19. Contractor Production Report (QC Report) (8 pages) - EXAMPLE.pdf

PDF 2 MB Posted

Attached to
Simplified Acquisition of Base Engineer Requirements (SABER) IDIQ at Seymour Johnson AFB, Goldsboro, NC.
Solicitation number
FA480922B0001
Issued by

About this file

This document contains a contractor production report template and related quality control documents for a federal construction contract. The report templates require entry of contract details, weather data, work hours and descriptions, safety inspections, materials received, construction equipment used, and remarks. Related documents include preparatory and initial phase checklists, a rework items list, and a testing plan and log. The templates appear to be for documenting work progress and quality control for indefinite delivery/indefinite quantity construction contracts awarded by the Air Force Civil Engineer Center.

View the file

Other files

File Type Posted
FA480922B0001 - Bid Record - 14-Dec-22 (2 pages).pdf PDF
FA480922B0001 Abstract - Bid Opening 14-Dec-22 (4 pages).pdf PDF
Solicitation Amendment - FA480922B00010006 (Conformed) (83 pages) posted 7-December-2022.pdf PDF
Solicitation Amendment FA480922B00010006 SF 30 (4 pages) dated 7-December-22.pdf PDF
25. Min Rqmnt Proj (VKAG 20-1040) SOO (10 pgs) Rev 3 dtd 6-Dec-2022.pdf PDF
FA480922B00010005 Request for Information dated 5-December-2022.pdf PDF
25. Minimum Requirement Project (VKAG 20-1040) Statement of Objectives (REVISION 02) (10 pages) dated 1-November-2022.pdf PDF
Solicitation Amendment - FA480922B00010005 (Conformed) (87 pages) dated 28-November-2022.pdf PDF
Solicitation Amendment FA480922B00010005 SF 30 (13 pages) dated 28-November-2022.pdf PDF
2. SABER XI Statement of Work (67 pages) Revision 3 dated 26Oct22.pdf PDF
28. Section 271000 Building Telecommunications Cabling System (13 pages) dated 27-Oct-22.pdf PDF
Solicitation Amendment FA480922B00010004 SF 30 (3 pages) dated 14-October-2022.pdf PDF
Solicitation Amendment FA480922B00010003 SF 30 (10 pages) dated 27-September-2022.pdf PDF
2. SABER XI Statement of Work (66 pages) Revision dated 24-Sept-22.pdf PDF
26. Minimum Requirement Project (VKAG 20-1040) Drawings (Full Set) (8 pages) Revision dated 9-Sept-22.pdf PDF
Solicitation Amendment FA480922B00010002 SF 30 (9 pages) dated 22-September-2022.pdf PDF
25. Minimum Requirement Project (VKAG 20-1040) Statement of Objectives (9 pgs) Revision dtd 22-Sept-22.pdf PDF
SABER XI Requests for Information (RFIs) and Responses (19 pages) 20 September 2022.pdf PDF
Solicitation Amendment FA480922B00010001 SF 30 (2 pages) dated 9-September-2022.pdf PDF
12. AF Form 66 Schedule of Material Submittals - VKAG 22-1200 SABER Basic XI (1 page) Revision dated 6-September-22.pdf PDF
SABER XI PreBid Conference and Site Visit Meeting Minutes with Attachments (18 pages) dtd 30 Aug 22.pdf PDF
10. SJAFB Standard Engineering Drawing Preparation and Support (CAD Standards) (71 pages) dated 1-Dec-22.pdf PDF
23. SABER XI IDIQ Bid Schedule (2 pages) - BLANK.pdf PDF
18. Request for Information (1 page) - BLANK.pdf PDF
14. AF Form 103 Base Civil Engineering Work Clearance Request (2 pages) - BLANK.pdf PDF
12. AF Form 66 Schedule of Material Submittals - VKAG 22-1200 SABER Basic XI (1 page) dated 24-May-22.pdf PDF
Solicitation - FA480922B0001 - SJAFB SABER (Posted 19-Aug-22).pdf PDF
5. Environmental Management System Site-Specific Training (15 pages) dated April-22.pdf PDF
7.Section 02821 Centipede Grass Hydro-Seeding (10 pages) dated 24-May-22.pdf PDF
22. Wage Determinations (51 pages) dated 25-Feb-22.pdf PDF
13. AF Form 66 Schedule of Material Submittals (1 page) - BLANK.pdf PDF
2. SABER XI Statement of Work (65 pages) dated 12-Aug-22.pdf PDF
25. Minimum Requirement Project (VKAG 20-1040) - Statement of Objectives (5 pages) dated 9-May-22.pdf PDF
15. AF Form 3000 Material Approval Submittal (2 pages) - BLANK.pdf PDF
27. Pre-Proposal Conference and Site Visit Location Map (2 pages).pdf PDF
4. Section 01560 Environmental Management Supplement SJAFB Contractors (2 pages) dated 5-Jul-22.pdf PDF
26. Minimum Requirement Project (VKAG 20-1040) Drawings (Full Set) (7 pages) dated 1-Nov-20.pdf PDF
20. SJAFB Access Request Application (2 pages) - EDITABLE.pdf PDF
6. Section 02051 Asbestos Removal, Cleanup and Disposal, Facility Demolition (2 pages) dated 24-May-22.pdf PDF
24. Determination of Contractor Responsibility (3 pgs) - BLANK.pdf PDF
21. Climatic Data Summary for SJAFB (2 pages) dated 13-May-22.pdf PDF
11. Installation Development and Design (ID2) SJAFB (90 pages) dated Mar-11.pdf PDF
1. Nonapropriated Fund (NAF) Standard Clauses (21 pages) dated 2-Jun-22.pdf PDF
17. AF Form 3064 Contract Progress Schedule (3 pages) - EXAMPLE.pdf PDF
9. Seymour Johnson Mass Notification System Message Script (2 pages) dated 24-May-22.pdf PDF
8. Section 02938 Sod (2 pages) dated 24-May-22.pdf PDF
16. AF Form 3065 Contract Progress Report (1 page) - BLANK.pdf PDF
3. Section 01560 Environmental Protection (8 pages) dated 1-Jul-22.pdf PDF
Show all 48

