This document is an appendix to a federal construction contract solicitation providing landscape design standards and procedures. It outlines requirements for developing a Florida coastal landscape theme using regional plant materials in curvilinear layouts with low maintenance goals. The appendix specifies conducting site analyses, using approved plant and material lists, following landscape and irrigation specifications, and developing landscape designs for different grounds categories including route of excellence areas, medians, improved areas, military family housing, security buffers, and special interest areas. It provides details on planting, mulching, edging, buffering, and maintenance standards and establishes an establishment period watering schedule for landscape installation areas without irrigation.

Solicitation Package

View the file

Other files for this federal contract opportunity

Other files attached to Multiple Award Construction Contract, newest first.
File Type Posted
MACC_Section_M_0003.pdf PDF
MACC_Section_L_0003.pdf PDF
Solicitation_Amendment_FA481419RA0010003_SF_30.pdf PDF
Q&A_Clarification.pdf PDF
APPENDICES_1_-_17,_FA481419RA001.zip ZIP file
RFP_Attachment_1_SOW.pdf PDF
Q&A.pdf PDF
Solicitation_Amendment_1.pdf PDF
Sign_in_sheet.pdf PDF
Site_Visit_Briefing_Slides_V2.ppt PPT presentation
16-0123(Seed).zip ZIP file
SEED_SOW_App_K_Design_Req.pdf PDF
Attachment_3,_Performance_Reference.docx DOCX document
Attachment_5_Wage_Determinations.pdf PDF
Attachment_4,_Performance_Survey.doc DOC document
RFP_Attachment_7,_NAF_Construction_Clauses.docx DOCX document
MAP.JPG JPG image
SEED_SOW_App_E_Haz_Matls_Fm_Instruc.pdf PDF
SOW_Appendix_2_MacDill_AFB_Traffic_Control_Standards.pdf PDF
SEED_SOW_App_I_16-0123_Asbestos_Notif_FM.pdf PDF
ppi_tool.accdb MDB file
SEED_SOW_App_F_16-0123_Min_Perf_Stan.pdf PDF
SEED_SOW_App_H_16-0123_CD_Disp_Form.pdf PDF
SOW_Appendix_5_SOP_4_Investigation_Derived_Waste.pdf PDF
SOW_Appendix_9_Contractor_Security.pdf PDF
SOW_Appendix_8_Antiterrorism_Level_I_Training_Aid.pdf PDF
SEED_SOW_App_I_16-0123_Asbestos_Notif_FM.pdf PDF
SOW_Appendix_6_SOP_6_Well_Install_Abn.pdf PDF
SEED_SOW_App_J_As_Builts.pdf PDF
SEED_SOW_App_G_MAFB_Grn_Procur_Determ_Fm.pdf PDF
MACC_Section_L_V3.pdf PDF
SEED_SOW_App_E_Haz_Matls_Fm_Instruc.pdf PDF
2018_MacDill_Design_Guide.pdf PDF
SEED_SOW_App_F_16-0123_Min_Perf_Stan.pdf PDF
MACC_Section_M_V3.pdf PDF
Interior_Design_Guide_(AMC.pdf PDF
RFP_Attachment_1_SOW.pdf PDF
SEED_SOW_App_C_16-0123_AF66.XLS XLS spreadsheet
SOW_Appendix_7_List_of_ERP_Sites.pdf PDF
SEED_SOW_App_A_16-0123_Drawings.pdf PDF
SEED_SOW_App_D_16-0123_FGUA_Fee_Inspection_Memo.pdf PDF
SEED_SOW_App_A_16-0123_Drawings.pdf PDF
SEED_SOW_App_D_16-0123_FGUA_Fee_Inspection_Memo.pdf PDF
SEED_SOW_App_A_16-0123_Drawings.pdf PDF
MACC_Section_L_V3.pdf PDF
SEED_SOW_App_F_16-0123_Min_Perf_Stan.pdf PDF
MACC_Section_M_V3.pdf PDF
Solicitation_-_FA481419RA001.pdf PDF
RFP_Attachment_1_SOW.pdf PDF
SEED_SOW_App_A_16-0123_Drawings.pdf PDF
Show all 50

Multiple Award Construction Contract has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

General Landscape Theme

Develop the Florida Coastal look with regional plant materials in curvilinear layouts. Include landscaping with all new facilities and use it to enhance and unify existing non-conforming facilities. Sustainability and low maintenance are the dominant goals for a properly designed landscape. In order to achieve these goals it is critical to select the right plant for the right location.

This can be achieved by understanding the level of maintenance a particular site will receive and by visiting the site to analyze its critical functional and aesthetic issues. Once this is accomplished, the designer can create a landscape plan that will reinforce and enhance the semi-tropical character of the area. Creating continuity and reducing the negative visual impact of unsightly features are some of the primary goals of the designer.

Maintenance and Design Procedures

• Conduct a site analysis to record the site’s existing conditions. There may be established plant material that can be saved.

