Attachment_18_-_Building_Construction_1354_Checklist__with_header.xls

XLS spreadsheet 84 KB Posted

Attached to
CANNON AFB, NM SABER Federal contract opportunity
Solicitation number
FA4855-13-R-0009
Issued by
Department of the Air Force Special Operations Command

About this file

Attachment 18

View the file

Other files for this federal contract opportunity

Other files attached to CANNON AFB, NM SABER, newest first.
File Type Posted
Amendment_5.pdf PDF
Attachment__01_-_SABER_2013_General_Requirements_update_7_Aug_2013_with_header.doc DOC document
Amendment_4.pdf PDF
Q_and_A_-_Revised.pdf PDF
Attachment_S4_-_Coefficient_Spreadsheet.xls XLS spreadsheet
Q_and_A.pdf PDF
CZQZ_13-1090_Renovate_Community_Center_SOO 1 .docx DOCX document
Amendment_3_(SF_30).pdf PDF
Amendment_2.pdf PDF
Amendment_1.doc DOC document
Attachment_25e.docx DOCX document
Attachment_25b.docx DOCX document
Attachment_25d.docx DOCX document
Attachment_25a.docx DOCX document
Attachment_25f.docx DOCX document
Attachment_25c.docx DOCX document
Attachment_TO3.pdf PDF
SABER_Pre-Proposal_Conference_and_Site_Visit.pptx PPTX presentation
Second_Floor_Project_Drawings_11X17.pdf PDF
(15_Dec_2012)_CZQZ131090_2nd_Floor_Comm_Call-out.docx DOCX document
1208_2nd_floor_as-built_Floor_Plan_Plans_(1).pdf PDF
CZQZ_13-1090_Renovate_Community_Center_SOO.docx DOCX document
Attachment_S3_-_Past_Performance_Questionaire_1.docx DOCX document
Attachment_08_-_Facility_Excellence_Guide_with_header.pdf PDF
Attachment_S5_-_Question_and_Answer_Template.docx DOCX document
Attachment_04_-_CAFB_Electrical_Standards-March_13 _2012_with_header.pdf PDF
Attachment_S2_-_Past_Performance_Project_Data_(REVISED).doc DOC document
Attachment_21_-_Contractor_handbook_23_Mar_2012_with_header.doc DOC document
Attachment_05_-_CAFB_Hardware_Specifications_Guideline-_2011_with_header.pdf PDF
Attachment_12__-AF_Form_3064__Contract_Progress_Scheule.xfdl XFDL file
Attachment_S1_-_Letter_of_Instruction_to_Reference_for_PPQ_-_REVISED.doc DOC document
Attachment_10_-_US_Army_Corps_Of_Engineer_Mobile_District_Des_with_header.pdf PDF
Attachment_16_-_AF_Form_103v5_Work_Clearance_Request_with_header.pdf PDF
Attachment_15_-_AF_Form_3000_Material_Approval_Submittal.xfdl XFDL file
Attachment_17_-_USAF_Hot_Work_Permit.xfdl XFDL file
Attachment_11_-_UFC_1-300-8 _Real_Property_Transfer_with_header.pdf PDF
Attachment_20_-_Base_Contractor_Storage_Lot_Agreement_with_header.doc DOC document
Attachment_22_-_Cannon_AFB_and_Melrose_AFR_Civilian_Contractor_Environmental_Guide_with_header.doc DOC document
SABER_Solicitation.doc DOC document
Attachment_S4_-_Coefficient_Spreadsheet.xls XLS spreadsheet
Attachment_09_-_GeoBase_Initial_Operating_Capability_Implemen_with_header.pdf PDF
Attachment_07_-_CAFB_CAD_Standards_with_header.pdf PDF
Attachment_23_-_CAFB_and_MAFR_Civilian_Contractor_Environmental_Guide_Appendix_A_Forms_(2)_with_header.doc DOC document
Attachment_03_-_CAFB_Architectural_Compatibility_Guide-2013_with_header.pdf PDF
Attachment_02_-_SABER_Specifications.pdf PDF
Attachment__01_-_SABER_General_Requirements_update_29_Jan_13_with_header.doc DOC document
Attachment_24_-_SOW_Example_2013.doc DOC document
Attachment_14_-_Schedule_of_Material_Submittals_(AF66)_with_header.xls XLS spreadsheet
Attachment_S4A_Coefficient_Spreadsheet_(Example).xls XLS spreadsheet
Attachment_13_-_AF_Form_3065_Progrees_Report.xfdl XFDL file
Show all 50

