Attachment_23_-_CAFB_and_MAFR_Civilian_Contractor_Environmental_Guide_Appendix_A_Forms_(2)_with_header.doc

DOC document 103 KB Posted

Attached to
CANNON AFB, NM SABER Federal contract opportunity
Solicitation number
FA4855-13-R-0009
Issued by
Department of the Air Force Special Operations Command

About this file

Attachment 23

View the file

Other files for this federal contract opportunity

Other files attached to CANNON AFB, NM SABER, newest first.
File Type Posted
Amendment_5.pdf PDF
Attachment__01_-_SABER_2013_General_Requirements_update_7_Aug_2013_with_header.doc DOC document
Q_and_A_-_Revised.pdf PDF
Amendment_4.pdf PDF
Attachment_S4_-_Coefficient_Spreadsheet.xls XLS spreadsheet
Amendment_3_(SF_30).pdf PDF
Q_and_A.pdf PDF
CZQZ_13-1090_Renovate_Community_Center_SOO 1 .docx DOCX document
Amendment_2.pdf PDF
Attachment_TO3.pdf PDF
Amendment_1.doc DOC document
Attachment_25e.docx DOCX document
Attachment_25a.docx DOCX document
Attachment_25f.docx DOCX document
Attachment_25c.docx DOCX document
Attachment_25b.docx DOCX document
Attachment_25d.docx DOCX document
SABER_Pre-Proposal_Conference_and_Site_Visit.pptx PPTX presentation
Pre-Proposal_Minutes_and_Sign-In.pdf PDF
Second_Floor_Project_Drawings_11X17.pdf PDF
(15_Dec_2012)_CZQZ131090_2nd_Floor_Comm_Call-out.docx DOCX document
CZQZ_13-1090_Renovate_Community_Center_SOO.docx DOCX document
1208_2nd_floor_as-built_Floor_Plan_Plans_(1).pdf PDF
Attachment_18_-_Building_Construction_1354_Checklist__with_header.xls XLS spreadsheet
Attachment_02_-_SABER_Specifications.pdf PDF
Attachment__01_-_SABER_General_Requirements_update_29_Jan_13_with_header.doc DOC document
Attachment_24_-_SOW_Example_2013.doc DOC document
Attachment_14_-_Schedule_of_Material_Submittals_(AF66)_with_header.xls XLS spreadsheet
Attachment_S4A_Coefficient_Spreadsheet_(Example).xls XLS spreadsheet
Attachment_13_-_AF_Form_3065_Progrees_Report.xfdl XFDL file
Attachment_06_-_CAFB_Sustainable_Landscape_Development_Plan_-_2012_with_header.pdf PDF
Attachment_19_-_CAFB_Labeling_Standards_for_Communications_with_header.pdf PDF
Attachment_S3_-_Past_Performance_Questionaire_1.docx DOCX document
Attachment_08_-_Facility_Excellence_Guide_with_header.pdf PDF
Attachment_S5_-_Question_and_Answer_Template.docx DOCX document
Attachment_04_-_CAFB_Electrical_Standards-March_13 _2012_with_header.pdf PDF
Attachment_S2_-_Past_Performance_Project_Data_(REVISED).doc DOC document
Attachment_21_-_Contractor_handbook_23_Mar_2012_with_header.doc DOC document
Attachment_05_-_CAFB_Hardware_Specifications_Guideline-_2011_with_header.pdf PDF
Attachment_12__-AF_Form_3064__Contract_Progress_Scheule.xfdl XFDL file
Attachment_09_-_GeoBase_Initial_Operating_Capability_Implemen_with_header.pdf PDF
Attachment_07_-_CAFB_CAD_Standards_with_header.pdf PDF
Attachment_03_-_CAFB_Architectural_Compatibility_Guide-2013_with_header.pdf PDF
Attachment_S1_-_Letter_of_Instruction_to_Reference_for_PPQ_-_REVISED.doc DOC document
Attachment_10_-_US_Army_Corps_Of_Engineer_Mobile_District_Des_with_header.pdf PDF
Attachment_16_-_AF_Form_103v5_Work_Clearance_Request_with_header.pdf PDF
Attachment_15_-_AF_Form_3000_Material_Approval_Submittal.xfdl XFDL file
Attachment_17_-_USAF_Hot_Work_Permit.xfdl XFDL file
Attachment_11_-_UFC_1-300-8 _Real_Property_Transfer_with_header.pdf PDF
Attachment_20_-_Base_Contractor_Storage_Lot_Agreement_with_header.doc DOC document
Show all 50

