SEED_SOW_App_B_16-0123_BLANK_3052.xlsx

XLSX spreadsheet 56 KB Posted

Attached to
Multiple Award Construction Contract Federal contract opportunity
Solicitation number
FA481419RA001
Issued by
Department of the Air Force Air Mobility Command

About this file

This document contains an eight page construction cost estimate breakdown for repair and renovation work at MacDill Air Force Base. The estimate provides line item details for various construction divisions including general requirements, existing conditions, concrete, masonry, openings, finishes, specialties, plumbing, HVAC, electrical, communications, earthwork and summaries. Materials, labor hours and costs are estimated for each line item along with unit quantities and totals. The work includes items such as demolition, doors and windows, flooring, ceilings, plumbing fixtures, ductwork, controls and electrical work. Specifications are provided for items like concrete work, brick veneer, glass windows, carpeting, suspended ceilings, piping and insulation removal and installation. Estimates are given for project management, site supervision, office space and portable toilet rental. The total proposed contract price will be determined from this breakdown along with overhead and profit.

The related federal contract opportunity is a solicitation for multiple award construction contracts with the Department of the Air Force Air Mobility Command. The purpose of Amendment 3 is to remove certain page limits and cut sheet requirements from the seed project technical submissions. Clarification is provided regarding the changes.

Solicitation Package

View the file

Other files for this federal contract opportunity

Other files attached to Multiple Award Construction Contract, newest first.
File Type Posted
MACC_Section_L_0003.pdf PDF
Solicitation_Amendment_FA481419RA0010003_SF_30.pdf PDF
Q&A_Clarification.pdf PDF
MACC_Section_M_0003.pdf PDF
Solicitation_Amendment_FA481419RA0010002_SF_30.pdf PDF
QA2_-_MASTER.pdf PDF
MACC_Section_L.pdf PDF
APPENDICES_1_-_17,_FA481419RA001.zip ZIP file
RFP_Attachment_1_SOW.pdf PDF
Q&A.pdf PDF
Sign_in_sheet.pdf PDF
16-0123(Seed).zip ZIP file
Attachment_5_Wage_Determinations.pdf PDF
RFP_Attachment_6_Background_Check.xlsx XLSX spreadsheet
Attachment_3,_Performance_Reference.docx DOCX document
MAP.JPG JPG image
SOW_Appendix_8_Antiterrorism_Level_I_Training_Aid.pdf PDF
SEED_SOW_App_F_16-0123_Min_Perf_Stan.pdf PDF
SEED_SOW_App_H_16-0123_CD_Disp_Form.pdf PDF
SOW_Appendix_5_SOP_4_Investigation_Derived_Waste.pdf PDF
SOW_Appendix_9_Contractor_Security.pdf PDF
SEED_SOW_App_I_16-0123_Asbestos_Notif_FM.pdf PDF
SOW_Appendix_6_SOP_6_Well_Install_Abn.pdf PDF
SEED_SOW_App_J_As_Builts.pdf PDF
SEED_SOW_App_G_MAFB_Grn_Procur_Determ_Fm.pdf PDF
MACC_Section_L_V3.pdf PDF
SEED_SOW_App_E_Haz_Matls_Fm_Instruc.pdf PDF
SEED_SOW_App_A_16-0123_Drawings.pdf PDF
SEED_SOW_App_A_16-0123_Drawings.pdf PDF
SOW_Appendix_3_Landscape_and_Design_Procedures.pdf PDF
SEED_SOW_App_D_16-0123_FGUA_Fee_Inspection_Memo.pdf PDF
SEED_SOW_16-0123.pdf PDF
SEED_SOW_App_H_16-0123_CD_Disp_Form.pdf PDF
SEED_SOW_App_D_16-0123_FGUA_Fee_Inspection_Memo.pdf PDF
SEED_SOW_App_G_MAFB_Grn_Procur_Determ_Fm.pdf PDF
Solicitation_-_FA481419RA001_(2).pdf PDF
SEED_SOW_App_E_Haz_Matls_Fm_Instruc.pdf PDF
SOW_Appendix_2_MacDill_AFB_Traffic_Control_Standards.pdf PDF
SEED_SOW_App_I_16-0123_Asbestos_Notif_FM.pdf PDF
ppi_tool.accdb MDB file
2018_MacDill_Design_Guide.pdf PDF
SEED_SOW_App_F_16-0123_Min_Perf_Stan.pdf PDF
RFP_Attachment_1_SOW.pdf PDF
SEED_SOW_App_A_16-0123_Drawings.pdf PDF
SEED_SOW_App_A_16-0123_Drawings.pdf PDF
MACC_Section_M_V3.pdf PDF
SEED_SOW_App_A_16-0123_Drawings.pdf PDF
SEED_SOW_16-0123.pdf PDF
MACC_Section_L_V3.pdf PDF
SEED_SOW_App_F_16-0123_Min_Perf_Stan.pdf PDF
Show all 50