CANNON AFB, NM SABER has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Instruction Page

CONSTRUCTION CHECKLIST INSTRUCTIONS
1. Complete the checklist as thoroughly as possible.
2. Provide the following information with the checklist.
a. COMPLETED BUILDING CHECKLIST
b. REMARKS OR SCOPE OF WORK SHEET -(explain the work actually performed, please be precise):
EXAMPLE:
This project provides for the addition of a 6,880 SF facility to the existing Blood Processing Laboratory
Building 1705. This facility is designed to house 50 chest type freezer units and is constructed of steel
framing covered with composite metal paneling.
The new building is equipped with an emergency back-up generator and automatic transfer/by pass-
isolation switchgear as required to maintain continuous power to the proposed freezer high temperature
alarm system, winter exhaust fan ventilation on system, summer air conditioning system and a fire alarm
system. The building also has three overhead doors for the movement of large items in and out of the
facility. Heat is not needed in this addition.
The 275 gallon aboveground day fuel tank (diesel), located in the mechanical room, is used to service
the 275 KW emergency generator. The 2500 gallon underground fueled oil tank (diesel) is used to replenish
the 275 gallon aboveground day fuel tank.
Demolition cost is $3,000.00 for partial removal of roof section and part of wall where the new addition
was attached to the existing building.
NOTE:Existing building doors not have a fire protection system.
CONTRACTOR'S NAME:
ADDRESS:
TELEPHONE NUMBER:
c. FINAL SABER INSPECTION CHECKLIST (Include date of final inspection and list of attendees).
d. DRAWING OF THE STRUCTURE WITH LENGTH AND WIDTH DIMENSIONS (Attach drawing
of new building with exterior dimensions, if an addition, provide drawing with the existing structure and new
addition with exterior dimensions).
e. COMPLETE "STATEMENT OF CONDITION" (must be completed by Engineering Flight Chief)
f. INSTALLATION/OPERATING MANUALS
g. ACCEPTANCE AND COMPLETION LETTER
3. Return completed checklist to your Construction Contract Inspector.

