Q&A_Clarification.pdf
PDF 62 KB Posted
- Attached to
- Multiple Award Construction Contract Federal contract opportunity
- Solicitation number
- FA481419RA001
About this file
This document provides clarifications to a solicitation for a multiple award construction contract with the Department of the Air Force Air Mobility Command. Offerors are informed that asbestos abatement documentation and cut sheets will be required once the seed project is awarded, and that certain page limitations have been removed from the technical factor submission. Additionally, items addressing applicable guidance/criteria and design calculations should be excluded from the page limit. Blank sheets provided in the solicitation are for offerors' use in detailing expected design elements.
Q&A Clarifications
View the file
Other files for this federal contract opportunity
Show all 50
Multiple Award Construction Contract has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. Clarification: RFI 106: The AF Form 103, as well as the survey drawings, will not be required to be submitted at this time. Offerors need to be aware that those documents will be expected for the future phases of the project.
2. Clarification RFI 118: Asbestos abatement documentation will be required once the seed project is awarded.
3. Clarification RE Cutsheets: Cut sheets will be required once the seed project is awarded. This requirement has been taken out of section L.
4. Clarification RE Blank Pages: Those sheets are provided for the use of the Offeror. Sheet titles provide some indications of the types of details that would be expected in a 65% Design Effort.
5. Clarification RE Item #4) Applicable Guidance/criteria & Item #5) Design Calculations: Items #4 and 5, should NOT be included in the 20 page limit. This has been updated in section L.