13._Table_of_Contents_26_Oct_16.pdf

PDF 11 KB Posted

Attached to
(MACC) Multiple Award Construction Contract, McConnell AFB, KS 67221 Federal contract opportunity
Solicitation number
FA4621-16-R-0001
Issued by
Department of the Air Force Air Mobility Command

About this file

13. Table of Contents 26 Oct 16 (Specs)

View the file

Other files for this federal contract opportunity

Other files attached to (MACC) Multiple Award Construction Contract, McConnell AFB, KS 67221, newest first.
File Type Posted
Questions_and_Answers__6_-_10Nov_16.pdf PDF
Amendment__4_FA4621-16-R-000104.pdf PDF
Attach__23_-_Sht._AE101_8_Nov_16.pdf PDF
MACC_Amendment__3_FA4621-16-R-000103.pdf PDF
Attach__22_Specs_and_Drawings_Revision_Amendment_3.pdf PDF
Q A__5_-_4_Nov_16.pdf PDF
Revised_As-Builts_31_Oct_16.pdf PDF
Q A__4_-_31_Oct_16.pdf PDF
Revised_As-Builts_for_Seed_Project.pdf PDF
QUESTIONS__3_-_Pre-Proposal_Conference_27_Oct_16.pdf PDF
20.__Sht._M-102_26_Oct_16.pdf PDF
18.__Sht._AE101_26_Oct_16.pdf PDF
FA4621-16-R-0001_-_Amendment__2.pdf PDF
17.__Sht._AE100_26_Oct_16.PDF PDF
14.__09_29_00_26_Oct_16.pdf PDF
21.__Sht._M-103_26_Oct_16.pdf PDF
19.__Sht._M-101_26_Oct_16.pdf PDF
15.__23_64_10_26_Oct_16.pdf PDF
16.__Sht_G-002.pdf PDF
Attach__1_-_Sign-In_Sheet_-_Pre-Proposal_Conference_20_Oct_16.pdf PDF
Attach__2_-_16-R-0001_MACC_Pre-Proposal_Conf_Slides.pdf PDF
Pre-Proposal_Conference_Meeting_Minutes_FA4621-16-R-0001_20_Oct_16.pdf PDF
QUESTIONS__2_-_19_Oct_16.pdf PDF
Seed_Project_Verified_Quantities.pdf PDF
FA4621-16-R-0001-0001_Amendment_-_Pre-Proposal_Conference.pdf PDF
QUESTIONS__1.docx DOCX document
Attach__7_-_Seed_Project_-_Price_Schedule.xlsx XLSX spreadsheet
Attach__11_-_Past_Performance_Questionnaire_(PPQ).pdf PDF
Attach__6_-_Seed_Project__SOW.pdf PDF
Attach__1_-_General_Statement_of_Work_(SOW)_ _Specs.pdf PDF
Attach__4_-_KS160035_Heavy.pdf PDF
Attach__8_-_Repair_Dorms_340__342_350_Specs.pdf PDF
Attach__9__-_Repair_Dorms_340_342_350_Drawings-Plans.pdf PDF
Attach__10_-_Dorms_Submittal_Registry.pdf PDF
Attach__5_-_KS160062_Building.pdf PDF
1.__FA4621-16-R-0001_Solicitation_7_Oct_16.pdf PDF
Attach__2_-_KS160002_Residential.pdf PDF
Attach__12_-_NAF_General_Provisions.pdf PDF
Attach__3_-_KS160020_Highway.pdf PDF
Show all 39

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Repair Dorms 340 & 342 Chilled Water Valves and Access McConnell Air Force Base, Wichita, Kansas

PRQE 17-0125

26 Oct 16

PROJECT TABLE OF CONTENTS

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

(PREPARED AND FURNISHED SEPARATELY BY THE GOVERNMENT)

DIVISION 01 - GENERAL REQUIREMENTS

01000 GENERAL CONDITIONS

01 73 29 CUTTING AND PATCHING

01 74 19 CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT

DIVISION 02 - EXISTING CONDITIONS

02 41 00 SELECTIVE DEMOLITION

DIVISION 03 - CONCRETE

03 30 00.00 10 CAST-IN-PLACE CONCRETE

DIVISION 05 – METALS

05 51 33 METAL LADDERS

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 92 00 JOINT SEALANTS

DIVISION 08 – OPENINGS

08 14 00 WOOD DOORS

08 31 13 ACCESS DOORS AND FRAMES

DIVISION 09 – FINISHES

09 29 00 GYPSUM BOARD

09 30 05 TILE SETTING MATERIALS AND ACCESSORIES

09 30 10 CERAMIC TILE

09 51 00 ACOUSTICAL CEILINGS

09 65 00 RESILIENT FLOORING

09 68 00 CARPETING

09 90 00 PAINTS AND COATINGS

Repair Dorms 340 & 342 Chilled Water Valves and Access McConnell Air Force Base, Wichita, Kansas

PRQE 17-0125

26 Oct 16

DIVISION 23-HVAC

23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION AND EXHAUST

SYSTEMS

23 01 30.41 HVAC SYSTEM CLEANING

23 03 00.00 20 BASIC MECHANICAL MATERIALS AND METHODS

23 05 15 COMMON PIPING FOR HVAC

23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HAVAC

23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS

23 08 00.00 10 COMMISSIONING OF HVAC SYSTEMS

23 09 23.13 20 BACnet DIRECT DIGITAL CONTROL SYSTEMS FOR HVAC

23 11 25 FACILITY GAS PIPING

23 21 13.00 20 LOW TEMPERATURE WATER (LTW) HEATING SYSTEM

23 25 00 CHEMICAL TREATMENT OF WATER FOR MECHANICAL

SYSTEMS

23 36 00.00 40 AIR TERMINAL UNITS

23 37 13.00 40 DIFFUSERS, REGISTERS, AND GRILLS

23 41 13.00 40 PANEL FILTERS

23 52 43.00 20 LOW PRESSURE WATER HEATING BOILERS (UNDER 800,000

BTU/HR OUTPUT)

23 64 10 WATER CHILLERS, VAPOR COMPRESSION TYPE

23 82 19.00 40 FAN COIL UNITS

DIVISION 26-ELECTRICAL

26 00 00.00 20 BASIC ELECTRICAL MATERIALS AND METHODS

26 05 00.00 40 COMMON WORK RESULTS FOR ELECTRICAL

26 29 23 VARIABLE FREQUENCY DRIVE SYTEMS UNDER 600 VOLTS

DIVISION 26-EXTERIOR IMPROVEMENTS

32 31 00 FENCES AND GATES

File details come from the government source that posted it. Updated .