Attach 10 - Dorms Submittal Registry

View the file

Other files for this federal contract opportunity

Other files attached to (MACC) Multiple Award Construction Contract, McConnell AFB, KS 67221, newest first.
File Type Posted
Questions_and_Answers__6_-_10Nov_16.pdf PDF
Amendment__4_FA4621-16-R-000104.pdf PDF
Attach__23_-_Sht._AE101_8_Nov_16.pdf PDF
Attach__22_Specs_and_Drawings_Revision_Amendment_3.pdf PDF
Q A__5_-_4_Nov_16.pdf PDF
MACC_Amendment__3_FA4621-16-R-000103.pdf PDF
Q A__4_-_31_Oct_16.pdf PDF
Revised_As-Builts_31_Oct_16.pdf PDF
Revised_As-Builts_for_Seed_Project.pdf PDF
QUESTIONS__3_-_Pre-Proposal_Conference_27_Oct_16.pdf PDF
18.__Sht._AE101_26_Oct_16.pdf PDF
FA4621-16-R-0001_-_Amendment__2.pdf PDF
17.__Sht._AE100_26_Oct_16.PDF PDF
20.__Sht._M-102_26_Oct_16.pdf PDF
13._Table_of_Contents_26_Oct_16.pdf PDF
16.__Sht_G-002.pdf PDF
14.__09_29_00_26_Oct_16.pdf PDF
21.__Sht._M-103_26_Oct_16.pdf PDF
19.__Sht._M-101_26_Oct_16.pdf PDF
15.__23_64_10_26_Oct_16.pdf PDF
Pre-Proposal_Conference_Meeting_Minutes_FA4621-16-R-0001_20_Oct_16.pdf PDF
Attach__1_-_Sign-In_Sheet_-_Pre-Proposal_Conference_20_Oct_16.pdf PDF
Attach__2_-_16-R-0001_MACC_Pre-Proposal_Conf_Slides.pdf PDF
QUESTIONS__2_-_19_Oct_16.pdf PDF
Seed_Project_Verified_Quantities.pdf PDF
FA4621-16-R-0001-0001_Amendment_-_Pre-Proposal_Conference.pdf PDF
QUESTIONS__1.docx DOCX document
Attach__6_-_Seed_Project__SOW.pdf PDF
Attach__1_-_General_Statement_of_Work_(SOW)_ _Specs.pdf PDF
Attach__4_-_KS160035_Heavy.pdf PDF
Attach__7_-_Seed_Project_-_Price_Schedule.xlsx XLSX spreadsheet
Attach__11_-_Past_Performance_Questionnaire_(PPQ).pdf PDF
Attach__2_-_KS160002_Residential.pdf PDF
Attach__12_-_NAF_General_Provisions.pdf PDF
Attach__3_-_KS160020_Highway.pdf PDF
Attach__8_-_Repair_Dorms_340__342_350_Specs.pdf PDF
Attach__9__-_Repair_Dorms_340_342_350_Drawings-Plans.pdf PDF
Attach__5_-_KS160062_Building.pdf PDF
1.__FA4621-16-R-0001_Solicitation_7_Oct_16.pdf PDF
Show all 39

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(a) (b) (c) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