&RPage &P &C&A&RPage &P

1354ckls

Revised: 07 Feb 2010
"TAB" to each field
BUILDING CHECKLIST
(Required For Each Building)
FACILITY #:CAT CODE:WORK ORDER #:
PROJECT #:CONTRACT #:
DESCRIPTION:TOTAL PROJ COST:
DEMOLITION COSTS:DATE CONSTRUCTION COMPLETED:
DESIGN/SIOH COST:DESIGN WORK ORDER #
TYPE WORK (C/M/R):APPROPRIATION FUND CODE:
TYPE FUNDS (MCP, MC, O&M):PROJECT EEIC:
1. GENERAL DATA REQUIRED FOR FACILITIESNEWEXISTING
a.EXTERIOR DIMENSIONS (if an addition to existing building, only show data for the addition):
LengthWidthTotalArea Loc ID
(1)Main Bldgx=0sf
x0sf
x=0sf
(2)Wingx=0sf
Wingx=0sf
(3)Offsetx=0sf
Offsetx=0sf
(4)Basementx=0sf
TOTAL:=0SF
NUMBER OF FLOORS:BUILDING NET FLOOR AREA SF:
BUILDING / FACILITY HEIGHT:
CONSTRUCTION:
(1) Foundations (such as concrete)TYPE:
(2) Floors (such as wood, concrete)TYPE:
(3) Walls (such as wood siding)TYPE:
(4) Roof (such as built-up, shingle)TYPE:
(5) Building Primary Construction MaterialTYPE:METAL
OTHER BUILDING DATA:FeetCode
(1) Ceiling Height Main Bldg(5) FIRE RATING CODE
(2) Ceiling Height Basement
(3) Largest Door Opening Height
(4) Largest Door Opening Width
MISC DATA:
b.UTILITY CONNECTIONS
Utility ConnectionsNumber of pipesDiameter
of each pipeCapacity of all
inlet pipesAvailable or Connected (Yes/No)
Water
Gas
Sewer Pipe
Storm Sewer Pipe
Steam
Condensate
Communications
SystemEnergy TypeSource LocationFuel DescriptionAir Circulation
Heating
Air Conditioning
Hot Water
Steam
Electrical
ElectricPhaseVoltageWire
SizeConnected Load
- AMPSConnected Load - KVA
c.SYSTEMS IN BUILDING:
(1)FIRE PROTECTION:
CATEGORYUNIT
CODENOMENCLATUREUMAMOUNTTOTAL COST
880-211CLSD HD A / SPRINKSF
HD
880-212OPEN HEAD DELUGE SYSSF
HD
880-217AFFF PA SPRINK SYSF
HD
880-221AUTO FIRE DETECTION SYSSF
EA
880-222MAN FR ALARM/INT SYSEA
880-223MAN FR ALARM/EXT SYSEA
880-231C02 FIRE SYSTEMEA
880-232FOAM FR SYSEA
880-233OTHER FIRE SYSTEMEA
880-234HALON 1301 FIRE SYSTEMEA
(2)SECURITY:
CATEGORYUNIT
CODENOMENCLATUREUMAMOUNTTOTAL COST
872-841SECURITY ALARM SYSTEMEA
d.PLANTS IN BUILDING:
CATEGORYUNIT
CODENOMENCLATUREUMAMOUNTTOTAL COST
890-124A/C FROM CEN PLTSF
890-125A/C PLT LESS THAN 5 TNSF
TN
890-121A/C PLT 5 TO 25 TNTN
826-122A/C PLT 25 TO 100 TNTN
826-123A/C PLT OVER 100 TNTN
821-112HTG FUEL OIL STORAGEGA
821-113HTG FR CEN PLTSF
821-115HTG PLTMB
811-147ELEC E/PWR GEN PLTKW
890-134COMPRESSOR AIR PLTHP
e.RELATED FACILITIES:
CATEGORYUNIT
CODENOMENCLATUREUMAMOUNTTOTAL COST
812-2235140PRIM DISTR LINE OHLF
TRANSFORMERSKVA
POWER POLESEA
812-2245142SEC DISTR LINE OHLF
812-2255141PRIM DISTR LINE UGLF
TRANSFORMERSKVA
POWER POLESEA
812-2265143SEC DISTR LINE UGLF
135-5835165TEL DUCT FACILITYLF
890-144COMPRESSED AIR DISTLF
812-9265160EXTERIOR AREA LIGHTINGEA
824-4645045GAS MAINSLF
832-2664043SANITARY SEWAGE MAINLF
832-2555167INDUSTRIAL WASTE MAINLF
842-2454055WATER DISTR MAINSLF
843-3154025FIRE HYDRANTSEA
851-1435117CURBS & GUTTERSLF
851-1455093DRIVEWAYSY
851-1475115ROADSY
LF
852-262VEHICLE PARKING, N/ORGNSY
852-2894049SIDEWALKSY
871-1834047STORM DRAIN DSPLLF
872-2474070FENCE, SECURITYLF
872-2485097FENCE, INTERIORLF
890-187UTIL VAULT (4 or more transformers)SF
890-158LOAD & UNLOAD PLATFORMSF
843-3144059FIRE PROTECT WATER MAINLF
2. DEMOLITIONS
a.DEMOLITIONS NOT BEING REPLACED:
CATEGORYUNIT
CODENOMENCLATUREUMAMOUNTREMARKS
852-289SidewalkSY
851-145DrivewaySY
812-223Prim Distr Line OHLF
852-262Veh Pking, N/OrgnSY
851-147ROADSY
LF
b.DEMOLITIONS BEING REPLACED:
CATEGORYUNIT AMTREPLACED
CODENOMENCLATUREUMON 7115WITHTOTAL COST
852-289SidewalkSY
851-145DrivewaySY
890-121A/C Plt 5 to 25 TNTN
CONSULT THE REAL PROPERTY CATEGORY CODES LISTING ON THE CE WEB SITE AT THE RESOURCES/REAL ESTATE TAB FOR ADDITIONAL CATEGORY CODES AND PROPER NOMENCLATURES.

