USAFE GPMS - Appendix B - Deliverables (30 Apr 2020).docx

DOCX document 55 KB Posted

Attached to
Global Prepositioned Materiel Services (GPMS) Federal contract opportunity
Solicitation number
FA4890-19-RA004
Issued by
Department of the Air Force Air Combat Command

About this file

This document outlines deliverables required under a Global Prepositioned Materiel Services contract to provide receipt, storage, inventory, maintenance, outload and reconstitution of pre-positioned war reserve materiel assets supporting the Pacific Air Forces and U.S. Air Forces in Europe-Air Forces Africa. The contractor must submit 42 defined deliverables to the Air Combat Command Acquisition Management and Integration Center on various recurring and as-needed schedules, ranging from monthly to annually. Key deliverables include management, safety, and maintenance plans; status reports on assets like aerospace ground equipment, vehicles and containers; inventory and production reports for rapid airfield damage recovery and RED HORSE equipment; and environmental, facilities and project completion reports. Submission formats, recipients, and deadlines are prescribed for each deliverable.

View the file

Other files for this federal contract opportunity

Other files attached to Global Prepositioned Materiel Services (GPMS), newest first.
File Type Posted
GPMS Pre-Proposal Conference Update.pdf PDF
USAFE GPMS Quality Assurance Surveillance Plan (QASP) Draft (30 Apr 2020).pdf PDF
Industry Draft LM Quest Govt Rsp.docx DOCX document
Draft Section M GPMS 5May20.docx DOCX document
PACAF GPMS - Appendix A - Definitions Abbreviations and Acronyms (30 Apr 20).docx DOCX document
PACAF GPMS - Appendix C - Publications and Forms (30 Apr 20).docx DOCX document
Section J - PACAF List of Attachments (DRAFT).docx DOCX document
USAFE GPMS - Appendix C - Publications and Forms (30 Apr 20).docx DOCX document
PACAF GPMS - Appendix M - Certifications (30 Apr 2020).docx DOCX document
USAFE GPMS - Appendix G - Level of Effort (30 Apr 2020).docx DOCX document
USAFE GPMS - Appendix D - Quality Management System (30 Apr 2020).doc DOC document
USAFE GPMS - Appendix J - Government-Furnished Facilities (30 Apr 2020).docx DOCX document
PACAF GPMS - Appendix D - Quality Management System (30 Apr 2020).doc DOC document
PACAF GPMS - Appendix B - Deliverables (30 Apr 2020).docx DOCX document
