This notice provides details for an asbestos removal project at a facility in Florida. The document includes information on the facility owner and contractor conducting the removal, the planned dates for asbestos removal and renovation, descriptions of the planned work and procedures to be used, the asbestos waste transporter and disposal site, and amounts of regulated asbestos-containing materials to be removed by type. Signatures are provided by the owner/operator to certify the information and compliance with regulatory procedures.

Solicitation Package

View the file

Other files for this federal contract opportunity

Other files attached to Multiple Award Construction Contract, newest first.
File Type Posted
Solicitation_Amendment_FA481419RA0010002_SF_30.pdf PDF
QA2_-_MASTER.pdf PDF
MACC_Section_L.pdf PDF
Solicitation_Amendment_1.pdf PDF
APPENDICES_1_-_17,_FA481419RA001.zip ZIP file
RFP_Attachment_1_SOW.pdf PDF
Q&A.pdf PDF
Site_Visit_Briefing_Slides_V2.ppt PPT presentation
16-0123(Seed).zip ZIP file
SEED_SOW_App_K_Design_Req.pdf PDF
RFP_Attachment_6_Background_Check.xlsx XLSX spreadsheet
Attachment_4,_Performance_Survey.doc DOC document
RFP_Attachment_7,_NAF_Construction_Clauses.docx DOCX document
Attachment_3,_Performance_Reference.docx DOCX document
MAP.JPG JPG image
SEED_SOW_App_A_16-0123_Drawings.pdf PDF
SEED_SOW_App_D_16-0123_FGUA_Fee_Inspection_Memo.pdf PDF
SEED_SOW_App_A_16-0123_Drawings.pdf PDF
SOW_Appendix_3_Landscape_and_Design_Procedures.pdf PDF
SEED_SOW_App_D_16-0123_FGUA_Fee_Inspection_Memo.pdf PDF
SEED_SOW_App_B_16-0123_BLANK_3052.xlsx XLSX spreadsheet
SEED_SOW_16-0123.pdf PDF
SEED_SOW_App_H_16-0123_CD_Disp_Form.pdf PDF
SEED_SOW_App_G_MAFB_Grn_Procur_Determ_Fm.pdf PDF
Solicitation_-_FA481419RA001_(2).pdf PDF
2018_MacDill_Design_Guide.pdf PDF
SEED_SOW_App_F_16-0123_Min_Perf_Stan.pdf PDF
MACC_Section_M_V3.pdf PDF
Interior_Design_Guide_(AMC.pdf PDF
RFP_Attachment_1_SOW.pdf PDF
SEED_SOW_App_C_16-0123_AF66.XLS XLS spreadsheet
SOW_Appendix_7_List_of_ERP_Sites.pdf PDF
SEED_SOW_App_E_Haz_Matls_Fm_Instruc.pdf PDF
SOW_Appendix_2_MacDill_AFB_Traffic_Control_Standards.pdf PDF
ppi_tool.accdb MDB file
SEED_SOW_App_F_16-0123_Min_Perf_Stan.pdf PDF
SEED_SOW_App_H_16-0123_CD_Disp_Form.pdf PDF
SOW_Appendix_5_SOP_4_Investigation_Derived_Waste.pdf PDF
SOW_Appendix_9_Contractor_Security.pdf PDF
SOW_Appendix_8_Antiterrorism_Level_I_Training_Aid.pdf PDF
SEED_SOW_App_I_16-0123_Asbestos_Notif_FM.pdf PDF
SEED_SOW_App_A_16-0123_Drawings.pdf PDF
SEED_SOW_App_A_16-0123_Drawings.pdf PDF
SEED_SOW_App_A_16-0123_Drawings.pdf PDF
SEED_SOW_16-0123.pdf PDF
Solicitation_-_FA481419RA001.pdf PDF
RFP_Attachment_1_SOW.pdf PDF
MACC_Section_L_V3.pdf PDF
SEED_SOW_App_F_16-0123_Min_Perf_Stan.pdf PDF
MACC_Section_M_V3.pdf PDF
Show all 50

Multiple Award Construction Contract has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NOTICE OF DEMOLITION OR ASBESTOS RENOVATION

TYPE OF NOTICE (CHECK ONE ONLY): ORIGINAL REVISED CANCELLATION COURTESY

TYPE OF PROJECT (CHECK ONE ONLY): DEMOLITION RENOVATION

IF DEMOLITION, IS IT AN ORDERED DEMOLITION? YES NO

IF RENOVATION:

IS IT AN EMERGENCY RENOVATION OPERATION? YES NO

IS IT A PLANNED RENOVATION OPERATION? YES NO

I. Facility Name _ Address City State Zip _ County Site Consultant Inspecting Site Building Size (Square Feet) # of Floors Building Age in Years Prior Use: School/College/University Residence Small Business Other Present Use: School/College/University Residence Small Business Other II. Facility Owner Phone ( ) Email Address _______ Address City State _ Zip III. Contractor's Name Phone ( ) Email Address _______ Address _ City State Zip Is the contractor exempt from licensure under section 469.002(4), F.S.? YES NO IV. Scheduled Dates: (Notice must be postmarked 10 working days before the project start date) Asbestos Removal (mm/dd/yy) Start: Finish: Demo/Renovation (mm/dd/yy) Start: Finish:

V. Description of planned demolition or renovation work to be performed and methods to be employed, including demolition or renovation techniques to be used and description of affected facility components.

