MACC - Solicitation wage determination.docx

DOCX document 47 KB Posted

Attached to
Beale AFB MACC Federal contract opportunity
Solicitation number
FA4686-11-R-0012
Issued by
Department of the Air Force Air Combat Command

View the file

Other files for this federal contract opportunity

Other files attached to Beale AFB MACC, newest first.
File Type Posted
Amendment 5.doc DOC document
Response to Questions 8.docx DOCX document
Response to Questions 7.docx DOCX document
Sign In Sheet.pdf PDF
Response to Questions 6.docx DOCX document
Original Warehouse - Mech.PDF PDF
1986 Office Addition - Cover Page.PDF PDF
Original Warehouse - Elec.PDF PDF
Original Warehouse - Util.PDF PDF
1986 Office Addition - Elec-Mech.PDF PDF
Response to Questions 5.docx DOCX document
Response to Questions 4-.doc DOC document
Attachment 1 SOW 15 July 11.docx DOCX document
Amendment 4.doc DOC document
Beale AFB Design Compatibility Guide August 2009.pdf PDF
Amendment 3.doc DOC document
AF 3052 - Constr Cost Est Breakdown w cont.xls XLS spreadsheet
Response to Questions 3-.docx DOCX document
Amendment 2.doc DOC document
Response to Questions 2.docx DOCX document
Attachment 1 SOW 7 July 11.docx DOCX document
Amendment1.doc DOC document
Response to Questions 1.docx DOCX document
5704 Floor Plan —
MACC - Solicitation Attachment 1.docx DOCX document
CONTRACTOR PAST PERFORMANCE EVALUATION QUESTIONNAIRE.docx DOCX document
MACC ACC Approved solicitation.doc DOC document
Show all 27

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 1

FA4686-11-R-0012

Repairs to B5704, 940th Medical Warehouse
Revised: 22nd MOD on 3 June 2011

BAEY 10-4007

General Decision Number: CA100009 06/03/2011 CA9

Superseded General Decision Number: CA20080009

State: California

Construction Types: Building, Heavy (Heavy and Dredging) and Highway

Counties: Alpine, Amador, Butte, Colusa, El Dorado, Glenn, Lassen, Marin, Modoc, Napa, Nevada, Placer, Plumas, Sacramento, Shasta, Sierra, Siskiyou, Solano, Sonoma, Sutter, Tehama, Trinity, Yolo and Yuba Counties in California.

BUILDING CONSTRUCTION PROJECTS (excluding Amador County only);

DREDGING CONSTRUCTION PROJECTS (does not include hopper dredge work); HEAVY CONSTRUCTION PROJECTS (does not include water well drilling); AND HIGHWAY CONSTRUCTION PROJECTS

Modification Number Publication Date 0 03/12/2010 1 03/26/2010 2 07/02/2010 3 07/09/2010 4 08/13/2010 5 08/27/2010 6 09/10/2010 7 09/24/2010 8 10/01/2010 9 10/15/2010 10 10/29/2010 11 11/05/2010 12 11/19/2010 13 12/03/2010 14 01/21/2011 15 01/28/2011 16 02/11/2011 17 02/18/2011 18 03/18/2011 19 04/08/2011 20 04/15/2011 21 05/13/2011 22 06/03/2011

ASBE0016-001 01/01/2010

AREA 1: ALAMEDA, CONTRA COSTA, LAKE, MARIN, MENDOCINO,

MONTEREY, NAPA, SAN BENITO, SAN FRANCISCO, SAN MATEO, SANTA

CLARA, SANTA CRUZ, SOLANO, & SONOMA COUNTIES

AREA 2: ALPINE, AMADOR, BUTTE, CALAVERAS, COLUSA, DEL NORTE,

EL DORADO, FRESNO, GLENN, HUMBOLDT, KINGS, LASSEN, MADERA,

MARIPOSA, MERCED, MODOC, MONO, NEVADA, PLACER, PLUMAS,

SACRAMENTO, SAN JOAQUIN, SHASTA, SIERRA, SISKIYOU, STANISLAU,

SUTTER, TEHEMA, TRINITY, TULARE, TUOLUMNE, YOLO, & YUBA COUNTIES

Rates Fringes

Asbestos Workers/Insulator (Includes the application of all insulating materials, Protective Coverings, Coatings, and Finishes to all types of mechanical systems) Area 1......................$ 50.43 16.66 Area 2......................$ 39.78 16.66

ASBE0016-007 01/01/2010

Rates Fringes

Asbestos Removal worker/hazardous material handler (Includes preparation, wetting, stripping, removal, scrapping, vacuuming, bagging and disposing of all insulation materials from mechanical systems, whether they contain asbestos or not)....$ 15.18 2.80

BOIL0549-002 01/01/2009

Rates Fringes

BOILERMAKER

(1) Marin & Solano Counties.$ 40.17 22.32

(2) Remaining Counties......$ 37.01 22.25

BRCA0003-001 08/01/2008

Rates Fringes

MARBLE FINISHER..................$ 28.02 12.12

BRCA0003-004 05/01/2010

AREA 1: ALPINE, AMADOR, BUTTE, COLUSA, EL DORADO, GLENN,

LASSEN, MODOC, NEVADA, PLACER, PLUMAS, SACRAMENTO, SHASTA,

SIERRA, SUTTER, TEHAMA, YOLO AND YUBA COUNTIES

AREA 2: MARIN, NAPA, SISKIYOU, SOLANO, SONOMA AND TRINITY

COUNTIES

BRICKLAYER

AREA 1......................$ 33.86 18.24

AREA 2......................$ 39.10 20.97

SPECIALTY PAY:

(A) Underground work such as tunnel work, sewer work, manholes, catch basins, sewer pipes and telephone conduit shall be paid $1.25 per hour above the regular rate. Work in direct contact with raw sewage shall receive $1.25 per hour in addition to the above.

(B) Operating a saw or grinder shall receive $1.25 per hour above the regular rate.

(C) Gunite nozzle person shall receive $1.25 per hour above the regular rate.

BRCA0003-008 07/01/2010

Rates Fringes

TERRAZZO FINISHER................$ 30.30 13.77

TERRAZZO WORKER/SETTER...........$ 39.30 21.20

BRCA0003-010 01/01/2011

Rates Fringes

TILE FINISHER

Area 1......................$ 21.21 10.01 Area 2......................$ 21.26 12.44 Area 3......................$ 21.44 12.31 Area 4......................$ 20.93 11.79 Tile Layer Area 1......................$ 36.08 11.95 Area 2......................$ 34.41 13.68 Area 3......................$ 38.61 13.73 Area 4......................$ 35.45 13.68

AREA 1: Butte, Colusa, El Dorado, Glenn, Lassen, Modoc, Nevada, Placer, Plumas, Sacramento, Shasta, Sierra, Sutter, Tehema, Yolo, Yuba AREA 2: Alpine, Amador AREA 3: Marin, Napa, Solano, Siskiyou AREA 4: Sonoma

BRCA0003-014 08/01/2008

Rates Fringes

MARBLE MASON.....................$ 39.22 18.58

CARP0034-001 07/01/2010

Rates Fringes

Diver Assistant Tender, ROV Tender/Technician...........$ 36.75 26.34 Diver standby...............$ 41.43 26.34 Diver Tender................$ 40.43 26.34 Diver wet...................$ 82.86 26.34 Manifold Operator (mixed gas)........................$ 45.43 26.34 Manifold Operator (Standby).$ 40.43 26.34

DEPTH PAY (Surface Diving):

050 to 100 ft $2.00 per foot 101 to 150 ft $3.00 per foot 151 to 220 ft $4.00 per foot

SATURATION DIVING:

The standby rate shall apply until saturation starts. The saturation diving rate applies when divers are under pressure continuously until work task and decompression are complete. The diver rate shall be paid for all saturation hours.

