Attach__2_-_16-R-0001_MACC_Pre-Proposal_Conf_Slides.pdf
PDF 364 KB Posted
- Attached to
- (MACC) Multiple Award Construction Contract, McConnell AFB, KS 67221 Federal contract opportunity
- Solicitation number
- FA4621-16-R-0001
About this file
Conference Slides
View the file
Other files for this federal contract opportunity
Show all 39
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Pre-Proposal Conference for McConnell AFB
MACC
Solicitation
FA4621-16-R-0001
Pre-Proposal Conference Agenda
• Pre-Proposal conference slides
• Review solicitation & attachments
• Questions will be taken as we go thru the solicitation based on each applicable section.
• Explain / provide an overview of the seed project
• Conference final Q&A based on briefing
• Break
• Conduct site visit at dorms
• Final questions and answers 2
Early Exchanges of Information
• This conference facilitates the prudent exchange of information between the Government and prospective Offerors.
• Any questions or concerns that may be discussed at this time are specifically non-binding as only the CO can enter into obligations on behalf of the Government.
• If you have any questions concerning this notice, please feel free to ask the contract administrator.
Overview
• Identify key personnel and their responsibilities
• Solicitation & requirements overview
• Unique Government considerations
• Proposal requirements
• Conduct site visit
• Invite questions and answers
Key Gov’t Personnel & Their Responsibilities
• Contracting Officer (CO) – The only person who can bind the Government
• Contract Administrator (CA) – CO’s assistant
• Gov’t Project Engineer – Technical expert
• Gov’t Inspector – Quality assurance
Solicitation/Requirements
• Multiple Award Construction Contract (MACC)
• Contract Ceiling - $60M
• Ordering limits: $2,000 up to $10M
• Period of Performance (PoP) – 15 Dec 16 – 14 Dec 17 w/ 4 option years through 14 Dec 2021
• Seed Project (Attachments 6 thru 10)
• Up to six (6) contracts will be awarded
• Offeror with overall best value receives seed project
• All other awardees receive $500 partnership award
• Indefinite Quantity/Indefinite Delivery (ID/IQ)
• Firm Fixed Price (FFP)
• 100% Total Small Business Set-aside
• NAICS Code: 236220
• Size Standard: $36.5M
• SF1442, Attachments, Provisions, and Clauses
• Attachment 1 – MACC General Statement of Work (SOW)
• Attachment 2 – Wage Determination (WD) – Residential
• Attachment 3 – Wage Determination (WD) – Highway
• Attachment 4 – Wage Determination (WD) – Heavy
• Attachment 5 – Wage Determination (WD) – Building
Seed Project:
• Attachment 6 – Statement of Work (SOW)
• Attachment 7 – Price Schedule
• Attachment 8 – Specifications
• Attachment 9 – Plans/Drawings
• Attachment 10 – Submittal Register
• Attachment 11 – Past Performance Questionnaire (PPQ)
• Attachment 12 – NAF General Provisions and Clauses
Unique Considerations
• System for Award Management (SAM)
• FAR Clause 52.204-7 – System for Award Management
• Wide Area Workflow (WAWF/iRAPT)
• 252.232-7006 – Wide Area Workflow Payment Instructions
• Base Access Requests
• Attach 1: General SOW, Para 3.20.
Installation/Base Access 9
Unique Considerations
• Construction Wage Rate Requirements
• 52.211-12 – Liquidated Damages
• 52.236-5 – Material and Workmanship
• 52.246-21 – Warranty of Construction
Proposal Requirements
• Proposal Preparation/Instructions/Evaluation (Sections L & M) – Subjective Tradeoff
• Factor 1: Price
• Factor 2: Past Performance
• (Past Performance is significantly more important than Price)
• Bonding Capability (20% / $3M)
• Proposals are due to this office
• NLT 2:00 PM local CST, 8 Nov 2016
• Late proposals not accepted (FAR 15.208) 11
Proposal Requirements (cont’d)
• Amendments
• Only an amendment from the CO changes the solicitation
• Acknowledgement procedures (contractor must acknowledge to be binding)
• Requirement
• Seed Project SOW (Attachment 6)
• Price Schedule (Attachment 7)
• Seed Project Specifications (Attachment 8)
• Seed Project Drawings (Attachment 9)
• Review solicitation & attachments
• Site visit
Conclusion
• Proposals are due to this office
• NLT 2:00 PM local CST, 8 Nov 2016
• Proposal conference meeting minutes along with questions/answers will be provided via FBO.gov
• Questions?
• 25 Oct, 2:00 PM – Will be posted as soon as possible with meeting minutes
• Final questions are due to this office NLT 28 Oct, 2:00 PM (NLT 10 Days prior to solicitation due date) 13