DD-254 - GPMS.pdf PDF
PACAF GPMS - Appendix J - Government-Furnished Facilities (30 Apr 2020).docx DOCX document
USAFE GPMS - Appendix A - Definitions Abbreviations and Acronyms (30 Apr 20).docx DOCX document
Section L - Attachment 3 - GPMS USAFE Draft Pricing Template.xlsx XLSX spreadsheet
PACAF GPMS - Appendix O - Authorizations.docx DOCX document
PACAF GPMS - Appendix F - Award Fee Plan (30 Apr 2020).docx DOCX document
Section I - PACAF Provisions and Clauses DRAFT.pdf PDF
GPMS Industry Feedback Template.docx DOCX document
USAFE GPMS - Appendix M - Certifications (30 Apr 2020).docx DOCX document
GPMS Site Visit Cancellation.pdf PDF
Section M GPMS (Draft 5 Mar 2020).docx DOCX document
Section L GPMS (Draft 5 Mar 2020).docx DOCX document
Industry Questions Template.docx DOCX document
GPMS Industry Day Contractor Q&A-SAM Posting (4 Dec 19).xlsx XLSX spreadsheet
GPMS_Industry_Day_Attendees.docx DOCX document
GPMS_Industry_Day_Briefing_Final.pptx PPTX presentation
GPMS_Industry_Day_Questions_Final.docx DOCX document
GPMS_Industry_Day_Announcement_Rev_01.docx DOCX document
GPMS_Industry_Day_Announcement.docx DOCX document
2.3._(FOUO)_Guam_BEAR_UTC_Inventory_Sheets_-_Draft_GPMS_PWS_Release.pdf PDF
ID_Agenda.docx DOCX document
1.2._(FOUO)_USAFE_GPMS_(DABS-FEV_DD_Form_1391s)_-_Draft_GPMS_PWS_Release.pdf PDF
1._(FOUO)_USAFE_Performance_Work_Statement_(PWS)_-_Draft_GPMS_PWS_Release.docx DOCX document
2.1._(FOUO)_PACAF_GPMS_(RBCP_plus_NSNs)_-_Draft_GPMS_PWS_Release.xlsx XLSX spreadsheet
1.1._(FOUO)_USAFE_DABS-FEV_MILCON_-_Draft_GPMS_PWS_Release.pdf PDF
2._(FOUO)_PACAF_GPMS_Performance_Work_Statement_(PWS)_-_Draft_GPMS_PWS_Release.docx DOCX document
3.2._(FOUO)_USAFCENT_WPARR_(1_Aug_2019)_-_Draft_GPMS_PWS_Release.xlsx XLSX spreadsheet
1.3._(FOUO)_USAFE_GPMS_(DABS_UTC_&_Sq_Ft)_-_Draft_GPMS_PWS_Release.xlsx XLSX spreadsheet
3._(FOUU)_USAFCENT_WRM_Performance_Work_Statement_(PWS)_-_Draft_GPMS_PWS_Release.pdf PDF
2.4._(FOUO)_Guam_RADR_Vehicles_&_Material_-_Draft_GPMS_PWS_Release.xlsx XLSX spreadsheet
1.4._(FOUO)_USAFE_GPMS_(DABS_Sq_Mtr_Comparison)_-_Draft_GPMS_PWS_Release.xlsx XLSX spreadsheet
2.2._(FOUO)_Guam_&_Philippines_UTCs_(Draft_GPMS_PWS_Release.pdf PDF
3.1._(FOUO)_USAFCENT_WRM_Service_Summary_-_Draft_GPMS_PWS_Release.pdf PDF
RFI_-_Enterprise_WRM.pdf PDF
Atch_1-_E-WRM_Statement_of_Objective_(SOO).pdf PDF
Atch_2_-_E-WRM_Requested_Information.pdf PDF
Show all 50

