Attachment_23_-_CAFB_and_MAFR_Civilian_Contractor_Environmental_Guide_Appendix_A_Forms_(2)_with_header.doc
DOC document 103 KB Posted
- Attached to
- CANNON AFB, NM SABER Federal contract opportunity
- Solicitation number
- FA4855-13-R-0009
About this file
Attachment 23
View the file
Other files for this federal contract opportunity
Show all 50
CANNON AFB, NM SABER has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 23 FA4855-13-R-0009
ATTACHMENT A-1
CAFB ESOH-MIS CONTRACTOR WORKSHEET
| 1. |
| CONTRACTOR INFOMATION |
Contractor Name
Contract Number
Project Number
Estimated Start Date
Estimated Completion Date
Assigned Shop Code
(Leave shop code blank if not known)
| 2. |
| MATERIAL INFORMATION |
Material Stock Number (MSN), National Stock Number (NSN), Local Stock Number (LSN), Or Part Number
Material Noun (Be Specific)
Size (Quantity)
| CIRCLE ONE |
| Fluid Oz |
| Troy Oz |
| Container Type |
| Box |
| Bottle |
| Can |
| Drum |
| Bag |
| Gram |
| Pint |
| Pound |
| Cartridge |
| Other____________ |
| Quart |
| Kg |
| Gallon |
Unit of Issue
Units Per Container
Other _______________
| 3. |
| Task Description |
| 4. |
| LOCATION INFORMATION |
Will The Process Be Performed On: (Check All That Apply)
Existing Facility
Equipment
New Structure
Aircraft
Outdoors
Physical Location Of Process
Location Of Stored Materials
| 5. |
| ADDITIONAL INFORMATION (Circle Answer That Applies) |
| Is A Hazardous Waste Generated? |
| Yes |
| No |
| Additional Remarks: |
| 6. |
| CERTIFIER BLOCK |
This Request Cannot Be Processed Without A Government Representative’s Signature
| CONTRACTOR |
| Title: |
| Phone: |
| Date |
Printed Name
Signature
| GOV’T REP/PM |
| Title: |
| Phone: |
| Date |
Printed Name
Signature
NOTE: Manufacturer’s Material Safety Data Sheet (MSDS) Required With Every Worksheet
ATTACHMENT A-2
CAFB CONTRACTOR HAZARDOUS MATERIAL REVIEW
TO: 27 SOCONS
FROM: 27 SOLRS/LGRMSH (HAZMART)
RE:
CONTRACT NUMBER: _____________________
PROJECT NUMBER: _____________________
DATE: _____________________
The CAFB HAZMART has received/reviewed the attached AF-EESOH-MIS Contractor Worksheets and associated Material Safety Data Sheets. Documents and the attached packet may require additional action. Please see below comments.
Comment 1:
Tagged MSDS(s) need replacing because it is illegible or outdated.
Comment 2:
No action required, these items do not require tracking in the EESOH-MIS Database.
______ Worksheets are incomplete, additional information required. See comments below.
______ EESOH-MIS Contractor Worksheets must be filled out for each attached MSDS.
Return worksheet and MSDS to the Contracting Office for input into the EESOH-MIS database to create a hazardous material tracking account.
______ The MSDSs that were submitted have been reviewed and information entered into the hazardous materials tracking data base. The attached hazardous materials list will be the items that the Hazardous Material Office will track on a monthly basis using the Contractor Hazardous Material Usage Data worksheet.
If any additional or different types of hazardous materials will be used on this or any future project, MSDSs must be submitted for review.
______ No action needed, documents are complete and will be entered into the hazardous materials tracking database.
Comment 3:
Other Comments.
Comment 1:
Comment 1a:
Comment 2:
ATTACHMENT A-3
CONTRACTOR HAZARDOUS MATERIAL USAGE DATA
Contractor:________________________ ESOH-MIS Shop Code:_____________________
Contract/Project Number: ______________________ Location:______________________ The following information is required for tracking of hazardous materials on-base. For contracts exceeding two months, this form is required to be filed out monthly and returned to the Government Representative, who will return it to the Hazmart/Hazardous Materials Program Manager office. This information is required in order to comply with Environmental Laws and Regulations. For purchase orders/contracts less than two months, this form is required at start and completion of work.
| Material Name |
| Manufacturer |
| MSN # |
| Quantity in Stock |
| Quantity Used |
Print Name and Signature:
Contractor:_______________________________________________ Date:__________________________
File details come from the government source that posted it. Updated .