• Determine the site’s ground category located on the Grounds Categories Map on page 13.

• Use only approved planting material as specifi ed on the Landscape Material List located on page

14. Note the plant characteristics and ground categories given on this list indicate the ground category that a plant can be used in. Ground categories are based on the amount of maintenance an area will receive. It is critical that the designer specify the right plant material based on the amount of maintenance that a site will receive.

• Follow the Landscape and Irrigation Specifi cations located on page 27.

•Reduce maintenance by using proper plant materials in confi gurations that reduce or eliminate pruning.

Landscape Theme and Design Procedures

• Review the typical planting examples provided for different grounds categories located on pages 6-11.

• Install an irrigation system for new plant material.

When irrigation cannot be installed, provide a hand-watering schedule to establish planting growth and provide a soil polymer to retain water at the plants root system.

• All rock beds shall be treated with a pre-emergent herbicide and then top-dressed with 10 ml of weed fabric.

• All plant beds and tree rings shall be treated with a pre-emergent herbicide and then top-dressed with 3” cypress mulch. All new trees shall have a tree ring with a minimum of 24” radius. All new trees and palms shall be staked. All existing trees to remain shall have a 6’ radius mulch ring at a depth of 3”.

• Provide an 18” wide mulch area between a building and its foundation planting.

Edging

• Separate and defi ne all planting areas with sod cut edging.

• Provide polyethylene edging at all rock beds.

Landscape Screens

• Where possible use landscaping instead of walls for screening.

• Use large shrubs and trees that are appropriate for each site.

• Use shrubs, vines and trellis structures to screen mechanical equipment.

Open spaces

• Use a minimal plant palette, which provides pedestrians with excellent sight visibility and ties adjacent landscapes together.

• Use plant material to focus and direct pedestrian and vehicular traffi c.

• Use turf for all recreation areas, parade grounds, and open fi elds.

• Create sustainable natural areas using native plant material.

• Use plant material to control erosion problems where steep slopes may occur.

Streetscaping

• Landscaping along streets plays many roles. Landscaping establishes the hierarchy of the roadway by creating a uniform theme. It should focus and direct pedestrian and vehicular traffi c, and enhance security for sensitive facilities.

General Landscape Standards

Roadways (Route of Excellence and Improved/ Semi-improved areas)

• For primary roadways, plant evergreen street trees equally spaced to coordinate with light standards (see improved areas example on page 6). New trees should match existing species and specifi cations to create a uniform appearance.

• Use palms on high-profi le primary streets equally spaced to coordinate with light standards. New palms should match existing species and specifi cations to create a uniform appearance.

• Reduce the density of plantings in the industrial and fl ightline areas.

Parking Areas (Route of Excellence and Improved/ Semi-improved areas)

• Reduce negative visual impact of large parking areas with landscape buffers and parking islands. Evergreen shade trees should be used in parking islands when irrigation is provided. Limestone boulders and red cedar barkstone should be used in small parking islands where irrigation may not be provided.

• Use shrubs in groupings around the perimeter of parking areas to soften and buffer views from the street or facility.

Use evergreen trees or palm clusters to provide shade to the parking area.

• Avoid the use of large trees and shrubs where sight visibility and safety is a concern.

Recreational Trails

• Incorporate formal plantings at high visibility areas along the trail system.

• Use informal groupings of trees, shrubs, and fl owers at rest stops, play areas and intersections.

Facility Landscaping

• The goals of facility landscaping are to provide a soft transition from the horizontal ground plane to the vertical building plane, to highlight building entries and features.

Hide unattractive building features such as utility risers or service areas.

Community (Route of Excellence and Improved areas)

• Use landscaping elements that compliment building architectural features and proportions.

• Limit the use of palms to entries and high-visibility areas by framing desired views.

• Apply three-tiered planting schemes of ground cover, shrubs, and trees using a variety of species in lush combinations to provide seasonal color at building entries and other areas of focus.

• Provide security buffer when necessary (see pages 10-11).

Industrial and Flightline (Improved and Semi-improved areas)

• Minimize the use of deciduous trees and shrubs to prevent leaf buildup along the apron and runway.

• Reduce the quantity of landscaping by grouping landscape elements at entries and high-visibility areas.

• Provide security buffer when necessary (see pages 10-11).

General Offi cers Quarters

• Use landscaping elements that compliment building architectural features and proportions.

• Limit the use of palms to entries and high-visibility areas by framing desired views.

• Apply three-tiered planting schemes of ground cover, shrubs, and trees using a variety of species in lush combinations to provide seasonal color at building entries and other areas of focus.

• Provide security buffer when necessary (see pages 10-11).

Military Family Housing

• Use palms or accent trees on the corners of the front facade.

• Use evergreen shade trees to line the roadways.

• Limit the use of shrubs and ground cover due to limited irrigation.

• Provide irrigation bubblers at trees or a hand-watering schedule to establish growth.

• Lawn areas must be bahia sod due to limited irrigation.