Multiple Award Construction Contract has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RECAP

FOR OFFICIAL USE ONLY
CONSTRUCTION COST ESTIMATE BREAKDOWNSHEET NO.1OF8
CONTRACTORADDRESS
MacDill AFB, Tampa, Florida
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
RPR HVAC & RENOVATE COMM FAC B262 (SEED)
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION :
NVZR 16-0123
UNIT OFMATERIAL COSTLABOR COST$$
LINEITEMMEASUREQUANTITY$$$$OTHERLINE
NOUNITTOTALMAN-HOURSAVERAGETOTALDIRECTTOTAL
RATEUNIT COSTS
(1)(2)(3)(4)(5)(6)(7)(8)(9)(10)
2REPAIR 522 (R&M)
3REPAIR 524 (SUS)
4
5
6
7
8
9
10
11
12
13
14
15
SUBTOTAL
(AF Form 3052., AUG 93)
$ - 0
ERROR:#REF!

RPR 522(R&M)

FOR OFFICIAL USE ONLY
CONSTRUCTION COST ESTIMATE BREAKDOWNSHEET NO.2OF8
CONTRACTORADDRESS
MacDill AFB, Tampa, Florida
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
RPR HVAC & RENOVATE COMM FAC B262 (SEED)
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION :
NVZR 16-0123
UNIT OFMATERIAL COSTLABOR COST$$
LINEITEMMEASUREQUANTITY$$$$OTHERLINE
NOUNITTOTALMAN-HOURSAVERAGETOTALDIRECTTOTAL
RATEUNIT COSTS
(1)(2)(3)(4)(5)(6)(7)(8)(9)(10)
REPAIR 522 (R&M)
1DIVISION 01 - GENERAL REQUIREMENTS
2Project Manager
3Superintendent
4Risk factor
5Office Trailer, furnished, 32' x 8'
6Office Storage space, for delivery, delivery each way
7Office and storage space, for delivery, add per mile
8Extra hrs work
9Portable toilet
10DIVISION 02 - EXISTING CONDITIONS
11Demolition in mold contaminated area, ceiling, lighting fixtures, up to 2' x 4'
12Selective demolition, rubish handling, dumpter, 20C.Y, 5 Ton Capacity, weekly rental, includes one dump per week
13Demolition ceiling, suspended acoustical tile
14Floring removal 9" x 9" bown floor tile with mastic flooring
15Pipe insulation removal (HVAC system), inside the AHU & ductwork, vibration dampers, HVAC mastic & gasket.
16Air monitoring
17Furniture Moving cost
18DIVISION 03 - CONCRETE
19Concrete work associated with new sanitary pipe lines
20DIVISION 04 - MASONRY
21Brick veneer masonry, for wall at main entrance
22DIVISION 08 - OPENINGS
23Door demolition, door frames, metal, remove
24Doors & frames, aluminum, with fixed window, 3' x 7'
25Glass window, demolition (64" x 37")
26Door hardware, cipher lockset with dia
27DIVISION 09 - FINISHES
28Flooring demolition, carpet, bonded, includes surface scraping
29Mail slot removal, from wall
30Mail slot reinstallation
31Suspended ceiling, 2' x 2'
32Carpet, commercial grades, direct cement, nylon, level loop, 28 oz., light to medium traffic
33Surface preparation, interior, walls, wash, gypsum board and plaster
34Paints & coatings, interior latex, zero voc, doors, flush, both sides, roll & brush, primer, incl. frame & trim
35Walls and partitions, selective demolition, drywall, two layers, nailed or screwed
36Partition wall,, 2 layers,, taped both sides, installed on & incl.25 ga, NLB metal studs, 3-5/8" wide, 16" O.C., 8' to 12' high, 1/2" gypsum drywall
37Paints & coatings, walls & ceilings, interior, concrete, drywall or plaster, zero voc latex, primer or sealer coat, smooth finish, roller
38Wall base vinyl, standard color 2 1/2" high
39Wall base demolition
40Ceramic tiles for restrooms renovations
41Ceramic tiles for lobby, bathroom & shower room
42Add fire stopping for penetrations and partition walls
43Offices door signage
44DIVISION 10 - SPECIALTIES
45Partition Toilets ADA compliant for handicap with grab bar
46Toilets & partitions, selective demolition
47Restrooms counter reinforcing and cover panels
48DIVISION 22 - PLUMBING
49Urinal, selective demolition
50Drain cap for toilet removal
51Urinal, waterless
52sink, selective demolition
53Lavatory sink with cabinet
54Water fountain
55Janitor sink, MOP basin
56Bathrooms accessories, mirror, paper holder
57Sanitary piping & fittings, 6" to 12" diam
58Concrete sawing, concrete slabs
59Cleanouts and drains, selective demolition
60Vent stack, selective demolition
61Water heater, 80 gallons, selective demolition
62Hot water & cold water demolition
63Plumbing fixtures, selective demolition
64Sanitary pipe PVC, sewer piping, 4" diam
65Floor drain
662 way cleanout, 4" diam
67Vent stack
68Water heater, 50 gallons
69CPVC pipe, hot & cold water, 1 1/2" diam.
70Plumbing fixtures for water supply lines
71Hose bibs
72Wall penetrations seal around
73Expansion tank 2 gallons
74Sump pump for kitchen sink
75DIVISION 26 - ELECTRICAL
76Conduit, rigid galvanized steel, 1/2" to 1" diameter, electrical demolition, remove conduit to 10' high, including fittings & hangers
77Wire copper, selective demolition
78Receptacles & coverplates, selective demolition
79Junction box, selective demolition
80Interior LED fixtures, high bay, selective demolition
81Wire, copper, stranded, 600 volt, #500 Kcmil, type THW, in raceway
82Electric metallic tubing (EMT), 3" diameter, to 10' high, incl 2 terminations, 2 field bend elbows, 11 beam clamps, and 11 couplings per 100 LF
83Panelboard 400 amp, main breaker, 42 circuits
84Lighting outlets
85Interior LED fixtures, high bay, surface mounted, 3 bars, 246 watt
86Lighting receptacles
87Disconnect switch, 3 pole fusible, 400 amp, to 125 HP motor, 600 volt, NEMA 3r
88Wire, copper, stranded, 600 volt, #10 Kcmil, type THW, in raceway
89Electric metallic tubing (EMT), 1 1/2"" diameter, to 10' high, incl 2 terminations, 2 field bend elbows, 11 beam clamps, and 11 couplings per 100 LF
90Variable frequency drives,
91Electric metallic tubing (EMT), 1" diameter, to 10' high, incl 2 terminations, 2 elbows, 11 beam clamps, and 11 couplings per 100 LF (DATA)
92Relocate the electrical outlets
93Cap conduit
94Receptacles & coverplates
95DIVISION 27 - COMMUNICATIONS
96Fiber optic cable, 12 strand,for data outlets
97Relocate the data outlets
98Data , drop outlets
99DIVISION 31 - EARTHWORK
100New sanitary pipe 8" diam, connect to 10" main dist. Line
101SUB-TOTAL

