PACAF GPMS - Appendix G - Level of Effort (30 Apr 2020).docx

DOCX document 30 KB Posted

Attached to
Global Prepositioned Materiel Services (GPMS) Federal contract opportunity
Solicitation number
FA4890-19-RA004
Issued by
Department of the Air Force Air Combat Command

About this file

This document contains an appendix specifying required serviceability and readiness rates for assets supported through the Global Prepositioned Materiel Services contract. The appendix outlines required 95% serviceability or readiness rates for various asset categories including aerospace ground equipment, basic expeditionary airfield resources, fuels support equipment, vehicles, tanks racks adapters and pylons, force protection and security forces equipment, munition materiel handling equipment, rapid airfield damage repair equipment, and RED HORSE equipment and materiel. Container certifications must be 100% current. Inventory accuracy must be at 95% monthly and date of last inventory must be 100% current. One hundred percent of contingency or exercise taskings must meet required ready-to-load, port cutoff, or required delivery dates with exemptions only for issues outside the contractor's control. Reconstituted assets must be returned to full serviceability within 60 days of return to storage with exemptions only for issues like awaiting parts outside the contractor's control.

View the file

Other files for this federal contract opportunity

Other files attached to Global Prepositioned Materiel Services (GPMS), newest first.
File Type Posted
GPMS Pre-Proposal Conference Update.pdf PDF
USAFE GPMS Quality Assurance Surveillance Plan (QASP) Draft (30 Apr 2020).pdf PDF
PACAF GPMS Quality Assurance Surveillance Plan (QASP) Draft (30 Apr 2020.pdf PDF
Draft Section M GPMS 5May20.docx DOCX document
Draft Section L GPMS 5May20.docx DOCX document
USAFE GPMS - Appendix O - Authorizations.docx DOCX document
Section L - Attachment 3 - GPMS USAFE Draft Pricing Template.xlsx XLSX spreadsheet
PACAF GPMS - Appendix O - Authorizations.docx DOCX document
PACAF GPMS - Appendix F - Award Fee Plan (30 Apr 2020).docx DOCX document
Section I - PACAF Provisions and Clauses DRAFT.pdf PDF
GPMS Industry Feedback Template.docx DOCX document
USAFE GPMS - Appendix M - Certifications (30 Apr 2020).docx DOCX document
USAFE GPMS - Appendix D - Quality Management System (30 Apr 2020).doc DOC document
USAFE GPMS - Appendix J - Government-Furnished Facilities (30 Apr 2020).docx DOCX document
PACAF GPMS - Appendix D - Quality Management System (30 Apr 2020).doc DOC document
PACAF GPMS - Appendix B - Deliverables (30 Apr 2020).docx DOCX document
DD-254 - GPMS.pdf PDF
PACAF GPMS - Appendix J - Government-Furnished Facilities (30 Apr 2020).docx DOCX document
USAFE GPMS - Appendix A - Definitions Abbreviations and Acronyms (30 Apr 20).docx DOCX document
USAFE GPMS - Appendix F - Award Fee Plan (30 Apr 2020).docx DOCX document
USAFE GPMS - Appendix B - Deliverables (30 Apr 2020).docx DOCX document
USAFE GPMS Performance Work Statement (PWS) - Revised Draft (5 May 2020).docx DOCX document
PACAF GPMS Performance Work Statement (PWS) - Revised Draft (5 May 2020).docx DOCX document
USAFE GPMS - Appendix H - Special Requirements for Deployment Support (30 Apr 2020).docx DOCX document
Section L - Attachment 3 - GPMS PACAF Draft Pricing Template.xlsx XLSX spreadsheet
Section I - USAFE Provisions and Clauses DRAFT.pdf PDF
Section J - USAFE List of Attachments (DRAFT).docx DOCX document
GPMS Site Visit Cancellation.pdf PDF
Section M GPMS (Draft 5 Mar 2020).docx DOCX document
Section L GPMS (Draft 5 Mar 2020).docx DOCX document
Industry Questions Template.docx DOCX document
GPMS Draft Sect L and M Post.pdf PDF
GPMS_Industry_Day_Attendees.docx DOCX document
GPMS_Industry_Day_Briefing_Final.pptx PPTX presentation
GPMS_Industry_Day_Questions_Final.docx DOCX document
GPMS_Industry_Day_Announcement_Rev_01.docx DOCX document
3._(FOUU)_USAFCENT_WRM_Performance_Work_Statement_(PWS)_-_Draft_GPMS_PWS_Release.pdf PDF
2.4._(FOUO)_Guam_RADR_Vehicles_&_Material_-_Draft_GPMS_PWS_Release.xlsx XLSX spreadsheet
1.4._(FOUO)_USAFE_GPMS_(DABS_Sq_Mtr_Comparison)_-_Draft_GPMS_PWS_Release.xlsx XLSX spreadsheet
2.2._(FOUO)_Guam_&_Philippines_UTCs_(Draft_GPMS_PWS_Release.pdf PDF
2.1._(FOUO)_PACAF_GPMS_(RBCP_plus_NSNs)_-_Draft_GPMS_PWS_Release.xlsx XLSX spreadsheet
1.1._(FOUO)_USAFE_DABS-FEV_MILCON_-_Draft_GPMS_PWS_Release.pdf PDF
2._(FOUO)_PACAF_GPMS_Performance_Work_Statement_(PWS)_-_Draft_GPMS_PWS_Release.docx DOCX document
3.2._(FOUO)_USAFCENT_WPARR_(1_Aug_2019)_-_Draft_GPMS_PWS_Release.xlsx XLSX spreadsheet
1.3._(FOUO)_USAFE_GPMS_(DABS_UTC_&_Sq_Ft)_-_Draft_GPMS_PWS_Release.xlsx XLSX spreadsheet
3.1._(FOUO)_USAFCENT_WRM_Service_Summary_-_Draft_GPMS_PWS_Release.pdf PDF
GPMS_Industry_Day_Announcement.docx DOCX document
Atch_1-_E-WRM_Statement_of_Objective_(SOO).pdf PDF
Atch_2_-_E-WRM_Requested_Information.pdf PDF
RFI_-_Enterprise_WRM.pdf PDF
Show all 50