• Provide accent plantings at neighborhood entries and signs

Landscape Design, Route of Excellence Road right of way

• The primary goal is to create scenic roadways and facilities by establishing a landscape theme.

• Use palms equally spaced to coordinate with light standards.

New palms must match existing species and specifi cations to create a uniform appearance.

• Use St. Augustine or Bermuda grass in right of way, match existing conditions.

• Provide excellent sight visibility for pedestrians and vehicular traffi c.

Facility Landscape

• Create a three-tiered planting scheme of trees, shrubs and ground covers.

• Develop the Florida Coastal look using the approved plant list (see Route of Excellence Example).

• Plant evergreen trees between the facility and sidewalk to provide shade, coordinate spacing with lighting standards and existing site conditions.

Route of Excellence Example

Landscape Design, Road Medians

Landscape Theme

• Create a sustainable low maintenance landscape with visual continuity (see median example).

• Develop the Florida Coastal look with regional plant materials in a curvilinear layout.

Landscape Material

• Use red cedar barkstone and limestone boulders along the perimeter of the median.

• Create a curvilinear planting bed in the middle of the median.

Median Example

Landscape Design- Improved Areas

Improved Facility Landscaping

• Provide a soft transition from the horizontal ground plane to the vertical building plane.

• Highlight building entries and features.

• Hide unattractive building features such as utility risers or service areas.

• Develop the Florida Coastal look with regional plant materials in a curvilinear layout.

• Minimize plant material in areas of low visibility.

Improved Facility Example

Landscape Design- Military Family Housing

Landscaping Theme

• Develop the Florida Coastal look with regional plant materials in a curvilinear layout.

• Minimize plant material in areas of low visibility.

• Use palms or accent trees on the corners of the front facade (see housing example)

• Use evergreen shade trees to line the roadways.

• Limit the use of shrubs and ground cover due to limited irrigation.

• Use Bahia sod in turf areas

• Use colorful plantings at neighborhood entries and signs.

Housing Example

Landscape Design- Security Buffers Landscape Design Approach

• Analyze existing conditions and determine the most critical areas to protect.

• Create a tight linear buffer that a vehicle cannot penetrate (see linear buffer example page 11).

• Utilize existing plant material and enhance existing features.

• Use large trees with a minimum eight-inch caliper, and seven gallon minimum shrubs.

• Use limestone boulders approximately 3’x5’ and 2’x3’ in size.

• Maintain sight visibility at entry drives.

• Create earth berms with landscape plant material when possible (see earth berm example page 11).

Linear buffer example

Landscape Design- Security Buffers

Linear buffer example

Earth berm example

Landscape Design- Special Interest Areas Landscape Design Approach

• Develop the Florida Coastal look with regional plant materials in curvilinear layouts.

• Use landscape elements that compliment the buildings architectural features and proportions.

• Apply three-tiered planting schemes of ground cover, shrubs and trees using a variety of species in lush combinations to provide seasonal color at building entries and other areas of focus.

Special Interest example (Interior Courtyard)

Grounds Categories Map

Botanical Name: Common Name: Characteristics:

Palms Sabal palmetto Cabbage Palm N, E, ST, DT, 1, 2, 3, 4, 5

Washingtonia robusta Washington Palm DT, 1, 2, 3, 4 Phoenix canariensis Canary Island date DT, S, 1, 2, 3, Phoenix dactylifera Medjool date Palm ST, DT, S, 1, 2, 3 Bismarckia nobilis Bismarck Palm DT, ST, S, 1, 2, 3 Caryota mitis Fishtail Palm S, A, 1, 2, 3 Wodyetia bifurcata Foxtail Palm S, 1, 2, 3 Veitchia merrillii Christmas Palm A, 1, 2, 3 Ptychosperma elegans Alexander Palm A, 1, 2, 3 Phoenix roebelenii Pygmy Date Palm A, 1, 2, 3, 4 Syagrus romanzoffi ana Queen Palm DT, 1, 2, 3, 4, 5 Acoelorrhaphe wrightii Paurotis Palm N, 1, 2, 3 Serenoa repens Saw Palmetto N, ST, DT, 1, 2, 3, 4, 5 Zamia furfuracea Cardboard Palm A, ST, DT, 1, 2, 3, 4, 5

Large Trees Magnolia grandifl ora Southern Magnolia N, F, E, ST, DT, 1, 2, 3, 4, 5

Pinus elliottii Slash Pine N, E, DT, 4, 5 Quercus virginana Live Oak N, E, ST, DT, 1, 2, 3, 4, 5 Taxodium distichum Bald Cypress N, D, DT, 3, 4 Juniperus siliciola Red Cedar N, E, ST, 1, 2, 3, 4