RPR 524(SUS)

FOR OFFICIAL USE ONLY
CONSTRUCTION COST ESTIMATE BREAKDOWNSHEET NO.6OF8
CONTRACTORADDRESS
MacDill AFB, Tampa, Florida
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
RPR HVAC & RENOVATE COMM FAC B262 (SEED)
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION :
NVZR 16-0123
UNIT OFMATERIAL COSTLABOR COST$$
LINEITEMMEASUREQUANTITY$$$$OTHERLINE
NOUNITTOTALMAN-HOURSAVERAGETOTALDIRECTTOTAL
RATEUNIT COSTS
(1)(2)(3)(4)(5)(6)(7)(8)(9)(10)
REPAIR 524 (SUS)
1DIVISION 21 - FIRE PROTECTION
2Smoke detector, electrical demolition
3Detection system, heat detector, smoke detector, ceiling type, excl. wires & conduit
4Detection system, strobe & horn, ADA compliance
5Fire Alarm, horn strobes, selective demolition
6Automatic fire suppression system, manual pull station
7Detection system, FACP fire alarm control panel,
8Fire client map software MONACO
9Mass notification client software MONACO
10Desktop UPS bakup power MONACO
11Desktop VOIP kit w/ microphone
12DIVISION 23 - HEATING, VENTILATION AND A/C
13Air handling unit & associated ductwork, selective demolition
14Water chiller, 20 Ton, selective demolition
15Pneumatic control system, VAV boxes, include thermostat, damper, reheat coil tubing
16Condense line, PVC pipe 2" diameter, schedule 40
17Control system unit, programming
18Outside air DX split system, 4 TON, indoor type
19Exhaust fan, selective demolition
20Metal ductwork, fabricated rectangular, galvanized steel, 500 to 1000 lb, incl. fittings, supports
21Ductwork, flexible coated fiberglass fabric on corrosion reistant metal helix, insulated, heavy duty, 12" diamter, pressure to 12"
22Supply troffer, diffusers, selective demolition
23Plenum Boxes, selective demolition
24Ductwork, glass fiber reinforced plastic, fabricated, selective demolition
25Duct thermal insulation, blanket type, fiberglass, flexible, FSK vapor barrier wrap, 2" thick
26DX unit with condenser unit, 1.5 TON, ductless, Comm. Room
27Ventilator, exhaust fan, rectangular, intake/exhaust, 0.033" S.P, 600CFM, 12" x 16", includes base & damper
28Control component, thermostat, automatic, clock, 24 hrs
29Refrigerant line sets, insulated cooper supply and returns lines, 1/2" and 3/4" tubes, 1/2" insulation, 100 ft long
30Ductwork, flex, prefabricated, selective demolition
31Test & Balance, building pressurization per SME
32Shut-off switch, emergency
33Aluminum pipe, exhaust system, 6" diam.
34Condensing unit, air cooled compresor, 4 ton, includes standard
35Dual coil, air cooled refrigerant condenser, 10 TON
36Direct expansion condensing unit, w/ cooles condensing unit 20 TON
37Diffusser, sidewall aluminum, 3 way dispersion, 14" x 8", includes opposite blade damper
38Grille, aluminum, air supply, adjustable, single deflection, 10" x 4"
39Louvers, aluminum, extruded, with screen, mill finish, dual combination, motor for electric or pneumatic, intake or exhaust
40Pipe insulation protective jacketing, PVC, white, 48" lengths, 20 mill thick, 2: ID, size based on OD insulation
41Louver, selective demolition
42Temporary AC Unit
43Fire dampers
44SUB-TOTAL