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACTOR PRODUCTION REPORT

(ATTACH ADDITIONAL SHEETS IF NECESSARY)

DATE Enter Date (DD/MMM/YY)

CONTRACT NO

Enter Cnt# Here

TITLE AND LOCATION

Enter Title and Location of Construction Contract Here REPORT NO Enter Report # Here

CONTRACTOR

Enter The Contractor's Company Name Here

SUPERINTENDENT

Enter Superintendent's Name Here

AM WEATHER

Enter AM Weather Data Here

PM WEATHER

Enter PM Weather Data Here

MAX TEMP (F)

Enter Max Temp Here

MIN TEMP (F)

Enter Min Temp Here

WORK PERFORMED TODAY

Schedule

Activity No. WORK LOCATION AND DESCRIPTION EMPLOYER NUMBER TRADE HRS

JOB

SAFETY

WAS A JOB SAFETY MEETING HELD THIS DATE?

(If YES attach copy of the meeting minutes) YES NO

WERE THERE ANY LOST TIME ACCIDENTS THIS DATE?

(If YES attach copy of completed OSHA report) YES NO

TOTAL WORK HOURS ON JOB

SITE,

THIS DATE, INCL CON'T SHEETS

CUMULATIVE TOTAL OF WORK

HOURS FROM PREVIOUS

REPORT

WAS CRANE/MANLIFT/TRENCHING/SCAFFOLD/HV ELEC/HIGH WORK/ HAZMAT WORK DONE?

(If YES attach statement or checklist showing inspection performed.) YES NO

WAS HAZARDOUS MATERIAL/WASTE RELEASED INTO THE ENVIRONMENT? YES NO

(If YES attach description of incident and proposed action.)

TOTAL WORK HOURS FROM

START OF CONSTRUCTION

Activity No. LIST SAFETY ACTIONS TAKEN TODAY/SAFETY INSPECTIONS CONDUCTED SAFETY REQUIREMENTS HAVE BEEN MET.

EQUIPMENT/MATERIAL RECEIVED TODAY TO BE INCORPORATED IN JOB (INDICATE SCHEDULE ACTIVITY NUMBER)

Activity No. Submittal # Description of Equipment/Material Received

CONSTRUCTION AND PLANT EQUIPMENT ON JOB SITE TODAY. INDICATE HOURS USED AND SCHEDULE ACTIVITY NUMBER.