Small Trees Ilex “Nellie R. Stevens” Nellie Stevens Holly A, E, 1, 2, 3, 4 Ilex vomitoria Yaupon Holly N, E, ST, DT, 1, 2, 3, 4, 5 Ilex cassine Dahoon Holly N, E, ST, DT, 1, 2, 3, 4, 5 Lagerstromia indica Crape Myrtle A,F, D, DT, 1, 2, 3, 4 Ligustrum japonica Ligustrum Tree A,E, DT, 1, 2, 3, 4 Magnolia grandifl ora Little Gem Magnolia A,F, 1, 2, 3 Callistemon rigidus Erect Bottle Brush A,F, E, ST, DT, 1, 2, 3, 4 Eriobotrya Japonica Loquat Tree A,F, E, 1, 2, 3

Large Shrubs Bougainvillea Bougainvillea A, F, DT, 1, 2, 3, 4, 5

Landscape Material List

Hibiscus rosa sinensis Hibiscus A, F, ST, 1, 2, 3 Jasminum multifl orum Downy Jasmine A,F, 1, 2, 3, 4 Myrica cerifera Wax Myrtle ST, DT, 4, 5 Nerium oleander “hardy red” Oleander A,F, ST, 1, 2, 3 Osmanthus fragrans Sweet Olive A,F, 1, 2, 3 Viburnum odoratissimum Sweet Viburnum DT, 1, 2, 3, 4, 5 Viburnum suspensum Sandankwa Viburnum DT, 1, 2, 3, 4, 5 Coccoloba uvifera Sea Grape N, ST, DT, 1, 2, 3, 4, 5 Viburnum obovatum Walter Viburnum N, DT, 2, 3, 4, 5 Allamanda schottii Bush Allamanda A,F, ST, 1, 2, 3, 4 Alpinia zerumbet ‘Variegata’ Variegated Shellfl ower A, F, DT, 1, 2, 3, 4 Galphimia glauca Thryallis A,F, DT, 1, 2, 3, Philodendron selloum Selloum A, DT, 1, 2, 3, 4, 5 Podocarpus macrophyllus Yew Podocarpus DT, ST, 1, 2, 3, 4, 5 Strelitzia reginae Bird-of-Paradise A, F, 1, 2, 3, 4 Ligustrum japonia Japanese Privet DT, 1, 2, 3, 4, 5 Plumbago auriculata Plumbago ‘Leadwort’ A,F, DT, 1, 2, 3, 4, 5 Philodendron xanadue Xanadue A, 1, 2, 3

Small Shrubs Agapanthus africanus Agapanthus A, F, 1, 2, 3 Illex vomitoria nana Dwarf Yaupon Holly N, DT, ST, 1, 2, 3, 4, 5 Ilex crenata “compacta” Compact Holly DT, 1, 2, 3, 4, 5 Ixora “nora grant” Ixora A,F, DT, ST, 1, 2, 3, 4, 5 Pentas lanceolata Pentas A,F, 1, 2, 3 Rhaphioleis indica Dwarf Indian Hawthorn F, DT, ST, 1, 2, 3, 4, 5 Strelitzia (varieties) Bird of Paradise A, DT, 1, 2, 3, 4 Codiaeum Variegatum ‘Mammey’ Croton A, DT, 1, 2, 3, 4, 5 Scheffl era Arboricola ‘Trinette’ Dwarf Scheffl era A, 1, 2, 3, 4 Zamia fl oridana Coontie A, N, DT, ST, 1, 2, 3, 4, 5

Ornamental Grasses

Tripsacum dactyloides Fakahatchee Grass A, N, DT, 1, 2, 3, 4, 5

Tripsacum fl oridana Dwarf Fakahatchee Grass N, DT, 1, 2, 3, 4, 5 Spartina bakeri Marsh Grass A,N, ST, DT, 1, 2, 3, 4, 5 Pennisetum alopecuroides White Fountain Grass A, DT, 1, 2, 3, 4, 5 Pennisetum setaceum Red Fountain Grass A, DT, 1, 2, 3, 4, 5

Muhlenbergia capillaris Muhly Grass A, N, DT, ST, 1, 2, 3, 4, 5

Ground Cover / Liriope muscari “evergreen giant” Big Blue Lily Turf 1, 2, 3, 4 Vines Liriope muscari “varigata” Varigated Liriope 1, 2, 3, 4

Ophipojon japonicus Mondo Grass 1, 2, 3, 4 Jasminum nitidum Star jasmine 1, 2, 3, 4 Trachelospermum jasminoides Confederate jasmine DT, 1, 2, 3, 4 Trachelospermum asiaticum Minima jasmine DT, 1, 2, 3, 4, 5 Dietes vegeta African Iris A, 1, 2, 3, 4 Evolvulus glomerata Blue Daze A,1, 2, 3, 4 Lantana montevidensis Weeping Lantana A, ST, DT, 1, 2, 3, 4, 5 Lantana camara ‘new gold’ Gold Lantana A, 1, 2, 3, 4 Tulbaghia violacea Society Garlic A, 1, 2, 3

Sod St. Augustine ‘Floratam’ Stenotaphrum secundatum 1, 2, 3, 4 Bermuda Sod Cynodon dactyloids 1, 2, 3, 4 Paspalum Sod Paspalum vaginatum ST, DT, 1, 2, 3, 4, 5 Argentine Bahia Paspalum notatum DT, 4, 5

Characteristics and Grounds Categories

Characteristics:

N= Native, F= Flower, E= Evergreen, D= Deciduous, ST= Salt Tolerant, DT= Drought Tolerant, S= Specimen, A= Accent

Grounds Categories:

1= Route of Excellence: one annual shrub pruning, turf and shrub fertilization.