SUMMARY

8 OF 8
INSTRUCTIONS FOR COMPLETING AF FORM 3052
Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to
permit itemizing of all direct costs.
Col 2 Unit of Measure. Description of the unit in which each item is to be estimated (examples : square yards - SY, cubic yards - CY, square
feet - SF, linear feet - LF, board feet - BF, each - EA, pound -LB).
Col 3 Quantity. Contractor's estimate of quantity required in terms of unit of measure (column 2). Items and units of measure will be
furnished by the Government. Quantity estimates will be furnished by the Government only when it is anticipated that a unit price contract will
be issued. Otherwise, the contractor is responsible for determining quantity estimates.
Col 4 and 5 Material Costs. Enter unit cost (Col 4) of material to be supplied and total cost (Col 5) for item listed in column 1.
Col 6, 7 and 8 Labor Costs. Enter in Col 6 the estimated number of man-hours or man days needed to perform the work listed in column 1.
Enter in Col 7 the average rate per man-hour (man-day) and in Col 8 the total labor cost.
Col 9 Other Direct Costs. Enter estimated costs of special equipment and other items (listed in column 1) which are special to the contract
and of significant dollar value.
Col 10 Line Total. Self-explanatory.
NOTE: In addition to the other totals entered on various pages, the grand total of column 10, plus overhead and profit will be shown on the last
page as follows.

FOR OFFICIAL USE ONLY

REPAIR 522 (R&M)REPAIR 524 (SUS)TOTAL
TOTAL MATERIAL COSTSERROR:#REF!ERROR:#REF!ERROR:#DIV/0!ERROR:#REF!ERROR:#REF!

TOTAL LABOR COSTS

TOTAL OTHER DIRECT COSTS

TOTAL DIRECT COSTS

OVERHEAD

PROFIT

BOND

TOTAL

DATE : FIRM NAME:

TITLE :By:
(Signature)

INSTRUCTIONS TO OFFERORS

1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and
estimated costs (and attached supporting information) suitable for detailed review and analysis. Prior to the award of a contract resulting from
this proposal the offeror shall, under the conditions stated in ASPR 3-807.3, be required to submit a certificate of current cost or pricing data
(see ASPR 3-807.3(e) and 3-807.4)
2. In addition to the specific information required by this form, the offeror is expected, in good faith, to incorporate in and submit with this
form any additional data, supporting schedules, or substantiation which are reasonably required for the conduct of an appropriate review and
analysis in the light of the specific facts of this procurement. For effective negotiations, it is essential that there be a clear understanding of
a. The existing, verifiable data.
b. The judgmental factors applied in projecting from known data to the estimate, and
c. The contingencies used by the offeror in his proposed price.
In short, the offeror's estimating process itself needs to be disclosed.
3. When attachment of supporting cost or pricing data to this form is impracticable, the data will be described (with schedules as appropriate),
and made available to the contracting officer or his authorized representative upon request.
4. By submission of this proposal the offeror grants to the contracting officer, or his authorized representative, the right to examine, for the
purpose of verifying the cost or pricing data submitted, those books, records, documents and other supporting data which will permit adequate
evaluation of such cost or pricing data, along with the computations and projections used herein. This right may be exercised in connection
with any negotiations prior to contract award.

(Reverse of AF Form 3052., AUG 93)

File details come from the government source that posted it. Updated .