Line

Acti vity

Trans-mittal #

Specification

Section

SD

# Submittal Description Item Submitted

Paragraph

Classificati on: GOVT or A/E

Revwr Submit

Approval

Needed

By

Material

Needed

By

Action

Code

Date Of

Action

Date FWD to APPR /

Auth Date

RCD From

CONTR

Date

FWD To

Other

Revwr

Date

RCD

From

Other

Revwr

Action

Code

Date Of

Action

Mailed To

CONTR/

Date RCD

From

APPR

Authority Remarks

02 41 00 01 SD-01 Preconstruction Submittals

02 41 00 01 Existing Conditions 1.9

05 51 33 02 SD-02 Shop Drawings

05 51 33 02 Ladders 2.3

05 51 33 03 SD-03 Product Data

05 51 33 03 Ladders 2.3

05 51 33 03 Ladder Safety Devices

05 51 33 07 SD-07 Certificates

05 51 33 07 Fabricator Certification for Ladder 1.3

05 51 33 07 Assembly

07 92 00 03 SD-03 Product Data

07 92 00 03 Sealants 2.1

07 92 00 03 Primers 2.2

07 92 00 03 Bond breakers 2.3

07 92 00 03 Backstops 2.4

07 92 00 07 SD-07 Certificates

07 92 00 07 Sealant 3.3.6

08 31 13 02 SD-02 Shop Drawings

08 31 13 02 Shop Drawings G

08 31 13 03 SD-03 Product Data

08 31 13 03 Product data G

08 31 13 04 SD-04 Samples

08 31 13 04 Samples G

08 31 13 05 SD-05 Design Data

08 31 13 05 Schedule G

09 30 05 03 SD-03 Product Data

09 30 05 03 Product Data

09 30 05 02 SD-04 Samples

09 30 05 02 Samples

09 30 05 07 SD-07 Certificates

09 30 05 07 Manufacturer's Certificates

09 30 10 02 SD-02 Shop Drawings

09 30 10 02 Detail Drawings 3.2 G

09 30 10 03 SD-03 Product Data

09 30 10 03 Tile 2.1 G

APPROVING AUTHORITY

(d)

*An Excel spreadsheet version will be given at award.

CONTRACTOR SCHEDULE

DATES

CONTRACTOR

ACTION

TITLE: 15-521 McConnell AFB Dorms 340_342 & 350 HVAC Upgrades

SUBMITTAL REGISTER

JOB NAME:

LOCATION: Wichita, KS

CONTRACT NO:

CONTRACTOR:

APPROVING AUTHORITY

(d)

*An Excel spreadsheet version will be given at award.

CONTRACTOR SCHEDULE

DATES

CONTRACTOR

ACTION

TITLE: 15-521 McConnell AFB Dorms 340_342 & 350 HVAC Upgrades

SUBMITTAL REGISTER

JOB NAME:

LOCATION: Wichita, KS

CONTRACT NO:

CONTRACTOR:

09 30 10 03 Setting-Bed 2.2 G

09 30 10 04 SD-04 Samples

09 30 10 04 Tile 2.1 G

09 30 10 04 Transition Strips 2.1 G

09 30 10 04 Transition Strips 2.5 G

09 30 10 04 Grout 2.4 G

09 30 10 07 SD-07 Certificates

09 30 10 07 Tile 2.1

09 30 10 07 Mortar and Grout 2.4

09 30 10 08 SD-08 Manufacturer’s Instructions

09 30 10 08 Maintenance Instructions 3.6

09 30 10 10 SD-10 Operation and Maintenance

09 30 10 10 Data

09 30 10 10 Installation 3.2 G

09 51 00 02 SD-02 Shop Drawings

09 51 00 02 Approved Detail Drawings 1.2

09 51 00 03 SD-03 Product Data

09 51 00 03 Acoustical Ceiling Systems

09 51 00 03 Certification

09 51 00 04 SD-04 Samples

09 51 00 04 Acoustical Units 2.1

09 51 00 07 SD-07 Certificates

09 51 00 07 Acoustical Units 2.1

09 65 00 02 SD-02 Shop Drawings

09 65 00 02 Resilient Base and Accessories 2.7 G

09 65 00 03 SD-03 Product Data

09 65 00 03 Resilient Base and Accessories 2.7 G

09 65 00 03 Wall Base 2.1

09 65 00 04 SD-04 Samples

09 65 00 04 Resilient Base and Accessories 2.7 G

09 65 00 06 SD-06 Test Reports

09 65 00 06 Moisture, Alkalinity and Bond G

09 65 00 06 Tests

09 65 00 08 SD-08 Manufacturer’s Instructions

09 65 00 08 Surface Preparation 3.2 G

09 65 00 08 Installation 3.1 G

09 65 00 10 SD-10 Operation and Maintenance

09 65 00 10 Data

09 65 00 10 Resilient Base and Accessories 2.7 G

(d)

*An Excel spreadsheet version will be given at award.

