0.91 m(2'0" X 2'0" X 3'0") High 112 EA $596.18 $30,573.96 $35,157.55

$16,222.92 $0.00 $485,807 A1010020201 Spread Footing 59.13 m3 $459.59 $17,409.74 $9,024.05

$4,309.57 $0.00 $348,870 A1010010121 Frost Depth Modification To Foundation Wall 2,851.94 m $170.34 $142,483.43 $327,100.40

$3,188.93 $0.00 $163,778 A1010010112 0.38 m X 0.762 m(1'3" X 2'6") Grade Beam 27,579 kPa(4000 PSI) 792.21 m $440.38 $169,452.98 $175,107.39

Equipment SubBid Total Cost A1010010103 1'0" X 3'0" Strip Footing 3000 PSI 792.21 m $206.74 $98,322.76 $62,265.85

BUILDING SHELL Size: 9,368.16 m2

ASSEMBLY Quantity UOM Unit Cost Material Labor

$0.00

Facility: CH Container Warehouse 13,019,651

Facility: CH Rolling Stock Warehouse #1 Type: PRIMARY FACILITIES

Total/SF Material/SF Labor/SF Eqp/SF Sub/SF 5,778.38 m2 $175.51 $81.09 $94.42 $0.00

$2,280.94 $0.00 $0.00 $6,750

FSA: STORAGE - WRM STORAGE AREA 1,014,159

$95,547.38 $0.00 $0.00 $169,923 D5020020229 100W Hps Wall Mount 3 EA $2,250.15 $4,469.52

$58,325.28 $0.00 $0.00 $93,682 D5020020217 8' - 2 Lamp Industrial Fluorescent Fixture 160 EA $1,062.02 $74,375.15

$1,224.03 $0.00 $0.00 $5,493 D5020010103 Duplex Receptacle Long Run 69 EA $1,357.71 $35,356.75

$4,990.26 $0.00 $0.00 $20,150 D2010060601 8 GPH Electric Water Cooler - Wall Mounted 3 EA $1,830.88 $4,268.61

$37,489.44 $0.00 $0.00 $66,123 D2010040408 Wall Hung 24" By 20" Janitors Sink Of Porcelain Enamel 3 EA $6,716.70 $15,159.85

$55,158.26 $0.00 $0.00 $139,756 C3030900602 Paint To Metal Deck And Light Steel Framing 5,778.38 m2 $11.44 $28,633.19

$16,784.27 $0.00 $0.00 $26,629 C3020909002 Floor Hardener, Metallic Light Service 5,778.38 m2 $24.19 $84,598.06

$36,455.77 $0.00 $0.00 $58,184 C3010900502 Paint To Concrete Block Using Brushes, Two Coats 1,456.93 m2 $18.28 $9,844.65

$186,393.10 $0.00 $0.00 $298,751 C3010900501 Paint To Gypsum Board Walls Using Roller 5,077.26 m2 $11.46 $21,728.23

$3,286.77 $0.00 $0.00 $11,219 C3010030302 5/8" Gypsum Board On Furring Channel W/Rigid Insulation 5,077.26 m2 $58.84 $112,357.80

$1,446.47 $0.00 $0.00 $12,776 C1030070702 Fire Extinguisher Cabinet, 8" X 16" X 38" 17 EA $659.96 $7,932.51

$816.15 $0.00 $0.00 $6,855 C1020010110 6'0" X 7'0" Pair Hollow Metal Doors 3 EA $4,258.83 $11,330.03

$45,396.55 $0.00 $0.00 $97,868 C1020010102 3'0" X 7'0" Hollow Metal Door W/ 8" X 8" Vision Glass 3 EA $2,284.89 $6,038.52

Labor Equipment SubBid Total Cost C1010010114 Non-Load Bearing 8 X 8 X 16 Concrete Block 658.74 m2 $148.57 $52,471.75