DIVING IN ENCLOSURES:

Where it is necessary for Divers to enter pipes or tunnels, or other enclosures where there is no vertical ascent, the following premium shall be paid: Distance traveled from entrance 26 feet to 300 feet: $1.00 per foot. When it is necessary for a diver to enter any pipe, tunnel or other enclosure less than 48" in height, the premium will be $1.00 per foot.

WORK IN COMBINATION OF CLASSIFICATIONS:

Employees working in any combination of classifications within the diving crew (except dive supervisor) in a shift are paid in the classification with the highest rate for that shift.

CARP0034-003 07/01/2010

Rates Fringes

Piledriver.......................$ 36.75 26.34

CARP0035-001 08/01/2010

AREA 1: MARIN, NAPA, SOLANO & SONOMA

AREA 3: SACRAMENTO

AREA 4: ALPINE, BUTTE, COLUSA, EL DORADO, GLENN, LASSEN,

MODOC, NEVADA, PLACER, PLUMAS, SHASTA, SIERRA, SISKIYOU,

SUTTER, TEHAMA, TRINITY, YOLO & YUBA

Drywall Installers/Lathers:

Area 1......................$ 37.50 23.58 Area 3......................$ 31.67 23.58 Area 4......................$ 30.77 23.58 Drywall Stocker/Scrapper Area 1......................$ 18.75 14.40 Area 3......................$ 15.84 14.40 Area 4......................$ 15.39 14.40

CARP0035-009 07/01/2010

Marin County

Rates Fringes

CARPENTER

Bridge Builder/Highway Carpenter...................$ 37.50 23.14 Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer.......................$ 37.65 23.14 Journeyman Carpenter........$ 37.50 23.14 Millwright..................$ 37.60 24.73

CARP0035-010 07/01/2010

AREA 1: Marin, Napa, Solano & Sonoma Counties

AREA 2: Alpine, San Benito and Santa Cruz

AREA 3: Alpine, Butte, Colusa, El Dorado, Glenn, Lassen, Modoc, Nevada, Placer, Plumas, Sacramento, Shasta, Sierra, Siskiyou, Sutter, Tehama, Trinity, Yolo & Yuba counties

Modular Furniture Installer Area 1 Installer I................$ 22.11 14.98 Installer II...............$ 18.68 14.98 Lead Installer.............$ 25.56 15.48 Master Installer...........$ 29.78 15.48 Area 2 Installer I................$ 19.46 14.98 Installer II...............$ 16.51 14.98 Lead Installer.............$ 22.43 15.48 Master Installer...........$ 26.06 15.48 Area 3 Installer I................$ 18.51 14.98 Installer II...............$ 15.74 14.98 Lead Installer.............$ 21.31 15.48 Master Installer...........$ 24.73 15.48

CARP0046-001 07/01/2010

El Dorado (West), Placer (West), Sacramento and Yolo Counties

Rates Fringes

Carpenters Bridge Builder/Highway Carpenter...................$ 37.50 23.14 Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer.......................$ 31.32 23.14 Journeyman Carpenter........$ 31.62 23.14 Millwright..................$ 33.67 24.73

Footnote: Placer County (West) includes territory West of and including Highway 49 and El Dorado County (West) includes territory West of and including Highway 49 and territory inside the city limits of Placerville.

CARP0046-002 07/01/2010

Alpine, Colusa, El Dorado (East), Nevada, Placer (East), Sierra, Sutter and Yuba Counties

Carpenters Bridge Builder/Highway Carpenter...................$ 37.50 23.14 Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer.......................$ 30.42 23.14 Journeyman Carpenter........$ 30.27 23.14 Millwright..................$ 34.12 24.73

CARP0152-003 07/01/2010

Amador County

Rates Fringes

Carpenters Bridge Builder/Highway Carpenter...................$ 37.50 23.14 Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer.......................$ 30.42 23.14 Journeyman Carpenter........$ 30.27 23.14 Millwright..................$ 32.77 24.73

CARP0180-001 07/01/2010

Solano County

Rates Fringes

Carpenters Bridge Builder/Highway Carpenter...................$ 37.50 23.14 Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer.......................$ 37.65 23.14 Journeyman Carpenter........$ 37.50 23.14 Millwright..................$ 37.60 24.73

CARP0751-001 07/01/2010

Napa and Sonoma Counties

Rates Fringes

Carpenters Bridge Builder/Highway Carpenter...................$ 37.50 23.14 Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer.......................$ 37.65 23.14 Journeyman Carpenter........$ 37.50 23.14 Millwright..................$ 37.60 24.73

CARP1599-001 07/01/2010

Butte, Glenn, Lassen, Modoc, Plumas, Shasta, Siskiyou, Tehama and Trinity Counties

Carpenters Bridge Builder/Highway Carpenter...................$ 37.50 23.14 Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer.......................$ 30.42 23.14 Journeyman Carpenter........$ 30.27 23.14 Millwright..................$ 32.77 24.73

ELEC0006-002 12/01/2008

MARIN, NAPA, SOLANO & SONOMA COUNTIES

Rates Fringes

Sound & Communications Installer...................$ 29.87 3%+11.95 Technician..................$ 34.01 3%+11.95

SCOPE OF WORK INCLUDES-

SOUND & VOICE TRANSMISSION (Music, Intercom, Nurse Call, Telephone); FIRE ALARM SYSTEMS [excluding fire alarm work when installed in raceways (including wire and cable pulling) and when performed on new or major remodel building projects or jobs], TELEVISION & VIDEO SYSTEMS, SECURITY SYSTEMS, COMMUNICATIONS

SYSTEMS that transmit or receive information and/or control systems that are intrinsic to the above.

EXCLUDES-

Excludes all other data systems or multiple systems which include control function or power supply; excludes installation of raceway systems, line voltage work, industrial work, life-safety systems (all buildings having floors located more than 75' above the lowest floor level having building access); excludes energy management systems.

ELEC0180-001 06/01/2010

NAPA AND SOLANO COUNTIES

Rates Fringes

CABLE SPLICER....................$ 46.92 3%+18.10

ELECTRICIAN......................$ 41.71 3%+18.10

ELEC0340-002 12/01/2010

ALPINE, AMADOR, BUTTE, COLUSA, EL DORADO, GLENN, LASSEN,

NEVADA, PLACER, PLUMAS, SACRAMENTO, TRINITY, YOLO, YUBA COUNTIES

Communications System Sound & Communications Installer...................$ 24.13 3%+10.65 Sound & Communications Technician..................$ 27.75 3%+10.65

SCOPE OF WORK

Includes the installation testing, service and maintenance, of the following systems which utilize the transmission and/or transference of voice, sound, vision and digital for commercial, education, security and entertainment purposes for the following TV monitoring and surveillance, background-foreground music, intercom and telephone interconnect, inventory control systems, microwave transmission, multi-media, multiplex, nurse call system, radio page, school intercom and sound, burglar alarms, and low voltage master clock systems.

A. SOUND AND VOICE TRANSMISSION/TRANSFERENCE SYSTEMS

Background foreground music Intercom and telephone interconnect systems, Telephone systems, Nurse call systems, Radio page systems, School intercom and sound systems, Burglar alarm systems, Low voltage master clock systems, Multi-media/multiplex systems, Sound and musical entertainment systems, RF systems, Antennas and Wave Guide.

B. FIRE ALARM SYSTEMS

Installation, wire pulling and testing

C. TELEVISION AND VIDEO SYSTEMS Television monitoring and surveillance systems, Video security systems, Video entertainment systems, Video educational systems, Microwave transmission systems, CATV and CCTV

D. SECURITY SYSTEMS Perimeter security systems Vibration sensor systems Card access systems Access control systems Sonar/infrared monitoring equipment

E. COMMUNICATIONS SYSTEMS THAT TRANSMIT OR RECEIVE

INFORMATION AND/OR CONTROL SYSTEMS THAT ARE INTRINSIC TO

THE ABOVE LISTED SYSTEMS SCADA (Supervisory Control and Data Acquisition) PCM (Pulse Code Modulation) Inventory Control Systems Digital Data Systems Broadband and Baseband and Carriers Point of Sale Systems VSAT Data Systems Data Communication Systems RF and Remote Control Systems Fiber Optic Data Systems WORK EXCLUDED Raceway systems are not covered (excluding Ladder-Rack for the purpose of the above listed systems). Chases and/or nipples (not to exceed 10 feet) may be installed on open wiring systems. Energy management systems. SCADA (Supervisory Control and Data Acquisition) when not intrinsic to the above listed systems (in the scope). Fire alarm systems when installed in raceways (including wire and cable pulling) shall be performed at the electrician wage rate, when either of the following two

(2) conditions apply:

1. The project involves new or major remodel building trades construction.

2. The conductors for the fire alarm system are installed in conduit.

* ELEC0340-003 06/01/2011

ALPINE (West of Sierra Mt. Watershed), AMADOR, BUTTE, COLUSA, EL DORADO (West of Sierra Mt. Watershed), GLENN, LASSEN, NEVADA (West of Sierra Mt. Watershed), PLACER, PLUMAS, SACRAMENTO, SHASTA, SIERRA (West of Sierra Mt. Watershed), SUTTER, TEHAMA, TRINITY, YOLO & YUBA COUNTIES

ELECTRICIAN

Remaining area..............$ 38.93 16.57 Sierra Army Depot, Herlong..$ 48.66 3%+13.25 Tunnel work.................$ 40.88 3%+13.25

CABLE SPLICER: Receives 110% of the Electrician basic hourly rate.

ELEC0401-005 12/01/2009

ALPINE (east of the main watershed divide), EL DORADO (east of the main watershed divide), NEVADA (east of the main watershed), PLACER (east of the main watershed divide) and SIERRA (east of the main watershed divide) COUNTIES:

ELECTRICIAN......................$ 35.40 13.02+3%

ELEC0551-004 06/01/2009

MARIN AND SONOMA COUNTIES

Rates Fringes

ELECTRICIAN......................$ 44.00 3%+13.00

ELEC0659-006 01/01/2011

DEL NORTE, MODOC and SISKIYOU COUNTIES

Rates Fringes

ELECTRICIAN......................$ 29.78 3%+$13.55

ELEC0659-008 02/01/2010

DEL NORTE, MODOC & SISKIYOU COUNTIES

Rates Fringes

Line Construction

(1) Cable Splicer...........$ 47.34 13.74

(2) Lineman, Pole Sprayer, Heavy Line Equipment Man....$ 42.27 13.54

(3) Tree Trimmer............$ 29.70 9.94

(4) Line Equipment Man......$ 36.35 10.85

(5) Powdermen, Jackhammermen...............$ 31.90 10.00

(6) Groundman...............$ 29.59 10.24

ELEC1245-004 06/01/2009

ALL COUNTIES EXCEPT DEL NORTE, MODOC & SISKIYOU

Rates Fringes

LINE CONSTRUCTION

(1) Lineman; Cable splicer..$ 44.47 13.11

(2) Equipment specialist (operates crawler tractors, commercial motor vehicles, backhoes, trenchers, cranes (50 tons and below), overhead & underground distribution line equipment)...........$ 35.52 12.07

(3) Groundman...............$ 27.17 11.82

(4) Powderman...............$ 39.71 12.23

HOLIDAYS: New Year's Day, M.L. King Day, Memorial Day, Independence Day, Labor Day, Veterans Day, Thanksgiving Day and day after Thanksgiving, Christmas Day

ELEV0008-001 01/01/2010

Rates Fringes

ELEVATOR MECHANIC................$ 54.89 20.035

FOOTNOTE:

PAID VACATION: Employer contributes 8% of regular hourly rate as vacation pay credit for employees with more than 5 years of service, and 6% for 6 months to 5 years of service.

PAID HOLIDAYS: New Years Day, Memorial Day, Independence Day, Labor Day, Veterans Day, Thanksgiving Day, Friday after Thanksgiving, and Christmas Day.

ENGI0003-008 07/01/2009

Rates Fringes

Dredging: (DREDGING:

CLAMSHELL & DIPPER DREDGING;

HYDRAULIC SUCTION DREDGING:)

AREA 1:

(1) Leverman...............$ 38.94 22.58

(2) Dredge Dozer; Heavy duty repairman.............$ 33.98 22.58

(3) Booster Pump Operator; Deck Engineer; Deck mate;

Dredge Tender; Winch Operator...................$ 32.86 22.58

(4) Bargeman; Deckhand;

Fireman; Leveehand; Oiler..$ 29.56 22.58

AREA 2:

(1) Leverman...............$ 40.94 22.58

(2) Dredge Dozer; Heavy duty repairman.............$ 35.98 22.58

(3) Booster Pump Operator; Deck Engineer; Deck mate;

Dredge Tender; Winch Operator...................$ 34.86 22.58

(4) Bargeman; Deckhand;

Fireman; Leveehand; Oiler..$ 31.56 22.58

AREA DESCRIPTIONS

AREA 1: ALAMEDA,BUTTE, CONTRA COSTA, KINGS, MARIN, MERCED,

NAPA, SACRAMENTO, SAN BENITO, SAN FRANCISCO, SAN JOAQUIN,

SAN MATEO, SANTA CLARA, SANTA CRUZ, SOLANO, STANISLAUS,

SUTTER, YOLO, AND YUBA COUNTIES

AREA 2: MODOC COUNTY

THE REMAINGING COUNTIES ARE SPLIT BETWEEN AREA 1 AND AREA 2

AS NOTED BELOW:

ALPINE COUNTY:

Area 1: Northernmost part Area 2: Remainder

CALAVERAS COUNTY:

Area 1: Remainder Area 2: Eastern part

COLUSA COUNTY:

Area 1: Eastern part Area 2: Remainder

ELDORADO COUNTY:

Area 1: North Central part Area 2: Remainder

FRESNO COUNTY:

Area 1: Remainder Area 2: Eastern part

GLENN COUNTY:

Area 1: Eastern part Area 2: Remainder

LASSEN COUNTY:

Area 1: Western part along the Southern portion of border with Shasta County Area 2: Remainder

MADERA COUNTY:

Area 1: Except Eastern part Area 2: Eastern part

MARIPOSA COUNTY

Area 1: Except Eastern part Area 2: Eastern part

MONTERREY COUNTY

Area 1: Except Southwestern part Area 2: Southwestern part

NEVADA COUNTY:

Area 1: All but the Northern portion along the border of Sierra County Area 2: Remainder

PLACER COUNTY:

Area 1: Al but the Central portion Area 2: Remainder

PLUMAS COUNTY:

Area 1: Western portion Area 2: Remainder

SHASTA COUNTY:

Area 1: All but the Northeastern corner Area 2: Remainder

SIERRA COUNTY:

Area 1: Western part Area 2: Remainder

SISKIYOU COUNTY:

Area 1: Central part Area 2: Remainder

SONOMA COUNTY:

Area 1: All but the Northwestern corner Area 2: Remainder

TEHAMA COUNTY:

Area 1: All but the Western border with Mendocino & Trinity Counties Area 2: Remainder

TRINITY COUNTY:

Area 1: East Central part and the Northeastern border with Shasta County Area 2: Remainder

TUOLUMNE COUNTY:

Area 1: Except Eastern part Area 2: Eastern part

ENGI0003-018 07/01/2010

"AREA 1" WAGE RATES ARE LISTED BELOW

"AREA 2" RECEIVES AN ADDITIONAL $2.00 PER HOUR ABOVE AREA 1

RATES.

SEE AREA DEFINITIONS BELOW

OPERATOR: Power Equipment

(AREA 1:)

GROUP 1.....................$ 37.77 23.00

GROUP 2.....................$ 36.24 23.00

GROUP 3.....................$ 34.76 23.00

GROUP 4.....................$ 33.38 23.00

GROUP 5.....................$ 32.11 23.00

GROUP 6.....................$ 30.79 23.00

GROUP 7.....................$ 29.65 23.00

GROUP 8.....................$ 28.51 23.00

GROUP 8-A...................$ 28.30 23.00

OPERATOR: Power Equipment (Cranes and Attachments -

AREA 1:)

GROUP 1

Cranes.....................$ 38.65 23.00 Oiler......................$ 29.39 23.00 Truck crane oiler..........$ 31.68 23.00

GROUP 2

Cranes.....................$ 36.89 23.00 Oiler......................$ 29.18 23.00 Truck crane oiler..........$ 31.42 23.00

GROUP 3

Cranes.....................$ 35.14 23.00 Hydraulic..................$ 30.79 23.00 Oiler......................$ 28.90 23.00 Truck Crane Oiler..........$ 31.18 23.00 OPERATOR: Power Equipment (Piledriving - AREA 1:)

GROUP 1

Lifting devices............$ 38.99 23.00 Oiler......................$ 29.73 23.00 Truck crane oiler..........$ 32.01 23.00

GROUP 2

Lifting devices............$ 37.17 23.00 Oiler......................$ 29.46 23.00 Truck Crane Oiler..........$ 31.76 23.00

GROUP 3

Lifting devices............$ 35.49 23.00 Oiler......................$ 29.24 23.00 Truck Crane Oiler..........$ 31.47 23.00

GROUP 4.....................$ 33.72 23.00

GROUP 5.....................$ 31.08 23.00

GROUP 6.....................$ 28.85 23.00

OPERATOR: Power Equipment (Steel Erection - AREA 1:)

GROUP 1

Cranes.....................$ 39.62 23.00 Oiler......................$ 30.07 23.00 Truck Crane Oiler..........$ 32.30 23.00

GROUP 2

Cranes.....................$ 37.85 23.00 Oiler......................$ 29.80 23.00 Truck Crane Oiler..........$ 32.08 23.00

GROUP 3

Cranes.....................$ 36.37 23.00 Hydraulic..................$ 31.42 23.00 Oiler......................$ 29.58 23.00 Truck Crane Oiler..........$ 31.81 23.00

GROUP 4.....................$ 34.35 23.00

GROUP 5.....................$ 33.05 23.00

OPERATOR: Power Equipment (Tunnel and Underground Work

- AREA 1:)

SHAFTS, STOPES, RAISES:

GROUP 1....................$ 33.87 23.00

GROUP 1-A..................$ 36.34 23.00

GROUP 2....................$ 32.61 23.00

GROUP 3....................$ 31.28 23.00

GROUP 4....................$ 30.14 23.00

GROUP 5....................$ 29.00 23.00

UNDERGROUND:

GROUP 1....................$ 33.77 23.00

GROUP 1-A..................$ 36.34 23.00

GROUP 2....................$ 32.51 23.00

GROUP 3....................$ 31.18 23.00

GROUP 4....................$ 30.04 23.00

GROUP 5....................$ 28.90 23.00

FOOTNOTE: Work suspended by ropes or cables, or work on a Yo-Yo Cat: $.60 per hour additional.

POWER EQUIPMENT OPERATOR CLASSIFICATIONS

GROUP 1: Operator of helicopter (when used in erection work);

Hydraulic excavator, 7 cu. yds. and over; Power shovels, over 7 cu. yds.

GROUP 2: Highline cableway; Hydraulic excavator, 3-1/2 cu.

yds. up to 7 cu. yds.; Licensed construction work boat operator, on site; Power blade operator (finish); Power shovels, over 1 cu. yd. up to and including 7 cu. yds.

m.r.c.

GROUP 3: Asphalt milling machine; Cable backhoe; Combination backhoe and loader over 3/4 cu. yds.; Continuous flight tie back machine assistant to engineer or mechanic; Crane mounted continuous flight tie back machine, tonnage to apply; Crane mounted drill attachment, tonnage to apply;

Dozer, slope brd; Gradall; Hydraulic excavator, up to 3 1/2

cu. yds.; Loader 4 cu. yds. and over; Long reach excavator;

Multiple engine scraper (when used as push pull); Power shovels, up to and including 1 cu. yd.; Pre-stress wire wrapping machine; Side boom cat, 572 or larger; Track loader 4 cu. yds. and over; Wheel excavator (up to and including 750 cu. yds. per hour)

GROUP 4: Asphalt plant engineer/box person; Chicago boom;

Combination backhoe and loader up to and including 3/4 cu.

yd.; Concrete batch plant (wet or dry); Dozer and/or push cat; Pull- type elevating loader; Gradesetter, grade checker (GPS, mechanical or otherwise); Grooving and grinding machine; Heading shield operator; Heavy-duty drilling equipment, Hughes, LDH, Watson 3000 or similar;

Heavy-duty repairperson and/or welder; Lime spreader;

Loader under 4 cu. yds.; Lubrication and service engineer (mobile and grease rack); Mechanical finishers or spreader machine (asphalt, Barber-Greene and similar); Miller Formless M-9000 slope paver or similar; Portable crushing and screening plants; Power blade support; Roller operator, asphalt; Rubber-tired scraper, self-loading (paddle-wheels, etc.); Rubber- tired earthmoving equipment (scrapers); Slip form paver (concrete); Small tractor with drag; Soil stabilizer (P & H or equal); Spider plow and spider puller;

Tubex pile rig; Unlicensed constuction work boat operator, on site; Timber skidder; Track loader up to 4 yds.;

Tractor-drawn scraper; Tractor, compressor drill combination; Welder; Woods-Mixer (and other similar Pugmill equipment)

GROUP 5: Cast-in-place pipe laying machine; Combination slusher and motor operator; Concrete conveyor or concrete pump, truck or equipment mounted; Concrete conveyor, building site; Concrete pump or pumpcrete gun; Drilling equipment, Watson 2000, Texoma 700 or similar; Drilling and boring machinery, horizontal (not to apply to waterliners, wagon drills or jackhammers); Concrete mixer/all; Person and/or material hoist; Mechanical finishers (concrete) (Clary, Johnson, Bidwell Bridge Deck or similar types);

Mechanical burm, curb and/or curb and gutter machine, concrete or asphalt); Mine or shaft hoist; Portable crusher; Power jumbo operator (setting slip-forms, etc., in tunnels); Screed (automatic or manual); Self-propelled compactor with dozer; Tractor with boom D6 or smaller;

Trenching machine, maximum digging capacity over 5 ft.

depth; Vermeer T-600B rock cutter or similar

GROUP 6: Armor-Coater (or similar); Ballast jack tamper;

Boom- type backfilling machine; Assistant plant engineer;

Bridge and/or gantry crane; Chemical grouting machine, truck-mounted; Chip spreading machine operator; Concrete saw (self-propelled unit on streets, highways, airports and canals); Deck engineer; Drilling equipment Texoma 600, Hughes 200 Series or similar up to and including 30 ft.

m.r.c.; Drill doctor; Helicopter radio operator;

Hydro-hammer or similar; Line master; Skidsteer loader, Bobcat larger than 743 series or similar (with attachments); Locomotive; Lull hi-lift or similar; Oiler, truck mounted equipment; Pavement breaker, truck-mounted, with compressor combination; Paving fabric installation and/or laying machine; Pipe bending machine (pipelines only); Pipe wrapping machine (tractor propelled and supported); Screed (except asphaltic concrete paving);

Self- propelled pipeline wrapping machine; Soils & materials tester; Tractor; Self-loading chipper; Concrete barrier moving machine

GROUP 7: Ballast regulator; Boom truck or dual-purpose A-frame truck, non-rotating - under 15 tons; Truck-mounted rotating telescopic boom type lifting device, Manitex or similar (boom truck) - under 15 tons; Cary lift or similar;

Combination slurry mixer and/or cleaner; Drilling equipment, 20 ft. and under m.r.c.; Firetender (hot plant);

Grouting machine operator; Highline cableway signalperson;

Stationary belt loader (Kolman or similar); Lift slab machine (Vagtborg and similar types); Maginnes internal full slab vibrator; Material hoist (1 drum); Mechanical trench shield; Pavement breaker with or without compressor combination); Pipe cleaning machine (tractor propelled and supported); Post driver; Roller (except asphalt); Chip Seal; Self-propelled automatically applied concrete curing mahcine (on streets, highways, airports and canals);

Self-propelled compactor (without dozer); Signalperson;

Slip-form pumps (lifting device for concrete forms); Tie spacer; Tower mobile; Trenching machine, maximum digging capacity up to and including 5 ft. depth; Truck- type loader

GROUP 8: Bit sharpener; Boiler tender; Box operator;

Brakeperson; Combination mixer and compressor (shotcrete/gunite); Compressor operator; Deckhand; Fire tender; Forklift (under 20 ft.); Generator;

Gunite/shotcrete equipment operator; Hydraulic monitor; Ken seal machine (or similar); Mixermobile; Oiler; Pump operator; Refrigeration plant; Reservoir-debris tug (self-propelled floating); Ross Carrier (construction site);

Rotomist operator; Self-propelled tape machine; Shuttlecar;

Self-propelled power sweeper operator (includes vacuum sweeper); Slusher operator; Surface heater; Switchperson;

Tar pot firetender; Tugger hoist, single drum; Vacuum cooling plant; Welding machine (powered other than by electricity)

GROUP 8-A: Elevator operator; Skidsteer loader-Bobcat 743 series or smaller, and similar (without attachments); Mini excavator under 25 H.P. (backhoe-trencher); Tub grinder wood chipper

ALL CRANES AND ATTACHMENTS

GROUP 1: Clamshell and dragline over 7 cu. yds.; Crane, over 100 tons; Derrick, over 100 tons; Derrick barge pedestal-mounted, over 100 tons; Self-propelled boom-type lifting device, over 100 tons

GROUP 2: Clamshell and dragline over 1 cu. yd. up to and including 7 cu. yds.; Crane, over 45 tons up to and including 100 tons; Derrick barge, 100 tons and under;

Self-propelled boom-type lifting device, over 45 tons;

Tower crane

GROUP 3: Clamshell and dragline up to and including 1 cu.

yd.; Cranes 45 tons and under; Self-propelled boom-type lifting device 45 tons and under; Boom Truck or dual purpose A-frame truck, non-rotating over 15 tons;

Truck-mounted rotating telescopic boom type lifting device, Manitex or similar (boom truck) over 15 tons;

PILEDRIVERS

GROUP 1: Derrick barge pedestal mounted over 100 tons;

Clamshell over 7 cu. yds.; Self-propelled boom-type lifting device over 100 tons; Truck crane or crawler, land or barge mounted over 100 tons

GROUP 2: Derrick barge pedestal mounted 45 tons to and including 100 tons; Clamshell up to and including 7 cu.

yds.; Self-propelled boom-type lifting device over 45 tons;

Truck crane or crawler, land or barge mounted, over 45 tons up to and including 100 tons; Fundex F-12 hydraulic pile rig

GROUP 3: Derrick barge pedestal mounted under 45 tons; Self-propelled boom-type lifting device 45 tons and under;

Skid/scow piledriver, any tonnage; Truck crane or crawler, land or barge mounted 45 tons and under

GROUP 4: Assistant operator in lieu of assistant to engineer;

Forklift, 10 tons and over; Heavy-duty repairperson/welder

GROUP 5: Deck engineer

GROUP 6: Deckhand; Fire tender

STEEL ERECTORS

GROUP 1: Crane over 100 tons; Derrick over 100 tons; Self-propelled boom-type lifting device over 100 tons

GROUP 2: Crane over 45 tons to 100 tons; Derrick under 100 tons; Self-propelled boom-type lifting device over 45 tons to 100 tons; Tower crane

GROUP 3: Crane, 45 tons and under; Self-propelled boom-type lifting device, 45 tons and under

GROUP 4: Chicago boom; Forklift, 10 tons and over; Heavy-duty repair person/welder

GROUP 5: Boom cat

TUNNEL AND UNDERGROUND WORK

GROUP 1-A: Tunnel bore machine operator, 20' diameter or more

GROUP 1: Heading shield operator; Heavy-duty repairperson;

Mucking machine (rubber tired, rail or track type); Raised bore operator (tunnels); Tunnel mole bore operator

GROUP 2: Combination slusher and motor operator; Concrete pump or pumpcrete gun; Power jumbo operator

GROUP 3: Drill doctor; Mine or shaft hoist

GROUP 4: Combination slurry mixer cleaner; Grouting Machine operator; Motorman

GROUP 5: Bit Sharpener; Brakeman; Combination mixer and compressor (gunite); Compressor operator; Oiler; Pump operator; Slusher operator

AREA DESCRIPTIONS:

POWER EQUIPMENT OPERATORS, CRANES AND ATTACHMENTS,TUNNEL AND

UNDERGROUND [These areas do not apply to Piledrivers and Steel Erectors]

AREA 1: ALAMEDA, BUTTE, CONTRA COSTA, KINGS, MARIN, MERCED,

NAPA, SACRAMENTO, SAN BENITO, SAN FRANCISCO, SAN JOAQUIN,

SAN MATEO, SANTA CLARA, SANTA CRUZ, SOLANO, STANISLAUS,

SUTTER, YOLO, AND YUBA COUNTIES

AREA 2 - MODOC COUNTY

THE REMAINING COUNTIES ARE SPLIT BETWEEN AREA 1 AND AREA 2 AS

NOTED BELOW:

ALPINE COUNTY:

Area 1: Northernmost part Area 2: Remainder

CALAVERAS COUNTY:

Area 1: Except Eastern part Area 2: Eastern part

COLUSA COUNTY:

Area 1: Eastern part Area 2: Remainder

DEL NORTE COUNTY:

Area 1: Extreme Southwestern corner Area 2: Remainder

ELDORADO COUNTY:

Area 1: North Central part Area 2: Remainder

FRESNO COUNTY

Area 1: Except Eastern part Area 2: Eastern part

GLENN COUNTY:

Area 1: Eastern part Area 2: Remainder

HUMBOLDT COUNTY:

Area 1: Except Eastern and Southwestern parts Area 2: Remainder

LAKE COUNTY:

Area 1: Southern part Area 2: Remainder

LASSEN COUNTY:

Area 1: Western part along the Southern portion of border with Shasta County Area 2: Remainder

MADERA COUNTY

Area 1: Remainder Area 2: Eastern part

MARIPOSA COUNTY

Area 1: Remainder Area 2: Eastern part

MENDOCINO COUNTY:

Area 1: Central and Southeastern parts Area 2: Remainder

MONTEREY COUNTY

Area 1: Remainder Area 2: Southwestern part

NEVADA COUNTY:

Area 1: All but the Northern portion along the border of Sierra County Area 2: Remainder

PLACER COUNTY:

Area 1: All but the Central portion Area 2: Remainder

PLUMAS COUNTY:

Area 1: Western portion Area 2: Remainder

SHASTA COUNTY:

Area 1: All but the Northeastern corner Area 2: Remainder

SIERRA COUNTY:

Area 1: Western part Area 2: Remainder

SISKIYOU COUNTY:

Area 1: Central part Area 2: Remainder

SONOMA COUNTY:

Area 1: All but the Northwestern corner Area 2: Reaminder

TEHAMA COUNTY:

Area 1: All but the Western border with mendocino & Trinity Counties Area 2: Remainder

TRINITY COUNTY:

Area 1: East Central part and the Northeaster border with Shasta County Area 2: Remainder

TULARE COUNTY;

Area 1: Remainder Area 2: Eastern part

TUOLUMNE COUNTY:

Area 1: Remainder Area 2: Eastern Part

ENGI0003-019 06/29/2009

SEE AREA DESCRIPTIONS BELOW

Rates Fringes

OPERATOR: Power Equipment

(LANDSCAPE WORK ONLY)

GROUP 1

AREA 1.....................$ 28.64 20.53

AREA 2.....................$ 30.64 20.53

GROUP 2

AREA 1.....................$ 25.04 20.53

AREA 2.....................$ 27.04 20.53

GROUP 3

AREA 1.....................$ 20.43 20.53

AREA 2.....................$ 22.43 20.53

GROUP DESCRIPTIONS:

GROUP 1: Landscape Finish Grade Operator: All finish grade work regardless of equipment used, and all equipment with a rating more than 65 HP.

GROUP 2: Landscape Operator up to 65 HP: All equipment with a manufacturer's rating of 65 HP or less except equipment covered by Group 1 or Group 3. The following equipment shall be included except when used for finish work as long as manufacturer's rating is 65 HP or less: A-Frame and Winch Truck, Backhoe, Forklift, Hydragraphic Seeder Machine, Roller, Rubber-Tired and Track Earthmoving Equipment, Skiploader, Straw Blowers, and Trencher 31 HP up to 65 HP.

GROUP 3: Landscae Utility Operator: Small Rubber-Tired Tractor, Trencher Under 31 HP.

AREA DESCRIPTIONS:

AREA 1: ALAMEDA, BUTTE, CONTRA COSTA, KINGS, MARIN, MERCED,

NAPA, SACRAMENTO, SAN BENITO, SAN FRANCISCO, SAN JOAQUIN,

SAN MATEO, SANTA CLARA, SANTA CRUZ, SOLANO, STANISLAUS,

SUTTER, YOLO, AND YUBA COUNTIES

AREA 2 - MODOC COUNTY

THE REMAINING COUNTIES ARE SPLIT BETWEEN AREA 1 AND AREA 2 AS

NOTED BELOW:

ALPINE COUNTY:

Area 1: Northernmost part Area 2: Remainder

CALAVERAS COUNTY:

Area 1: Except Eastern part Area 2: Eastern part

COLUSA COUNTY:

Area 1: Eastern part Area 2: Remainder

DEL NORTE COUNTY:

Area 1: Extreme Southwestern corner Area 2: Remainder

ELDORADO COUNTY:

Area 1: North Central part Area 2: Remainder

FRESNO COUNTY

Area 1: Except Eastern part Area 2: Eastern part

GLENN COUNTY:

Area 1: Eastern part Area 2: Remainder

HUMBOLDT COUNTY:

Area 1: Except Eastern and Southwestern parts Area 2: Remainder

LAKE COUNTY:

Area 1: Southern part Area 2: Remainder

LASSEN COUNTY:

Area 1: Western part along the Southern portion of border with Shasta County Area 2: Remainder

MADERA COUNTY

Area 1: Remainder Area 2: Eastern part

MARIPOSA COUNTY

Area 1: Remainder Area 2: Eastern part

MENDOCINO COUNTY:

Area 1: Central and Southeastern parts Area 2: Remainder

MONTEREY COUNTY

Area 1: Remainder Area 2: Southwestern part

NEVADA COUNTY:

Area 1: All but the Northern portion along the border of Sierra County Area 2: Remainder

PLACER COUNTY:

Area 1: All but the Central portion Area 2: Remainder

PLUMAS COUNTY:

Area 1: Western portion Area 2: Remainder

SHASTA COUNTY:

Area 1: All but the Northeastern corner Area 2: Remainder

SIERRA COUNTY:

Area 1: Western part Area 2: Remainder

SISKIYOU COUNTY:

Area 1: Central part Area 2: Remainder

SONOMA COUNTY:

Area 1: All but the Northwestern corner Area 2: Reaminder

TEHAMA COUNTY:

Area 1: All but the Western border with mendocino & Trinity Counties Area 2: Remainder

TRINITY COUNTY:

Area 1: East Central part and the Northeaster border with Shasta County Area 2: Remainder

TULARE COUNTY;

Area 1: Remainder Area 2: Eastern part

TUOLUMNE COUNTY:

Area 1: Remainder Area 2: Eastern Part

IRON0002-004 07/01/2010

Rates Fringes

Ironworkers:

Fence Erector...............$ 26.58 15.26 Ornamental, Reinforcing and Structural..............$ 33.00 23.73

PREMIUM PAY:

$6.00 additional per hour at the following locations:

China Lake Naval Test Station, Chocolate Mountains Naval Reserve-Niland, Edwards AFB, Fort Irwin Military Station, Fort Irwin Training Center-Goldstone, San Clemente Island, San Nicholas Island, Susanville Federal Prison, 29 Palms - Marine Corps, U.S. Marine Base - Barstow, U.S. Naval Air Facility - Sealey, Vandenberg AFB

$4.00 additional per hour at the following locations:

Army Defense Language Institute - Monterey, Fallon Air Base, Naval Post Graduate School - Monterey, Yermo Marine Corps Logistics Center

$2.00 additional per hour at the following locations:

Port Hueneme, Port Mugu, U.S. Coast Guard Station - Two Rock

LABO0067-002 04/01/2010

AREA "A" - ALAMEDA, CONTRA COSTA, MARIN, SAN FRANCISCO, SAN

MATEO AND SANTA CLARA COUNTIES

AREA "B" - ALPINE, AMADOR, BUTTE, CALAVERAS, COLUSA, DEL

NORTE, EL DORADO, FRESNO, GLENN, HUMBOLDT, KINGS, LAKE, LASSEN,

MADERA, MARIPOSA, MENDOCINO, MERCED, MODOC, MONTEREY, NAPA,

NEVADA, PLACER, PLUMAS, SACRAMENTO, SAN BENITO, SAN JOAQUIN,

SANTA CRUZ, SHASTA, SIERRA, SISKIYOU, SOLANO, SONOMA,

STANISLAUS, SUTTER, TEHAMA, TRINITY, TULARE, TUOLUMNE, YOLO AND

YUBA COUNTIES

Asbestos Removal Laborer Areas A & B.................$ 18.68 6.60 LABORER (Lead Removal) Area A......................$ 36.25 6.68 Area B......................$ 35.25 6.68

ASBESTOS REMOVAL-SCOPE OF WORK: Site mobilization; initial site clean-up; site preparation; removal of asbestos-containing materials from walls and ceilings; or from pipes, boilers and mechanical systems only if they are being scrapped; encapsulation, enclosure and disposal of asbestos-containing materials by hand or with equipment or machinery; scaffolding; fabrication of temporary wooden barriers; and assembly of decontamination stations.