CONTRACTOR SCHEDULE

DATES

CONTRACTOR

ACTION

TITLE: 15-521 McConnell AFB Dorms 340_342 & 350 HVAC Upgrades

SUBMITTAL REGISTER

JOB NAME:

LOCATION: Wichita, KS

CONTRACT NO:

CONTRACTOR:

09 68 00 02 SD-02 Shop Drawings

09 68 00 02 Installation Drawings 3.4 G

09 68 00 02 Moldings 2.4 G

09 68 00 03 SD-03 Product Data

09 68 00 03 Carpet 2.1 G

09 68 00 03 Moldings 2.4 G

09 68 00 04 SD-04 Samples

09 68 00 04 Carpet 2.1 G

09 68 00 04 Moldings 2.4 G

09 68 00 06 SD-06 Test Reports

09 68 00 06 Moisture and Alkalinity Tests 3.2 G

09 68 00 07 SD-07 Certificates

09 68 00 07 Carpet 2.1

09 68 00 07 Regulatory Requirements 1.4

09 68 00 08 SD-08 Manufacturer’s Instructions

09 68 00 08 Surface Preparation 3.1

09 68 00 08 Installation 3.4

09 68 00 10 SD-10 Operation and Maintenance

09 68 00 10 Data

09 68 00 10 Carpet 2.1 G

09 68 00 10 Cleaning and Protection 3.5 G

09 90 00 03 SD-03 Product Data

09 90 00 03 Certification

09 90 00 03 Coating 2.1 G

09 90 00 04 SD-04 Samples

09 90 00 04 Color 1.8 G

09 90 00 08 SD-08 Manufacturer’s Instructions

09 90 00 08 Application instructions 3.2.1

09 90 00 08 Mixing 3.5.2

09 90 00 08 Manufacturer's Material Safety 1.5.2

09 90 00 08 Data Sheets

1 23 00 00 02 Shop Drawings Detail Drawings 1.4.5 G

2 23 00 00 03 Product Data Metallic Flexible Duct 2.9.1.1

3 23 00 00 03 Product Data Insulated Nonmetallic Flexible Duct

Runouts 2.9.1.2

4 23 00 00 03 Product Data Duct Connectors 2.9.1.2

5 23 00 00 03 Product Data Duct Access Doors 2.9.2 G

6 23 00 00 03 Product Data Fire Dampers

7 23 00 00 03 Product Data Manual Balancing Dampers 2.9.3 G

8 23 00 00 03 Product Data Automatic Smoke-Fire Dampers

(d)

*An Excel spreadsheet version will be given at award.

CONTRACTOR SCHEDULE

DATES

CONTRACTOR

ACTION

TITLE: 15-521 McConnell AFB Dorms 340_342 & 350 HVAC Upgrades

SUBMITTAL REGISTER

JOB NAME:

LOCATION: Wichita, KS

CONTRACT NO:

CONTRACTOR:

9 23 00 00 03 Product Data Sound Attenuation Equipment

10 23 00 00 03 Product Data Diffusers 2.9.7.1

11 23 00 00 03 Product Data Registers and Grilles 2.9.7.2

12 23 00 00 03 Product Data Louvers 2.9.8

13 23 00 00 03 Product Data Air Vents, Penthouses, and

Goosenecks 2.9.9

14 23 00 00 03 Product Data Centrifugal Fans 2.10.1.1

15 23 00 00 03 Product Data In-Line Centrifugal Fans 2.10.1.2

16 23 00 00 03 Product Data Axial Flow Fans

17 23 00 00 03 Product Data Ceiling Exhaust Fans 2.10.1.3

18 23 00 00 03 Product Data Air Handling Units 2.11 G

19 23 00 00 03 Product Data Room Fan-Coil Units 2.12.1 G

20 23 00 00 03 Product Data Constant Volume, Single Duct Terminal

Units G

21 23 00 00 03 Product Data Variable Volume, Single Duct Terminal

Units G

22 23 00 00 03 Product Data Variable Volume, Single Duct, Fan-

Powered Terminal Units G

23 23 00 00 03 Product Data Reheat Units G

24 23 00 00 03 Product Data Test Procedures

25 23 00 00 03 Product Data Diagrams G

26 23 00 00 06 Test Reports Performance Tests 3.9 G

27 23 00 00 06 Test Reports Damper Acceptance Test G

28 23 00 00 08 Manufacturer’s Instructions Manufacturer's Installation Instructions 3.2

29 23 00 00 08 Manufacturer’s Instructions Operation and Maintenance Training 3.11.2

30 23 00 00 10 Operation and Maintenance Data Operation and Maintenance Manuals 3.11.1 G