2= General Offi cers Quarters: one annual turf and shrub fertilization. Monthly shrub pruning.

3= Special Interest Areas: one annual shrub pruning, turf fertilization and turf/ shrub pest treatment.

Note: this category is not shown on the Grounds Categories Map. This category is given to areas that require higher maintenance and can be located in a variety of grounds categories.

4= Improved, Semi-improved and Hospitals: Mowing, edging, line trimming and one annual fertilization/ pest treatment (Bermuda only)

5= Military Family Housing: Mowing, edging, line trimming.

Palms

Cabbage Palm (N, E, ST, DT, 1, 2, 3, 4, 5)

Medjool Date Palm (S, ST, DT, 1, 2, 3)

Bismarck Palm (S, DT, ST, 1, 2, 3)

Fishtail Palm (A, 1, 2, 3)

Foxtail Palm (S, 1, 2, 3)

Christmas Palm (A, 1, 2, 3)

Palms

Queen Palm (DT, 1, 2, 3, 4, 5)

Paurotis Palm (N, 1, 2, 3)

Saw Palmetto (N, ST, DT, 1, 2, 3, 4, 5)

Cardboard Palm (A, ST, DT, 1, 2, 3, 4, 5)

Pygmy Date Palm (A, 1, 2, 3, 4)

Large Trees

Southern Magnolia (N, F, E, ST, DT, 1, 2, 3, 4, 5)

Slash Pine (N, E, DT, 4, 5)

Live Oak (N, E, ST, DT, 1, 2, 3, 4, 5)

Bald Cypress (N, D, DT, 3, 4)

Red Cedar (N, E, ST, 1, 2, 3, 4)

Small Trees

Nellie Stevens Holly (A, E, 1, 2, 3, 4)

Yaupon Holly (N, E, ST, DT, 1, 2, 3, 4, 5)

Dahoon Holly (N, E, ST, DT, 1, 2, 3, 4, 5)

Crape Myrtle (A, F, D, DT, 1, 2, 3, 4)

Ligustrum Tree (A, E, DT, 1, 2, 3, 4)

Little Gem Magnolia (A, F, 1, 2, 3, 4)

Bottle Brush (A, F, E, ST, DT, 1, 2, 3, 4) Loquat Tree (A, E, DT, 1, 2, 3, 4)

Large Shrubs

Bougainvillea (A, F, DT, 1, 2, 3, 4, 5) Hibiscus ( A, F, ST, 1, 2, 3)

Downy Jasmine (A, F, 1, 2, 3, 4)

Wax Myrtle (ST, DT, 4, 5) Oleander (A, F, ST, 1, 2, 3)

Sweet Olive (A, F, 1, 2, 3)

Sweet Viburnum (DT, 1, 2, 3, 4, 5)

Sandankwa Viburnum (DT, 1, 2, 3, 4, 5)

Sea Grape (N, ST, DT, 1, 2, 3, 4, 5)

Alamanda (A, F, ST, 1, 2, 3, 4)

Variegated Shell Ginger (A, F, DT, 1, 2, 3, 4)

Thryallis (A, F, DT, 1, 2, 3)

Philodendron (DT, 1, 2, 3, 4, 5)

Downy Jasmine (A, F, 1, 2, 3, 4)

Podocarpus (DT, ST, 1, 2, 3, 4, 5)

Bird of Paradise (A, F, 1, 2, 3, 4)

Plumbago (A, F, DT, 1, 2, 3, 4, 5)

Xanadue (A, 1, 2, 3)

Small Shrubs

Agapanthus (A, F, 1, 2, 3) Dwarf Indian Hawthorn (N, DT, ST, 1, 2, 3, 4, 5)

Croton (A, DT, 1, 2, 3, 4, 5)

Dwarf Scheffl era (A, 1, 2, 3, 4)

Coontie (A, N, DT, ST, 1, 2, 3, 4, 5)

Dwarf Yaupon Holly (N, DT, ST, 1, 2, 3, 4, 5)

Ixora (A, F, DT, ST, 1, 2, 3, 4, 5)

Ornamental Grasses

Fakahatchee Grass (A, N, DT, 1, 2, 3, 4, 5) Dwarf Fakahatchee (N, DT, 1, 2, 3, 4, 5)

Sandcord grass (A, N, ST, DT, 1, 2, 3, 4, 5)

Muhly Grass (A, N, DT, ST, 1, 2, 3, 4, 5)