Activity No. Owner Description of Construction Equipment Used Today (incl Make and Model) Hours Used

Activity No. REMARKS

CONTRACTOR/SUPERINTENDENT DATE

FA480922B0001

Attachment 19

Current as of 24-May-2022

CONTRACTOR QUALITY CONTROL REPORT

(ATTACH ADDITIONAL SHEETS IF NECESSARY)

DATE Enter (DD/MMM/YY) REPORT Enter Rpt # Here

NO

PHASE CONTRACT NO Enter Cnt# Here CONTRACT TITLE Enter Title and Location of Construction Contract Here

PR

EP

A R

AT

O

R Y

WAS PREPARATORY PHASE WORK PREFORMED TODAY? YES NO

IF YES, FILL OUT AND ATTACH SUPPLEMENTAL PREPARATORY PHASE CHECKLIST.

Activity No. Definable Feature of Work Index #

IN

IT

IA

L

WAS INITIAL PHASE WORK PREFORMED TODAY? YES NO

IF YES, FILL OUT AND ATTACH SUPPLEMENTAL INITIAL PHASE CHECKLIST.

Activity No. Definable Feature of Work Index #

FO

LL

O W

-U P

WORK COMPLIES WITH CONTRACT AS APPROVED DURING INITIAL PHASE? YES NO

WORK COMPLIES WITH SAFETY REQUIREMENTS? YES NO

Schedule Activity No.

Description of Work, Testing Performed & By Whom, Definable Feature of Work, Specification Section, Location and List of Personnel Present

REWORK ITEMS IDENTIFIED TODAY (NOT CORRECTED BY CLOSE OF BUSINESS) REWORK ITEMS CORRECTED TODAY (FROM REWORK ITEMS LIST)

Activity No. Description Schedule Activity No. Description

REMARKS (Also Explain Any Follow-Up Phase Checklist Item From Above That Was Answered "NO"), Manuf. Rep On-Site, etc.

On behalf of the contractor, I certify that this report is complete and correct and equipment and material used and work performed during this reporting period is in compliance with the contract drawings and specifications to the best of my knowledge except as noted in this report. AUTHORIZED QC MANAGER AT SITE DATE

GOVERNMENT QUALITY ASSURANCE REPORT DATE

QUALITY ASSURANCE REPRESENTATIVE'S REMARKS AND/OR EXCEPTIONS TO THE REPORT

GOVERNMENT QUALITY ASSURANCE MANAGER DATE

INITIAL PHASE CHECKLIST SPEC SECTION DATE

Enter Spec Section # Here Enter Date (DD/MMM/YY)

CONTRACT NO DEFINABLE FEATURE OF WORK SCHEDULE ACT NO. INDEX #

Enter Cnt# Here Enter DFOW Here Enter Sched Act ID Here Enter Index# Here

GOVERNMENT REP NOTIFIED HOURS IN ADVANCE: YES NO

NAME POSITION COMPANY/GOVERNMENT

IDENTIFIY FULL COMPLIANCE WITH PROCEDURES IDENTIFIED AT PREPARATORY. COORDINATE PLANS, SPECIFICATIONS, AND SUBMITTALS.

COMMENTS:

ENSURE PRELIMINARY WORK IS COMPLETE AND CORRECT. IF NOT, WHAT ACTION IS TAKEN?

ESTABLISH LEVEL OF WORKMANSHIP.

WHERE IS WORK

LOCATED?

IS SAMPLE PANEL REQUIRED? YES NO

WILL THE INIITAL WORK BE CONSIDERED AS A SAMPLE? YES NO

(IF YES, MAINTAIN IN PRESENT CONDITION AS LONG AS POSSIBLE AND DESCRIBE LOCATION OF

SAMPLE)

RESOLVE ANY DIFFERENCES.

COMMENTS:

REVIEW JOB CONDITIONS USING EM 385-1-1 AND JOB HAZARD ANALYSIS

COMMENTS:

OTHER ITEMS OR REMARKS

PR

EL

IM

IN

A R

Y

PR

O C

ED

U

R E

C O

M

PL

IA

NC

E O

TH

ER

C

H

EC

K S

A

FE

TY

R

ES

O

LU

TI

O

N

W

R K

M A

N

SH

IP

PE

SO

N

N

EL

P

RE

SE

N

T

QC MANAGER DATE

FA480922B0001

Attachment 19

Instructions for Using Report Forms in MS-Word

In the Report Header, fields that have instructional text such as “Enter Title and Location of Construction Contract Here” prompt the user to enter the information in a specific location, governed by the field. Single mouse click anywhere in the field and the field will darken. Entry of text/data at this point will delete the instructional text in the field and will be replaced with entered text/data.

All check boxes are all defaulted as unchecked (i.e.; ). To check the box (i.e.; ), double click the box and the “Check Box Form Field Options” box will appear. In the “Default value” section of the box, click in the Radio Button for “Checked”, then click on the “OK” button and the box will be checked.