$0.00

STORAGE - WRM STORAGE AREA Size: 5,778.38 m2

ASSEMBLY Quantity UOM Unit Cost Material

Total/SF Material/SF Labor/SF Eqp/SF Sub/SF

538.82 m2 $236.84 $108.17 $128.67 $0.00

$8,030.61 $0.00 $0.00 $14,190

FSA: MECHANICAL, ELECTRICAL, & BUILDING SUPPORT 127,615

$3,970.80 $0.00 $0.00 $6,353 D5020020276 Compact Fluorescent Lamp Holder 17 EA $834.70 $6,159.34

$10,853.32 $0.00 $0.00 $17,161 D5020010156 120 Volt 20 Amp Single Pole Switch 9 EA $705.93 $2,382.55

$4,076.84 $0.00 $0.00 $5,552 D5020010102 120 Volt, 20 Amp Duplex Receptacle - Masonry Partition 25 EA $686.44 $6,307.71

$1,317.65 $0.00 $0.00 $1,772 C3030050704 Suspension System For Gypsum Board Ceiling 62.99 m2 $88.15 $1,475.48

$10,497.91 $0.00 $0.00 $16,655 C3030020301 5/8" Gypsum Wallboard Ceiling, 1 Layer, Fire Rated 62.99 m2 $28.13 $453.99

$30,582.43 $0.00 $0.00 $65,931 C3010900502 Paint To Concrete Block Using Brushes, Two Coats 911.25 m2 $18.28 $6,157.45

Labor Equipment SubBid Total Cost C1010010114 Non-Load Bearing 8 X 8 X 16 Concrete Block 443.77 m2 $148.57 $35,348.80

$0.00

MECHANICAL, ELECTRICAL, & BUILDING SUPPORT Size: 538.82 m2

ASSEMBLY Quantity UOM Unit Cost Material

Total/SF Material/SF Labor/SF Eqp/SF Sub/SF

162.58 m2 $953.74 $574.39 $365.88 $13.48

$6,086.25 $257.64 $0.00 $9,026

FSA: COVERED EXTERIOR LOADING DOCK W/LEVELER 155,055

$6,752.37 $447.55 $0.00 $46,100

E1030020606 609.60mm (24") Deep Dock Leveler Pit Wall W/Stl Angle 2 EA $4,512.89 $2,681.89

$2,513.12 $0.00 $0.00 $4,573 E1030020602 1.83m x 2.44m (6'0" X 8'0") Long 9.07Mg (10 Ton) Capacity Dock

Leveler With Stairs

2 DOCK $23,049.81 $38,899.69

$6,583.94 $0.00 $0.00 $13,828 D5020020280 Dock Lights 4 EA $1,143.34 $2,060.25

$2,532.97 $0.00 $0.00 $4,486 D5020020254 High Bay 400W Hps Fixture 6 EA $2,304.71 $7,244.34

$35,014.09 $1,485.86 $0.00 $77,041 D5020010136 Equipment Connections For Up To 5 HP 2 EA $2,243.23 $1,953.48

Labor Equipment SubBid Total Cost C3030909002 Exterior Canopy W/Framing 162.58 m2 $473.88 $40,541.26

COVERED EXTERIOR LOADING DOCK W/LEVELER Size: 162.58 m2

ASSEMBLY Quantity UOM Unit Cost Material

DD Form 1391, DEC 99 (E-Form) PREVIOUS EDITIONS MAY BE USED INTERNALLY PAGE NO. 19

FSA:

$3,438.97 $0.00 $0.00 $5,456 $7,814.37 $0.00 $0.00 $16,847

C3010900502 Paint To Concrete Block Using Brushes, Two Coats 298.51 m2 $18.28 $2,017.10

Labor Equipment SubBid Total Cost C1010010114 Non-Load Bearing 8 X 8 X 16 Concrete Block 113.39 m2 $148.57 $9,032.26

$0.00

MECHANICAL, ELECTRICAL, & BUILDING SUPPORT Size: 176.51 m2

ASSEMBLY Quantity UOM Unit Cost Material

Total/SF Material/SF Labor/SF Eqp/SF Sub/SF

13.94 m2 $5,285.18 $2,957.51 $2,327.67 $0.00

$1,619.05 $0.00 $0.00 $4,055

FSA: 1/2 BATH 73,649

$920.85 $0.00 $0.00 $1,615 D5020020286 Residential Bath Exhaust Fan/Light 6 EA $675.78…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .