Amendment__4_FA4621-16-R-000104.pdf
PDF 48 KB Posted
- Attached to
- (MACC) Multiple Award Construction Contract, McConnell AFB, KS 67221 Federal contract opportunity
- Solicitation number
- FA4621-16-R-0001
View the file
Other files for this federal contract opportunity
Show all 39
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to incorporate the follow ing changes to Attachment #9, Draw ings:
1) Replace Sht. AE101 dated 26 Oct 16 w ith new Sht. AE101 dated 8 Nov 16. Sht. AE101 is modif ied to clarify tile requirements in the vanity and bathroom areas, and to clarify that ceiling tile is to be tegular edge, not square edge.
The changes are show n in red on the revised documents. See Summary of Changes.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 4
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 08-Nov-2016
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X FA4621-16-R-0001
X 9B. DATED (SEE ITEM 11)
07-Oct-2016
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
08-Nov-2016
CODE
22D CONTRACTING SQUADRON - FA4621
53384 KANSAS ST STE 121
MCCONNELL AFB KS 67221-3702
FA4621 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
1240047841A Highlight
FA4621-16-R-0001
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
The Table of Contents has changed from:
Exhibit/Attachment Table of Contents
DOCUMENT TYPE DESCRIPTION PAGES DATE
Attachment 1 MACC General Statement of Work (SOW)
8 15-AUG-2016
Attachment 10 Submittal Register - Seed Project
10 05-AUG-2016
Attachment 11 Past Performance Questionnaire (PPQ)
5 22-AUG-2016
Attachment 12 NAF General Provisions and Clauses
13 01-JAN-2015
Attachment 13 Specifications Table of Contents
2 26-OCT-2016
Attachment 14 Specification 09 29 00 Gypsum Board
6 26-OCT-2016
Attachment 15 Spec 23 64 10 Water Chiller, Vapor Compression
19 26-OCT-2016
Attachment 16 Drawings Sht. G-002 Summary of Work
1 26-OCT-2016
Attachment 17 Drawings Sht. AE100 1 26-OCT-2016 Attachment 18 Drawings Sht. AE101 1 26-OCT-2016 Attachment 19 Drawings Sht. M101 1 26-OCT-2016 Attachment 2 Wage Determination
(WD) KS160002
Residential
4 08-JAN-2016
Attachment 20 Drawings Sht. M102 1 26-OCT-2016 Attachment 21 Drawings Sht. M103 1 26-OCT-2016 Attachment 22 Specs & Drawings
Revisions (Amendment # 3)
28 04-NOV-2016
Attachment 3 Wage Determination
(WD) KS160020
Highway
9 08-JAN-2016
Attachment 4 Wage Determination (WD) KS160035 Heavy
4 29-APR-2016
Attachment 5 Wage Determination (WD) KS160062 Building
6 30-SEP-2016
Attachment 6 Statement of Work (SOW) Seed Project
2 15-AUG-2016
Attachment 7 Price Schedule - Seed Project
1 15-AUG-2016
Attachment 8 Specifications - Seed Project
385 05-AUG-2016
Attachment 9 Plans/Drawings - Seed Project
65 05-AUG-2016
to:
Exhibit/Attachment Table of Contents
DOCUMENT TYPE DESCRIPTION PAGES DATE
Attachment 1 MACC General Statement of Work (SOW)
8 15-AUG-2016
Attachment 10 Submittal Register - Seed Project
10 05-AUG-2016
Attachment 11 Past Performance Questionnaire (PPQ)
5 22-AUG-2016
Attachment 12 NAF General Provisions and Clauses
13 01-JAN-2015
Attachment 13 Specifications Table of Contents
2 26-OCT-2016
Attachment 14 Specification 09 29 00 Gypsum Board
6 26-OCT-2016
Attachment 15 Spec 23 64 10 Water Chiller, Vapor Compression
19 26-OCT-2016
Attachment 16 Drawings Sht. G-002 Summary of Work
1 26-OCT-2016
Attachment 17 Drawings Sht. AE100 1 26-OCT-2016 Attachment 18 Drawings Sht. AE101 1 26-OCT-2016 Attachment 19 Drawings Sht. M101 1 26-OCT-2016 Attachment 2 Wage Determination
(WD) KS160002
Residential
4 08-JAN-2016
Attachment 20 Drawings Sht. M102 1 26-OCT-2016 Attachment 21 Drawings Sht. M103 1 26-OCT-2016 Attachment 22 Specs & Drawings
Revisions (Amendment # 3)
28 04-NOV-2016
Attachment 23 Drawings Sht. AE101 (Revised)
1 08-NOV-2016
Attachment 3 Wage Determination
(WD) KS160020
Highway
9 08-JAN-2016
Attachment 4 Wage Determination (WD) KS160035 Heavy
4 29-APR-2016
Attachment 5 Wage Determination (WD) KS160062 Building
6 30-SEP-2016
Attachment 6 Statement of Work (SOW) Seed Project
2 15-AUG-2016
Attachment 7 Price Schedule - Seed Project
1 15-AUG-2016
Attachment 8 Specifications - Seed Project
385 05-AUG-2016
Attachment 9 Plans/Drawings - Seed Project
65 05-AUG-2016
(End of Summary of Changes)
Highlight
1240047841A Highlight
1240047841A Highlight
Highlight
File details come from the government source that posted it. Updated .