The “Hour” fields where intentionally not programmed to total. If the Contractor deleted the formula in a field within the range that was to be totaled, the total would be wrong.

With the ability to [unlimitedly] expand the Contractor Production Report and Contractor Quality Control Representative Report, their Continuation Sheets are obsolete.

In the footer of each form are data fields for the Sheet number and the total number of sheets in the report (Sheet 1 of 2). The first number will generate itself when pages of the report are added. But MS-Word will not automatically update the second number. To update the NumPages field, click the field or the field results and then press F9. You can also click Options in the Tools menu, click the Print tab, and then select the Update fields check box.

PREPARATORY PHASE CHECKLIST SPEC SECTION DATE

(CONTINUED ON SECOND PAGE) Enter Spec Section # Here Enter Date (DD/MMM/YY)

CONTRACT NO DEFINABLE FEATURE OF WORK SCHEDULE ACT NO. INDEX #

Enter Cnt# Here Enter DFOW Here Enter Sched Act ID Here Enter Index# Here

GOVERNMENT REP HOURS IN ADVANCE: NOTIFIED

NAME POSITION COMPANY/GOVERNMENT

REVIEW SUBMITTALS AND/OR SUBMITTAL REGISTER. HAVE ALL SUBMITTALS BEEN APPROVED? YES NO

IF NO, WHAT ITEMS HAVE NOT BEEN SUBMITTED?

ARE ALL MATERIALS ON HAND? YES NO

IF NO, WHAT ITEMS ARE

MISSING?

CHECK APPROVED SUBMITTALS AGAINST DELIVERED MATERIAL. (THIS SHOULD BE DONE AS MATERIAL ARRIVES.)

COMMENTS:

ARE MATERIALS STORED PROPERLY? YES NO

IF NO, WHAT ACTION IS TAKEN?

REVIEW EACH PARAGRAPH OF SPECIFICATIONS.

DISCUSS PROCEDURE FOR ACCOMPLISHING THE

WORK.

CLARIFY ANY DIFFERENCES.

ENSURE PRELIMINARY WORK IS CORRECT AND PERMITS ARE ON FILE.

IF NOT, WHAT ACTION IS TAKEN?

YES

PR

EL

IM

IN

A R

Y W

O R

K

M

IT

S

M A

TE

R

IA

L

ST

O

RA

G

E

SP

EC

IF

IC

A

TI

NS

SU

B

M

IT

TA

LS

SO

N N

EL

P

RE

SE

N T

FA480922B0001

Attachment 19

TE

ST

IN

G

IDENTIFY TEST TO BE PERFORMED, FREQUENCY, AND BY

WHOM.

WHEN REQUIRED?

WHERE REQUIRED?

REVIEW TESTING PLAN.

HAS TEST FACILITIES BEEN

APPROVED?

SA

FE

TY

ACTIVITY HAZARD ANALYSIS APPROVED?

REVIEW APPLICABLE PORTION OF EM 385-1-1.

YES NO

M

EE

TI

N G

C O

M M

EN

TS

NAVY/ROICC COMMENTS DURING MEETING.

TH

ER

IT

EM

S O

R R

EM

A

KS

OTHER ITEMS OR REMARKS:

QC MANAGER DATE

Attachment 19

REWORK ITEMS LIST

Contract No. and Title: Enter Contract # and Title Here

Contractor: Enter Contractor's Company Name Here

NUMBER

DATE

IDENTIFIED

DESCRIPTION

CONTRACT

REQUIREMENT

(Spec. Section and Par. No., Drawing No.

and Detail No., etc.)

ACTION TAKEN

BY QC MANAGER

RESOLUTION

DATE

COMPLETED

TESTING PLAN AND LOG

CONTRACT NUMBER

Enter Contract # Here

PROJECT TITLE AND LOCATION

Enter Contract Title and Location Here

CONTRACTOR

Enter Contractor's Company Name Here

SPECIFICATION

SECTION

AND

PARAGRAPH

NUMBER

ITEM

OF

WORK TEST REQUIRED

ACCREDITED/

APPROVED

LAB

SAMPLED BY TESTED BY

LOCATION

OF TEST

DATE

COMPLETED

DATE

FORWARDED

TO

CONTR. OFF. REMARKS YES NO

ON

SITE

OFF

SITE

FA480922B0001

Attachment 19

PREPARATORY PHASE CHECKLIST
TESTING PLAN AND LOG

File details come from the government source that posted it. Updated .