LABO0067-003 07/01/2009

AREA A: ALAMEDA, CONTRA COSTA, MARIN, SAN FRANCISCO, SAN MATEO

& SANTA CLARA

AREA B: ALPINE, AMADOR, BUTTE, CALAVERAS, COLUSA, DEL NORTE,

EL DORADO, FRESNO, GLENN, HUMBOLDT, KINGS, LAKE, LASSEN,

MADERA, MARIPOSA, MENOCINO, MERCED, MODOC, MONTEREY, NAPA,

NEVADA, PLACER, PLUMAS, SANCRMENTO, SAN BENITO, SAN JOAQUIN,

SANTA CRUZ, SIERRA, SHASTA, SISKIYOU, SOLANO, SONOMA,

STANISLAUS,TEHAMA,TRINITY, TULARE, TUOLUMNE, YOLO & YUBA

LABORER (TRAFFIC CONTROL/LANE

CLOSURE)

Escort Driver, Flag Person Area A.....................$ 26.89 14.93 Area B.....................$ 25.89 14.93 Traffic Control Person I Area A.....................$ 27.19 14.93 Area B.....................$ 26.19 14.93 Traffic Control Person II Area A.....................$ 24.69 14.93 Area B.....................$ 23.69 14.93

TRAFFIC CONTROL PERSON I: Layout of traffic control, crash cushions, construction area and roadside signage.

TRAFFIC CONTROL PERSON II: Installation and removal of temporary/permanent signs, markers, delineators and crash cushions.

LABO0067-006 06/28/2010

AREA "A" - ALAMEDA, CONTRA COSTA, MARIN, SAN FRANCISCO, SAN

MATEO AND SANTA CLARA COUNTIES

AREA "B" - ALPINE, AMADOR, BUTTE, CALAVERAS, COLUSA, EL

DORADO, FRESNO, GLENN, KINGS, LASSEN, MADERA, MARIPOSA, MERCED,

MODOC, MONTEREY, NAPA, NEVADA, PLACER, PLUMAS, SACRAMENTO, SAN

BENITO, SAN JOAQUIN, SANTA CRUZ, SHASTA, SIERRA, SISKIYOU,

SOLANO, SONOMA, STANISLAUS, SUTTER, TEHAMA, TRINITY, TULARE,

TUOLUMNE, YOLO AND YUBA COUNTIES

Laborers: (CONSTRUCTION CRAFT

LABORERS - AREA A:)

Construction Specialist Group.......................$ 27.84 15.82

GROUP 1.....................$ 27.14 15.82

GROUP 1-a...................$ 27.36 15.82 GROUP 1-c...................$ 27.19 15.82 GROUP 1-e...................$ 27.69 15.82 GROUP 1-f...................$ 27.72 15.82 GROUP 1-g (Contra Costa County).....................$ 27.34 15.82

GROUP 2.....................$ 26.99 15.82

GROUP 3.....................$ 26.89 15.82

GROUP 4.....................$ 20.58 15.82

See groups 1-b and 1-d under laborer classifications.

Laborers: (CONSTRUCTION CRAFT

LABORERS - AREA B:)

Construction Specialist Group.......................$ 26.84 15.82

GROUP 1.....................$ 26.14 15.82

GROUP 1-a...................$ 26.36 15.82 GROUP 1-c...................$ 26.19 15.82 GROUP 1-e...................$ 26.69 15.82 GROUP 1-f...................$ 26.72 15.82

GROUP 2.....................$ 25.99 15.82

GROUP 3.....................$ 25.89 15.82

GROUP 4.....................$ 19.58 15.82

See groups 1-b and 1-d under laborer classifications.

Laborers: (GUNITE - AREA A:)

GROUP 1.....................$ 28.10 15.82

GROUP 2.....................$ 27.60 15.82

GROUP 3.....................$ 27.60 15.82

GROUP 4.....................$ 27.60 15.82

Laborers: (GUNITE - AREA B:)

GROUP 1.....................$ 27.10 15.82

GROUP 2.....................$ 26.60 15.82

GROUP 3.....................$ 26.01 15.82

GROUP 4.....................$ 25.89 15.82

Laborers: (WRECKING - AREA A:)

GROUP 1.....................$ 27.14 15.82

GROUP 2.....................$ 26.99 15.82

Laborers: (WRECKING - AREA B:)

GROUP 1.....................$ 26.14 15.82

GROUP 2.....................$ 25.99 15.82

Landscape Laborer (GARDENERS, HORTICULTURAL & LANDSCAPE

LABORERS - AREA A:)

(1) New Construction........$ 26.89 15.82

(2) Establishment Warranty Period......................$ 20.58 15.82 Landscape Laborer (GARDENERS, HORTICULURAL & LANDSCAPE

LABORERS - AREA B:)

(1) New Construction........$ 25.89 15.82

(2) Establishment Warranty Period......................$ 19.58 15.82

FOOTNOTES:

Laborers working off or with or from bos'n chairs, swinging scaffolds, belts shall receive $0.25 per hour above the applicable wage rate. This shall not apply to workers entitled to receive the wage rate set forth in Group 1-a below.

LABORER CLASSIFICATIONS

CONSTRUCTION SPECIALIST GROUP: Asphalt ironer and raker;

Chainsaw; Laser beam in connection with laborers' work;

Cast-in- place manhole form setter; Pressure pipelayer;

Davis trencher - 300 or similar type (and all small trenchers); Blaster; Diamond driller; Multiple unit drill;

Hydraulic drill

GROUP 1: Asphalt spreader boxes (all types); Barko, Wacker and similar type tampers; Buggymobile; Caulker, bander, pipewrapper, conduit layer, plastic pipelayer; Certified hazardous waste worker including Leade Abatement;

Compactors of all types; Concrete and magnesite mixer, 1/2

yd. and under; Concrete pan work; Concrete sander; Concrete saw; Cribber and/or shoring; Cut granite curb setter;

Dri-pak-it machine; Faller, logloader and bucker; Form raiser, slip forms; Green cutter; Headerboard, Hubsetter, aligner, by any method; High pressure blow pipe (1-1/2" or over, 100 lbs. pressure/over); Hydro seeder and similar type; Jackhammer operator; Jacking of pipe over 12 inches;

Jackson and similar type compactor; Kettle tender, pot and worker applying asphalt, lay-kold, creosote, lime, caustic and similar type materials (applying means applying, dipping or handling of such materials); Lagging, sheeting, whaling, bracing, trenchjacking, lagging hammer; Magnesite, epoxyresin, fiberglass, mastic worker (wet or dry); No joint pipe and stripping of same, including repair of voids; Pavement breaker and spader, including tool grinder;

Perma curb; Pipelayer (including grade checking in connection with pipelaying); Precast-manhole setter;

Pressure pipe tester; Post hole digger, air, gas and electric; Power broom sweeper; Power tampers of all types (except as shown in Group 2); Ram set gun and stud gun;

Riprap stonepaver and rock-slinger, including placing of sacked concrete and/or sand (wet or dry) and gabions and similar type; Rotary scarifier or multiple head concrete chipping scarifier; Roto and Ditch Witch; Rototiller;

Sandblaster, pot, gun, nozzle operators; Signalling and rigging; Tank cleaner; Tree climber; Turbo blaster;

Vibrascreed, bull float in connection with laborers' work;

Vibrator; Hazardous waste worker (lead removal); Asbestos and mold removal worker

GROUP 1-a: Joy drill model TWM-2A; Gardner-Denver model DH143 and similar type drills; Track driller; Jack leg driller;

Wagon driller; Mechanical drillers, all types regardless of type or method of power; Mechanical pipe layers, all types regardless of type or method of power; Blaster and powder;

All work of loading, placing and blasting of all powder and explosives of whatever type regardless of method used for such loading and placing; High scalers (including drilling of same); Tree topper; Bit grinder

GROUP 1-b: Sewer cleaners shall receive $4.00 per day above Group 1 wage rates. "Sewer cleaner" means any worker who handles or comes in contact with raw sewage in small diameter sewers. Those who work inside recently active, large diameter sewers, and all recently active sewer manholes shal receive $5.00 per day above Group 1 wage rates.

