FY22 McConnell AFB - Multiple Award Construction Contract (MACC) Federal contract opportunity
Solicitation number
FA4621-22-R-0002
Issued by
Department of the Air Force Air Mobility Command

About this file

This solicitation is for a McConnell Air Force Base Multiple Award Construction Contract. The Air Force intends to award up to six indefinite-delivery/indefinite-quantity contracts for construction projects between $2,000 and $10,000,000 each. Each contract will have a base period of 24 months plus two additional 24-month option periods. Awarded contractors must be capable of providing design-build, renovation, and new construction services across multiple trades. The total contract value is not to exceed $75,000,000 over six years. Responses are due by November 2021 and will be evaluated on a best value tradeoff of past performance and price, with past performance being more important. This is a total small business set-aside for NAICS 236220 commercial and institutional building construction. The seed project for pricing is repair of HVAC systems in Building 852 and includes multiple construction disciplines.

This request for proposal is for a McConnell Air Force Base Multiple Award Construction Contract. The Air Force intends to award up to six indefinite-delivery/indefinite-quantity contracts for construction projects valued between $2,000 and $10,000,000 each over a six-year period not exceeding $75,000,000 total. Responses are due in November 2021 and will be evaluated on a best value tradeoff of past performance and the price provided for the seed project repairing HVAC systems in Building 852, which includes multiple construction disciplines. This is a total small business set-aside for NAICS 236220 commercial and institutional building construction. Awarded contractors must be capable of providing design-build, renovation, and new construction services across multiple construction trades.

View the file

Other files for this federal contract opportunity

Other files attached to FY22 McConnell AFB - Multiple Award Construction Contract (MACC), newest first.
File Type Posted
FA462122R0002 - Amendment 2.pdf PDF
conform-faqs.doc DOC document
Final Questions for MACC 2022.docx DOCX document
Warranty Barcode Spreadsheet.xlsx XLSX spreadsheet
Attach 18 - Updated TOC and Spec 26 51 00.pdf PDF
Attach 19 - Drawing changes 30 Nov 21.pdf PDF
B852 Site Visit Photos.pdf PDF
FA462122R0002 - Amendment 1.pdf PDF
1029383 Asbestos Survey - Final.pdf PDF
Boeing Trainer PDF.pdf PDF
Questions from the Pre Proposal Conference 19 Nov 21 Final.docx DOCX document
Attach 16 - Spec 28 31 76.pdf PDF
Attach 17 - Rev Drawings 11-22-2021.pdf PDF
Pre-Proposal Conference Meeting Minutes w Attachments - FA4621-22-R-0002 - 23 Nov 21.pdf PDF
Pre Site Visit Q and As Final responses.docx DOCX document
Existing Mechanical Schedules.pdf PDF
Attach 1 - General Statement of Work (SOW).pdf PDF
Attach 13 - PRQE 063118 Phasing Plan.pdf PDF
Attach 3 - MACC General Conditions.pdf PDF
Attach 6 - Wage Det Highway KS47 - 25 Jun 21.pdf PDF
Attach 9 - PRQE 063118 Price Schedule.xlsx XLSX spreadsheet
Attach 15 - NAF General Provisions 2021.pdf PDF
Solicitation - FA462122R0002 11-5 Final.pdf PDF
Attach 2 - MACC Combined Spec Sections.pdf PDF
Attach 7 - Wage Det Residential KS02 - 1 Jan 21.pdf PDF
Attach 10 - PRQE 063118 Statement of Work (SOW).pdf PDF
Attach 11 - PRQE 063118 Specifications.pdf PDF
Attach 12 - PRQE 063118 Drawings.pdf PDF
Attach 4 - Wage Det Building KS57 - 30 Jul 21.pdf PDF
Attach 5 - Wage Det Heavy KS30 - 6 Aug 21.pdf PDF
Attach 8 - Past Present Performance Questionnaire (PPPQ).pdf PDF
Show all 31

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Submittal Register Arch

SUBMITTAL REGISTERCONTRACT NO.
TITLE AND LOCATION
PRQE 063118 Repair (SUS) HVAC Systems - Bldg 852CONTRACTOR
ACTIVITY NOTRANSMITTAL NOSPEC SECTDESCRIPTION
ITEM SUBMITTEDPARAGRAPH #CLASSIFICATION
GOVT OR A/E REVWRCONTRACTOR:
SCHEDULE DATESCONTRACTOR
ACTIONAPPROVING AUTHORITYMAILED TO CONTR/
DATE RCD FRM APPR AUTHREMARKS
SUBMITAPPROVAL

NEEDED

BY MATERIAL

NEEDED

BY ACTION CODE DATE

OF

ACTION DATE FWD

TO APR

AUTH/

DATE RCD

FROM

CONTR DATE FWD

TO OTHER

REVIEWER DATE RCD

FROM OTH

REVIEWER ACTION CODE DATE

OF

ACTION

(a)(b)(c)(d)(e)(f)(g)(h)(i)(j)(k)(l)(m)(n)(o)(p)(q)(r)
101 35 26SD-01 Preconstruction Submittals
Accident Prevention Plan1.7
SD-06 Test Reports
LHE Inspection Reports1.12.3
SD-07 Certificates
Crane Operators/Riggers
Standard Lift Plan1.12.4
Hot Work Permit1.13
201 45 00.00 10SD-01 Preconstruction Submittals
Contractor Quality Control Plan3.2.1
301 57 19SD-01 Preconstruction Submittals
Environmental Prevention Plan1.7
Solid Waste Management Permit1.11
401 74 19SD-01 Preconstruction Submittals
Waste Management Plan1.5
501 91 00.15 10SD-01 Preconstruction Submittals
Commissioning Firm1.7
Lead Commissioning Specialist1.7.1
Technical Commissioning Specialist1.7.2
Commissioning Firm's Contract
SD-06 Test Reports
Interim Construction Plhase Comm. Plan
Final Construction Phase Comm. Plan3.1.2.1
Pre-Functional Checklists3.1.2.1.1
Issues Log1.8
Commissionng Report3.2
Post-Construction Trend Log Report
SD-07 Certificates
Certificate of Readiness1.9
SD-10 Operation and Maintenance Data
Training Plan3.1.4
Training Attendance Rosters
Systems Manual3.1.5
SD-11 Closeout Submittals
Final Commissioning Report3.2
Final Construction Phase Comm. Plan3.1.2.1
603 30 00SD-01 Preconstruction Submittals
Concrete Curing Plan1.6.3.1
QC Plan1.6.6
QC Personnel Certification1.6.7
QC Org. Chart1.6.7
Laboratory Accreditation1.6.9
Maturity Method Data
SD-02 Shop Drawings
Formwork1.6.2.1
Reinforcing Steel1.6.2.2
SD-03 Product Data
Joint Selants2.4.5
Joint Filler2.4.4
Formwork Materials2.1
Cementitious Materials2.3.1
Vapor Retarder and Vapor Barrier2.4.6
Concrete Curing Materials2.4.1
Reinforcement2.6
Liquid Chemical Floor Hardeners and Seal2.4.3.1
Admixtures2.3.4
Mechanical Reinforcing Bar Connectors2.6.2
Waterstops2.2.2
Local/Regional Materials
Biodegradable Form Release Agent2.2.3
Nonshirnk Grout2.4.2
SD-05 Design Data
Concrete Mix Design2.5
SD-06 Test Reports
Concrete Mix Design2.5
Fly Ash2.3.1.2
Pozzolan
Aggregates2.3.3
Compressive Strength Tests3.13.2.3
Unit Weight of Structural Concrete3.13.2.5
Air Content3.13.2.4
Slump Tests3.13.2.1
Water2.3.2
SD-07 Certificates
Reinforcing Bars2.6
Welder Qualifications
Safety Data Sheets
Forest Stewardship Council
Field Testing Technician and Testing Agy
SD-08 Manufacturer's Instructions
Liquid Chemical Floor Hardeners and Seal3.10.1.6
Joint Sealants3.11
Curing Compounds3.12
704 20 00SD-02 Shop Drawings
Cut CMU Drawings
Reinforcement Detail Drawings
SD-03 Product Data
Hot Weather Procedures1.5.1
Cold Weather Procedures1.5.2
Cement2.4.1.2
Cementitious Materials2.4.1.1
Masonry Product Date2.2
SD-04 Samples
Admixtures for Masronry Mortar2.4.1.6
Anchors, Ties, and Bar Positioners2.6.2
Joint Reinfocement2.6.3
Unit Masonry
SD-05 Design Data
Masonry Compressive Strength2.1
Fire-Rated Concrete Masonry Units2.1
Bracing Calculations
SD-06 Test Reports
Field Testing of Mortar3.6.1.1
Field Testing of Grout3.6.1.2
Prism Tests3.6.1.3
Single-Wythe Masonry Wall Water Pene.3.6.1.4
SD-07 Certificates
Cementitious Materials2.4.1.1
Admixtures for Masonry Mortar2.4.1.6
Admixtures for Grout2.4.2.2
Anchors, Ties, and Bar Positioners2.6.2
Joint Reinforcement2.6.3
SD-08 Manufacturer's Instructions
Admixtures for Masonry Mortar
Admixtures for Grout
SD-11 Closeout Submittals
Recycled Content of Cement
805 12 00SD-02 Shop Drawings
Fabrication Drawings1.3.2
SD-03 Product Data
Shop Primer2.5.2
Non-Shrink Grout2.4.2
905 40 00SD-02 Shop Drawings
Framing Components1.2
SD-03 Product Data
Steel Studs, Joists, Tracks, Bracing2.1
SD-05 Design Data
Metal Framing Calculations1.6.2
SD-07 Certificates
Load Bearing Cold-Framing Metal Frame1.4
1005 50 13SD-02 Shop Drawings
Fabrication Drawing of Structural Steel1.2
Door Frames
Access Doors and Panels
Cover Plates and Frames
Expansion Joint Covers
Floor Gratings and Roof Walkways
Wheel Guards
Window and Door Guards
Embedded Angles and Plates
Roof Hatch
SD-03 Product Data
Access Doors and Panels2.3
Cover Plates and Frames2.4
Control-Joint covers
Expansion Joint Covers
Floor Gratings and Roof Walkways2.1.5
Structural Steel Door Frames
Wheel Guards
Window and Door Guards
Roof Hatch
Mechanical Units
SD-04 Samples
Expansion Joint Covers
Control-Joint covers
1106 10 00SD-06 Test Reports
Preservative Treated Wood1.4.3
SD-07 Certificates
Certificates of Grade1.2
1206 20 00SD-02 Shop Drawings
Detail Drawings1.3
SD-03 Product Data
Wood Items and Trim2.1
SD-04 Samples
Moldings and Trim1.2
1306 41 16.00 10SD-02 Shop Drawings
Shop Drawings1.4.1
SD-03 Product Data
Wood Materials2.1
SD-04 Samples
Plastic Laminates2.3
Cabinet Hardware2.6
SD-07 Certificates
Quality Assurance1.4.1
Laminate Clad Casework1.3
Urea Formaldehyde Certificate1.3
1406 61 16SD-02 Shop Drawings
Detail Drawings1.4.1
Installation3.1
SD-03 Product Data
Solid Polymer Material2.1
SD-04 Samples
Material2.1
SD-06 Test Reports
Solid Polymer Material2.1
SD-07 Certificates
Fabrication2.1.1.
Qualifications1.4.1
SD-10 Operation and Maintenance Data
Cleanup3.2
1507 21 13SD-03 Product Data
Block or Board Insulation2.1
1607 21 16SD-03 Product Data
Blanket Insulation2.1
Vapor Retarder2.3
Pressure Sensitive Tape2.3
Accessories2.4
Certification2.2
SD-08 Manufacturer's Instructions
Insulation
1707 84 00SD-02 Shop Drawings
Firestopping Materials1.2.3
SD-07 Certificates
Firestopping Materials2.1
Installer Qualifications1.2.3.c
Inspection1.2.3.d
1807 92 00SD-03 Product Data
Sealants1.2
1908 11 13SD-02
Doors1.2
Frames1.2
Accessories1.2
Weatherstripping1.2
Schedule of Doors
Schedule of Frames
SD-03 Product Data
Doors2.1
Frames2.4
Accessories2.2
Accessories2.5
Weatherstripping2.6
SD-04 Samples
Factory Applied Enamel Finish2.8.3
2008 11 16SD-02 Shop Drawings
Door and Frames1.3
SD-04 Samples
Finish Sample1.6.2.1
SD-05 Design Data
Structural Calculations for Deflection1.2.1
SD-08 Manufacturer's Instructions
Doors and Frames
2108 14 00SD-02 Shop Drawings
Doors1.2
SD-03 Product Data
Doors2.1
Accessories2.2
Water-Resistant Sealer2.3.7
Sample Warranty1.4
Sound Transmission Class Rating
Fire Resistance Rating
SD-04 Samples
Doors1.2
Door Finish Colors2.3.6.3
SD-06 Test Reports
Split Resistance1.2
Cycle-Slam1.2
Hinge Loading Resistance1.2
2208 51 13SD-02 Shop Drawings
Windows1.4.1
Fabrication drawings1.4.1
SD-03 Product Data
Aluminum Windows2.1
Frames2.1
Accessories2.2.6
SD-04 Samples
Finish Sample2.2.7
SD-05 Design Data
Structural Calculations for Deflection1.4.3
Design Analysis1.4.3
SD-06 Test Reports
Minimum Condensation Resistance Fact.1.4.4.
2308 71 00SD-02 Shop Drawings
Hardware Schedule3.6
Keying Schedule2.3.8
SD-03 Product Data
Hardware Items2.1
SD-08 Manufacturer's Instructions
Installation
SD-10 Operation and Maintenance Data
Hardware Schedule1.2
SD-11 Closeout Submittals
Key Bitting1.4
2408 81 00SD-02 Shop Drawings
Installation1.2
SD-03 Product Data
Insulating Glass2.2
Glazing Accessories2.3
SD-07 Certificates
Insulating Glass1.2
SD-08 Manufacturer's Instructions
Setting and Sealing Materials
Glass Setting
2509 22 00SD-02 Shop Drawings
Metal Support Systems1.2
2609 29 00SD-03 Product Data
Cementition Backer Units2.1.1
Glass Mat Water Resistant Backer Board2.1.2
Glass Mat Covered/Rein. Gypsum Sheath2.1.3
Paperless Impact Resistant Gypsum
Accessories1.2
Certification
SD-07 Certificates
Asbestos Free Materials1.2
SD-08 Manufacturer's Instructions
Material Safety Data Sheets
SD-10 Operation and Maintenance Data
Manufacturer Maintenance Inst.
Waste Management3.8
2709 51 00SD-02 Shop Drawings
Approved Detail Drawings3.1
SD-03 Product Data
Acoustical Ceiling Systems2.1/2.2
Certification1.2.1
SD-04 Samples
Acoustical Units2.5
Acoustical Ceiling Tiles2.5
SD-06 Test Reports
Fire Resistive Ceilings
Ceiling Attenuation Class and Test3.1.3
SD-07 Certificates
Acoustical Units2.2
Acoustical Ceiling Tiles2.1
2809 65 00SD-03 Product Data
Resilient and Mouldings2.5
Adhesives2.3
Certification2.1
SD-04 Samples
Resilient and Mouldings2.5
SD-08 Manufacturer's Instructions
Surface Preparation
Installation
SD-10 Operation and Maintenance Data
Resilient Flooring and Accessories
2909 68 00SD-02 Shop Drawings
Installation1.2
SD-03 Product Data
Carpet Tile2.1
Moldings2.4
Surface Preparation3.3
Installation3.4
Regulatory Requirements2.3
SD-04 Samples
Carpet Tile2.1
Moldings2.1
SD-06 Test Reports
Moisture and Alkalinity Tests3.2
SD-07 Certificates
Carpet2.1
Regulatory Requirements2.3
SD-10 Operation and Maintenance Data
Carpet Tile
Cleaning and Protections
Maintenance Service
3009 90 00SD-02 Shop Drawings
Piping Identification1.11.3
Stencil Color Stencil Codes3.1
SD-03 Product Data
Certification2.1
Coating2.1
Manu. Tech. Data Sheets2.1
Sealants
SD-04 Samples
Color1.2/1.10
SD-07 Certificates
Applicator's Qualifications1.3
Qualification Testing Lab for Coatings1.11.5.1
SD-08 Manufacturer's Instructions
Application Instructions
Mixing
MSDS
SD-10 Operation and Maintenance Data
Coatings
3110 14 02SD-02 Shop Drawings
Detail Drawings1.2
SD-03 Product Data
Installation1.2
SD-04 Samples
Interior Signage1.3.1
SD-10 Operation and Maintenance Data
Approved Manu. Instructions
Protection and Cleaning
3210 26 13SD-03 Product Data
Corner Guards2.2.1
3310 28 13SD-03 Product Data
Toilet Accessories2.1
3412 21 00SD-02 Shop Drawings
Installation
SD-03 Product Data
Window Blinds2.1
Installation3.3
Certification2.1
SD-04 Samples
Window Blinds2.1
SD-06 Test Reports
Window Blinds1.2
SD-08 Manufacturer's Instructions
Window Blinds
SD-10 Operation and Maintenance Data
Window Blinds
3521 13 13SD-01 Preconstruction Submittals
Qualified Fire Protection Engineer1.2.3
Sprinkler System Designer1.4.2.1
Sprinkler System Installer1.4.2.2
SD-02 Shop Drawings
Shop Drawings1.4.1.1
SD-03 Product Data
Pipe2.2.1
Valves; Gate, Check, Butterfly, Globe2.2.3
Sprinklers2.4
Pipe Hangers and Supports
Valve Supervisory (Tamper) Switch2.3.1
Air Vent2.5.5
SD-05 Design Data
Hydraulic Calculations1.4.1.3
SD-06 Test Reports
Test Procedures3.5.1
SD-07 Certificates
Verification of Compliant Installation3.5.2.1
Request for Government Final Test3.5.2.2
SD-10 Operation and Maintenance Data
Operating and Maintenance Inst.
Spare Parts Data1.6
SD-11 Closeout Submittals
As-Built Drawings
3622 00 00SD-03 Product Data
Countertop Lavatories2.4.1
Service Sinks
SD-10 Operation and Maintenance Data
Plumbing System
3723 05 15SD-01 Preconstruction Submittals
Material, Equipment, and Fixture Lists1.3
SD-02 Shop Drawings
Record Drawings
Connection Diagrams3.1
Coordination Drawings3.1
Fabrication Drawings3.1
Installation Drawings3.1
SD-03 Product Data
Pipe and Fittings2.1
Piping Specialties2.2
Valves2.3
Miscellaneous Materials2.4
Supporting Elements2.5
Equipment Foundation Data2.5.5
SD-05 Design Data
Pipe and Fittings2.1
Piping Specialties2.2
Valves2.3
SD-06 Test Reports
Hydrostatic Tests3.8
Air Tests3.8
Valve Operating Tests3.8
Drainage Tests3.8
Non-Destructive Electric Tests
System Operation Tests3.8
SD-07 Certificates
Record of Satisfactory Field Operation'
List of Qualified Permanent Serv. Org.1.4.3
Listing of Product Installations1.4.1
Records of Existing Conditions
SD-10 Operation and Maintenance Data
Operation and Maintenance Manuals
3823 05 48.00 40SD-03 Product Data
Equipment and Performance Data2.2
Isolators2.2.3
3923 05 93SD-02 Shop Drawings
TAB Schematic Drawings and Report1.3.3
SD-03 Product Data
Equipment and Performance Data3.3.3
TAB Related HVAC Submittals1.4
SD-06 Test Reports
Certified Final DALT Report1.4
SD-07 Certificates
Independent TAB Agency & Personnel1.5.1
TAB Submittal and Work Schedule3.3
TAB Pre-Field Engineering Report3.3.2
4023 07 00SD-02 Shop Drawings
MICA Plates2.1.1
Pipe Insulation Systems and Ass. Access2.3
Duct insulation Systems and Ass. Acces2.4
Recycled Content for Insul. Systems2.3.1
SD-03 Product Data
Pipe Insulation Systems2.3
Duct insulation Systems2.4
SD-04 Samples
Thermal Insulation1.3
Display Samples1.3
SD-07 Certificates
Indoor Air Quality for Adhesives2.2.1
SD-08 Manufacturer's Instructions
Pipe Insulation Systems
Duct Insulation Systems
4123 09 23.02SD-03 Product Data
DDC Control System2.1
4223 11 20SD-02 Shop Drawings
Gas Piping System1.3.1
SD-03 Product Data
Pipe and Fittings2.2
Gas Equipment Connectors2.2.6
Gas Piping System2.5
Pipe Coating Materials2.1
Pressure Regulators2.5.1
Risers
Transition Fittings2.2.4
Valves2.3
Warning and ID Tape2.7
SD-06 Test Reports
Testing3.14
Pressure Tests3.14.1
Test with Gas3.14.2
SD-07 Certificates
Welders Procedures and Quals
Assigned Number, Letter or Symbol
SD-08 Manufacturer's Instructions
PE Pipe and Fittings
Pipe Coating Materiials
SD-10 Operation and Maintenance Data
Gas Facility System and Equip. Ops
Gas Facility System Maintenance
Gas Facility Equipment Maintenance
4323 21 13.00 20SD-02 Shop Drawings
Hot Water Heating System1.3.1
SD-03 Product Data
Pumps1.4
Expansion Tanks2.3.2
Flow Measuring Equipment2.3.5
External Air Separation Tanks2.3.3
Hot Water Heating Pipe2.1
SD-06 Test Reports
Hydrostatic Test of Piping Systems3.3.1
Auxiliary Equipment and Acc. Tests3.3.2
SD-07 Certificates
Report of Pirior Installations
SD-10 Operation and Maintenance Data1.4
4423 21 23SD-02 Shop Drawings
System Coordination2.1.2
SD-03 Product Data
Instructions2.2.2
Equipment Data2.2.4
Training Period3.5.2
SD-06 Test Reports
Factory Tests2.1.1
Field Quality Control3.3
SD-07 Certificates
Manufacturer's Representative1.3.1
SD-10 Operation and Maintenance Data
O&M Manuals3.5.1
Training3.5.2
4523 25 00SD-03 Product Data