31 23 00 00 10 Operation and Maintenance Data Fire Dampers G

32 23 00 00 10 Operation and Maintenance Data Manual Balancing Dampers 2.9.3 G

33 23 00 00 10 Operation and Maintenance Data Automatic Smoke-Fire Dampers G

34 23 00 00 10 Operation and Maintenance Data Centrifugal Fans 2.10.1.1 G

35 23 00 00 10 Operation and Maintenance Data In-Line Centrifugal Fans 2.10.1.2 G

36 23 00 00 10 Operation and Maintenance Data Axial Flow Fans G

37 23 00 00 10 Operation and Maintenance Data Air Handling Units 2.11 G

38 23 00 00 10 Operation and Maintenance Data Room Fan-Coil Units 2.12.1 G

39 23 00 00 10 Operation and Maintenance Data Variable Volume, Single Duct, Fan-

Powered Terminal Units

40 23 01 30.41 01 Preconstruction Submittals Record of Existing Conditions 3.1.1.1

41 23 01 30.41 01 Preconstruction Submittals Coordination Plan 3.1.1.2

42 23 01 30.41 01 Preconstruction Submittals NADCA Firm 1.4.1

43 23 01 30.41 01 Preconstruction Submittals NADCA Team Assistants 1.4.1

44 23 01 30.41 01 Preconstruction Submittals NADCA Air System Cleaning Specialist

(ASCS)

1.4.1

45 23 01 30.41 01 Preconstruction Submittals NADCA Supervisor Qualifications 1.4.1

46 23 01 30.41 01 Preconstruction Submittals Records of Experience in the Field of

HVAC System Cleaning 1.4.2

47 23 01 30.41 01 Preconstruction Submittals NADCA Work Execution Schedule 1.5.1

(d)

*An Excel spreadsheet version will be given at award.

CONTRACTOR SCHEDULE

DATES

CONTRACTOR

ACTION

TITLE: 15-521 McConnell AFB Dorms 340_342 & 350 HVAC Upgrades

SUBMITTAL REGISTER

JOB NAME:

LOCATION: Wichita, KS

CONTRACT NO:

CONTRACTOR:

48 23 01 30.41 03 Product Data Material Safety Data Sheets (MSDS) 1.4.3

49 23 01 30.41 06 Test Reports Testing Procedures Summary 3.3.2

50 23 01 30.41 06 Test Reports Post-Project Report 3.3.2

51 23 05 15 01 Preconstruction Submittals Material, Equipment, and Fixture Lists 1.2

52 23 05 15 02 Shop Drawings Record Drawings 1.2

53 23 05 15 02 Shop Drawings Connection Diagrams 1.2

54 23 05 15 02 Shop Drawings Coordination Drawings 1.2

55 23 05 15 02 Shop Drawings Fabrication Drawings 1.2

56 23 05 15 02 Shop Drawings Installation Drawings 3.1

57 23 05 15 03 Product Data Pipe and Fittings 2.1

58 23 05 15 03 Product Data Piping Specialties 2.2

59 23 05 15 03 Product Data Valves 2.3

60 23 05 15 03 Product Data Miscellaneous Materials 2.4

61 23 05 15 03 Product Data Supporting Elements 2.5

62 23 05 15 03 Product Data Equipment Foundation Data 1.2

63 23 05 15 04 Samples Manufacturer's Standard Color Charts 1.2

64 23 05 15 05 Design Data Pipe and Fittings 2.1

65 23 05 15 05 Design Data Piping Specialties 2.2

66 23 05 15 05 Design Data Valves 2.3

67 23 05 15 06 Test Reports Hydrostatic Tests 3.1

68 23 05 15 06 Test Reports Air Tests 3.1

69 23 05 15 06 Test Reports Valve-Operating Tests 3.1

70 23 05 15 06 Test Reports Drainage Tests 3.1

71 23 05 15 06 Test Reports Pneumatic Tests 3.1

72 23 05 15 06 Test Reports Non-Destructive Electric Tests 3.1

73 23 05 15 06 Test Reports System Operation Tests 3.1

74 23 05 15 07 Certificates Record of Satisfactory Field Operation 1.4.2

75 23 05 15 07 Certificates List of Qualified Permanent Service

Organizations 1.4.3

76 23 05 15 07 Certificates Listing of Product Installations 1.2

77 23 05 15 07 Certificates Records of Existing Conditions 1.2

78 23 05 15 07 Certificates Surface Resistance 3.1

79 23 05 15 07 Certificates Shear and Tensile Strengths 3.1

80 23 05 15 07 Certificates Temperature Ratings 3.1

81 23 05 15 07 Certificates Bending Tests 3.1

82 23 05 15 07 Certificates Flattening Tests 3.1

83 23 05 15 07 Certificates Transverse Guided Weld Bend Tests 3.1

84 23 05 15 10 Operation and Maintenance Data Operation and Maintenance Manuals 3.9

(d)

*An Excel spreadsheet version will be given at award.

