FA480922B00010005 Request for Information dated 5-December-2022.pdf
PDF 118 KB Posted
- Attached to
- Simplified Acquisition of Base Engineer Requirements (SABER) IDIQ at Seymour Johnson AFB, Goldsboro, NC.
- Solicitation number
- FA480922B0001
About this file
This document provides information regarding a solicitation for a Simplified Acquisition of Base Engineer Requirements (SABER) IDIQ contract at Seymour Johnson Air Force Base in North Carolina. The solicitation is set aside for 8(a) or 8(a) Joint Venture Small Businesses registered in the System for Award Management. The contract will encompass a wide variety of construction and maintenance tasks such as concrete, masonry, carpentry, plumbing, electrical work, roofing, pavement repair, excavation, welding, painting, site development, landscaping, asbestos and lead abatement. The period of performance is one base year with four one-year option periods and a six-month extension period. The bid opening is scheduled for October 4th, 2022. Bidders must be registered in SAM to be eligible for award.
View the file
Other files
Show all 48
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FA480922B00010005
Request for Information
5-December-2022
Request for Information Regarding Statement of Objectives Minimum Requirement Project, VKAG 20-1040 dated 1-November-2022
Question: The Revised Statement of Objectives for the Minimum Requirement Project, page 7, paragraph 5 states, "The Contractor will not be installing/connecting the communication cable since all communication cable will be installed by someone else." However, paragraphs 6, 7, and 8 include instructions for cable and conduit installation. Please clarify whether or not SJAFB intends the contractor to install the communications cable for the minimum requirement project.
Response: Install the communications cable as identified in paragraphs 6, 7, and 8. A revised SOO to correct language in paragraph 5 will be posted.
Question: The Revised Statement of Objectives for the Minimum Requirement Project, page 7, paragraph 5 states, that the contractor shall "Install new communication cover plates on all new and existing communication outlets." The drawings released with Amendment 2 show seven existing communication outlets, all located within the demo area but do not show any other existing outlets. Are there existing outlets to remain and if so, how many?
Response: The drawings released with Amendment 2 do not show any existing communication outlets. Both keynotes 2 and 3 in drawing E-101 show locations of NEW communication ports to be installed. The Contractor is required to demolish all communication ports, associated conduit, and associated wire throughout office and waiting room areas excluding the utility closet.
Therefore, the only existing communication ports will be those left in the utility closet. The difference between notes 2 and 3 is that note 2 includes new receptacles along with the new communication outlets. The Contractor is responsible for determining the quantity and location of existing communication outlets.
Question: If there are existing outlets remaining, please confirm that the contractor is to install Category 6 lines to the new outlets only and that existing outlets are to be fitted with new cover plates and not be re-cabled. If additional existing outlets are to receive new cabling, please release revised drawings showing the number and location of these outlets and the cabling.
Response: See response to question #2.
Question: The revised statement of work 13.1.5.1. Preliminary Drawings, page 21, includes a requirement to include drawings of "proposed cable route(s)" with submission. Please confirm that these route drawings are not required for submission with the Minimum Requirement Project because of the solicitation instruction (dated 27-September, 2022) that "Bidders are not required to submit preliminary drawings at the time of bid submission."
Response: The proposed cable routes are not required for submission at the time of bid submission; they shall be required to be submitted with the preliminary drawings after award.