White Fountain Grass (A, DT, 1, 2, 3, 4, 5)

Red Fountain Grass (A, DT, 1, 2, 3, 4, 5)

Ground Covers

Liriope (1, 2, 3, 4) Varigated Liriope (1, 2, 3, 4)

Mondo Grass (1, 2, 3, 4)

Confederate Jasmine (A, DT, 1, 2, 3, 4)

African Iris (A, 1, 2, 3, 4) Minima Jasmine (DT,1, 2, 3, 4, 5)

Purple Lantana (A, ST, DT, 1, 2, 3, 4, 5)

Gold Lantana (A, 1, 2, 3, 4)

Society Garlic (A, 1, 2, 3)

Landscape Specifi cations Part one – general

1.01 Extent of landscape development work is shown on the drawings and in the notes and schedules

1.02 Provide trees, palms, shrubs, and ground cover of quality, size, genus, species and variety shown.

Described in grades and standards for nursery, latest edition, published by the Florida department of agriculture and consumer services. Provide healthy, vigorous stock, free of disease, insects, eggs, larvae, and defects such as knots, injuries, abrasions or disfi gurement. Do not make substitutions. If specifi ed landscape materials are not obtainable, submit proof of non-availability to landscape architect or project manager, together with proposal for use of equivalent material.

1.03 Provide protective covering during delivery of plant materials. Plant stock immediately, or store in a shaded area, keep rootballs moist at all times. Do not remove stock from containers until planting time. Time delivery so that sod will be installed within 24 hours after arrival at site.

1.04 Determine location of underground utilities and perform work in a manner which will avoid possible damage. Hand excavate if required, when conditions detrimental to plant growth are encountered, such as rubble fi ll, adverse drainage conditions, or obstructions, notify the landscape architect or project manager before planting. Contractor shall examine subgrade, verify elevations, observe overall site conditions and notify project manager of any unsatisfactory conditions. The contractor shall not proceed with work, until conditions have been corrected.

1.05 Warranty trees, palms, shrubs and ground cover, for a period of one year after date of substantial completion, against defects including death and unsatisfactory growth, except for defects resulting from neglect by owner, abuse or damage by others, or unusual phenomena or incidence which are beyond the contractor control. Remove and replace trees, palms, shrubs, and ground cover found to be dead or in unhealthy condition during warranty period. Warranty lawns through specifi ed lawn maintenance period, and until fi nal acceptance.

Part two – products

2.01 The contractor shall have a sample of site soil tested to determine soil analysis. Tests results shall determine appropriate soil amendments for lawn and landscape areas. Contractor shall submit copies of test results and proposed soil amendments to the owner and the landscape architect for approval. Soil testing and soil amendments approval shall be accomplished.

2.02 Landscape mix - 60% peat humus, 20% wood chips, 20% compost, N.P.K. 3.2.1, As manufactured by hillary peat or approved equal.

2.03 Mulch - organic mulch free from deleterious materials and consisting of the following: shredded

- grade a, cypress mulch or red cedar barkstone

2.04 Fertilizer - for trees, palms, shrubs, and ground cover, provide “agriform” tables by sierra chemical co., Slow release tablets, 20 - 10 - 5 formulation or approved equal. Tablet amounts shall be as follows:

1 Gallon - 1 tablets 7 gallon - 3 tablets 30 gallon - 6 tablets 3 Gallon - 2 tablets 15 gallon - 4 tablets b&b palms - 6 tablets

2.05 For lawns, provide fertilizer with 16-4-8 formulation. Fertilize at a rate of 12 pounds per 1,000 S.F. Fertilizer shall be delivered to the site in the original containers and bear the manufacturer’s guarantee.

2.06 Pre-emergent herbicide - “Surfl an” pre-emergent herbicide or approved equal.

2.07 Stakes and guys - provide pressure treated wood stakes in the sizes indicated. Provide arbor ties.

2.08 Trees and palms - provide trees and palms of height and caliper specifi ed and with branching confi guration recommended by Florida number one standards for species required. Provide single stem trees except where special forms are specifi ed.

2.09 Shrubs and ground cover - provide plants of the height and spread specifi ed and with branching confi guration and minimum number of canes or runners recommended by Florida number one standards.

Part three – execution

3.01 Preparation of planting soil - before mixing clean existing soil of roots, plants, stones. And other extraneous materials harmful or toxic to plant growth. Mix landscape mix with existing soil at the ratio by volume 1:1. Install agriform fertilizer tablets during backfi ll operations.

3.02 Excavations for plants - excavate pits twice as wide as the plant rootball and loosen subsoil on bottom of excavation. Fill excavations with water and allow to percolate out before planting. Set stock in the center of pit with the top of ball at the same elevation as adjacent fi nish grade. Place planting soil backfi ll around sides of rootball, and work each layer to eliminate voids and air pockets. Place agriform tablets in plant pits during backfi ll operations, repeat watering until no more water is absorbed. Mulch all tree rings and planted areas with a 3” deep layer of mulch.

