Attachment 24

View the file

Other files for this federal contract opportunity

Other files attached to CANNON AFB, NM SABER, newest first.
File Type Posted
Amendment_5.pdf PDF
Attachment__01_-_SABER_2013_General_Requirements_update_7_Aug_2013_with_header.doc DOC document
Q_and_A_-_Revised.pdf PDF
Amendment_4.pdf PDF
Attachment_S4_-_Coefficient_Spreadsheet.xls XLS spreadsheet
Q_and_A.pdf PDF
CZQZ_13-1090_Renovate_Community_Center_SOO 1 .docx DOCX document
Amendment_3_(SF_30).pdf PDF
Amendment_2.pdf PDF
Amendment_1.doc DOC document
Attachment_25e.docx DOCX document
Attachment_25a.docx DOCX document
Attachment_25f.docx DOCX document
Attachment_25c.docx DOCX document
Attachment_25b.docx DOCX document
Attachment_25d.docx DOCX document
Attachment_TO3.pdf PDF
SABER_Pre-Proposal_Conference_and_Site_Visit.pptx PPTX presentation
Second_Floor_Project_Drawings_11X17.pdf PDF
(15_Dec_2012)_CZQZ131090_2nd_Floor_Comm_Call-out.docx DOCX document
CZQZ_13-1090_Renovate_Community_Center_SOO.docx DOCX document
1208_2nd_floor_as-built_Floor_Plan_Plans_(1).pdf PDF
Attachment_S3_-_Past_Performance_Questionaire_1.docx DOCX document
Attachment_08_-_Facility_Excellence_Guide_with_header.pdf PDF
Attachment_S5_-_Question_and_Answer_Template.docx DOCX document
Attachment_04_-_CAFB_Electrical_Standards-March_13 _2012_with_header.pdf PDF
Attachment_S2_-_Past_Performance_Project_Data_(REVISED).doc DOC document
Attachment_21_-_Contractor_handbook_23_Mar_2012_with_header.doc DOC document
Attachment_05_-_CAFB_Hardware_Specifications_Guideline-_2011_with_header.pdf PDF
Attachment_12__-AF_Form_3064__Contract_Progress_Scheule.xfdl XFDL file
Attachment_09_-_GeoBase_Initial_Operating_Capability_Implemen_with_header.pdf PDF
Attachment_07_-_CAFB_CAD_Standards_with_header.pdf PDF
Attachment_23_-_CAFB_and_MAFR_Civilian_Contractor_Environmental_Guide_Appendix_A_Forms_(2)_with_header.doc DOC document
Attachment_03_-_CAFB_Architectural_Compatibility_Guide-2013_with_header.pdf PDF
Attachment_S1_-_Letter_of_Instruction_to_Reference_for_PPQ_-_REVISED.doc DOC document
Attachment_10_-_US_Army_Corps_Of_Engineer_Mobile_District_Des_with_header.pdf PDF
Attachment_16_-_AF_Form_103v5_Work_Clearance_Request_with_header.pdf PDF
Attachment_15_-_AF_Form_3000_Material_Approval_Submittal.xfdl XFDL file
Attachment_17_-_USAF_Hot_Work_Permit.xfdl XFDL file
Attachment_11_-_UFC_1-300-8 _Real_Property_Transfer_with_header.pdf PDF
Attachment_20_-_Base_Contractor_Storage_Lot_Agreement_with_header.doc DOC document
Attachment_22_-_Cannon_AFB_and_Melrose_AFR_Civilian_Contractor_Environmental_Guide_with_header.doc DOC document
SABER_Solicitation.doc DOC document
Attachment_S4_-_Coefficient_Spreadsheet.xls XLS spreadsheet
Attachment_18_-_Building_Construction_1354_Checklist__with_header.xls XLS spreadsheet
Attachment_02_-_SABER_Specifications.pdf PDF
Attachment__01_-_SABER_General_Requirements_update_29_Jan_13_with_header.doc DOC document
Attachment_14_-_Schedule_of_Material_Submittals_(AF66)_with_header.xls XLS spreadsheet
Attachment_S4A_Coefficient_Spreadsheet_(Example).xls XLS spreadsheet
Attachment_13_-_AF_Form_3065_Progrees_Report.xfdl XFDL file
Show all 50

CANNON AFB, NM SABER has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 24 FA4855-13-R-0009

SCOPE OF WORK

Project Title Contract # FA4855-xx-D-xxxx CZQZ xx-xxxx 1 Feb 2013

1. OBJECTIVE: To renovate the second floor of Bldg 1208 to facilitate the 27 SOW Community Center, with new bathrooms, video room, cyber gaming room, sound studio, and a multi-purpose room. Work will also include updating and relocation of existing electrical system.

2. WORK LOCATION: Bldg 1208, Cannon AFB, NM.

3. PRINCIPAL FEATURES: The work required is to include but is not limited to the furnishing of materials, equipment, facilities, transportation, labor, and supervision required to accomplish the following:

Define the Project as best as possible to ensure that it is evident that the government can with reasonable certainty your organization is aware of what is needed required and defined out, Demo

3.1. Remove xxxxxxx .

3.1.1. Include demo of existing lighting

3.1.2. Demo 20 sf area (4’x5’ area) as identified in the project drawings

NEW INSTALLATION

3.2. Install fire detection system to mare up with existing fire control system.

3.2.1. Full coverage of Open Bay Area

3.2.2. Coverage of each of the five separate rooms/areas

3.3. Install and connect power from the new facility to the transformer within the area.

Identify Options as required separately on the SOW

4. PERFORMANCE PERIOD:

Submittal-------------------------xx Calendar days

Material Procurement----------xx Calendar days

Construction---------------------xxx Calendar days TOTAL------- xxx Calendar days

5. NON-TYPICAL ISSUES/ITEMS: Anything outside of the ordinary that may come up or need addressed to include NPIs.

6. RELATED PROJECTS: None

7. SAFETY: All OSHA, AFOSH and other applicable DOD Standards apply as stated in SABER contract FA4855-11-D-0003.

8. SPECIFICATIONS: All materials and construction criteria used in SABER contract

FA4855-11-D-0003, will be strictly adhered to.

8.1 Sections to be used on this project are:

02 32 00 Subsurface Drilling, Sampling, and Testing

02 41 00 Demolition and Reconstruction 02 61 13 Excavation and Handling of Contaminated Material 02 82 14 Asbestos Hazard Control Activities 02 82 16 Engineering Control of Asbestos Containing Material 02 82 33 13 20 Removal Control and Disposal of Paint with Lead 03 30 00 Cast-In-Place Concrete 26 00 00 00 20 Basic Electrical Materials and Methods 21 13 13 00 10 Wet Pipe Sprinkler System, Fire Protection

21 13 17 00 10 Dry Pipe Sprinkler System, Fire Protection NOTE: Continue as necessary and add additional specifications as needed; make sure that all specification sections that are not part of the initial contract are submitted for approval

9. SPECIAL REQUIREMENTS: Materials must be commercial/industrial quality and made in the U.S. In the event of strong wind and monsoon conditions, contractor will secure all materials at no cost to the government.

10. POINT OF CONTACT: xxxxxsxxxx/PM at xxx-xxxx.