Attachment_19_-_CAFB_Labeling_Standards_for_Communications_with_header.pdf

PDF 41 KB Posted

Attached to
CANNON AFB, NM SABER Federal contract opportunity
Solicitation number
FA4855-13-R-0009
Issued by
Department of the Air Force Special Operations Command

About this file

Attachment 19

View the file

Other files for this federal contract opportunity

Other files attached to CANNON AFB, NM SABER, newest first.
File Type Posted
Amendment_5.pdf PDF
Attachment__01_-_SABER_2013_General_Requirements_update_7_Aug_2013_with_header.doc DOC document
Q_and_A_-_Revised.pdf PDF
Amendment_4.pdf PDF
Attachment_S4_-_Coefficient_Spreadsheet.xls XLS spreadsheet
Amendment_3_(SF_30).pdf PDF
Q_and_A.pdf PDF
CZQZ_13-1090_Renovate_Community_Center_SOO 1 .docx DOCX document
Amendment_2.pdf PDF
Attachment_TO3.pdf PDF
Amendment_1.doc DOC document
Attachment_25e.docx DOCX document
Attachment_25a.docx DOCX document
Attachment_25f.docx DOCX document
Attachment_25c.docx DOCX document
Attachment_25b.docx DOCX document
Attachment_25d.docx DOCX document
SABER_Pre-Proposal_Conference_and_Site_Visit.pptx PPTX presentation
Pre-Proposal_Minutes_and_Sign-In.pdf PDF
Second_Floor_Project_Drawings_11X17.pdf PDF
(15_Dec_2012)_CZQZ131090_2nd_Floor_Comm_Call-out.docx DOCX document
CZQZ_13-1090_Renovate_Community_Center_SOO.docx DOCX document
1208_2nd_floor_as-built_Floor_Plan_Plans_(1).pdf PDF
Attachment_18_-_Building_Construction_1354_Checklist__with_header.xls XLS spreadsheet
Attachment_02_-_SABER_Specifications.pdf PDF
Attachment__01_-_SABER_General_Requirements_update_29_Jan_13_with_header.doc DOC document
Attachment_24_-_SOW_Example_2013.doc DOC document
Attachment_14_-_Schedule_of_Material_Submittals_(AF66)_with_header.xls XLS spreadsheet
Attachment_S4A_Coefficient_Spreadsheet_(Example).xls XLS spreadsheet
Attachment_13_-_AF_Form_3065_Progrees_Report.xfdl XFDL file
Attachment_06_-_CAFB_Sustainable_Landscape_Development_Plan_-_2012_with_header.pdf PDF
Attachment_S3_-_Past_Performance_Questionaire_1.docx DOCX document
Attachment_08_-_Facility_Excellence_Guide_with_header.pdf PDF
Attachment_S5_-_Question_and_Answer_Template.docx DOCX document
Attachment_04_-_CAFB_Electrical_Standards-March_13 _2012_with_header.pdf PDF
Attachment_S2_-_Past_Performance_Project_Data_(REVISED).doc DOC document
Attachment_21_-_Contractor_handbook_23_Mar_2012_with_header.doc DOC document
Attachment_05_-_CAFB_Hardware_Specifications_Guideline-_2011_with_header.pdf PDF
Attachment_12__-AF_Form_3064__Contract_Progress_Scheule.xfdl XFDL file
Attachment_09_-_GeoBase_Initial_Operating_Capability_Implemen_with_header.pdf PDF
Attachment_07_-_CAFB_CAD_Standards_with_header.pdf PDF
Attachment_23_-_CAFB_and_MAFR_Civilian_Contractor_Environmental_Guide_Appendix_A_Forms_(2)_with_header.doc DOC document
Attachment_03_-_CAFB_Architectural_Compatibility_Guide-2013_with_header.pdf PDF
Attachment_S1_-_Letter_of_Instruction_to_Reference_for_PPQ_-_REVISED.doc DOC document
Attachment_10_-_US_Army_Corps_Of_Engineer_Mobile_District_Des_with_header.pdf PDF
Attachment_16_-_AF_Form_103v5_Work_Clearance_Request_with_header.pdf PDF
Attachment_15_-_AF_Form_3000_Material_Approval_Submittal.xfdl XFDL file
Attachment_17_-_USAF_Hot_Work_Permit.xfdl XFDL file
Attachment_11_-_UFC_1-300-8 _Real_Property_Transfer_with_header.pdf PDF
Attachment_20_-_Base_Contractor_Storage_Lot_Agreement_with_header.doc DOC document
Show all 50

CANNON AFB, NM SABER has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PATCH PANEL

TELECOMMUNICATIONS RACK

PORT ON PANEL

R1 -A -1

HORIZONTAL CABLES

TR1 - TR2

100 PR 24 AWG

CA01 301 - 400

CABLE NUMBER

TERMINATED COUNT

TERMINATION LOCATIONS

CABLE SIZE

TR1 - TR2

12 FIBER MM

FO 01 1-12

TERMINATION LOCATIONS

FIBER CABLE NUMBER

SINGLE OR CABLE SIZE

CABLE GUAGE

FIBER TERMINATIONS

BUILDING BACKBONE CABLES

MMAC - 1 - X

R1 -A - X

TELECOMMUNICATIONS RACK

JACK NUMBER

DEVICE

CARD NUMBER

PORT NUMBER

PATCH CABLES

MULTIMODE

WARNING

IF THIS CLAMP OR CABLE

IS LOOSE OR MUST BE

REMOVED PLEASE CALL THE

BUILDING TELECOMMUNICATIONS

MANAGER

TMGB

TR1

ER1

TELECOMMUNICATIONS

MAIN GROUNDING

BUSBAR

TELECOMMUNICATIONS

ROOM

EQUIPMENT ROOM

GROUNDING

TBB

TGB

TGB

TBB

Milton.Mahon Typewritten Text Attachment 19

Milton.Mahon Typewritten Text

FA4855-13-R-0009

Premises Wiring - 27 SOCS/SCOS Cable labeling program 1/29/09 Questions can be directed to 575-784-2710

OUTLET PORT

R1-A

1 2

PATCH PANEL LETTER

(Patch Panels will be lettered in order starting with A)

TELECOMMUNICATIONS RACK NUMBER

(Telecommunications Racks will be numbered numerically, starting with 1, i.e. R1, R2)

3 R1-A 4

JACK LOCATION LABELS

R1-A

1 2

R1-A

5 6

Jacks shall be arranged and labeled according to their location in a room. They shall be arranged clockwise in ascending order around the room while standing in the doorway looking into the room. Floor jack number arrangement should work in clockwise order, looking out the TR doorway. The 27 SOCS labeling scheme adheres to the requirements outlined in the TIA/EIA 606 telecommunication standard.

A

PATCH PANEL

NUMBER

OUTLET PORT

LOCATION

SINGLE GANG

DOUBLE GANG

R1-A

3 4 R1-A

3 4

R1-A

7 8

OUTLET PORT

(Ports will be numbered according to port number on patch panel. Ports will be numbered consecutively per quad face plate.)

1 R1-A 2

100 PR 24 AWG

CA01 301 - 400

CABLE NUMBER

TERMINATED COUNT

CABLE SIZE

FO Bxx- Bxx 1-12 MM or SM

Fiber Optic Cable I.D.

FIBER CABLE NUMBER

SINGLE OR

CABLE GUAGE

FIBER Cable Strand Count

OUTSIDE PLANT CABLES

MULTIMODE

Copper Cable I.D.

CA-01, 301-400

P1-24PF

Example

FO B10-B355

1-12, SM

Example

File details come from the government source that posted it. Updated .