3.03 Apply pre-emergent herbicide to all areas to be mulched, according to the manufacturer’s recommended rate. Contractor is responsible for reapplying appropriate herbicide to maintain a weed free condition in all areas throughout all landscape operations.

3.04 Guy and stake all trees and palms immediately after planting, as indicated in the details.

Part four – maintenance

4.01 Tree, palm, shrub, and ground cover maintenance - begin maintenance immediately after planting.

Maintain plant stock until fi nal acceptance but in no case less then 30 days after substantial completion. Maintain by pruning, weeding, and adjusting irrigation as required for healthy growth. Tighten and repair stake and guy supports and reset trees and palms to proper grades or vertical position as required. Spray as needed to keep plant stock free of insects and disease.

4.02 During landscape work, keep pavements clean and work area in an orderly condition. Protect landscape work and materials from damage due to operations by other contractors and trades.

Maintain protection during installation and maintenance periods. Treat, repair, or replace damaged landscape work as directed.

4.03 Contractor shall remove staking and guying materials after one growing season.

Part fi ve - inspection and acceptance

5.01 When landscape work is completed, landscape architect or project manager will make an inspection to determine acceptability. When landscape work does not comply with requirements, replace rejected work and continue maintenance until reinspected by the landscape architect or project manager. Remove rejected plants and materials promptly from the project site.

Part six - existing plant material fertilization

6.01 For shrubs and ground cover the fertilizer applications shall be as follows March, June, September, and December. Use a 8-10-10 formulation at a rate of two pounds per 100 sf.

6.02 For trees the fertilizer applications shall be as follows: March, June and September. Use a 13-6- 10 formulation at a rate of two pounds per inch of caliper of less than 6” caliper and fi ve pounds per inch of caliper over 6” caliper.

6.03 For palms the fertilizer applications shall be as follows: March, July and October. Use a palm special 10-5-5 formulation at a rate of seven pounds per palm trunk. Apply palm foliar spray mix to all foliage surface as follows: April, august and November.

6.04 For lawns the fertilizer applications shall be as follows: February, April, June September and December. Use a 16-4-8 formulation at a rate of 5 -6 pounds per 1,000 sf.

6.05 Do not allow chemicals to fall on, or translocate on, off-site area. Do not allow water containing toxic amounts of chemicals to pool or puddle after completion of operations.

Part one – general

1.01 Extent of irrigation work includes irrigation system for landscape areas as shown on the drawings.

Work includes installation of underground irrigation system for project site, ready to permanently operate, in compliance with all applicable codes.

1.02 Product data - submit for approval, manufacturer’s technical data for the following items: backfl ow preventer, electric valve, gate valve, valve box, wire, controller, rain check, spray, rotor heads and drip irrigation equipment.

1.03 Record drawings - following completion and acceptance of irrigation installation furnish “as-built” drawings showing all irrigation heads, valves, controllers, and pipe locations to scale.

Contractor shall provide a diagram of list of zones, inside each controller cover.

Part two – products

2.01 Pressure pipe - comply with the following for pressure piping: ANSI/ASTM a 120. Schedule 40.

2.02 Lateral pipe - comply with the following for lateral piping: ANSI/ASTM a 120, schedule 40.

Provide galvanized pipe where required by local code or as indicated in drawings.

2.03 Pipe fi ttings - comply with the following: ASTM d2466 socket fi ttings with ASTM d2564 solvent cement.

2.04 Solvent cement and cleaner - provide quick drying and fast holding products such as manufactured by arrow or approved equal. Pipe cleaner shall be. Purple.

2.05 Electric valves shall be globe valves operated by low-power solenoid, normally closed, with manual fl ow adjustment.

2.06 Gate valves shall be bronze, threaded, and of line size. Gate valves shall be installed in a plastic valve box, in the same manner as electric valves.

2.07 Spray and rotor heads shall be pop-up type or installed on risers, as indicated .On the irrigation plan. Heads shall be connected to pipes with fl ex pipe attachments. Spray and rotor heads shall be Rainbird and Hunter.

2.08 Valve boxes shall be green plastic 10” round, with lid. Valves in boxes shall be set in a 3” deep, clean gravel bed.

2.09 Controller shall include transformer and wiring to hardwire into building electrical system.

Controller shall have power backup to maintain settlings at least eight hours without building power. Provide lockable cover.

2.10 Wiring shall be type UF, control cable, with PVC insulation, color coded. Common wire shall be white.

Irrigation Specifi cations

2.1 1 Rain check shall be installed on outside of building, as per the state of Florida regulations.

Part three – execution

3.01 Install irrigation heads in the approximate locations. Make minor adjustments as necessary to avoid plant material and other obstructions.

3.02 Locate gate valve downstream of backfl ow preventer.

3.03 Utilize PVC schedule 40 sleeves for all crossings of walks, paving, walls or foundations by piping or control wiring.