Global Prepositioned Materiel Services (GPMS) has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Contract Number: FA4890-19-R-A004

APPENDIX G

Level of Effort

1.0. General. The below reflect the required serviceability rates and or mission support process rates required for the GPMS program. These rates, when combined with the requirements of the PWS and applicable Appendices, should provide the information necessary to determine the estimated Level of Effort for the GPMS requirements. Unless otherwise specified for a specific functional area, rates shall be based on the serviceable assets (the numerator) divided by assets on-hand (the denominator). Assets that are deployed or in reconstitution shall not be included in the quantity of assets on-hand; once reconstituted assets are returned to a serviceable, stored configuration they shall be included in the equation.

1.1. Aerospace Ground Equipment (AGE): 95% Serviceability Rate

1.2. Basic Expeditionary Airfield Resources (BEAR): 95% Serviceability Rate

1.3. Fuels Support Equipment (FSE): 95% Serviceability Rate

1.4. Vehicles: 95% Vehicle-In-Commission Rate

Readiness Rate = Total OW Vehicles -VDP-VDM-LTI/Total OW Vehicles

Example:

VIC Rate = [2520(OW)-50 (VDP)-20 (VDM)-10 (LTI)]/2520(OW) Assigned = 97% VIC

Note: Round computations to the next whole number e.g. 89.3 shall be rounded to 89%; 89.7 shall be rounded as 90%.

Note: Vehicle Down for Parts (VDP); a.k.a. Non-Mission Capable Supply (NMCS) Vehicle Down for Maintenance (VDM); a.k.a. Non-Mission Capable Maintenance (NMCM) Limited Technical Inspection (LTI)

1.5. Tanks, Racks, Adapters & Pylons (TRAP): 95% Serviceability Rate

1.6. Medical Assets/Emergency Medical Support Systems (EMEDS): N/A

1.7. Force Protection (FP)/Security Forces (SF): 95% Serviceability Rate

1.8. Munition Materiel Handling Equipment (MMHE): 95% Serviceability Rate

1.9. Rapid Airfield Damage Repair (RADR): 95% Serviceability Rate

1.10. RED HORSE (RH) Equipment & Materiel: 95% Serviceability Rate

1.11. Containers: Container air/sea-worthiness certifications must be 100% current. Certification criteria are specified in applicable guidance; new containers, unless damaged, are typically certified for 5 years from manufacturing; after initial certification expires, inspections and re-certifications are typically required every 30 months. Containers must be fully emptied to perform the inspections.

1.12. Materiel Management:

1.12.1. Inventory Accuracy: 95% (monthly)

1.12.2. Date of Last Inventory (DOLI): 100% current

1.13. Outload: GPMS Contingency and Exercise Taskings shall meet the required Ready-to-Load Date (RLD), Port Cutoff Date (PCD), or Required Delivery Date (RDD). With the exception of retrograde taskings (e.g. assets tasked to return to depot), 100% of Contingency or Exercise Taskings are required to meet the designated RLD/PCD/RDD; only issues outside of contractor contract shall be acceptable exemptions.

1.14. Reconstitution: The contractor shall reconstitute assets to full serviceability within 60 days from return of assets to the storage location. Assets shall be inspected and accepted upon return, placed into reconstitution status, required parts ordered, and maintenance actions (e.g. Corrosion Control) scheduled. Only issues outside of contractor control (e.g. awaiting parts) shall exempt the contractor from the 60-day reconstitution requirement.

Page G-2 of 2