CONTRACTOR SCHEDULE

DATES

CONTRACTOR

ACTION

TITLE: 15-521 McConnell AFB Dorms 340_342 & 350 HVAC Upgrades

SUBMITTAL REGISTER

JOB NAME:

LOCATION: Wichita, KS

CONTRACT NO:

CONTRACTOR:

85 23 07 00 02 Shop Drawings MICA Plates G

86 23 07 00 02 Shop Drawings Pipe Insulation Systems

87 23 07 00 02 Shop Drawings Duct Insulation Systems

88 23 07 00 03 Product Data Pipe Insulation Systems G

89 23 07 00 03 Product Data Duct Insulation Systems G

90 23 07 00 04 Samples Thermal Insulation 2.2.1.3 G

91 23 07 00 04 Samples Display Samples 3.1.1 G

92 23 07 00 08 Manufacturer’s Instructions Pipe Insulation Systems G

93 23 07 00 08 Manufacturer’s Instructions Duct Insulation Systems G

94 23 08 00.00 10 02 Shop Drawings Commissioning Plan 1.5.2.2 G

95 23 08 00.00 10 03 Product Data Pre-Functional Performance Test

Checklists

3.2.1 G

96 23 08 00.00 10 03 Product Data Functional Performance Tests 3.2.2 G

97 23 08 00.00 10 06 Test Reports Commissioning Report 3.3

98 23 08 00.00 10 07 Certificates Commissioning Firm 1.5.1

99 23 08 00.00 10 07 Certificates Commissioning Specialist 1.5.2

100 23 09 23.13 20 02 Shop Drawings Control system drawings title sheet 1.4.1.1 G

101 23 09 23.13 20 02 Shop Drawings List of I/O Points 1.4.1.2 G

102 23 09 23.13 20 02 Shop Drawings Control System Components List 1.4.1.3 G

103 23 09 23.13 20 02 Shop Drawings Control system schematics 1.4.1.4 G

104 23 09 23.13 20 02 Shop Drawings HVAC Equipment Electrical Ladder diagrams

1.4.1.5 G

105 23 09 23.13 20 02 Shop Drawings Component wiring diagrams 1.4.1.6 G

106 23 09 23.13 20 02 Shop Drawings Terminal strip diagrams 1.4.1.7 G

107 23 09 23.13 20 02 Shop Drawings BACnet communication architecture schematic

1.4.1.8 G

108 23 09 23.13 20 03 Product Data Direct Digital Controllers 2.1.1 G

109 23 09 23.13 20 03 Product Data BACnet Gateways 2.1.1.13 G

110 23 09 23.13 20 03 Product Data BACnet Protocol Analyzer G

111 23 09 23.13 20 03 Product Data DDC Software 2.1.2 G

112 23 09 23.13 20 03 Product Data BACnet Operator Workstation G

113 23 09 23.13 20 03 Product Data BACnet Operator Workstation DDC

Software G

114 23 09 23.13 20 03 Product Data Notebook Computer G

115 23 09 23.13 20 03 Product Data Sensors and Input Hardware 2.2 G

116 23 09 23.13 20 03 Product Data Output Hardware 2.3 G

117 23 09 23.13 20 03 Product Data Surge and transient protection 2.4.2 G

118 23 09 23.13 20 03 Product Data Indicators 2.6 G

119 23 09 23.13 20 03 Product Data Duct smoke detectors 2.5.1 G

120 23 09 23.13 20 03 Product Data Variable frequency (motor) drives 2.7 G

121 23 09 23.13 20 05 Design Data Performance Verification Testing Plan 3.4.2 G

122 23 09 23.13 20 05 Design Data Pre-Performance Verification Testing

Checklist

3.4.4 G

(d)

*An Excel spreadsheet version will be given at award.

