1029383 Asbestos Survey - Final.pdf

PDF 2 MB Posted

Attached to
FY22 McConnell AFB - Multiple Award Construction Contract (MACC) Federal contract opportunity
Solicitation number
FA4621-22-R-0002
Issued by
Department of the Air Force Air Mobility Command

About this file

This solicitation requests proposals for a Multiple Award Construction Contract at McConnell Air Force Base. The government intends to award up to six firm-fixed price indefinite-delivery/indefinite-quantity contracts for a total not-to-exceed amount of $75 million over six years. Task orders will be issued on a competitive basis for individual construction projects ranging from $2,000 to $10 million. Work includes design-build, renovation, new construction, and repair of facilities, roadways, and airfields integrating multiple trades. Successful offerors must have the capability to provide full project design from concept or performance work statement. Responses are due by November 2021 and will be evaluated based on a best value tradeoff between past performance, which is significantly more important than price. A pre-proposal conference will be held on November 17, 2021.

View the file

Other files for this federal contract opportunity

Other files attached to FY22 McConnell AFB - Multiple Award Construction Contract (MACC), newest first.
File Type Posted
Final Questions for MACC 2022.docx DOCX document
Warranty Barcode Spreadsheet.xlsx XLSX spreadsheet
Attach 18 - Updated TOC and Spec 26 51 00.pdf PDF
Attach 19 - Drawing changes 30 Nov 21.pdf PDF
FA462122R0002 - Amendment 2.pdf PDF
conform-faqs.doc DOC document
Questions from the Pre Proposal Conference 19 Nov 21 Final.docx DOCX document
Attach 16 - Spec 28 31 76.pdf PDF
Attach 17 - Rev Drawings 11-22-2021.pdf PDF
B852 Site Visit Photos.pdf PDF
FA462122R0002 - Amendment 1.pdf PDF
Boeing Trainer PDF.pdf PDF
Pre-Proposal Conference Meeting Minutes w Attachments - FA4621-22-R-0002 - 23 Nov 21.pdf PDF
Pre Site Visit Q and As Final responses.docx DOCX document
Existing Mechanical Schedules.pdf PDF
Solicitation - FA462122R0002 11-5 Final.pdf PDF
Attach 2 - MACC Combined Spec Sections.pdf PDF
Attach 7 - Wage Det Residential KS02 - 1 Jan 21.pdf PDF
Attach 10 - PRQE 063118 Statement of Work (SOW).pdf PDF
Attach 11 - PRQE 063118 Specifications.pdf PDF
Attach 12 - PRQE 063118 Drawings.pdf PDF
Attach 14 - PRQE 063118 Submittal Register.xls XLS spreadsheet
Attach 1 - General Statement of Work (SOW).pdf PDF
Attach 13 - PRQE 063118 Phasing Plan.pdf PDF
Attach 3 - MACC General Conditions.pdf PDF
Attach 6 - Wage Det Highway KS47 - 25 Jun 21.pdf PDF
Attach 9 - PRQE 063118 Price Schedule.xlsx XLSX spreadsheet
Attach 15 - NAF General Provisions 2021.pdf PDF
Attach 4 - Wage Det Building KS57 - 30 Jul 21.pdf PDF
Attach 5 - Wage Det Heavy KS30 - 6 Aug 21.pdf PDF
Attach 8 - Past Present Performance Questionnaire (PPPQ).pdf PDF
Show all 31

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

iSi Environmental (iSi) F:\DATA\Krehbiel Architecture\2010015 NESHAP Survey Bldg 852\1-Cover Letter.docx

Wichita, Kansas Atlanta, Georgia Tulsa, Oklahoma Phone: (888) 264-7050 www.iSiEnvironmental.com

November 13, 2020

Ed Knox

Krehbiel Architecture

1300 East Lewis

Wichita, Kansas 67211

Re: Asbestos Survey – Building 852 McConnell AFB

Dear Mr. Knox:

iSi Environmental (iSi) has completed the asbestos survey of the areas to be impacted by renovation activities at Bldg. 852 MAFB. This survey is required for identification of asbestos-containing materials (ACM) which were accessible. After laboratory analysis of the samples, the following ACM were identified:

No Asbestos Detected

This survey was performed by an EPA-accredited inspector and sample analysis was performed by a National Voluntary Laboratory Accreditation Program (NVLAP) and American Industrial

Hygiene Association (AIHA) accredited laboratory. iSi cannot guarantee all ACM were identified since the possibility exists there may be ACM hidden from sight by non-ACM or be located in inaccessible locations.

If asbestos is discovered it is recommended the Owner employ a licensed asbestos abatement contractor for abatement of any ACM required to be removed prior to renovation or demolition activities. Before asbestos abatement is undertaken, an asbestos abatement plan and notification should be prepared by the asbestos abatement contractor.

This report has been prepared for the exclusive use of our client, in accordance with generally accepted asbestos survey practices within the constraints of the client’s directives. No warranties, either expressed or implied, are intended or made. Conclusions drawn by others from the results of this survey, as described within this report, should recognize the limitations of the survey methods.

iSi Environmental (iSi) F:\DATA\Krehbiel Architecture\2010015 NESHAP Survey Bldg 852\1-Cover Letter.docx

If you have any questions or require additional services, please contact me at (316) 265-0012 or raunquoe@isienvironmental.com.

Sincerely, Ron Aunquoe

Inspector

Certificate #6970226

Attachments: Sample Data Summary

Bulk Sample Analysis & Chain of Custody

Sample Location Map

Credentials cc: iSi Project Number 2010015

Asbestos Survey of

Building 852

McConnell AFB

Wichita, Kansas prepared for

Krebiel Architecture

1300 East Lewis

Wichita, Kansas 67211

November 13, 2020

SAMPLE DATA SUMMARY

Building:

SAMPLE DATA SUMMARY

Building 852 MAFB Wichita, Kansas

Inspection Date: October 29, 2020

Inspector: Ron Aunquoe- #687620

Asbestos-Containing Sample Data

Sample Description Sample Number Location

#01VG Vibration Gasket Boiler Rom

#02WM White Mastic (MJF) Boiler Room

#03FT White/Gray 12" Floor Tile & Mastic South Entrance

#04FT White/Gray 12" Floor Tile & Mastic Power Room

#05FT White/Gray 12" Floor Tile & Mastic Room 112

#06SR White Sheetrock & Compound Room 123

#07SR White Sheetrock & Compound Room 114

#08CP White/Gray 2x2 Ceiling Panel Power Room

#09CP White/Gray 2x4 Ceiling Panel Room 126

#10CP White/Gray 2x4 Ceiling Panel Room 125

#11CP White/Gray 2x2 Ceiling Panel Room 129

#12CP White/Gray 2x2 Ceiling Panel Break Room

#13CP White/Gray 2x4 Ceiling Panel Room 112

NAD = No Asbestos Detected

%Asbestos Friable or

· Non-Friable

NAD

NAD

NAD

NAD

NAD

NAD

NAD

NAD

NAD

NAD

NAD

NAD

NAD

BULK SAMPLE ANALYSIS & CHAIN OF

CUSTODY

Date Received: 11/03/2020

Project: Asbestos Survey

QuanTEM Lab No. 328514

Analyzed By: Cassie Sanborn

Methodology: EPA/600/R-93/116

Polarized Light Microscopy Asbestos Analysis Report

Project Location: McConnel AFB Wichita, KS - Building #852 West

Project Number: 2010015

Account Number: B263

Received By: Chloe Collins

Date Analyzed: 11/05/2020

QuanTEM

Sample ID

Client

Sample ID Composition

Color /

Description Asbestos (%)

Non-Asbestos

Fiber (%)

Client: ISI Environmental Services

Allen Sill

215 S. Laura

Wichita, KS 67211

Non Fibrous

001 #01VG Homogeneous BinderAsbestos Not Present 40Cellulose

Gasket

Gray/White

002 #02WM Layered CaCO3

Binder

Asbestos Not Present NA

Mastic

White

002a Layered Foil

Binder

Asbestos Not Present 30

Cellulose

Glass FiberWrap

White

002b Layered Asbestos Not Present 100Glass Fiber

Insulation

Gray

003 #03FT Layered CaCO3

Vinyl

Asbestos Not Present NA

Floor Tile

White/Gray

003a Layered TarAsbestos Not Present NA

Mastic

Black

004 #04FT Layered CaCO3

Vinyl

Asbestos Not Present NA

Floor Tile

White/Gray

QuanTEM is a NVLAP accredited PLM laboratory (Lab Code: 101959-0). This report relates only to the specific items tested. NVLAP accreditation applies only to analysis performed utilizing EPA/600/M4-82-020 and EPA/600/R-93/116 methods. This report may not be used to claim product endorsement by NVLAP or any agency of the US Government. This report may not be reproduced except in full, without the written approval of the laboratory.

Unless otherwise noted, upon receipt the condition of the sample was acceptable for analysis.

QuanTEM Lab No. 328514

Analyzed By: Cassie Sanborn

Methodology: EPA/600/R-93/116

Polarized Light Microscopy Asbestos Analysis Report

Project Location: McConnel AFB Wichita, KS - Building #852 West

Project Number: 2010015

Account Number: B263

Received By: Chloe Collins

Date Analyzed: 11/05/2020

QuanTEM

Sample ID

Client

Sample ID Composition

Color /

Description Asbestos (%)

Non-Asbestos

Fiber (%)

Client: ISI Environmental Services

Allen Sill

215 S. Laura

Wichita, KS 67211

Non Fibrous

004a Layered TarAsbestos Not Present NA

Mastic

Black

005 #05FT Layered GlueAsbestos Not Present NA

Mastic

Yellow

005a Layered CaCO3

Vinyl

Asbestos Not Present NA

Floor Tile

White/Gray

005b Layered TarAsbestos Not Present NA

Mastic

Black

006 #06SR Layered CaCO3

Paint

Asbestos Not Present NA

Texture

White

006a Layered CaCO3Asbestos Not Present NA

Joint Compound

White

QuanTEM is a NVLAP accredited PLM laboratory (Lab Code: 101959-0). This report relates only to the specific items tested. NVLAP accreditation applies only to analysis performed utilizing EPA/600/M4-82-020 and EPA/600/R-93/116 methods. This report may not be used to claim product endorsement by NVLAP or any agency of the US Government. This report may not be reproduced except in full, without the written approval of the laboratory.

QuanTEM Lab No. 328514

Analyzed By: Cassie Sanborn

Methodology: EPA/600/R-93/116

Polarized Light Microscopy Asbestos Analysis Report

Project Location: McConnel AFB Wichita, KS - Building #852 West

Project Number: 2010015

Account Number: B263

Received By: Chloe Collins

Date Analyzed: 11/05/2020

QuanTEM

Sample ID

Client

Sample ID Composition

Color /

Description Asbestos (%)

Non-Asbestos

Fiber (%)

Client: ISI Environmental Services

Allen Sill

215 S. Laura

Wichita, KS 67211

Non Fibrous

006b Layered GypsumAsbestos Not Present 10

Cellulose

Glass FiberSheetrock

White

007 #07SR Layered CaCO3

Paint

Asbestos Not Present NA

Texture

White

007a Layered CaCO3Asbestos Not Present NA

Joint Compound

White

007b Layered GypsumAsbestos Not Present 10

Cellulose

Glass FiberSheetrock

White

008 #08CP Homogeneous Perlite

Paint

Asbestos Not Present 50

Cellulose

Glass FiberCeiling Tile

White/Gray

009 #09CP Homogeneous Perlite

Paint

Asbestos Not Present 50

Cellulose

Glass FiberCeiling Tile

White/Gray

010 #10CP Homogeneous Perlite

Paint

Asbestos Not Present 50

Cellulose

Glass FiberCeiling Tile

White/Gray

QuanTEM is a NVLAP accredited PLM laboratory (Lab Code: 101959-0). This report relates only to the specific items tested. NVLAP accreditation applies only to analysis performed utilizing EPA/600/M4-82-020 and EPA/600/R-93/116 methods. This report may not be used to claim product endorsement by NVLAP or any agency of the US Government. This report may not be reproduced except in full, without the written approval of the laboratory.

QuanTEM Lab No. 328514

Analyzed By: Cassie Sanborn

Methodology: EPA/600/R-93/116

Polarized Light Microscopy Asbestos Analysis Report

Project Location: McConnel AFB Wichita, KS - Building #852 West

Project Number: 2010015

Account Number: B263

Received By: Chloe Collins

Date Analyzed: 11/05/2020

QuanTEM

Sample ID

Client

Sample ID Composition

Color /

Description Asbestos (%)

Non-Asbestos

Fiber (%)

Client: ISI Environmental Services

Allen Sill

215 S. Laura

Wichita, KS 67211

Non Fibrous

011 #11CP Homogeneous Perlite

Paint

Asbestos Not Present 50

Cellulose

Glass FiberCeiling Tile

White/Gray

012 #12CP Homogeneous Perlite

Paint

Asbestos Not Present 50

Cellulose

Glass FiberCeiling Tile

White/Gray

013 #13CP Homogeneous Perlite

Paint

Asbestos Not Present 50

Cellulose

Glass FiberCeiling Tile

White/Gray

Date of Report

11/5/2020

Cassie Sanborn, Laboratory Analyst

QuanTEM is a NVLAP accredited PLM laboratory (Lab Code: 101959-0). This report relates only to the specific items tested. NVLAP accreditation applies only to analysis performed utilizing EPA/600/M4-82-020 and EPA/600/R-93/116 methods. This report may not be used to claim product endorsement by NVLAP or any agency of the US Government. This report may not be reproduced except in full, without the written approval of the laboratory.

iSi> Environmental

215 S. Laura • Wichita, Kansas 67211 • Phone: (316) 265-0012

CHAIN OF CUSTODY

DATE 10-29-20

CLIENT Krebiel Architecture

ADDRESS 1300 E. Lewis VVICnlla,K.S bl£11

PO # Ed Knox

PAGE OF

PROJECT Asbestos Survey

ADDRESS McConnel AFB Wichita,Ks

BLDG # Building #852 West

JOB # 2010015

PHONE : ___________ _

FAX : ed.knox@krebielarchitecture.com

TEST FOR:

ASBESTOS X

LEAD --

OTHER _____ __ _

T d 3 d urnaroun : ,.. 'd.-4

SAMPLE TYPE OF

TYPE OF ANALYSIS :

PLM;..:.X..:.___

TEM

ATO~SORPTION

TCLP ---

OTBE"""R--

DESCRIPTION OF

NUMBER CONTAI NER MATERIAL

#01VG Plastic Bag Gray/White Vibration Gasket (Boiler Room)

#02WM \ White Mastic on MJF (Boiler Room)

#03FT \ White/Gray 12" Floor Tile & Mastic (South Entr)

#04FT

\ White/Gray 12" Floor Tile & Mastic (Power Room)

#05FT White/Gray 12" Floor Tile & Mastic (Room 112)

#06SR I White Sheetrock & Compound (Room 123)

#07SR I White Sheetrock & Compound (Room 114)

#08CP White/Gray 2X2 Ceiling Panel (Power Room)

#09CP White/Gray 2X4 Ceiling Panel (Room 126)

#10CP White/Gray 2X4 Ceiling Panel (Room 125)

#11CP \ White/Gray 2X2 Ceiling Panel (Room 129)

#12CP \ White/Gray 2X2 Ceiling Panel (Break Room)

#13CP J White/Gray 2X4 Ceiling Panel (Room 11 2)

I NSPECTOR/SAMPLER Ron Aunquoe

DATE RECEIVED BY DATE

1-2- - 2.C)

I

Black

Black

Black

T-1

T-2

T-3

T-4

T-5

T-6

SAMPLE LOCATION MAP

PROJECT: . Asbestos Survey Sample Location Sheet

LOCATION: Building 852 MAFB Wichita, Ks

CLIENT: Krehbiel Architecture

#11CP

®i l

®b

#09CP ' . ®i~

DATE 10-29-2020

BY Ron Aunquoe

JOB NO.

#OSFT

__,_--H-#13CP

01VG

01WM

10CP

SHEET NO.

OF

l I i I I I

I J i I l i

I I i

I I

CREDENTIALS

Expiration: 10/9/2021 Certificate Number: 6970226

1~ Precision Environmental

215 S. Laura :J Wichita, KS 67211 :J Phone: (316) 264-7050 :J Email: training@isienvironmental.com

Ron Aunquoe has successfully completed a course in and passed the final written exam with a score of at least 70% for EPA and Missouri Approved

AHERA Asbestos Inspector Refresher Training EPA/AHERA Accreditation for under 40 CFR Part 763, Subpart E, Appendix C, Section 206 of the Toxic Substances Control Act (TSCA Title II), 15 U.S.C. 2646. Missouri Training Provider MO #126

. ·' /. "-..._, _j-·· "-==-<. / · .•. ::... . ...-:,. ·~ ;···,.._.~ ··:.- -~-<---

'---- l

Shannon Brownlee, Instructor October 9. 2020

Date(s)

1-Cover Letter
2-Cover Page
3_Separator Pgs Asbestos
4_Sample Data Summary
5_Lab Report
6_Sample location sheet bldg. 852 MAFB
7_Asbestos Inspector CERT 2020-2021

File details come from the government source that posted it. Updated .