Procedures to be Used (Check All That Apply):

Strip and Removal Glove Bag Bulldozer Wrecking Ball Wet Method Dry Method Explode Burn Down

OTHER:

VI. Procedures for Unexpected RACM:

VII. Asbestos Waste Transporter: Name Phone ( ) Address City State Zip _______ VIII. Waste Disposal Site: Name _ Class Address City State Zip IX. RACM or ACM: Procedure, including analytical methods, employed to detect the presence of RACM and Category I and II nonfriable ACM.

X. Fee Invoice Will Be Sent to Address in Block Below: (Print or Type)

Name:

Address:

City:

State/Zip:

*Identify and describe surfacing material and other materials as applicable:

I certify that the above information is correct and that an individual trained in the provisions of this regulation (40 CFR Part 61, Subpart M) will be on-site during the demolition or renovation and evidence that the required training has been accomplished by this person will be available for inspection during normal business hours.

(Print Name of Owner/Operator) (Date) (Signature of Owner/Operator) (Date)

DEP USE ONLY Postmark/Date Received ID#

DEP Form 62-257.900(1) Effective 10-12-08

Florida Department of Environmental Protection

Division of Air Resource Management

Amount of RACM or ACM*

RACM ACM

square feet surfacing material linear feet pipe cubic feet of RACM off facility components square feet cementitious material square feet resilient flooring square feet asphalt roofing

Instructions

The state asbestos removal program requirements of s. 376.60, F.S., and the renovation or demolition notice requirements of the National Emission Standards for Hazardous Air Pollutants (NESHAP), 40 CFR Part 61, Subpart M, as embodied in Rule 62-257, F.A.C., are included on this form.

Check to indicate whether this notice is an original, a revision, a cancellation, or a courtesy notice (i.e., not required by law). If the notice is a revision, please indicate which entries have been changed or added.

Check to indicate whether the project is a demolition or a renovation.

If you checked demolition, was it ordered by the State or a local government agency? If so, in addition to the information required on the form, the owner/operator must provide the name of the agency ordering the demolition, the title of the person acting on behalf of the agency, the authority for the agency to order the demolition, the date of the order, and the date ordered to begin. A copy of the order must also be attached to the notification.

If you checked renovation, is it an emergency renovation operation? If so, in addition to the information required on the form, the owner/operator must provide the date and hour the emergency occurred, the description of the sudden, unexpected event, and an explanation of how the event caused unsafe conditions or would cause equipment damage or an unreasonable financial burden. If you checked renovation and it is a planned renovation operation, please note that the notice is effective for a period not to exceed a calendar year of January 1 through December 31.

I. Complete the facility information. This section describes the facility where the renovation or demolition is scheduled.

This address will be used by the Department inspector to locate the project site. Provide the name of the consultant or firm that conducted the asbestos site survey/inspection. For “prior use” check the appropriate box to indicate whether the prior use of the facility is that of a school, college, or university; residence, as “residential dwelling” is defined in Rule 62-257.200, F.A.C.; small business, as defined in s. 288.703(1), F.S.; or other. If “other” is checked, identify the use. Please follow the same instructions for “present use.”

II. Complete the facility owner information.

III. Complete the contractor information.

IV. List separately the scheduled start and finish dates (month/day/year) for both the asbestos removal portion of the project and the renovation or demolition portion of the project.

V. Describe and check the methods and procedures to be used for a planned demolition or renovation. Include a description of the affected facility components. (Note: The NESHAP for asbestos, which is adopted and incorporated by reference in Rule 62-204.800, F.A.C., requires obtaining Department approval prior to using a dry removal method in accordance with 40 CFR section 61.145(3)(c)(i).)

VI. Describe the procedures to be used in the event unexpected RACM is found or previously nonfriable asbestos material becomes crumbled, pulverized, or reduced to powder after start of the project.

VII. Complete the asbestos waste transporter information.

VIII. Complete the waste disposal site information.

IX. List the amount of RACM or ACM of each type of asbestos to be removed. (Note: A volume measurement of RACM off facility components is only permissible if the length or area could not be measured previously.) Identify and describe the listed surfacing material and other listed materials as applicable.

X. Provide the address where the Department is to send the invoice for any fee due. Do not send a fee with the notification. The fee will be calculated by the Department pursuant to Rule 62-257.400, F.A.C.

Sign the form and mail the original to the district or local air program having jurisdiction in the county where the project is scheduled (DO NOT FAX). The correct address can be obtained by contacting the State Asbestos Coordinator at:

Department of Environmental Protection, Division of Air Resources Management, 2600 Blair Stone Road, Tallahassee, FL 32399-2400.

DEP Form 62-257.900(1) Effective 10-12-08