3.04 Provide 18” minimum cover over main line and 12” cover over all other irrigation sleeves, wires and pipes. Excavate trenches to a depth of 3” below invert of pipe. Backfi ll trenches to within 6” of grade with clean material from excavation. Remove organic materials as well as rocks and debris larger than 1” diameter. Place acceptable backfi ll material in 6” lifts, compacting each lift.

3.05 Location of existing and proposed underground utilities, structures and plantings shall be the responsibility of the contractor. Any damages occurring due to irrigation installation shall be replaced or repaired to the original condition.

3.06 Install circuit valves in valve box, set in 3” deep drainage backfi ll, arranged for easy adjustment and removal. Adjust valve fl ow rate to match that required for each zone.

3.07 Lay pipe on solid subbase, uniformly sloped with out humps or depressions. All joints shall be attached using PVC cleaner and glue. Maintain pipe interiors free of dirt and debris. Close open ends of pipe by acceptable means when pipe installation is not in progress.

3.08 Adjust settings of controller for proper plant material establishment. After establishment period, reset controller as per local watering restrictions. Connect rain check to controller.

3.09 Flush circuit lines with a full head of water and install heads after hydrostatic test is completed.

Install lawn heads at manufacturer’s recommended heights. Install heads on risers at 28” height or 4” above adjacent shrubs. Locate part circle heads to maintain a minimum distance of 4” from walks and walls and 12” from pavement with no curbs.

Part four – testing

4.01 Notify landscape architect or project manager when testing will be conducted. Conduct tests in the presence of the landscape architect or the owner’s representative.

4.02 After completion of lawn installation and mulching, carefully adjust sprinkler heads so they will be fl ush with or not more than 1/2” above adjacent soil or mulch. Perform operational testing after sprinkler heads have been adjusted to their fi nal positions. Contractor shall demonstrate that each zone meets coverage requirements and that automatic controls function properly. Contractor shall uncover pipe and valve connections as directed by the owner’s representative. Proper spray patterns, correct nozzle radius, and clean nozzles will all be required for fi nal system approval.

4.03 After system testing approval, contractor shall instruct the owner’s personnel in the operation and maintenance of the system, including spray pattern and valve adjustments, and programming the controller.

Establishment Period Watering Schedule (for areas with no irrigation)

1.01 During landscape installation the contractor shall water-in installed landscape materials and continue watering until substantial completion. At substantial completion the contractor shall begin the following 90 day watering schedule. The landscape contractor shall water all plant materials shown on the landscape planting plans, for a thirteen week, ninety day watering period based on the following plant establishment period schedule.

30 gallon container plants: 25 gallon water/each application 15 gallon container plants: 10 gallon water/each application 3 gallon container plants: 5 gallon water/each application 1 gallon container plants: 2 gallon water/each application

1st 4 weeks at 3 applications per week = 12 events 2nd 4 weeks at 2 applications per week = 8 events 3rd 5 weeks at 1 application per week = 5 events Total number of applications = 25 events

Glossary Terms

Earth Berm- is a mound of earth typical used on a security buffer to protect a structure from vehicular impact.

Florida Coastal- is the general landscape theme for the Base. The theme focuses on using regional plant material in curvilinear layouts to create a semi-tropical appearance.

Foundation Planting- is the landscape located adjacent to the structures foundation.

Grounds Categories- indicates the amount of maintenance a particular grounds area will receive. See page 13 for Grounds Categories Map.

General Offi cers Quarters- is not shown on the Grounds Categories Map. This is where the highest-ranking military personnel live.

High Visibility Area- are areas seen frequently by the public and require more aesthetic consideration.

Improved/ Semi-improved areas- is identifi ed on the Grounds Categories Map on page 13. The amount of maintenance for these areas is defi ned in the Characteristics and Grounds Categories located on page 16.

Industrial/ Flightline areas- are industrial type facilities adjacent to the airfi eld.

Linear Buffer- is a landscape security buffer that is designed in a linear layout without earth berms.

Maintenance Category- indicates the amount of maintenance of a site.

Pre-Emergent Herbicide- is a herbicide that is applied before seed germination to control seeding of weeds.

Route of Excellence- scenic roads and facilities that require higher standards of design and maintenance.

The following roads are designated as part of the Route of Excellence: Florida Keys Avenue, Tampa Point Boulevard, Administrative Avenue and Staff Circle. See Grounds Categories Map on page 13 for locations.

Security Buffer- is a landscape buffer that protects a structure from vehicular impact.

Soil Polymer- are gels that can absorb hundreds of times their weight in water, releasing it as the soil dries.

Add soil polymers to plant material when irrigation is not provided.

Special Interest Areas- is not shown on the Grounds Categories Map. This category is given to areas that require higher maintenance and can be located in a variety of grounds categories. The amount of maintenance for these areas is defi ned in the Characteristics and Grounds Categories located on page 16.

Weed Fabric- is a fabric that blocks weeds from penetrating through to the surface. Use weed fabric only in rock beds.