Global Prepositioned Materiel Services (GPMS) has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Contract Number: FA4890-19-R-A004

APPENDIX B

DELIVERABLES

1.0 GENERAL. Deliverables are items within the Performance Work Statement (PWS) the Government would like the Contractor to provide. These could be in the form of plans, reports, Contract Data Requirement Lists (CRDL), and/or data systems. Deliverables are considered an integral part of this contract and shall be nonproprietary in nature. In the event the contractor determines that proprietary information must be included within a document, all proprietary information must be clearly marked “[contractor name] Proprietary” (e.g. Alpha Business Company (ABC) would mark their proprietary information as “ABC Proprietary”) at both the document level and to the sub-paragraph level. Once submitted to the Government, all deliverables and the information & data (unless proprietary) within become the property of the Government for GPMS Program use. Unless otherwise required by the specific deliverable, all submitted reports and plans shall be accurate to the last calendar day of the previous month.

1.1 Deliverables Matrix. This matrix captures deliverables within the PWS and provides details (who, when and how) for each deliverable. Unless a template is provided in following paragraphs, contractor format is acceptable (MS Office 2013 or Adobe Pro 2015, or more recent).

Note: Applicable templates will be provided with the Final RFP.

2.0 PROGRAM MANAGEMENT.

3.0 OPERATIONS AND MAINTENANCE.

3.1 General

3.2.1 Aerospace Ground Equipment (AGE)

3.2.2 Basic Expeditionary Airfield Resources (BEAR)

3.2.3 Fuels Support Equipment (FSE)

3.2.4 Vehicles

3.2.5 Tanks, Racks, Adapters & Pylons (TRAP)

3.2.6 Medical Assets/Emergency Medical Support Systems (EMEDS): N/A

3.2.7 Force Protection (FP) Equipment

3.2.8 Munitions Materiel Handling Equipment (MMHE)

3.2.9 Rapid Airfield Damage Recovery (RADR) Equipment and Materiel

3.2.10 RED HORSE Equipment and Materiel

4.0 MISSION SUPPORT.

4.1 Materiel Management

4.2 Container Management

4.3 Fuels

5.0 CONTINGENCY LOGISTICS SUPPORT (CLS).

5.1 Comprehensive Tasking Report (CTR)

6.0 FACILITIES MANAGEMENT

6.1 Administration

6.2 Performance

6.3. Environmental, Safety, and Health (ES&H) Program

7.0 ADDITIONAL PLANS & REPORTS.

Page C-1 of 2 image1.emf

USAFE GPMS Deliverables Matrix Deliverables

The contractor shall make every attempt to ensure all plans, instructions, reports, and special publications are non-proprietary. In the event the Contractor determines that proprietary information must be included within a document, all proprietary information must be clearly marked “[contractor name] Proprietary” (e.g. Alpha Business Company (ABC) would mark their proprietary information as “ABC Proprietary” at both the document level and to the sub-paragraph level. Unless otherwise required by the specific deliverable, all submitted reports and plans shall be accurate to the last calendar day of the previous month.

Deliverable Functional Area Deliverable Title For Who How Frequency When (NLT) Primary PWS Reference(s)

1ManagementManagement Plan (includes LCMP, HR Plan, Labor Strike Plan, Training Plan, Site Management Plan, Contingency Plan, Employment in Time of War Plan, Evacuation Plan, Expeditionary Site Plan, Outload Plan, Deployable Teams Plan, Security Plan)AMIC PMCS/PKFB/DRQM
USAFE/A4RI, 86 MMSElectronic

(E-mail/ Sharepoint/ DoD SAFE) Annually Initial plan due 30 Days after Award of Contract (DAC) & annually NLT 30 calendar days before the start of the next period of performance, or within 10 calendar days of a substantive revision. PWS Section A Para 2.1.1. (and sub-paragraphs)

PWS Section D Para 2.2.1.

2SafetyHealth & Safety PlanAMIC PCEC/PMCS/DRQM
USAFE/A4RI, 86 MMSElectronic

(E-mail/ Sharepoint/ DoD SAFE) After Revision 90 DAC & Annually & 10 business days after a revision PWS Section A Para 2.1.2.1.

3SafetySafety Mishap NotificationAMIC PCEC/PMCS/DRQM
USAFE/A4RI, 86 MMSE-MailAs Requiredwithin 24 hours of mishap/event.PWS Section A

Para 2.1.2.2.

4SafetySaftey Mishap ReportAMIC PCEC/PMCS/DRQM
USAFE/A4RI, 86 MMSElectronic

(E-mail/ Sharepoint/ DoD SAFE) As Required within 24 hours of mishap/event. PWS Section A Para 2.1.2.2., 2.1.2.3., 5 Management Supplemental Manpower Report AMIC PKFB/PMCS Electronic (E-mail/ Sharepoint/ DoD SAFE) Monthly 45 DAC & Monthly NLT 10th Calendar Day of the Month; data current as of the last calendar day of the previous month PWS Section A Para 2.1.11.1.

6ManagementKey Personnel Manning ReportAMIC PKFB/PMCS/DRQM
USAFE/A4RI, 86 MMSElectronic

(E-mail/ Sharepoint/ DoD SAFE) Monthly 45 DAC & Monthly NLT 10th Calendar Day of the Month; data current as of the last calendar day of the previous month PWS Section A Para 2.1.11.2

7 Management Monthly Readiness Metrics USAFE/A4RI, 86 MMS SIPRNet Monthly TBD PWS Section A Para 2.2.1.1.

8ManagementCost/Schedule Status ReportAMIC PKFB/PMCS
USAFE/A4RIElectronic

(E-mail/ Sharepoint/ DoD SAFE) Monthly 30 DAC & Monthly NLT 10th Calendar Day of the Month; data current as of the last calendar day of the previous month PWS Section A Para 2.4.3

9ManagementMaintenance Control PlanAMIC PLG/PSC/PMCS/DRQM
USAFE/A4RI, 86 MMSElectronic

(E-mail/ Sharepoint/ DoD SAFE) Annually 45 DAC & Annually NLT 45 days prior to start of the next period of performance PWS Section A Para. 3.1.2.