GROUP 1-c: Burning and welding in connection with laborers' work; Synthetic thermoplastics and similar type welding

GROUP 1-d: Maintenance and repair track and road beds. All employees performing work covered herein shall receive $ .25 per hour above their regular rate for all work performed on underground structures not specifically covered herein. This paragraph shall not be construed to apply to work below ground level in open cut. It shall apply to cut and cover work of subway construction after the temporary cover has been placed.

GROUP 1-e: Work on and/or in bell hole footings and shafts thereof, and work on and in deep footings. (A deep footing is a hole 15 feet or more in depth.) In the event the depth of the footing is unknown at the commencement of excavation, and the final depth exceeds 15 feet, the deep footing wage rate would apply to all employees for each and every day worked on or in the excavation of the footing from the date of inception.

GROUP 1-f: Wire winding machine in connection with guniting or shot crete

GROUP 1-g, CONTRA COSTA COUNTY: Pipelayer (including grade checking in connection with pipelaying); Caulker; Bander;

Pipewrapper; Conduit layer; Plastic pipe layer; Pressure pipe tester; No joint pipe and stripping of same, including repair of voids; Precast manhole setters, cast in place manhole form setters

GROUP 2: Asphalt shoveler; Cement dumper and handling dry cement or gypsum; Choke-setter and rigger (clearing work);

Concrete bucket dumper and chute; Concrete chipping and grinding; Concrete laborer (wet or dry); Driller tender, chuck tender, nipper; Guinea chaser (stake), grout crew;

High pressure nozzle, adductor; Hydraulic monitor (over 100 lbs. pressure); Loading and unloading, carrying and hauling of all rods and materials for use in reinforcing concrete construction; Pittsburgh chipper and similar type brush shredders; Sloper; Single foot, hand-held, pneumatic tamper; All pneumatic, air, gas and electric tools not listed in Groups 1 through 1-f; Jacking of pipe - under 12 inches

GROUP 3: Construction laborers, including bridge and general laborer; Dump, load spotter; Flag person; Fire watcher;

Fence erector; Guardrail erector; Gardener, horticultural and landscape laborer; Jetting; Limber, brush loader and piler; Pavement marker (button setter); Maintenance, repair track and road beds; Streetcar and railroad construction track laborer; Temporary air and water lines, Victaulic or similar; Tool room attendant (jobsite only)

GROUP 4: Final clean-up work of debris, grounds and building including but not limited to: street cleaner; cleaning and washing windows; brick cleaner (jobsite only); material cleaner (jobsite only). The classification "material cleaner" is to be utilized under the following conditions:

A: at demolition site for the salvage of the material.

B: at the conclusion of a job where the material is to be salvaged and stocked to be reused on another job.

C: for the cleaning of salvage material at the jobsite or temporary jobsite yard.

The material cleaner classification should not be used in the performance of "form stripping, cleaning and oiling and moving to the next point of erection".

GUNITE LABORER CLASSIFICATIONS

GROUP 1: Structural Nozzleman

GROUP 2: Nozzleman, Gunman, Potman, Groundman

GROUP 3: Reboundman

GROUP 4: Gunite laborer

WRECKING WORK LABORER CLASSIFICATIONS

GROUP 1: Skilled wrecker (removing and salvaging of sash, windows and materials)

GROUP 2: Semi-skilled wrecker (salvaging of other building materials)

LABO0067-010 07/01/2010

Rates Fringes

Tunnel and Shaft Laborers:

GROUP 1.....................$ 33.35 16.08

GROUP 2.....................$ 33.12 16.08

GROUP 3.....................$ 32.87 16.08

GROUP 4.....................$ 32.42 16.08

GROUP 5.....................$ 31.88 16.08

Shotcrete Specialist........$ 33.87 16.08

TUNNEL AND SHAFT CLASSIFICATIONS

GROUP 1: Diamond driller; Groundmen; Gunite and shotcrete nozzlemen

GROUP 2: Rodmen; Shaft work & raise (below actual or excavated ground level)

GROUP 3: Bit grinder; Blaster, driller, powdermen, heading;

Cherry pickermen - where car is lifted; Concrete finisher in tunnel; Concrete screedman; Grout pumpman and potman;

Gunite & shotcrete gunman & potman; Headermen; High pressure nozzleman; Miner - tunnel, including top and bottom man on shaft and raise work; Nipper; Nozzleman on slick line; Sandblaster - potman, Robotic Shotcrete Placer, Segment Erector, Tunnel Muck Hauler, Steel Form raiser and setter; Timberman, retimberman (wood or steel or substitute materials therefore); Tugger (for tunnel laborer work);

Cable tender; Chuck tender; Powderman - primer house

GROUP 4: Vibrator operator, pavement breaker; Bull gang -muckers, trackmen; Concrete crew - includes rodding and spreading, Dumpmen (any method)

GROUP 5: Grout crew; Reboundman; Swamper/ Brakeman

LABO0073-001 07/01/2009

Rates Fringes

Plasterer tender.................$ 28.37 14.14

LABO0139-002 07/01/2009

NAPA, SOLANO AND SONOMA COUNTIES

Rates Fringes

LABORER (Brick) Mason Tender-Brick..........$ 27.28 14.93

LABO0185-002 07/01/2009

ALPINE, AMADOR, BUTTE, COLUSA, EL DORADO, GLENN, LASSEN, MODOC,

NEVADA, PLACER, PLUMAS, SACRAMENTO, SHASTA, SIERRA, SISKIYOU,

SUTTER, TEHAMA, TRINITY, YOLO AND YUBA COUNTIES

LABORER

Mason Tender-Brick..........$ 27.03 14.93

LABO0291-001 07/01/2009

MARIN COUNTY

Rates Fringes

LABORER

Mason Tender-Brick..........$ 28.28 14.93

PAIN0016-004 01/01/2011

MARIN, NAPA, SOLANO & SONOMA COUNTIES

Rates Fringes

Painters:........................$ 32.71 19.16

PREMIUMS:

EXOTIC MATERIALS - $0.75 additional per hour.

SPRAY WORK: - $0.50 additional per hour.

INDUSTRIAL PAINTING - $0.25 additional per hour [Work on industrial buildings used for the manufacture and processing of goods for sale or service; steel construction (bridges), stacks, towers, tanks, and similar structures]

HIGH WORK:

over 50 feet - $2.00 per hour additional 100 to 180 feet - $4.00 per hour additional Over 180 feet - $6.00 per houir additional

PAIN0016-005 07/01/2010

ALPINE, BUTTE, COLUSA, EL DORADO (west of the Sierra Nevada Mountains), GLENN, LASSEN (west of Hwy. 395, excluding Honey Lake); MARIN, MODOC, NAPA, NEVADA (west of the Sierra Nevada Mountains), PLACER (west of the Sierra Nevada Mountains), PLUMAS, SACRAMENTO, SHASTA, SIERRA (west of the Sierra Nevada Mountains), SISKIYOU, SOLANO, SONOMA, SUTTER, TEHAMA, TRINITY, YOLO AND YUBA…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .