9. Seymour Johnson Mass Notification System Message Script (2 pages) dated 24-May-22.pdf

PDF 2 MB Posted

Attached to
Simplified Acquisition of Base Engineer Requirements (SABER) IDIQ at Seymour Johnson AFB, Goldsboro, NC.
Solicitation number
FA480922B0001
Issued by

About this file

This solicitation notice announces an invitation for bids for an indefinite delivery indefinite quantity contract to provide maintenance, repair, alteration, and minor construction projects at Seymour Johnson Air Force Base, Fort Fisher Military Recreation Area, and Dare County Bombing Range in North Carolina. Services include work in concrete, masonry, carpentry, plumbing, HVAC, electrical, roofing, pavement repair, excavation, welding, painting, site development, landscaping, asbestos and lead abatement, and demolition. The base year of performance is 12 months with four 12-month option periods and a six-month extension period. Bids are due on October 4, 2022. Offerors must be registered in the System for Award Management. The solicitation will be set aside for certified 8(a) small businesses.

View the file

Other files

File Type Posted
FA480922B0001 - Bid Record - 14-Dec-22 (2 pages).pdf PDF
FA480922B0001 Abstract - Bid Opening 14-Dec-22 (4 pages).pdf PDF
Solicitation Amendment - FA480922B00010006 (Conformed) (83 pages) posted 7-December-2022.pdf PDF
Solicitation Amendment FA480922B00010006 SF 30 (4 pages) dated 7-December-22.pdf PDF
25. Min Rqmnt Proj (VKAG 20-1040) SOO (10 pgs) Rev 3 dtd 6-Dec-2022.pdf PDF
FA480922B00010005 Request for Information dated 5-December-2022.pdf PDF
25. Minimum Requirement Project (VKAG 20-1040) Statement of Objectives (REVISION 02) (10 pages) dated 1-November-2022.pdf PDF
Solicitation Amendment - FA480922B00010005 (Conformed) (87 pages) dated 28-November-2022.pdf PDF
Solicitation Amendment FA480922B00010005 SF 30 (13 pages) dated 28-November-2022.pdf PDF
2. SABER XI Statement of Work (67 pages) Revision 3 dated 26Oct22.pdf PDF
28. Section 271000 Building Telecommunications Cabling System (13 pages) dated 27-Oct-22.pdf PDF
Solicitation Amendment FA480922B00010004 SF 30 (3 pages) dated 14-October-2022.pdf PDF
Solicitation Amendment FA480922B00010003 SF 30 (10 pages) dated 27-September-2022.pdf PDF
2. SABER XI Statement of Work (66 pages) Revision dated 24-Sept-22.pdf PDF
26. Minimum Requirement Project (VKAG 20-1040) Drawings (Full Set) (8 pages) Revision dated 9-Sept-22.pdf PDF
Solicitation Amendment FA480922B00010002 SF 30 (9 pages) dated 22-September-2022.pdf PDF
25. Minimum Requirement Project (VKAG 20-1040) Statement of Objectives (9 pgs) Revision dtd 22-Sept-22.pdf PDF
SABER XI Requests for Information (RFIs) and Responses (19 pages) 20 September 2022.pdf PDF
Solicitation Amendment FA480922B00010001 SF 30 (2 pages) dated 9-September-2022.pdf PDF
12. AF Form 66 Schedule of Material Submittals - VKAG 22-1200 SABER Basic XI (1 page) Revision dated 6-September-22.pdf PDF
SABER XI PreBid Conference and Site Visit Meeting Minutes with Attachments (18 pages) dtd 30 Aug 22.pdf PDF
10. SJAFB Standard Engineering Drawing Preparation and Support (CAD Standards) (71 pages) dated 1-Dec-22.pdf PDF
23. SABER XI IDIQ Bid Schedule (2 pages) - BLANK.pdf PDF
18. Request for Information (1 page) - BLANK.pdf PDF
14. AF Form 103 Base Civil Engineering Work Clearance Request (2 pages) - BLANK.pdf PDF
12. AF Form 66 Schedule of Material Submittals - VKAG 22-1200 SABER Basic XI (1 page) dated 24-May-22.pdf PDF
Solicitation - FA480922B0001 - SJAFB SABER (Posted 19-Aug-22).pdf PDF
19. Contractor Production Report (QC Report) (8 pages) - EXAMPLE.pdf PDF
5. Environmental Management System Site-Specific Training (15 pages) dated April-22.pdf PDF
7.Section 02821 Centipede Grass Hydro-Seeding (10 pages) dated 24-May-22.pdf PDF
22. Wage Determinations (51 pages) dated 25-Feb-22.pdf PDF
13. AF Form 66 Schedule of Material Submittals (1 page) - BLANK.pdf PDF
2. SABER XI Statement of Work (65 pages) dated 12-Aug-22.pdf PDF
25. Minimum Requirement Project (VKAG 20-1040) - Statement of Objectives (5 pages) dated 9-May-22.pdf PDF
15. AF Form 3000 Material Approval Submittal (2 pages) - BLANK.pdf PDF
27. Pre-Proposal Conference and Site Visit Location Map (2 pages).pdf PDF
4. Section 01560 Environmental Management Supplement SJAFB Contractors (2 pages) dated 5-Jul-22.pdf PDF
26. Minimum Requirement Project (VKAG 20-1040) Drawings (Full Set) (7 pages) dated 1-Nov-20.pdf PDF
20. SJAFB Access Request Application (2 pages) - EDITABLE.pdf PDF
6. Section 02051 Asbestos Removal, Cleanup and Disposal, Facility Demolition (2 pages) dated 24-May-22.pdf PDF
24. Determination of Contractor Responsibility (3 pgs) - BLANK.pdf PDF
21. Climatic Data Summary for SJAFB (2 pages) dated 13-May-22.pdf PDF
11. Installation Development and Design (ID2) SJAFB (90 pages) dated Mar-11.pdf PDF
1. Nonapropriated Fund (NAF) Standard Clauses (21 pages) dated 2-Jun-22.pdf PDF
17. AF Form 3064 Contract Progress Schedule (3 pages) - EXAMPLE.pdf PDF
8. Section 02938 Sod (2 pages) dated 24-May-22.pdf PDF
16. AF Form 3065 Contract Progress Report (1 page) - BLANK.pdf PDF
3. Section 01560 Environmental Protection (8 pages) dated 1-Jul-22.pdf PDF
Show all 48

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARTMENT OF THE AIR FORCE

4TH FIGHTER WING (ACC)

SEYMOUR JOHNSON AFB, NC 27531 D

E

P A

R T M

ENT OF DE

F E

N S

E

U N

IT

ED STATES OF AM

ER

IC

A

Seymour Johnson AFB Mass Notification System Message Script

Switch Position # 1

Message Name/Description: All Clear

Pre-Alert Tone Type: No tone

Male or Female Voice: Female

Message Content: “All Clear All Clear The Event has been terminated Resume normal actions”

Switch Position # 2

Message Name/Description: LOCK DOWN

Pre-Alert Tone Type: No tone

Male or Female Voice: Female

Message Content: Lock Down, Lock down, Lock Down. Lock down your facility until the All Clear has been given.

Switch Position # 3

Message Name/Description: Evacuation

Pre-Alert Tone Type: Continuous 1k htz

Male or Female Voice: Female

Message Content: “Attention , Attention , Please Evacuate the building in a calm expedient manner and proceed to your designated rally point for further information “

Switch Position # 4

Message Name/Description: Bomb

Pre-Alert Tone Type: Continuous 1k htz

Male or Female Voice: Female

Message Content: “Attention , Attention, there has been a bomb threat near your area please stay calm and indoors until you receive further instruction”

Switch Position # 5

Message Name/Description: FPCon Increase

Pre-Alert Tone Type: Continuous 1k htz

Male or Female Voice: Female

Message Content: “Attention, Attention, implement increased FPCON. Contact your Unit Security Manager for futher instructions”

FA480922B0001

Attachment 9

Current as of 24-May-2022

Global Power For America

Switch Position # 6

Message Name/Description: Weather

Pre-Alert Tone Type: Continuous 1k htz

Male or Female Voice: Female

Message “Content: “Attention, Attention, hazardous Weather condition, Seek further information from local authorities, Take necessary precautions”

Switch Position # 7

Message Name/Description: Carbon Monoxide

Pre-Alert Tone Type: Temporal 4 Alert Tone Male or Female Voice: Female

Message Content: Attention, Attention. Carbon monoxide has been detected in the building. Please leave the building by the nearest exit.

Switch Position # 8

Message Name/Description: Test

Pre-Alert Tone Type: Continuous 1k htz

Male or Female Voice: Female

Message Content: “Attention, Attention, This is a Test of the Mass Notification system disregard all alarms until the All Clear is given.”

NOTE: the switch position number for the messages above also specifies the priority level

NAC / Dry Contact

Message Name/Description: Fire * Priority: Select a priority level.

Tone Type: Continuous 1k htz

Male or Female Voice: Female

Message Content: “May I have your attention please. May I have your attention please. A fire emergency has been reported in the building.

Please leave the building by the nearest exit or exit stairway.

Do not use the elevators.”

Any changes to this scrip shall comply with all UFC’s and building codes.

FA480922B0001

Attachment 9

Current as of 24-May-2022

File details come from the government source that posted it. Updated .