CONTRACTOR SCHEDULE

DATES

CONTRACTOR

ACTION

TITLE: 15-521 McConnell AFB Dorms 340_342 & 350 HVAC Upgrades

SUBMITTAL REGISTER

JOB NAME:

LOCATION: Wichita, KS

CONTRACT NO:

CONTRACTOR:

123 23 09 23.13 20 06 Test Reports Performance Verification Testing

Report

3.4.11 G

124 23 09 23.13 20 07 Certificates Contractor's Qualifications 1.6.6 G

125 23 09 23.13 20 09 Manufacturer’s Field Reports Pre-PVT Checklist 3.4.1 G

126 23 09 23.13 20 10 Operation and Maintenance Data BACnet Direct Digital Control Systems 1.4 G

127 23 09 23.13 20 10 Operation and Maintenance Data Controls System Operators Manuals 3.3 G

128 23 09 23.13 20 10 Operation and Maintenance Data VFD Service Manuals 2.7.2 G

129 23 09 23.13 20 11 Closeout Submittals Training documentation 3.5.1 G

130 23 11 25 02 Shop Drawings Gas Piping System 2.2 G

131 23 11 25 02 Shop Drawings Gas Piping System 3.3 G

132 23 11 25 03 Product Data Pipe and Fittings G

133 23 11 25 03 Product Data Gas equipment connectors G

134 23 11 25 03 Product Data Gas Piping System 2.2 G

135 23 11 25 03 Product Data Gas Piping System 3.3 G

136 23 11 25 03 Product Data Pipe Coating Materials 2.1 G

137 23 11 25 03 Product Data Pressure regulators G

138 23 11 25 03 Product Data Risers G

139 23 11 25 03 Product Data Transition fittings 2.2.9 G

140 23 11 25 03 Product Data Valves 2.3 G

141 23 11 25 03 Product Data Warning and identification tape 2.2.6 G

142 23 11 25 06 Test Reports Testing 3.15 G

143 23 11 25 06 Test Reports Pressure Tests G

144 23 11 25 06 Test Reports Test With Gas 3.15.1 G

145 23 11 25 07 Certificates Welders procedures and qualifications G

146 23 11 25 07 Certificates assigned number, letter, or symbol G

147 23 11 25 08 Manufacturer’s Instructions PE pipe and fittings G

148 23 11 25 08 Manufacturer’s Instructions pipe coating materials 2.1 G

149 23 11 25 10 Operation and Maintenance Data Gas facility system and equipment operation G

150 23 11 25 10 Operation and Maintenance Data Gas facility system maintenance G

151 23 11 25 10 Operation and Maintenance Data Gas facility equipment maintenance G

152 23 21 13.00 20 02 Shop Drawings Hot water heating system 1.3.1

153 23 21 13.00 20 03 Product Data Convectors

154 23 21 13.00 20 03 Product Data Finned tube radiators 2.4.1

155 23 21 13.00 20 03 Product Data Pumps 2.3.1

156 23 21 13.00 20 03 Product Data Expansion tanks 2.3.2

157 23 21 13.00 20 03 Product Data Flow measuring equipment 2.3.5

158 23 21 13.00 20 03 Product Data Backflow preventers 2.3.4

159 23 21 13.00 20 03 Product Data External air separation tanks 2.3.3

160 23 21 13.00 20 03 Product Data Hot water heating pipe 2.1.1

(d)

*An Excel spreadsheet version will be given at award.

CONTRACTOR SCHEDULE

DATES

CONTRACTOR

ACTION

TITLE: 15-521 McConnell AFB Dorms 340_342 & 350 HVAC Upgrades

SUBMITTAL REGISTER

JOB NAME:

LOCATION: Wichita, KS

CONTRACT NO:

CONTRACTOR:

161 23 21 13.00 20 06 Test Reports Hydrostatic test of piping system 3.3.1

162 23 21 13.00 20 06 Test Reports Auxiliary equipment and accessory tests 3.3.2

163 23 21 13.00 20 07 Certificates Backflow preventer certification 1.5.3

164 23 21 13.00 20 07 Certificates Report of prior installations

165 23 21 13.00 20 07 Certificates Welding procedures

166 23 21 13.00 20 07 Certificates Welder's qualifications

167 23 21 13.00 20 10 Operation and Maintenance Data Convectors G

168 23 21 13.00 20 10 Operation and Maintenance Data Finned tube radiators 2.4.1 G

