Site_Visit_Briefing_Slides_V2.ppt

PPT presentation 2 MB Posted

Attached to
Multiple Award Construction Contract Federal contract opportunity
Solicitation number
FA481419RA001
Issued by
Department of the Air Force Air Mobility Command

About this file

This briefing document outlines a site visit for a multiple award construction contract at MacDill Air Force Base. The contract will be for design, design-build, or construction projects over seven years with a total estimated value of $500 million. Awards will be made to up to ten small businesses, with task orders competed on a fair opportunity basis. Projects will involve repair and renovation work at Building 262, including HVAC, electrical, fire alarm, and communications system upgrades. Asbestos and lead-based paint abatement may be required. The site visit will include a bus tour and briefing on an example seed project to replace HVAC equipment and renovate office spaces at the specified facility.

Pre-Proposal Slides

View the file

Other files for this federal contract opportunity

Other files attached to Multiple Award Construction Contract, newest first.
File Type Posted
MACC_Section_M_0003.pdf PDF
MACC_Section_L_0003.pdf PDF
Solicitation_Amendment_FA481419RA0010003_SF_30.pdf PDF
Q&A_Clarification.pdf PDF
Solicitation_Amendment_FA481419RA0010002_SF_30.pdf PDF
QA2_-_MASTER.pdf PDF
APPENDICES_1_-_17,_FA481419RA001.zip ZIP file
RFP_Attachment_1_SOW.pdf PDF
Q&A.pdf PDF
MACC_Section_L.pdf PDF
Sign_in_sheet.pdf PDF
16-0123(Seed).zip ZIP file
Attachment_3,_Performance_Reference.docx DOCX document
RFP_Attachment_6_Background_Check.xlsx XLSX spreadsheet
Attachment_5_Wage_Determinations.pdf PDF
MAP.JPG JPG image
SEED_SOW_App_E_Haz_Matls_Fm_Instruc.pdf PDF
SOW_Appendix_2_MacDill_AFB_Traffic_Control_Standards.pdf PDF
SEED_SOW_App_I_16-0123_Asbestos_Notif_FM.pdf PDF
ppi_tool.accdb MDB file
SEED_SOW_App_A_16-0123_Drawings.pdf PDF
SEED_SOW_App_D_16-0123_FGUA_Fee_Inspection_Memo.pdf PDF
SEED_SOW_App_A_16-0123_Drawings.pdf PDF
SOW_Appendix_3_Landscape_and_Design_Procedures.pdf PDF
SEED_SOW_App_D_16-0123_FGUA_Fee_Inspection_Memo.pdf PDF
SEED_SOW_App_B_16-0123_BLANK_3052.xlsx XLSX spreadsheet
SEED_SOW_16-0123.pdf PDF
SEED_SOW_App_H_16-0123_CD_Disp_Form.pdf PDF
SEED_SOW_App_G_MAFB_Grn_Procur_Determ_Fm.pdf PDF
Solicitation_-_FA481419RA001_(2).pdf PDF
SEED_SOW_App_F_16-0123_Min_Perf_Stan.pdf PDF
SEED_SOW_App_H_16-0123_CD_Disp_Form.pdf PDF
SOW_Appendix_5_SOP_4_Investigation_Derived_Waste.pdf PDF
SOW_Appendix_9_Contractor_Security.pdf PDF
SOW_Appendix_8_Antiterrorism_Level_I_Training_Aid.pdf PDF
SEED_SOW_App_I_16-0123_Asbestos_Notif_FM.pdf PDF
SOW_Appendix_6_SOP_6_Well_Install_Abn.pdf PDF
SEED_SOW_App_J_As_Builts.pdf PDF
SEED_SOW_App_G_MAFB_Grn_Procur_Determ_Fm.pdf PDF
MACC_Section_L_V3.pdf PDF
SEED_SOW_App_E_Haz_Matls_Fm_Instruc.pdf PDF
2018_MacDill_Design_Guide.pdf PDF
SEED_SOW_App_F_16-0123_Min_Perf_Stan.pdf PDF
SEED_SOW_App_A_16-0123_Drawings.pdf PDF
SEED_SOW_App_A_16-0123_Drawings.pdf PDF
MACC_Section_L_V3.pdf PDF
SEED_SOW_App_F_16-0123_Min_Perf_Stan.pdf PDF
SEED_SOW_App_A_16-0123_Drawings.pdf PDF
SEED_SOW_16-0123.pdf PDF
MACC_Section_M_V3.pdf PDF
Show all 50