10AGEAGE Status ReportAMIC PMCS/PLG
USAFE/A4RI, 86 MMSElectronic

(E-mail/ Sharepoint/ DoD SAFE) Monthly NLT 10 days after contract start date; monthly thereafter NLT 10th calendar day of the month; data current as of the last calendar day of the previous month PWS Section A Para 3.2.1.3.1.

11BEARBEAR Inventory ReportAMIC PMCS/PCEC
USAFE/A4RI, 86 MMSElectronic

(E-mail/ Sharepoint/ DoD SAFE) Monthly NLT 45 DAC and monthly NLT 10th calendar day of the month; data current as of the last calendar day of the previous month PWS Section A Para 3.2.2.1.1.

12BEARBEAR UTC Status ReportAMIC PMCS/PCEC
USAFE/A4RI, 86 MMSElectronic

(E-mail/ Sharepoint/ DoD SAFE) Monthly NLT 45 DAC and monthly NLT 10th calendar day of the month; data current as of the last calendar day of the previous month PWS Section A Para 3.2.2.1.2.

13FuelsFSE Status reportAMIC PMCS/PLGF
USAFE/A4RI, 86 MMSElectronic

(E-mail/ Sharepoint/ DoD SAFE) Monthly NLT 45 DAC & monthly NLT 5th calendar day of the month; data current as of the last calendar day of the previous month PWS Section A Para 3.2.3.6.1

14FuelsFSE Dispositon ReportAMIC PMCS/PLGF
USAFE/A4RI, 86 MMSElectronic

(E-mail/ Sharepoint/ DoD SAFE) Monthly NLT 5th calendar day of the month; data shall be current as of the last calendar day of the previous month PWS Section A Para 3.2.3.6.2.

15FuelsFSE Hose ReportAMIC PMCS/PLGF/DRQM
USAFE/A4RI, 86 MMSElectronic

(E-mail/ Sharepoint/ DoD SAFE) Quarterly NLT 45 DAC & quarterly NLT the 5th calendar day of the quarter (Oct, Jan, Apr, Jul); data shall be current as of the last calendar day of the previous quarter PWS Section A Para 3.2.3.6.3.

16VehiclesVehicle Reconstitution ReportAMIC PMCS/PLGT/DRQM
USAFE/A4RI, 86 MMSElectronic

(E-mail/ Sharepoint/ DoD SAFE) As Required 90 DAC & Weekly (when vehicles are in reconstitution) PWS Section A Para 3.2.4.2.1.

17VehiclesVehicle Production SlidesAMIC PMCS/PLGT/DRQM
USAFE/A4RI, 86 MMSElectronic

(E-mail/ Sharepoint/ DoD SAFE) Monthly 10 calendar days before the monthly Vehicle Production Meeting/Telecon; data shall be current as of the date of submission PWS Section A Para 3.2.4.2.2., 3.2.4.4.

18VehiclesVehicle Serviceability ReportAMIC PMCS/PLGT/DRQM
USAFE/A4RI, 86 MMSElectronic

(E-mail/ Sharepoint/ DoD SAFE) Monthly 90 DAC & NLT 10th Calendar Day of the Month; data current as of the last calendar day of the previous month PWS Section A Para 3.2.4.2.3.

19VehiclesVehicle Receieved ReportAMIC PMCS/PLGT/DRQM
USAFE/A4RI, 86 MMSElectronic

(E-mail/ Sharepoint/ DoD SAFE) As Required When required, NLT 10th Calendar Day of the Month; data current as of the last calendar day of the previous month PWS Section A Para 3.2.4.2.4.