169 23 25 00 03 Product Data Water Treatment System G

170 23 25 00 03 Product Data Water Analysis 2.5 G

171 23 25 00 03 Product Data Spare Parts 1.6

172 23 25 00 03 Product Data Field Instructions 3.4

173 23 25 00 03 Product Data Tests 3.5 G

174 23 25 00 03 Product Data Training Course 3.4 G

175 23 25 00 06 Test Reports Condenser Water QA Tests

176 23 25 00 06 Test Reports Steam Boiler Water QA Tests

177 23 25 00 10 Operation and Maintenance Data Water Treatment System

178 23 36 00.00 40 01 Preconstruction Submittals Records of Existing Conditions 1.3

179 23 36 00.00 40 02 Shop Drawings Record Drawings 3.3

180 23 36 00.00 40 03 Product Data Spare Parts 1.3

181 23 36 00.00 40 10 Operation and Maintenance Data Operation and Maintenance Manuals 3.3

182 23 37 13.00 40 01 Preconstruction Submittals Material, Equipment, and Fixture Lists 2.2.1

183 23 37 13.00 40 01 Preconstruction Submittals Records of Existing Conditions 2.2.1

184 23 37 13.00 40 02 Shop Drawings Fabrication Drawings 2.2.1

185 23 37 13.00 40 02 Shop Drawings Installation Drawings 3.1

186 23 37 13.00 40 03 Product Data Equipment and Performance Data 2.1

187 23 37 13.00 40 04 Samples Manufacturer's Standard Color Chart 2.2.1

188 23 37 13.00 40 10 Operation and Maintenance Data Type TS Supply Troffer

189 23 37 13.00 40 10 Operation and Maintenance Data Type TSR Combination Supply and

Return Troffer

190 23 41 13.00 40 02 Shop Drawings Installation Drawings 3.2

191 23 41 13.00 40 03 Product Data Physical Characteristics 1.1

192 23 41 13.00 40 03 Product Data Performance Data 1.1

193 23 41 13.00 40 03 Product Data Air Filters 2.1

194 23 41 13.00 40 03 Product Data Filter Gages 2.2

195 23 41 13.00 40 03 Product Data Manometers 2.2

196 23 41 13.00 40 06 Test Reports Test Reports 3.3

197 23 41 13.00 40 07 Certificates Air Filters 2.1

198 23 41 13.00 40 07 Certificates Filter Gages 2.2

199 23 41 13.00 40 07 Certificates Manometers 2.2

(d)

*An Excel spreadsheet version will be given at award.

CONTRACTOR SCHEDULE

DATES

CONTRACTOR

ACTION

TITLE: 15-521 McConnell AFB Dorms 340_342 & 350 HVAC Upgrades

SUBMITTAL REGISTER

JOB NAME:

LOCATION: Wichita, KS

CONTRACT NO:

CONTRACTOR:

200 23 52 43.00 20 02 Shop Drawings Fuel Train 1.3.2.2

201 23 52 43.00 20 02 Shop Drawings Wiring Diagram 1.3.2.2

202 23 52 43.00 20 03 Product Data Boilers 2.1

203 23 52 43.00 20 03 Product Data Boiler Trim and Control Equipment 2.2

204 23 52 43.00 20 03 Product Data Burners and Control Equipment

205 23 52 43.00 20 03 Product Data Stack, Breeching, and Supports

206 23 52 43.00 20 03 Product Data Local/Regional Materials 1.6.1

207 23 52 43.00 20 03 Product Data Environmental Data 1.6.2

208 23 52 43.00 20 06 Test Reports Operational Tests 3.4.1

209 23 52 43.00 20 06 Test Reports Water Analysis 1.3.3

210 23 52 43.00 20 07 Certificates Boilers 2.1

211 23 52 43.00 20 07 Certificates Burners and Control Equipment

212 23 52 43.00 20 07 Certificates Boiler Trim and Control Equipment 2.2

213 23 52 43.00 20 08 Manufacturer’s Instructions Boilers 2.1

214 23 52 43.00 20 08 Manufacturer’s Instructions Feedwater Treatment Feeder

215 23 52 43.00 20 10 Operation and Maintenance Data Boilers 2.1

216 23 52 43.00 20 11 Closeout Submittals boilers 2.1

217 23 82 19.00 40 01 Preconstruction Submittals Material, Equipment, and Product