(IF CATEGORY CODE LISTING INDICATES MORE THAN ONE UNIT OF MEASURE (UM), DATA FOR EACH "UM" MUST BE PROVIDED; IF ADDITIONAL SPACE IS NEEDED, PROVIDE THE DATA ON A SEPARATE SHEET OF PAPER IN THE SAME FORMAT AS AREA BEING WORKED)

3. ADDITION TO EXISTING BUILDING OR FACILITY
YESNO
a.UTILITY PLANTS OR SYSTEMS:
ADDED.
REPLACED.
REMOVED.
b.REAL PROPERTY INSTALLED EQUIP (RPIE).
ADDED.
REPLACED.
REMOVED
4. ALTERATION OR REHABILITATION OF A BUILDING OR FACILITY
YESNO
a.ADDITION / DELETION OF RELATED FACILITIES
b.ADDITION / DELETION OF PORCHES, BALCONIES, MEZZANINES, ETC
c.REAL PROPERTY INSTALLED EQUIP (RPIE).
ADDED.
REPLACED.
REMOVED.
5. CERTIFICATION:
I certify that the above information is accurate and complete to the best of my
knowledge and belief.
CONTRACTOR REPRESENTATIVE (sign/date)
PROJECT MONITOR/INSPECTOR (sign/date)
CONCUR:CHIEF, CONSTRUCTION MGT or SABER (sign/date)
6. STATEMENT OF CONDITION (Condition Code (CC) Descriptions are on CE Web site)
Project has extended useful life of the facilityYESNO
Current CC is:Project has upgraded CC to:
_____________________________________
CHIEF, ENGINEER FLIGHT (sign/date)
Revised 12/14/2010

&CAttach 18 FA4855-13-R-0009 &C&"Arial,Regular"&9Page &P&R&"Arial,Regular"&9 1354ckls Includes Material & Labor Costs UM = Unit of Measure C - Construction M - Maintenance R - Repair MCP = Military Cns Prog MC = Minor Cns O&M = Ops & Maint From ground to top of last floor Example:

23' 4" = 23.33 SF

Enter 23.33 here Example:

30' 10" = 30.83 Enter 30.83 here Length x Width entry will automatically compute total SF New facilities will always be Condition Code 1. Condition Codes for existing facilities can be located in the 7115 Inventory listing located on the CE Web Site.

Portrait/Letter

MARGINS:

Top .30 Bottom .25 Left .50 Right .25 Footer .20 Header 0 i.e.: Abandoned In Place Physically Demolished Enter amount being demolished, i.e. -25; this will show as (25) From ground to top of last floor Enter total cost for PRIM OH, Transformers and Poles under PRIM OH cat code on DD Fm 1354 Enter total cost for PRIM UG, Transformers and Poles under PRIM UG cat code on DD Fm 1354 joanna.kidd, McGuire AFB:

Thousand BTU's divided by 1,000,000 = MB. If less than 1 MB, enter 1 in unit amount column.

Example:

12,000 BTU's / 1,000,000 = .012 MB;

enter 1 in unit amount column.

Beginning here are several blank rows for additional cat codes needed to be entered with associated info.

Beginning here are several blank rows for additional cat codes needed to be entered with associated info.

Beginning here are several blank rows for additional cat codes needed to be entered with associated info.

Format: 145-346 If multiple usage, identify in "Misc Data" below.

These items will not normally appear on the DD Fm 1354; any cost associated with the replacements will be included at bldg category code on the DD Fm 1354. The info is needed to make changes to the RPR, new serial/model # , etc will be obtained from the RPIE listing.

Beginning here are several blank rows for additional utility connections info, if needed.