Multiple Award Construction Contract has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

6th Air Mobility Wing Mission First – People Always – America Forever

MacDill Air Force Base Multiple Award Construction Contract (MACC) Pre-Proposal Site Visit

20 March 2019

Deliberate Excellence!

6th Contracting Squadron Mission Brief

Mr. Douglas Willard Chief, Performance Management Flight

Overview 9:00 – 9:15 Introduction and Orientation

Mr. Douglas Willard - Chief, Performance Management Flight

9:15 – 9:30 6th Contracting Squadron MACC Brief

Mr. Patrick Boyette – Team Lead, Performance Management Flight

9:30 – 9:40 6th Civil Engineer Squadron Brief

Mr. Louis Lantner – Chief, Construction Management

9:40 – 9:55 Break/Load Buses

9:55 – 10:30 Site Visit at B 262

10:30 – 10:55 Unload Buses at parking lot near SFS building (Conclusion)

6th Contracting Squadron Mission Brief

Mr. Patrick Boyette Team Lead, Performance Management Flight

6th Contracting Squadron Performance Management Flight

Procedures and Guidance Individual meetings with Government personnel are prohibited

Discussions amongst contractors during the site visit are prohibited

Questions and discussions regarding the procurement with Government personnel are prohibited

Questions must be provided in writing NLT 1:00 PM ET on Wednesday, 27 March via email to patrick.boyette@us.af.mil & 6cons.lgcm@us.af.mil

Any information regarding the procurement will be posted to the FedBizOpps website

MACC OVERVIEW

Contract for Design only; Design-Build or Construction only projects
Projects will be executed at MacDill AFB & Avon Park AFR
Est. Total Contract Value: $500M ceiling over 7 years
Contract Type: Firm-Fixed Priced, IDIQ
Competitive 100% Small Business Set Aside
Contract PoP: Base year w/ six 1-year options and a 6 month extension

MACC Procedures Award up to ten (10) IDIQ contracts

Pre-Performance conference will satisfy the minimum guarantee where more detail will be conveyed regarding working on the installation

All MACC awardees will be given fair opportunity to compete on all task orders (TO)

Participation is highly encouraged

Lack of participation will be reflected in annual performance reviews and a direct impact on CPAR ratings and the exercise of the next year’s option period

Task Order Procedures Contracting will issue Fair Opportunity Proposal Requests (FOPR) and all MACC Awardees will be given an opportunity to submit a proposal

FOPRs will be issued via email

Non responsive Awardees will be required to justify a no bid

Proposals will be evaluated according to the FOPR criteria

Multiple Award Construction Contract (MACC)

Mr. John Rodgers

6 CES/CEN

Mr. Louis Lantner

6 CES/CEM

6th Air Mobility Wing Mission First – People Always – America Forever

MACC SOLICITATION

SEED PROJECT REVIEW

NVZR 16-0123, Repair HVAC & Renovate 6 CS Facility

OBJECTIVES

PROJECT SCOPE

PROJECT LOCATION

EXISTING CONDITIONS

PHASE 1 SCOPE

PROPOSAL TECHNICAL ACCURACY

SUBFACTOR 1: Design Build/Construction Experience SUBFACTOR 2: DoD Project Construction Experience SUBFACTOR 3: SEED Project

PROJECT LOCATION

B262 COMM FACILITY

EXISTING CONDITIONS

NEW FLOOR PLAN

EXECUTIVE SUMMARY OF PROJECT SCOPE

ARCHITECTURAL:

Provide & install restroom walls, plumbing fixtures & piping (see plumbing), HVAC diffusers/grilles & ductwork (see Mechanical), flooring, restroom accessories, toilet partitions, lavatory counters, ceilings, and lighting (see electrical).
Provide & install ceiling grid & tiles, light fixtures & other electrical items (see electrical), flooring (in most locations except as noted on drawings), walls & doors/frames (as shown on drawings), and HVAC diffusers/grilles & ductwork (see mechanical).
Seal existing corridor fire walls above ceilings in locations where the return air openings and supply air ductwork (see mechanical drawings) have been removed.
Where electrical & communication outlets and other electrical items are being abandoned (see electrical drawings and/or electrical section of this SOW) fill/patch and prep for paint the existing walls

EXECUTIVE SUMMARY OF PROJECT SCOPE

MECHANICAL:

Provide a complete test and balancing of the air distribution systems and final NEBB or AABC Certified Report shall be submitted for review and approval.
Provide and install a new 15 ton air handler and condensing unit with a unit controller and all devices shown in the controls diagram. Provide and install the air handler condensate drains to the new mechanical room floor drain.
Provide and install a new 4 ton air handler and condensing unit with a unit controller and all devices shown in the controls diagram. Provide and install the air handler condensate drains to the new mechanical room floor drain.
Provide and install a 1 ton air handler and condensing unit with a unit controller.
Provide and install new ductwork, insulation, variable air volume boxes, thermostats, and air devices shown in sheet M-102. Provide and install volume dampers on supply ductwork runoffs.
Provide and install a new HVAC emergency shutdown button (shelter in place) in accordance with UFC 4-010-01. The button should shut off all air handlers and exhaust fans and close all motorized dampers within 30 seconds.
Provide and install a new building control unit located in secure communications/storage room. The controls laptop will be procured from the government. This laptop and the controls software shall have DOD authorization to operate (ATO).

EXECUTIVE SUMMARY OF PROJECT SCOPE

ELECTRICAL:

Install New Light Fixtures, Switches, Receptacles, and Power Distribution Equipment as indicated on drawings and IAW User needs.
Electrical Contactor shall coordinate all drywall patching as required prior to final painting of walls. Walls may need to be opened up to run circuitry for Receptacles and Data Drops on the interior side of exterior walls. Contractor should take special note for work required to meet new electrical construction of this area.

FIRE ALARM:

Install new Fire Alarm Mass Notification Control Panel.
Install new Fire Alarm Local Indication Panel.
Install new Fire Alarm Mass Notification dual colored Speaker Strobes. All wiring in Conduit per MDGL.
Install new Pull Stations and Detection devices. All wiring in Conduit per MDGL.
Submit Fire Alarm Drawings signed and sealed by a Fire Alarm Engineer with a Bill of Material for Fire Mass Notification Equipment selected including Control Panel, LOC Panel, Devices, Wiring, Floorplan, Battery Calculations, and all other info required by NFPA 72.

EXECUTIVE SUMMARY OF PROJECT SCOPE

COMMUNICATION SYSTEMS:

Install new Comm Jacks and Wiring as indicated on drawings and IAW User needs.
Install new Cat 6 Patch Panel in Comm Room to accommodate new Data lines and IAW User needs.

Asbestos Containing Material (ACM) and Lead Based Paint (LBP) Information:

Visually Inspected and Assumed ACM and/or LBP for removal.
Based on the historical asbestos and lead-based paint records specific to this facility, a visual inspection was performed and suspect materials were identified. There is a high potential that ACM and/or LBP will be encountered during renovation and demolition activity. Suspect items specific to this scope include but are not limited to:

Thermal system insulation used to inhibit heat gain or loss on pipes, boilers, tanks, ducts, and various other building components HVAC mastic and /or tapes Resilient floor coverings, mastics, and adhesives.

Site Visit B262

Break

Load Buses for SEED Project Site Visit

UNKNOWN-0.bin

UNKNOWN-1.bin