Installation Lists 1.3

218 23 82 19.00 40 02 Shop Drawings Fabrication Drawings 2.2

219 23 82 19.00 40 02 Shop Drawings Installation Drawings 3.1

220 23 82 19.00 40 03 Product Data Equipment and Performance Data 2.2

221 23 82 19.00 40 03 Product Data Coils 2.2

222 23 82 19.00 40 03 Product Data Casing 2.2

223 23 82 19.00 40 03 Product Data Enclosure 2.2

224 23 82 19.00 40 03 Product Data Motors 2.2

225 23 82 19.00 40 03 Product Data Fan 2.2

226 23 82 19.00 40 03 Product Data Drain Pans 2.2

227 23 82 19.00 40 03 Product Data Filters 2.2

228 23 82 19.00 40 03 Product Data Controls 2.2

229 23 82 19.00 40 03 Product Data Vibration Isolation 2.2

230 23 82 19.00 40 04 Samples Manufacturer's Standard Color Chart 2.2

231 23 82 19.00 40 07 Certificates Listing of Product Installations 1.3

232 23 82 19.00 40 07 Certificates Certificates of Conformance 2.2

233 23 82 19.00 40 10 Operation and Maintenance Data Operation and Maintenance Manuals 3.3

234 26 05 00.00 40 01 Preconstruction Submittals Material, Equipment, and Fixture Lists 2.1

235 26 05 00.00 40 03 Product Data Conduits and Raceways 2.1.1

236 26 05 00.00 40 03 Product Data Wire and Cable 2.1.3

237 26 05 00.00 40 03 Product Data Splices and Connectors 3.2.1.3

238 26 05 00.00 40 03 Product Data Switches 2.1.4

(d)

*An Excel spreadsheet version will be given at award.

CONTRACTOR SCHEDULE

DATES

CONTRACTOR

ACTION

TITLE: 15-521 McConnell AFB Dorms 340_342 & 350 HVAC Upgrades

SUBMITTAL REGISTER

JOB NAME:

LOCATION: Wichita, KS

CONTRACT NO:

CONTRACTOR:

239 26 05 00.00 40 03 Product Data Receptacles 2.1.5

240 26 05 00.00 40 03 Product Data Outlets, Outlet Boxes, and Pull Boxes 2.1.6

241 26 05 00.00 40 03 Product Data Circuit Breakers 2.1.7

242 26 05 00.00 40 03 Product Data Panelboards

243 26 05 00.00 40 03 Product Data Lamps and Lighting Fixtures

244 26 05 00.00 40 03 Product Data Dry-Type Distribution Transformers

245 26 05 00.00 40 06 Test Reports Continuity Test

246 26 05 00.00 40 06 Test Reports Phase-Rotation Tests

247 26 05 00.00 40 06 Test Reports Insulation Resistance Test

248 26 05 00.00 40 07 Certificates Certification 1.4

249 26 05 00.00 40 08 Manufacturer’s Instructions Manufacturer's Instructions Part 2

250 26 29 23 02 Shop Drawings Schematic diagrams 1.5.1 G

251 26 29 23 02 Shop Drawings Interconnecting diagrams 1.5.2 G

252 26 29 23 02 Shop Drawings Installation drawings 1.5.3 G

253 26 29 23 03 Product Data Variable frequency drives 2.1 G

254 26 29 23 03 Product Data Wires and cables 2.3

255 26 29 23 03 Product Data Equipment schedule 1.5.4

256 26 29 23 06 Test Reports VFD Test 3.2.1

257 26 29 23 06 Test Reports Performance Verification Tests 3.2.2

258 26 29 23 06 Test Reports Endurance Test 3.2.3

259 26 29 23 08 Manufacturer’s Instructions Installation instructions 1.5.5

260 26 29 23 09 Manufacturer’s Field Reports VFD Factory Test Plan G

261 26 29 23 09 Manufacturer’s Field Reports Factory test results 1.5.6

262 26 29 23 10 Operation and Maintenance Data Variable frequency drives 2.1

File details come from the government source that posted it. Updated .