20TRAPTRAP Status ReportAMIC PMCS/PLG/DRQM
USAFE/A4RI, 86 MMSElectronic

(E-mail/ Sharepoint/ DoD SAFE) Monthly 45 DAC & NLT 5th calendar day of the month; data shall be current as of the last calendar day of the previous month. PWS Section A Para 3.2.5.4.1.

21Force ProtectionFP Equipment Status ReportAMIC PMCS/PLG
USAFE/FP, 86 MMSElectronic

(E-mail/ Sharepoint/ DoD SAFE) Monthly NLT 45 DAC & monthly NLT 5th calendar day of the month; data current as of the last calendar day of the previous month PWS Section A Para 3.2.7.1.4.1.

22RADRRADR Inventory ReportAMIC PMCS/PLG/PCEC/DRQM
USAFE/A4RI, 86 MMSElectronic

(E-mail/ Sharepoint/ DoD SAFE) Monthly 90 DAC & NLT 5th calendar day of the month; data shall be current as of the last calendar day of the previous month. PWS Section A Para 3.2.9.2.1.

23RADRRADR UTC Status ReportAMIC PMCS/PLG/PCEC/DRQM
USAFE/A4RI, 86 MMSElectronic

(E-mail/ Sharepoint/ DoD SAFE) Monthly 90 DAC & NLT 5th calendar day of the month; data shall be current as of the last calendar day of the previous month. PWS Section A Para 3.2.9.2.2.

24RADRRADR Production SlidesAMIC PMCS/PLG/PCEC/DRQM
USAFE/A4RI, 86 MMSElectronic

(E-mail/ Sharepoint/ DoD SAFE) Monthly 90 DAC & NLT 5th calendar day of the month; data shall be current as of the last calendar day of the previous month. PWS Section A Para 3.2.9.2.3.

25RED HORSERED HORSE Inventory ReportAMIC PMCS/PLG/PCEC/DRQM
USAFE/A4RI, 86 MMSElectronic

(E-mail/ Sharepoint/ DoD SAFE) Monthly 90 DAC & NLT 5th calendar day of the month; data shall be current as of the last calendar day of the previous month. PWS Section A Para 3.2.10.2.1.

26RED HORSERED HORSE UTC Status ReportAMIC PMCS/PLG/PCEC/DRQM
USAFE/A4RI, 86 MMSElectronic

(E-mail/ Sharepoint/ DoD SAFE) Monthly 90 DAC & NLT 5th calendar day of the month; data shall be current as of the last calendar day of the previous month. PWS Section A Para 3.2.10.2.2.

27RED HORSERED HORSE Production SlidesAMIC PMCS/PLG/PCEC/DRQM
USAFE/A4RI, 86 MMSElectronic

(E-mail/ Sharepoint/ DoD SAFE) Monthly 90 DAC & NLT 5th calendar day of the month; data shall be current as of the last calendar day of the previous month. PWS Section A Para 3.2.10.2.3.

28Materiel ManagementDeployed Asset ReportAMIC PLGS/PMCS
USAFE/A4RI, 86 MMSElectronic

(E-mail/ Sharepoint/ DoD SAFE) Monthly NLT the 5th calendar day of the month; data shall be current as of the last calendar day of the previous month PWS Section A Para 4.1.6.11.

29Container ManagementContainer and Flat Rack Serviceability and Availability ReportAMIC PMCS/PLGT/DRQM
USAFE/A4RI, 86 MMSElectronic

(E-mail/ Sharepoint/ DoD SAFE) Monthly 45 DAC & NLT 5th calendar day of the month; data shall be current as of the last calendar day of the previous month PWS Section A Para 4.2.4.8.

30FuelsFuel ReportAMIC PMCS/PLGF/DRQM
USAFE/A4RI, 86 MMSElectronic

(E-mail/ Sharepoint/ DoD SAFE) Monthly NLT 45 DAC & monthly NLT the 5th calendar day of the month; data shall be current as of the last calendar day of the previous month PWS Section A Para 4.3.6.1.