CANNON AFB, NM SABER has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 23 FA4855-13-R-0009

ATTACHMENT A-1

CAFB ESOH-MIS CONTRACTOR WORKSHEET

1.
CONTRACTOR INFOMATION

Contractor Name

Contract Number

Project Number

Estimated Start Date

Estimated Completion Date

Assigned Shop Code

(Leave shop code blank if not known)

2.
MATERIAL INFORMATION

Material Stock Number (MSN), National Stock Number (NSN), Local Stock Number (LSN), Or Part Number

Material Noun (Be Specific)

Size (Quantity)

CIRCLE ONE
Fluid Oz
Troy Oz
Container Type
Box
Bottle
Can
Drum
Bag
Gram
Pint
Pound
Cartridge
Other____________
Quart
Kg
Gallon

Unit of Issue

Units Per Container

Other _______________

3.
Task Description
4.
LOCATION INFORMATION

Will The Process Be Performed On: (Check All That Apply)

Existing Facility

Equipment

New Structure

Aircraft

Outdoors

Physical Location Of Process

Location Of Stored Materials

5.
ADDITIONAL INFORMATION (Circle Answer That Applies)
Is A Hazardous Waste Generated?
Yes
No
Additional Remarks:
6.
CERTIFIER BLOCK

This Request Cannot Be Processed Without A Government Representative’s Signature

CONTRACTOR
Title:
Phone:
Date

Printed Name

Signature

GOV’T REP/PM
Title:
Phone:
Date

Printed Name

Signature

NOTE: Manufacturer’s Material Safety Data Sheet (MSDS) Required With Every Worksheet

ATTACHMENT A-2

CAFB CONTRACTOR HAZARDOUS MATERIAL REVIEW

TO: 27 SOCONS

FROM: 27 SOLRS/LGRMSH (HAZMART)

RE:

CONTRACT NUMBER: _____________________

PROJECT NUMBER: _____________________

DATE: _____________________

The CAFB HAZMART has received/reviewed the attached AF-EESOH-MIS Contractor Worksheets and associated Material Safety Data Sheets. Documents and the attached packet may require additional action. Please see below comments.

Comment 1:

Tagged MSDS(s) need replacing because it is illegible or outdated.

Comment 2:

No action required, these items do not require tracking in the EESOH-MIS Database.

______ Worksheets are incomplete, additional information required. See comments below.

______ EESOH-MIS Contractor Worksheets must be filled out for each attached MSDS.

Return worksheet and MSDS to the Contracting Office for input into the EESOH-MIS database to create a hazardous material tracking account.

______ The MSDSs that were submitted have been reviewed and information entered into the hazardous materials tracking data base. The attached hazardous materials list will be the items that the Hazardous Material Office will track on a monthly basis using the Contractor Hazardous Material Usage Data worksheet.

If any additional or different types of hazardous materials will be used on this or any future project, MSDSs must be submitted for review.

______ No action needed, documents are complete and will be entered into the hazardous materials tracking database.

Comment 3:

Other Comments.

Comment 1:

Comment 1a:

Comment 2:

ATTACHMENT A-3

CONTRACTOR HAZARDOUS MATERIAL USAGE DATA

Contractor:________________________ ESOH-MIS Shop Code:_____________________

Contract/Project Number: ______________________ Location:______________________ The following information is required for tracking of hazardous materials on-base. For contracts exceeding two months, this form is required to be filed out monthly and returned to the Government Representative, who will return it to the Hazmart/Hazardous Materials Program Manager office. This information is required in order to comply with Environmental Laws and Regulations. For purchase orders/contracts less than two months, this form is required at start and completion of work.

Material Name
Manufacturer
MSN #
Quantity in Stock
Quantity Used

Print Name and Signature:

Contractor:_______________________________________________ Date:__________________________

File details come from the government source that posted it. Updated .