This statement of objectives outlines the scope of work for renovating a visitor's center building at Seymour Johnson Air Force Base in North Carolina. The project includes demolishing the existing roof, interior finishes, HVAC system, desk, and flooring. It also includes installing a new standing seam roof, VCT flooring, service counter, suspended ceiling, baseboards, bathroom signs, lighting fixtures, receptacles, switches, ductwork, diffusers, grilles, package HVAC unit, water fountain, and communications drops. Optional work includes installing ballistic doors, service counter windows, exterior windows, interior doors, an anti-terrorism/force protection trash enclosure, and chain link fencing. Submittals are required for materials, plans, and specifications. The solicitation notice is for an invitation for bids to support base engineer requirements at Seymour Johnson AFB, Fort Fisher Recreation Area, and Dare County Bombing Range through a simplified acquisition of base engineer requirements indefinite-delivery/indefinite-quantity multiple award contract.
View the file
Other files
Show all 48
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF OBJECTIVES
VKAG 20-1040
RENOVATE VISITOR’S CENTER
BLDG: 1700
Seymour Johnson AFB
North Carolina
FA480922B0001
Attachment 25
General Scope of Work The work covered by this specification consists of furnishing all labor, equipment and material, and performing all work in connection with “RENOVATE VISITOR’S CENTER” on Seymour Johnson AFB NC, in strict accordance with specifications and drawings, and subject to the terms and conditions of this contract. The work covered by this contract includes, but is not limited to the following:
Description of Work General Demo Work:
Demolition includes, but is not limited to, roof, interior finishes, HVAC system, existing desk and flooring in area of work IAW drawings and specified by this Statement of Work.
New Work:
Applicable Building Codes:
The following Building Codes and regulations shall be followed during the design and construction of this project:
- 2018 North Carolina State Building Code
- 2018 NFPA Life Safety Code
- ADA Accessibility Guidelines for Buildings And Facilities
Refer to Whole Building Design Guide (WBDG.org) for specific Unified Facilities Criteria including, but not limited to, the following:
- UFC 1-200-01 DoD Building Code
- UFC 4-022-01 Security Engineering: Entry Control Facilities/Access Control Points
- UFC 3-530-01 Interior and Exterior Lighting Systems and Controls
Civil/Architectural Demo Work:
Demolition includes, but is not limited to, existing roof, existing service counter, tile throughout facility, existing HVAC diffusers and grilles and ceiling.
New Work:
- Provide and install new standing seam roof and associated downspouts/gutters
- Provide and install VCT throughout building including bathrooms and utility closet
- Provide and install new service counter/wall/door IAW drawings; the new service counter/wall will be built to UL 752 Level 3 protection standards using most cost effective method meeting standards; door will open towards the customer side IAW drawings and will not be UL 752 Level 3 rated if Bid Option 1 is not selected; the wall will have 3 openings at each service station sized appropriately to accept a 48”x48” UL 752 Level 3 service window if one is installed in a future project (see attached drawing for sample configuration) Counter height shall be 42”. Counter shall have one power outlet per workstation and cable management openings for each workstation.
- Provide and install solid surface counter tops IAW drawings at new service counter
- Provide and install new suspended ceiling throughout entire facility excluding the utility closet
FA480922B0001
- Provide and install new base throughout entire interior of facility including bathrooms and utility closet
- Provide new unisex bathroom signs on existing bathroom doors.
Electrical
Demolition includes, but is not limited to, removing and disposing of all existing light fixtures, receptacles and receptacle cover plates, light switches and cover plates and any conduit or wiring in existing service counter.
New Work:
- Provide and install new light fixtures IAW drawings that meet foot-candle requirements found in UFC 3-530-01 ensuring entire facility has adequate and proper lighting to specification; use existing electrical whips to max extent possible
- Provide and install new receptacles and cover plates throughout facility; new locations to be IAW drawings while existing locations will be replaced but not moved
- Provide and install new light switches and cover plates in existing locations
- Provide and install COMM drops IAW drawings; existing COMM drops are to remain in place if possible
Mechanical Demo Work:
Demolition includes, but is not limited to, removing and disposing of entire current HVAC system (package unit, existing ductwork and all diffusers/grilles) and existing water fountain.
New Work:
- Provide and install new appropriately sized package unit (minimum 3 ton)
- Size, provide and install new ductwork IAW drawings
- Size, provide and install insulation for duct work
- Provide and install new diffusers and grilles IAW drawings
- Provide and install new bathroom vents in existing locations
- Test and balance system to ensure proper air flow
- Provide and install water fountain with bottle filling station in existing water fountain location
Bid Option 1: Ballistic Doors and Service Counter windows
Demolition includes, but is not limited to, removing and disposing of rear exterior door.
New Work:
- Provide and install exterior UL 752 Level 3 door where existing door is to be demo’d on rear of building
FA480922B0001
- Provide and install two 60” by 48” UL 752 Level 3 windows to replace existing exterior windows in the secure area.
- Provide and install two 60”x48” aluminum blinds for exterior windows behind service desk.
- Provide and install three 48” by 48” UL 752 Level 3 service windows in openings in new service counter; they will require a pass through for paperwork and small items (IDs and pens); windows will be spaced from frame to allow for conversation without speaker/microphone or will require installation of speaker/microphone; a 1” hole with conduit will run from customer service side to military side to allow USB devices to be placed on service side but connected to military computers
- Provide and install interior UL 752 Level 3 door at new service counter wall IAW drawings
Bid Option 2: AT/FP
Demolition includes, but is not limited to, necessary earthwork to install trashcan pad and drilling holes in existing concrete for new fence post anchors.
New Work:
- Install new chain link cage with gate inside existing privacy fence; the chain link fence gate is to match existing gate; the top of the cage will be enclosed with chain link material NTE 5” spacing between wires; support the top of the cage appropriately to prevent sagging; height is to match roof eave height (approximately 8 ft)
- Provide and install IAW drawings a concrete pad and privacy fence/cover with opening gate for two 65 gallon trashcans; must be able to wheel trashcans out of privacy structure and able to place trash into bins without removing trashcans from fenced area; located 33’ from building near existing parking spaces
Drawings NICET certified individuals who prepared technical documents and drawings must identify their credentials within those documents/drawings. NICET information provided must include the certified individual’s full name, their NICET certification number, the relevant certification practice area attained, the level of certification held within that practice area, and their certification expiration date.
Example:
(Drawing/Document) (prepared/reviewed) by:
NAME First, Middle Initial, Last NICET Certification No. ###### Practice Area Attained - Level IV Certification Expires: Month Day, Year
Provide shop drawings, construction drawings and as-built drawings.
Submittals:
FA480922B0001
1. UL 752 Level 3 Wall Protective Material
2. Receptacle Data Sheets
3. VCT Flooring
4. Solid Surface Counter Top
5. Lighting Fixtures
6. HVAC Package Unit
7. HVAC Diffusers and Grilles
8. Bathroom Vents
9. Electrical Plan
10. Ductwork and Insulation Plan
11. Paint Colors
12. Standing Seam Metal Roof Materials
13. Bid Option 1: UL 752 Level 3 Windows
14. Bid Option 1: UL 752 Level 3 Doors
15. Bid Option 2: Chain Link Fence Materials
16. Bid Option 2: Trash Can Concealment Plan