FA480922B00010005 Request for Information dated 5-December-2022.pdf

PDF 118 KB Posted

Attached to
Simplified Acquisition of Base Engineer Requirements (SABER) IDIQ at Seymour Johnson AFB, Goldsboro, NC.
Solicitation number
FA480922B0001
Issued by

About this file

This document provides information regarding a solicitation for a Simplified Acquisition of Base Engineer Requirements (SABER) IDIQ contract at Seymour Johnson Air Force Base in North Carolina. The solicitation is set aside for 8(a) or 8(a) Joint Venture Small Businesses registered in the System for Award Management. The contract will encompass a wide variety of construction and maintenance tasks such as concrete, masonry, carpentry, plumbing, electrical work, roofing, pavement repair, excavation, welding, painting, site development, landscaping, asbestos and lead abatement. The period of performance is one base year with four one-year option periods and a six-month extension period. The bid opening is scheduled for October 4th, 2022. Bidders must be registered in SAM to be eligible for award.

View the file

Other files

File Type Posted
FA480922B0001 - Bid Record - 14-Dec-22 (2 pages).pdf PDF
FA480922B0001 Abstract - Bid Opening 14-Dec-22 (4 pages).pdf PDF
Solicitation Amendment - FA480922B00010006 (Conformed) (83 pages) posted 7-December-2022.pdf PDF
Solicitation Amendment FA480922B00010006 SF 30 (4 pages) dated 7-December-22.pdf PDF
25. Min Rqmnt Proj (VKAG 20-1040) SOO (10 pgs) Rev 3 dtd 6-Dec-2022.pdf PDF
25. Minimum Requirement Project (VKAG 20-1040) Statement of Objectives (REVISION 02) (10 pages) dated 1-November-2022.pdf PDF
Solicitation Amendment - FA480922B00010005 (Conformed) (87 pages) dated 28-November-2022.pdf PDF
Solicitation Amendment FA480922B00010005 SF 30 (13 pages) dated 28-November-2022.pdf PDF
2. SABER XI Statement of Work (67 pages) Revision 3 dated 26Oct22.pdf PDF
28. Section 271000 Building Telecommunications Cabling System (13 pages) dated 27-Oct-22.pdf PDF
Solicitation Amendment FA480922B00010004 SF 30 (3 pages) dated 14-October-2022.pdf PDF
Solicitation Amendment FA480922B00010003 SF 30 (10 pages) dated 27-September-2022.pdf PDF
2. SABER XI Statement of Work (66 pages) Revision dated 24-Sept-22.pdf PDF
26. Minimum Requirement Project (VKAG 20-1040) Drawings (Full Set) (8 pages) Revision dated 9-Sept-22.pdf PDF
Solicitation Amendment FA480922B00010002 SF 30 (9 pages) dated 22-September-2022.pdf PDF
25. Minimum Requirement Project (VKAG 20-1040) Statement of Objectives (9 pgs) Revision dtd 22-Sept-22.pdf PDF
SABER XI Requests for Information (RFIs) and Responses (19 pages) 20 September 2022.pdf PDF
Solicitation Amendment FA480922B00010001 SF 30 (2 pages) dated 9-September-2022.pdf PDF
12. AF Form 66 Schedule of Material Submittals - VKAG 22-1200 SABER Basic XI (1 page) Revision dated 6-September-22.pdf PDF
SABER XI PreBid Conference and Site Visit Meeting Minutes with Attachments (18 pages) dtd 30 Aug 22.pdf PDF
10. SJAFB Standard Engineering Drawing Preparation and Support (CAD Standards) (71 pages) dated 1-Dec-22.pdf PDF
23. SABER XI IDIQ Bid Schedule (2 pages) - BLANK.pdf PDF
18. Request for Information (1 page) - BLANK.pdf PDF
14. AF Form 103 Base Civil Engineering Work Clearance Request (2 pages) - BLANK.pdf PDF
12. AF Form 66 Schedule of Material Submittals - VKAG 22-1200 SABER Basic XI (1 page) dated 24-May-22.pdf PDF
Solicitation - FA480922B0001 - SJAFB SABER (Posted 19-Aug-22).pdf PDF
19. Contractor Production Report (QC Report) (8 pages) - EXAMPLE.pdf PDF
5. Environmental Management System Site-Specific Training (15 pages) dated April-22.pdf PDF
7.Section 02821 Centipede Grass Hydro-Seeding (10 pages) dated 24-May-22.pdf PDF
22. Wage Determinations (51 pages) dated 25-Feb-22.pdf PDF
13. AF Form 66 Schedule of Material Submittals (1 page) - BLANK.pdf PDF
2. SABER XI Statement of Work (65 pages) dated 12-Aug-22.pdf PDF
25. Minimum Requirement Project (VKAG 20-1040) - Statement of Objectives (5 pages) dated 9-May-22.pdf PDF
15. AF Form 3000 Material Approval Submittal (2 pages) - BLANK.pdf PDF
27. Pre-Proposal Conference and Site Visit Location Map (2 pages).pdf PDF
4. Section 01560 Environmental Management Supplement SJAFB Contractors (2 pages) dated 5-Jul-22.pdf PDF
26. Minimum Requirement Project (VKAG 20-1040) Drawings (Full Set) (7 pages) dated 1-Nov-20.pdf PDF
20. SJAFB Access Request Application (2 pages) - EDITABLE.pdf PDF
6. Section 02051 Asbestos Removal, Cleanup and Disposal, Facility Demolition (2 pages) dated 24-May-22.pdf PDF
24. Determination of Contractor Responsibility (3 pgs) - BLANK.pdf PDF
21. Climatic Data Summary for SJAFB (2 pages) dated 13-May-22.pdf PDF
11. Installation Development and Design (ID2) SJAFB (90 pages) dated Mar-11.pdf PDF
1. Nonapropriated Fund (NAF) Standard Clauses (21 pages) dated 2-Jun-22.pdf PDF
17. AF Form 3064 Contract Progress Schedule (3 pages) - EXAMPLE.pdf PDF
9. Seymour Johnson Mass Notification System Message Script (2 pages) dated 24-May-22.pdf PDF
8. Section 02938 Sod (2 pages) dated 24-May-22.pdf PDF
16. AF Form 3065 Contract Progress Report (1 page) - BLANK.pdf PDF
3. Section 01560 Environmental Protection (8 pages) dated 1-Jul-22.pdf PDF
Show all 48

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA480922B00010005

Request for Information

5-December-2022

Request for Information Regarding Statement of Objectives Minimum Requirement Project, VKAG 20-1040 dated 1-November-2022

Question: The Revised Statement of Objectives for the Minimum Requirement Project, page 7, paragraph 5 states, "The Contractor will not be installing/connecting the communication cable since all communication cable will be installed by someone else." However, paragraphs 6, 7, and 8 include instructions for cable and conduit installation. Please clarify whether or not SJAFB intends the contractor to install the communications cable for the minimum requirement project.

Response: Install the communications cable as identified in paragraphs 6, 7, and 8. A revised SOO to correct language in paragraph 5 will be posted.

Question: The Revised Statement of Objectives for the Minimum Requirement Project, page 7, paragraph 5 states, that the contractor shall "Install new communication cover plates on all new and existing communication outlets." The drawings released with Amendment 2 show seven existing communication outlets, all located within the demo area but do not show any other existing outlets. Are there existing outlets to remain and if so, how many?

Response: The drawings released with Amendment 2 do not show any existing communication outlets. Both keynotes 2 and 3 in drawing E-101 show locations of NEW communication ports to be installed. The Contractor is required to demolish all communication ports, associated conduit, and associated wire throughout office and waiting room areas excluding the utility closet.

Therefore, the only existing communication ports will be those left in the utility closet. The difference between notes 2 and 3 is that note 2 includes new receptacles along with the new communication outlets. The Contractor is responsible for determining the quantity and location of existing communication outlets.

Question: If there are existing outlets remaining, please confirm that the contractor is to install Category 6 lines to the new outlets only and that existing outlets are to be fitted with new cover plates and not be re-cabled. If additional existing outlets are to receive new cabling, please release revised drawings showing the number and location of these outlets and the cabling.

Response: See response to question #2.

Question: The revised statement of work 13.1.5.1. Preliminary Drawings, page 21, includes a requirement to include drawings of "proposed cable route(s)" with submission. Please confirm that these route drawings are not required for submission with the Minimum Requirement Project because of the solicitation instruction (dated 27-September, 2022) that "Bidders are not required to submit preliminary drawings at the time of bid submission."

Response: The proposed cable routes are not required for submission at the time of bid submission; they shall be required to be submitted with the preliminary drawings after award.