31ManagementComprehensive Tasking Report (CTR)AMIC PMCS/DRQM
USAFE/A4RI, 86 MMSElectronic

(E-mail/ Sharepoint/ DoD SAFE) As Required NLT COB (local time) Fridays when Contingency or Exercise outload taskings have been directed. Submit reports weekly until a report reflects all taskings are closed; submit again upon receipt of additional taskings PWS Section A Para 5.3.1.

32FacilitiesFuture Projects PlanAMIC PKFB/PMCS/PCEC
USAFE/A4C/A4RI, 86 MMSElectronic

(E-mail/ Sharepoint/ DoD SAFE) Annually 90 DAC & Annually NLT 15 Jul PWS Section A Para 6.1.7.2.

33FacilitiesCivil Engineering Maintenance Control Plan (CEMCP)AMIC PCEC/PMCS/DRQM
USAFE/A4C, 86 MMSElectronic

(E-mail/ Sharepoint/ DoD SAFE) Annually 90 DAC & Annually 45 days prior to start of next period of performance PWS Section A Paras 6.1.7.3.

34ManagementEmergency Response PlanAMIC PKFB/PMCS/PCEC/DRQM
USAFE/A4C/A4RI, 86 MMSElectronic

(E-mail/ Sharepoint/ DoD SAFE) After Revision 90 DAC & 10 business days after a revision PWS Section A Para 6.1.7.4

35FacilitiesTest and Inspection ReportAMIC PCEC/PMCS/DRQM
USAFE/A4C, 86 MMSElectronic

(E-mail/ Sharepoint/ DoD SAFE) Annually NLT 15 Sep PWS Section A Para 6.2.1.1.

36EnvironmentalEnvironmental Protection Plan (EPP)AMIC PCEC/PMCS/DRQM
USAFE/A4C, 86 MMSElectronic

(E-mail/ Sharepoint/ DoD SAFE) After Revision 90 DAC & 10 business days after a revision PWS Section A Para 6.2.1.6.1, 6.3.1.

37EnvironmentalPesticide and Herbicide ReportAMIC PCEC/PMCS/DRQM
USAFE/A4C, 86 MMSElectronic

(E-mail/ Sharepoint/ DoD SAFE) Monthly 40 DAC & NLT the 10th calendar day of the month; data shall be current as of the last calendar day of the previous month PWS Section A Para 6.2.1.6.2., 6.3.1.1

38FacilitiesProject Completion ReportAMIC PCEC/PKFB/PMCS/DRQM
USAFE/A4C/A4RI, 86 MMSElectronic

(E-mail/ Sharepoint/ DoD SAFE) As Required As Required (30 days after 332 completion) PWS Section A Para 6.2.2.1.4.6.a.

39EnvironmentalSpill ReportAMIC PCEC/PMCS/DRQM
USAFE/A4C, 86 MMSElectronic

(E-mail/ Sharepoint/ DoD SAFE) As Required COB next business day PWS Section A Para 6.3.1.2

40ManagementPhase-In/Transition PlanAMIC PKFB/PMCS/DRQM
USAFE/A4RI, 86 MMSElectronic

(E-mail/ Sharepoint/ DoD SAFE) Initial plan with additional plans as directed by the PCO Initial plan due 15 days after award; additional plan(s) due as directed by the PCO. PWS Section D Para 1.3.

41ManagementExisting Conditions ReportAMIC PKFB/PMCS/DRQM/PCEC
USAFE/A4RI, 86 MMSElectronic

(E-mail/ Sharepoint/ DoD SAFE) Once per Award 90 days after performance start PWS Section D Para 1.6.

42EnvironmentalOzone Depleting Substances ReportAMIC PCEC/PMCS/DRQM
USAFE/A4C, 86 MMSElectronic

(E-mail/ Sharepoint/ DoD SAFE) Annually NLT 31 Oct of each year FAR Clause 52.223-11

Solicitation FA4890-15-R-0004

File details come from the government source that posted it. Updated .