Attach__7_-_Seed_Project_-_Price_Schedule.xlsx
XLSX spreadsheet 13 KB Posted
- Attached to
- (MACC) Multiple Award Construction Contract, McConnell AFB, KS 67221 Federal contract opportunity
- Solicitation number
- FA4621-16-R-0001
About this file
Attach 7 - Seed Project - Price Schedule
View the file
Other files for this federal contract opportunity
Show all 39
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| PRICE SCHEDULE for PRQE 17-0125, 17-0145, 17-0146 |
| Repair Dorms HVAC (Bldgs. 340, 342, & 350) |
For each line item refer to Attachment #9, Plans, Sheet G-002 Summary of Work.
LINE ITEM (0001): DESCRIPTION: TOTAL PRICE:
| BASE. Bldg 340 (PRQE 17-0125): Replace HVAC System. | ||
| 0001AA | BASE: Bldg 340, Replace HVAC System. This item includes all work associated with HVAC system repair/replacement, painting of walls, ceilings, and replacement of flooring, as well as other associated/miscelleneous work as described in the specifications and drawings. This work includes Design/Build Temperature Control Valves as described on Sht G-002 in (96) Dorm Rooms, (48 Kitchens) and associated Commons Areas of Bldg. 340. This work also includes demolishing the below-ground fuel piping between Bldg. 340 and the associated Utility Yard. (See Plans, Sheet G-002 Para 1. thru 1.7) | $ - 0 |
| OPTION 1. Bldg 342 (PRQE 17-0145): Replace HVAC System. | ||
| 0001AB | OPTION 1: Bldg 342, Replace HVAC System. This item includes all work associated with HVAC system repair/replacement, painting walls, ceilings, and replacement of flooring, and other associated/ miscelleneous work as described in the specifications and drawings. This work also includes Design/Build Temperature Control Valves as described on Sht. G-002 in (132) Dorm Rooms, (66 Kitchens) and associated Commons Areas of Bldg. 342. This work also includes demolishing the below-ground fuel piping between Bldg. 340 and the associated Utility Yard. (See Plans, Sheet G-002 Para 2. thru 2.6.14) | $ - 0 |
| OPTION 2. Bldg 350 (PRQE 17-0146): Clean and Flush Hot Water and Chilled Water Systems. | ||
| 0001AC | OPTION 2: Bldg 350, Clean and Flush Hot Water and Chilled Water Systems. This item includes all associated work as described in the specifications and drawings. Install strainers in B-wing (approx. 170 each) in hot water and chilled water systems. Replace air handling units. Replace wall‐mounted convection heaters and fan coils. Install door louvers in doors (50). All other associated/miscelleneous work as described in the specifications and drawings. (See Plans, Sheet G-002 Para 3. thru 3.7) | $ - 0 |
TOTAL PROPOSED PRICE: $ - 0
&"Times New Roman,Regular"&12
FA4621-16-R-0001, MACC SEED PROJECT -
Repair Dorms HVAC (Bldgs. 340, 342, & 350) &"Times New Roman,Bold"&16
PRICE SCHEDULE &"Times New Roman,Regular"&12
Attachment #7
&"Times New Roman,Regular"&12&P
Sheet2
Sheet3
File details come from the government source that posted it. Updated .