Water Treatment System2.1
Water Analysis2.5
Spare Parts Data2.6.4/2.7
Field Instructions3.4
Tests3.5
Training Course3.4
SD-10 Operation and Maintenance Data
Water Treatment System
4623 30 00SD-02 Shop Drawings
Detail Drawings1.4.4
SD-03 Product Data
Insulated Non-metallic Flex. Duct Runouts2.9.1.1
Duct Connectors2.9.1
Duct Access Doors2.9.2
Fire Dampers2.9.3
Manual Balancing Dampers2.9.4
Acoustical Duct Liner2.11.1.1
Diffusers2.9.6.1
Registers and Grills2.9.6.2
Louvers2.9.7
Air Vents, Penhouses, and Goosenecks2.9.8
Centrifugal Fans2.10.1.1
Centrifugal Power Roof Ventilators2.10.1.2
PL-109-58 for Ceiling EF product2.11.1.4
AHU2.11
VAV Single Duct Terminal Units2.12.1
Test Procedures3.1
Diagrams2.12.1
Indoor Air Quality for Sealants2.8
SD-08 Manufacturer's Instructions
Manufacturer's Installation Instructions
O&M Training3.12.2
SD-10 Operation and Maintenance Data
O&M Manuals3.12.1
Fire Dampers
Manual Balancing Dampers
Certrifugal Fans
Certrifugal Type Roof Ventilators
AHU's
VAV Single Duct Terminal Units
SD-11 Closeout Submittals
Indoor Air Quality During Construction2.8
4723 31 13.00 40SD-01 Preconstruction Submittals
Material, Equipment, and Fixture Lists2.2.1
Records of Existing Conditions2.1.1
SD-02 Shop Drawings
Connection Diagrams2.1
Offset Fitting Configurations2.2.1
SD-03 Product Data
Equipment and Performance Data
Galvanized Ductwork Materials2.3.1
Brazing Materials2.3.2
Milled Rolled Reinformcing and Sup. Mat.2.3.3
Round Sheet Metal Duct Fittings2.2.1
Turning Vanes2.2.4
Flexible Connectors2.2.6
Flexible Duct Materials2.2.9
Power Operated Dampers2.2.12
Gravity Backdraft and Relief Dampers2.2.11
Manual Volumne Dampers2.2.10
SD-05 Design Data
Design Analysis and Calculations2.1.1
SD-06 Test Reports
Operational Tests3.4.1
SD-07 Certificates
Listing of Produt Installations1.3
Galvanized Ductwork Materials2.3.1
Brazing Materials2.3.2
Mill Rolled Reinforcing and Supp. Mat.2.3.3
Round Sheet Metal Duct Fittings2.2.1
Turning Vanes2.2.4
Dampers2.2.5
Sound Traps
Flexible Connectors2.2.6
SD-10 Operation and Maintenance Data
O&M Manuals3.5.1
Power Operated Dampers2.2.12
SD-11 Closeout Submittals
Record Drawings3.5.2
4823 36 00.00 40SD-01 Preconstruction Submittals
Records of Existing Conditions1.2.1.c
SD-02 Shop Drawings
Fan-Powered Air Terminal Units1.2.1.c
SD-03 Product Data
Fan-Powered Air Terminal Units1.2.1.c
Induction Air Terminal Units2.1.2
SD-06 Test Reports
Test Reports3.2
SD-07 Certificates
List of Spare Parts
SD-10 Operation and Maintenance Data
Operation and Maintenance Manuals3.4.1
SD-11 Closeout Submittals
Record Drawings3.4.1
4923 37 13.00 40SD-01 Preconstruction Submittals
Material, Equipment, and Fixture Lists2.2.1
Installation Drawings3.1
SD-03 Product Data
Equipment and Performance Data2.1
Manufacturer's Standard Color Chart1.3
SD-10 Operation and Maintenance Data3.1.1
5023 41 13.00 40SD-03 Product Data
Air Filters2.1
Filter Gages2.2
5123 52 43.00 20SD-02 Shop Drawings
Fuel Train1.3.2.2
Wiring Diagram1.3.2.2
SD-03 Product Data
Boilers2.1
Boiler Trim and Control Equipment2.3
Stack,Breeching, and Supports2.3.17
SD-06 Test Reports
Operational Tests3.3.1/1.3.3
SD-07 Certificates
Boilers2.1
Burners and Control Equipment2.2
Boiler Trim and Control Equipment2.3
SD-08 Manufacturer's Instructions
Boilers
SD-10 Operation and Maintenance Data
Boilers1.5
SD-11 Closeout Submittals
Posted Operating Instructions1.5
5223 64 10SD-03 Product Data
Water Chiller2.4
Posted Instructions3.1.3
Verification of Dimensions1.6.1
Factory Tests2.4.1
System Performance Tests3.5
Demonstrations3.6
Refrigerant2.5.1
Water Chiller-Field Acceptance Test Plan3.4.1
SD-06 Test Reports
Field Acceptance Testing3.4.2
Water Chiller-Field Acceptance Test Rep.3.4.2
Factory Tests2.4.1
System Performance Tests3.5
SD-07 Certificates
Refrigeration System3.1.8
Ozone Depleting Substances Tech. Cert.1.3.1
SD-08 Manufacturer's Instructions
SD-10 Operation and Maintenance Data
O&M3.1.7
SD-11 Closeout Submittals
Indoor Air Quality During Construction
5323 64 26SD-03 Product Data
Grooved Mech. Connections for Steel2.2.2.4
Grooved Mech. Connections for Copper
Calibrated Balancing Valves2.4.4
Automatic Flow Control Valves2.4.5
Pump Discharge Valve2.4.6
Water Temperature Mixing Valve
Water Temperature Regulating Valves
Water Pressure Reducing Vlave2.4.7
Pressure Relief Valve2.4.8
Combination Pressure and Temp. Rel. Val.2.4.9
Expansion Joints2.5.9
Pumps2.6
Combination Strainer and Pump Suction2.5.3
Expansion Tanks2.7
Air Separator Tanks2.8
Water Treatment Systems2.9
SD-06 Test Reports
Piping Welds NDE Report3.1.1.3
Pressure Test Reports3.4.2
Condenser Water Quality Test Report1.3
One Year Inspection Report1.3
SD-07 Certificates
Employers Record Documents3.1.1.1
Welding Procedures and Qualifications1.3
Piping for Steam and Condensate2.2
Piping for High Pressure Compressed Air
Fittings2.2.2
Unions
Flanges2.2.2.2
Gaskets
Bolting
SD-08 Manufacturer's Instructions
Lesson Plan for Instruction3.5
SD-10 Operation and Maintenance Data
O&M Manuals1.3
5423 73 13.00 40SD-02 Shop Drawings
Installation Drawings3.2
Fabrication and Connection Drawings2.1
SD-03 Product Data
Equipment and Performance Data2.2
Sample Warranty1.5
Air Filter Gauges2.2.7.4
SD-04 Samples
SD-06 Test Reports
Final Test Reports3.3.2
SD-07 Certificates
List of Product Installations1.3
Cert. of Conformance1.3.1
Unit Cabinet2.2.2
Fan2.2.3
Drain Pans2.2.4
Insulation2.2.5
Plenums
Multizone AHU2.2.1
Spare Parts Data2.1
SD-10 Operation and Maintenance Data
O&M Manuals3.4.1
SD-11 Closeout Submittals
Warranty1.5
5523 74 33.00 40SD-02 Shop Drawings
Packaged UnitPart 2
Cooling CoilPart 2
ControlsPart 2
CasingPart 2
Installation Drawings3.1
SD-03 Product Data
Equipment and Performance DataPart 2
Air Conditioning Systems
Compressor1.2
Coolling Coil1.2
Fans1.2
Controls1.2
Casing1.2
Filters1.2
Vibration Isolation2.3.1
SD-07 Certificates
List of Product Installations1.3
Manufacturer's Warranty1.4
Coil Coating Warranty1.4
SD-10 Operation and Maintenance Data
O&M Manuals3.3
5623 82 00.00 20SD-03 Product Data
Unit Heaters2.1
Infrared Heaters2.1
SD-10 Operation and Maintenance Data
Unit Heaters1.3
Infrared Heaters1.3
5723 82 23.00 40SD-01 Preconstruction Submittals
Material, Equipment, and Fixture Lists2.2
List of Product Installations1.3
SD-02 Shop Drawings
Electrical Diagrams2.1
Pneumaitic Diagrams2.1
SD-03 Product Data
Gas Unit Heaters
Propeller Unit Heaters
Cabinet Unit Heaters2.2.1
Unit Ventilators
Casing
Heat exchamgers
Burners
Fans2.2.1.3
Motors
Controls2.1
Veritical Discharge Units
Horizontal Discharge Units
Heating Element2.2.1.2
Propellers
Filters2.2.1.4
Enclosures2.2.1.5
Wall Sleeve
Fresh-Air Intakes
Insulation
Vibration Isolation2.2
SD-04 Samples
Color Chart2.2
SD-05 Design Data
Connection Diagrams2.1
Control Diagrams
SD-07 Certificates
Records of Existing Conditions
Spare Parts Data2.2
SD-10 Operation and Maintenance Data
O&M Manuals
SD-11 Closeout Submittals
Record Drawings3.3
Warranty3.3
5825 05 11SD-01 Preconstruction Submittals
Wireless Communications Request3.1.3.3
Device Account Lock Exception Request
Multiple IP Connection Device Request
Contractor Computer Cybersecurity Como1.8.1.4
Contractor Temp. Network Cybersec. Stmt1.8.6
SD-02 Shop Drawings
Control System Inventory Report1.7.1
SD-03 Product Data
Control System Cybersecuiryt Doc.1.7.2
SD-06 Test Reports
Wireless Communication Test Report
SD-07 Certificates
5926 05 00.00 40SD-03 Product Data
Conduits and Raceways2.1.1
Wire and Cable2.2.1
Splices and Connectors
Switches2.2.3
Receptacles2.2.4
Outlet Boxes, Pull Boxes,and Junction2.1.3
Circuit Breakers2.1.4.1
Panelboards2.1.4
Device Plates2.2.2
SD-06 Test Reports
SD-08 Manufacturer's Instructions
Manufacturer's Instructions
6026 05 19.10 10SD-03 Product Data
Wire and Cable2.2.1
Conductors2.1.3
6126 05 26.00 40SD-03 Product Data
Ground Rods2.1.1.
Ground Wires2.1.2
Connectors and Fasteners2.1.3
Conductive Corrosion Inhibiting Comp2.1.4
Ground Buses2.1.5
SD-11 Closeout Submittals
Record Drawings3.2
6226 05 71.00 40SD-02 Shop Drawings
Connection Diagrams2.1
Fabrication Drawings2.1
Protective Devices2.2.1.1
SD-03 Product Data
Enclosures2.3.1
Circuit Breakers2.2.1
Control Devices
SD-08 Manufacturer's Instructions
Control Devices
Protective Devices
SD-10 Operation and Maintenance Data
Circuit Breakers
6326 20 00SD-02 Shop Drawings
Panelboards2.11
Cable Trays2.3
SD-03 Product Data
Receptacles2.1
Circuit Breakers2.11.3
Switches2.9
Surge Protective Devices2.19
SD-06 Test Reports
Ground Fault Receptacle Test3.4.3
SD-10 Operation and Maintenance Data
Electrical Systems
6426 24 16.00 40SD-03 Product Data
Panelboards2.1
Acceptance Tests2.3
SD-08 Manufacturer's Instructions
Manufacturer's Instructions
6526 29 23SD-02 Shop Drawings
Schematic Diagrams1.5.1
Interconnecting Diagrams1.5.2
Installation Drawings1.5.3
As-Built Drawings
SD-03 Product Data
Adjustable Speed Drives2.1
Wires and Cables2.3
Equipment Schedule1.5.4
SD-06 Test Reports
ASD Test3.3.1
Performance Verification Tests3.3.2
Endurance Test3.3.3
SD-08 Manufacturer's Instructions
Installation Instructions1.5.5
SD-09 Field Reports
ASD Test Plan2.5.1
Standard Products1.5.6
SD-10 Operation and Maintenance Data
Adjustable Speed Drives
6627 05 28.36 40SD-02 Shop Drawings
Fabrication Drawings2.2
Installation Drawings3.1.2
SD-03 Product Data
Cable Trays2.3.1
Supports2.3.1
SD-08 Manufacturer's Instructions
Manufacturer's Instructions
6727 10 00SD-02 Shop Drawings
Telecommunications Drawings1.6.1.1
Telecommunciations Space Drawings1.6.1.2
SD-03 Product Data
Telecommunications Cabling2.2.2
Patch Panel
Telecommunications Outlet/Connector
Equipment Support Frame2.3.1
Connector Blocks2.3.2
Spare Parts Data1.5
SD-06 Test Reports
Cable Testing3.5
SD-07 Certificates
Telecommunication Contractor Quals1.6.2.1
Key Personnel Qualifications1.6.2.2
Manufacturer Quals1.6.2.3
Test Plan1.6.3
SD-09 Field Reports
Factory Reel Test2.9.1
SD-10 Operation and Maintenance Data
Telecomm. O&M's
SD-11 Closeout Submittals
Record Documentation1.10.2
682820SD-03 Product Data
BA Steel Fencing Product1.4.B
Installation Drawings1.4.C
SD-04 Samples
Color Samples
SD-11 Closeout Submittals
Warranty1.7