Attach__7_-_Seed_Project_-_Price_Schedule.xlsx

XLSX spreadsheet 13 KB Posted

Attached to
(MACC) Multiple Award Construction Contract, McConnell AFB, KS 67221 Federal contract opportunity
Solicitation number
FA4621-16-R-0001
Issued by
Department of the Air Force Air Mobility Command

About this file

Attach 7 - Seed Project - Price Schedule

View the file

Other files for this federal contract opportunity

Other files attached to (MACC) Multiple Award Construction Contract, McConnell AFB, KS 67221, newest first.
File Type Posted
Questions_and_Answers__6_-_10Nov_16.pdf PDF
Amendment__4_FA4621-16-R-000104.pdf PDF
Attach__23_-_Sht._AE101_8_Nov_16.pdf PDF
Attach__22_Specs_and_Drawings_Revision_Amendment_3.pdf PDF
Q A__5_-_4_Nov_16.pdf PDF
MACC_Amendment__3_FA4621-16-R-000103.pdf PDF
Q A__4_-_31_Oct_16.pdf PDF
Revised_As-Builts_31_Oct_16.pdf PDF
Revised_As-Builts_for_Seed_Project.pdf PDF
QUESTIONS__3_-_Pre-Proposal_Conference_27_Oct_16.pdf PDF
18.__Sht._AE101_26_Oct_16.pdf PDF
FA4621-16-R-0001_-_Amendment__2.pdf PDF
17.__Sht._AE100_26_Oct_16.PDF PDF
20.__Sht._M-102_26_Oct_16.pdf PDF
13._Table_of_Contents_26_Oct_16.pdf PDF
16.__Sht_G-002.pdf PDF
14.__09_29_00_26_Oct_16.pdf PDF
21.__Sht._M-103_26_Oct_16.pdf PDF
19.__Sht._M-101_26_Oct_16.pdf PDF
15.__23_64_10_26_Oct_16.pdf PDF
Pre-Proposal_Conference_Meeting_Minutes_FA4621-16-R-0001_20_Oct_16.pdf PDF
Attach__1_-_Sign-In_Sheet_-_Pre-Proposal_Conference_20_Oct_16.pdf PDF
Attach__2_-_16-R-0001_MACC_Pre-Proposal_Conf_Slides.pdf PDF
QUESTIONS__2_-_19_Oct_16.pdf PDF
Seed_Project_Verified_Quantities.pdf PDF
FA4621-16-R-0001-0001_Amendment_-_Pre-Proposal_Conference.pdf PDF
QUESTIONS__1.docx DOCX document
Attach__6_-_Seed_Project__SOW.pdf PDF
Attach__1_-_General_Statement_of_Work_(SOW)_ _Specs.pdf PDF
Attach__4_-_KS160035_Heavy.pdf PDF
Attach__11_-_Past_Performance_Questionnaire_(PPQ).pdf PDF
Attach__2_-_KS160002_Residential.pdf PDF
Attach__12_-_NAF_General_Provisions.pdf PDF
Attach__3_-_KS160020_Highway.pdf PDF
Attach__8_-_Repair_Dorms_340__342_350_Specs.pdf PDF
Attach__9__-_Repair_Dorms_340_342_350_Drawings-Plans.pdf PDF
Attach__10_-_Dorms_Submittal_Registry.pdf PDF
Attach__5_-_KS160062_Building.pdf PDF
1.__FA4621-16-R-0001_Solicitation_7_Oct_16.pdf PDF
Show all 39

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

PRICE SCHEDULE for PRQE 17-0125, 17-0145, 17-0146
Repair Dorms HVAC (Bldgs. 340, 342, & 350)

For each line item refer to Attachment #9, Plans, Sheet G-002 Summary of Work.

LINE ITEM (0001): DESCRIPTION: TOTAL PRICE:

BASE. Bldg 340 (PRQE 17-0125): Replace HVAC System.
0001AABASE: Bldg 340, Replace HVAC System. This item includes all work associated with HVAC system repair/replacement, painting of walls, ceilings, and replacement of flooring, as well as other associated/miscelleneous work as described in the specifications and drawings. This work includes Design/Build Temperature Control Valves as described on Sht G-002 in (96) Dorm Rooms, (48 Kitchens) and associated Commons Areas of Bldg. 340. This work also includes demolishing the below-ground fuel piping between Bldg. 340 and the associated Utility Yard. (See Plans, Sheet G-002 Para 1. thru 1.7)$ - 0
OPTION 1. Bldg 342 (PRQE 17-0145): Replace HVAC System.
0001ABOPTION 1: Bldg 342, Replace HVAC System. This item includes all work associated with HVAC system repair/replacement, painting walls, ceilings, and replacement of flooring, and other associated/ miscelleneous work as described in the specifications and drawings. This work also includes Design/Build Temperature Control Valves as described on Sht. G-002 in (132) Dorm Rooms, (66 Kitchens) and associated Commons Areas of Bldg. 342. This work also includes demolishing the below-ground fuel piping between Bldg. 340 and the associated Utility Yard. (See Plans, Sheet G-002 Para 2. thru 2.6.14)$ - 0
OPTION 2. Bldg 350 (PRQE 17-0146): Clean and Flush Hot Water and Chilled Water Systems.
0001ACOPTION 2: Bldg 350, Clean and Flush Hot Water and Chilled Water Systems. This item includes all associated work as described in the specifications and drawings. Install strainers in B-wing (approx. 170 each) in hot water and chilled water systems. Replace air handling units. Replace wall‐mounted convection heaters and fan coils. Install door louvers in doors (50). All other associated/miscelleneous work as described in the specifications and drawings. (See Plans, Sheet G-002 Para 3. thru 3.7)$ - 0

TOTAL PROPOSED PRICE: $ - 0

&"Times New Roman,Regular"&12

FA4621-16-R-0001, MACC SEED PROJECT -

Repair Dorms HVAC (Bldgs. 340, 342, & 350) &"Times New Roman,Bold"&16

PRICE SCHEDULE &"Times New Roman,Regular"&12

Attachment #7

&"Times New Roman,Regular"&12&P

Sheet2

Sheet3

File details come from the government source that posted it. Updated .