SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
The purpose of this solicitation amendment is ot incorporate changes generated as a result of potential contractor questions received trhough May 10, 2010. These changes are incorporated in the SF 1422, Section H, Section I, Section J and Section L as indicated in the following.
SECTION A - SOLICITATION/CONTRACT FORM
The number of offeror copies required has decreased by 1 from 4 to 3.
SECTION H - SPECIAL CONTRACT REQUIREMENTS
The following have been modified:
LOCAL PROCEDURES
1.0 PLACE OF PERFORMANCE:
1.1 Locations of work will be at Joint Base Lewis-McChord (JBLM). The specific place of performance will be designated on each individual Task Order.
1.2 Any place the terms "engineer", "civil engineer", "62 CES" or similar designations for the engineering function are used in the solicitation and subsequent contract the terms "Department of Public Works" or DPW are considered freely interchangeable.
1.3 Any place "McChord AFB" may appear "Joint Base Lewis-McChord" or JBLM are interchangeable. Joint Base Lewis-McChord encompasses the entire facilities formerly known individually as Fort Lewis and McChord AFB.
1.4 References to the 62d Contracting Squadron or 62 CONS are interchangeable with the terms Directorate of Contracting or DOC.
2.0 GENERAL CONTRACT DESCRIPTION
2.1 This is an indefinite delivery, indefinite quantity (IDIQ) contract for construction efforts at Joint Base Lewis-McChord (JBLM), Washington. The government will award construction projects by individual Task Orders on an as needed basis. The contractor shall furnish all personnel, equipment, tools, materials, supervision, and other items and services necessary to design, manage, and accomplish a broad range of maintenance, repair, alteration, and/or new construction work on various real property facilities. During the contract period construction, repair or renovation projects will be identified to the Contracting Officer who will issue individual Task Orders to the contractor to complete the work. The contractor shall maintain an office on JBLM in order to receive work requests and other related requirements to accomplish each individual Task Order. The work shall include tasks in various trades such as carpentry, pavement repairs, roofing, asbestos abatement/removal, demolition, concrete masonry, welding, etc.
2.1.1 Unit Price Guides (UPG): UPGs include commercial pricing tools such as computer cost databases and libraries of hard copy books. The R.S. Means © cost data books are the designated UPGs for this solicitation and contract. UPGs consist of detailed task specifications along with a standard unit of measure and a unit price for each. Because the task specifications and prices apply to a general area or industry, it is necessary to tailor the UPG to the costs and practices of a specific location. This step, which is called “localization,” is critical to the success of a SABER Program. Commercial software alternatives are available for the localization process and for compiling the basic task listings and standard unit prices. Examples of commercially available estimating software compatible with the R.S. Means database are those published by WinEstimator Inc., 4Clicks, Sage North America, R.S. MEANS, Inc., et al.
2.1.2 COEFFICIENTS (REFERENCE SECTION B LINE ITEM 0001) Coefficients are factors that are multiplied against the standard unit prices in the UPG to calculate task order (TO) prices. Proposed coefficients should cover cost elements such as overhead, profit, minimum design costs, G&A expenses, bond premiums, and gross receipts taxes etc.
2.1.2.1 Coefficient 01 applies to all work on Joint Base Lewis-McChord (JBLM) during standard work hours except for task orders issued for work in a controlled area or otherwise requiring Government escorts. This coefficient remains valid for the entire contract period including any options exercised.
2.1.2.2 Coefficient 02 applies to all work on Joint Base Lewis-McChord (JBLM) during standard work hours to be performed in controlled areas or otherwise requiring Government escorts. This coefficient remains valid for the entire contract period including any options exercised.
2.1.2.3 Coefficient 03 applies to all work on Joint Base Lewis-McChord (JBLM) during non-standard work hours except for task orders issued for work in a controlled area or otherwise requiring Government escorts. This coefficient remains valid for the entire contract period including any options exercised.
2.1.2.4 Coefficient 04 applies all work on Joint Base Lewis-McChord (JBLM) during non-standard work hours to be performed in controlled areas or otherwise requiring Government escorts. This coefficient remains valid for the entire contract period including any options exercised.
2.1.2.5 Coefficient 05 applies to items not covered by the Unit Price Guide contractually referred to as Non Pre-Priced Items. This coefficient shall take into account any efficiency factor the contractor applied to Coefficients 01, 02, 03 and 04. This coefficient remains valid for the entire contract period including any options exercised.
2.1.2.6 Coefficient 06 is for that portion of coefficients 01, 02, 03 and 04 attributed to project estimating. Estimates provided and paid for using this coefficient will remain valid for 120 calendar days from the date the negotiated estimate is accepted by the Government without consideration given to the quarterly pricing updates of the Unit Price Guide provided for elsewhere in this contract. This coefficient remains valid for the entire contract period including any options exercised. This coefficient applies for Task Order Requests for Proposal (TORFP) where the contractor does not execute a Hold Harmless Agreement in lieu of receipt of this estimating fee. Coefficient 06 is intended for use to expedite year-end or emergency requirements; the contracting officer may process SABER projects up to the point of award in advance of full project funding. Coefficient 06 is designated to compensate the contractor for the level of effort expended in estimating, designing, and negotiating the project task order in advance of full funding. Any payment the contractor receives under this line item will be offset by a reduction from the negotiated price of the TO if the project results in a later award. While it is not the government’s intent to have the contractor provide an estimating service for projects with no serious SABER construction consideration, the Government is not obligated to issue a Task Order for the construction work described in the Task Order issued for project estimating. The Contracting Officer will work closely with Civil Engineering to insure that projects priced in advance of funding are not excessive and that there is a high probability of funding. This coefficient may be used for anticipated construction projects at the discretion of the Contracting Officer. However, the Hold Harmless Agreement included as an attachment to this solicitation and contract will normally be included in individual TORFP for yearend requirements issued under the authority of a Special Advanced Authority or emergency requirements which the contractor may accept and sign in lieu of payment under this coefficient.
2.1.3 Task Order Pricing
2.1.3.1 The "bare costs" are defined as the UPG price from the column that includes the total costs before the application of any overhead and profit.
2.1.3.2 The prices established in the RS MEANS® database Bare Costs (which means no markup for overhead and profit) column, will be multiplied by the City Cost Index Weighted Average Total for Tacoma, Washington and totaled, then Washington State Use Tax at the rate specified for Zip Code 98438 shall be added for the material costs to arrive as the total to which the coefficient shall be applied; then this subtotal shall be multiplied by the applicable coefficient to arrive at the actual price for a unit of work.
2.1.3.3 In order to be considered for contract award, offerors must submit all coefficients included as part of Line Item 0001. These six coefficients shall remain valid for the entire contract period including any options exercised. The Government uses these multipliers to determine the price of work for each task on individual task orders. The coefficient will be represented as “net”, a “decrease from” or an “increase to”, the prices listed in RS MEANS®. An offer of “net” would be represented as “1.0.” An example of a decrease from the prices in RS MEANS® would be “0.98.” An example of an increase above the prices in RS MEANS® would be “1.10”.
2.1.3.4 Offered coefficients must contain all allowable contractor costs, including contingencies and profit. Examples of such costs are State gross receipts taxes and payroll taxes, such as FICA, workmen’s compensation (when not included in the wage determination), state and federal unemployment taxes for direct payroll employees, superintendents’ salaries, builders’ risk insurance, mobilization and demobilization expenses, and bond premiums; and various overhead expenses, such as project estimating, site office overhead, field office building, furniture, equipment, on-site office staff salaries, vehicle and construction equipment maintenance, office administrative expenses and a proportional share of home office overhead. The coefficient should also include all insurance, special clothing for workers, traffic barricades, flag persons, additional supervision, paperwork fees associated with a particular task order, consultant fees, all on and off site storage, etc.
2.1.4 Non-Pre-priced Items (NPIs):
2.1.4.1 Items of work not covered by the Unit Price Guide (UPG) but within its scope and general intent and necessary to complete the requirements of a specific task order may be negotiated and incorporated into the task order by the Contracting Officer. Non-pre-priced work shall be so noted on each task order and will not exceed 10% of the final negotiated amount. Proposed costs for non-pre-priced items will be supported by three verifiable price quotes where possible.
2.1.4.2 Coefficient 05 shall be applied to the quoted, verified and negotiated NPI costs to arrive at the total cost for any NPIs before inclusion in the total task order price.
2.1.4.3 To permit recurrent use, a non-pre-priced line item must be incorporated by supplemental agreement into a locally developed non-pre-priced UPB. This may be done at any time during the contract period.
2.1.5 Construction projects under this contract will generally range from $2,000 to $750,000. However, where the Contracting Officer has determined in writing that an emergency exists or that the project is of such pressing need the maximum task order amount may be increased to $1,000,000 for an individual project. There is no pertinent historical information from previous SABER contracts due to the recent consolidation of Fort Lewis and McChord AFB into the Joint Base Lewis-McChord (JBLM). The estimated value of task orders is $9, 500,000 per year with a maximum contract program value of $47,500,000 over the life of the contract.
2.1.6 Ordering Procedures.
2.1.6.1 Work under this contract will be ordered by written Task Orders issued on DD Form 1155 (Order for Supplies or Services) to the contractor by the Contracting Officer.
2.1.6.2 Each award as a result of this solicitation will cite an individual Task Order number. Individual Task Order will be placed in a sequential numbering system, which relate back to the basic contract and their assigned Task Order Number.
2.1.6.3 The Government will not be obligated to reimburse the contractor for work performed, items delivered, or any costs incurred, nor shall the contractor be obligated to perform, deliver, or otherwise incur costs except as authorized by duly executed Task Orders. Requests for proposals will indicate funds availability. Occasionally, the government will request a proposal for projects for which funds are not certified or readily available. Air Mobility Command (AMC) refers to these acquisitions as “Normal Straddle Bid” or “Special Advance Authority” (SAA) projects. Information specifically identifying these projects and the funding restriction will be included in the request for proposal.
2.1.6.4 Task Orders will be firm fixed price and clearly define the specific services to be performed or the performance desired. Each Task Order may contain additional, site or project specific, provisions. Any such additional provisions shall be a part of the Task Order Request for Proposal.
2.1.6.5 Task Order projects shall be for non-complex performance oriented tasks requiring design up to 35%. Some projects may be already designed or require very little design effort. The ordering procedures are defined in the basic SABER specifications, Attachment 1.
2.1.6.6 Task Orders may be modified by the Contracting Officer. Modifications to Task Orders will be issued on Standard Form (SF) 30 and cite the Task Order Number.
2.1.6.7 Contractors are required to contact the Contracting Officer within two days after receipt of Task Order Request for Proposal (TORFP) if they plan not to participate in the walk through or submit a proposal on a Task Order.
2.1.6.8 Contractors are required to comply with the provisions identified at FAR 52.223-4 and 52.223-9, Alt 1.
2.1.6.9 The unit price data provided by the RS MEANS® UPG in the estimating database and the contractor supplied estimating software shall serve as the basis for establishing the value of the work performed on a unit price basis.
2.1.6.10 The contractor must include justification for any non-pre-priced work included for an individual requirement. The contractor shall first attempt to price all unit prices using the computerized database provided by RS MEANS®. If an item is not included in this database or if the contractor’s computer system is not available, the contractor shall use the hard copy of the MEANS Facility Construction Cost Data to price the items. If the contractor cannot locate a particular item in either of these sources, the contractor shall then extend the search to the following MEANS pricing guides before considering it a non-priced item.
Mechanical Cost Data
Plumbing Cost Data
Electrical Cost Data
Assemblies Cost Data
Repair and Remodeling Cost Data
2.1.6.11 The contractor’s proposal shall be supported by necessary documentation to indicate that adequate engineering and planning to accomplish the requirement have been done. Examples of documentation that might reasonably be expected would include drawings, calculations, catalog cuts, specifications, architectural renderings, etc.
2.1.6.12 Time for submittal of the contractor’s proposal for individual requirements will be as agreed upon by the government and the contractor or as specified in the TORFP.
2.1.6.13 Upon receipt of the contractor’s proposal, the Government will review the proposal for completeness. The Government will negotiate with the contractor all non-pre-priced items, quantities for pre-priced items, and performance times.
2.1.6.14 Each task order will include the following information.
Item number, description, material submittal requirements, quantity and unit prices for pre-priced and non-pre-priced items and total. This is accomplished by incorporating the entire negotiated agreement into the task order.
Task order price and delivery or performance date.
Liquidated damages, if any.
Any statement of work, drawings, or other pertinent data.
Any other task order unique Federal Acquisition Regulation (FAR) or departmental FAR supplement clauses required for a particular project. These additional provisions shall also be stated in the TORFP.
2.1.7 SEPARATE REQUIREMENT FOR PROJECT ESTIMATING:
2.1.7.1 In order to expedite year-end Normal Straddle Bid, Special Advance Authority, or emergency requirements, the government may request the contractor to prepare a design and cost proposal and participate in negotiations for a specific project prior to the Government's receipt of full project funding. This effort will be referred to as Project Estimating. Compensation for Project Estimating will be determined by multiplying each task negotiated for the work described in the request for proposal (individual Task Order) times the figure entered on the Price Schedule for Project Estimating. It is paramount that the figure entered on the Schedule for Project Estimating represent only that portion of CLIN 0009 (option year CLIN as appropriate), attributed to Project Estimating. The figure shall remain constant for the duration of the contract, to include any options that may be exercised and shall not be construed as an additional cost under the contract. Only the CLIN for Project Estimating shall be computed on Task Orders issued for that purpose.
2.1.7.2 Once funds become available for the actual construction of a project previously negotiated under a project estimating Task Order, the amount previously paid under that Task Order shall be deducted from the total price of the Task Order issued for the actual construction.
2.1.7.3 While it is not the government's intent to have the contractor provide an estimating service for projects with no serious SABER construction consideration, the Government is not obligated to issue a Task Order for the construction work described in the Task Order issued for project estimating.
2.1.7.4 If the Government and the contractor cannot come to an agreement on a particular project to be priced under the project estimating process, negotiations shall be terminated without cost to the government.
2.2 PROPOSAL PREPARATION COSTS
2.2.1 The costs for preparation of Task Order proposals shall be the responsibility of the contractor and not reimbursable. Each Task Order awarded will include, at a minimum, all labor wages, management, supervision, mobilization, material and equipment costs, and any costs associated with any required design effort. The contractor shall furnish all project management, planning, estimating, labor, transportation, materials, equipment, tools, supervision, design if applicable, and all other associated costs necessary to fulfill the requirements of the Task Order.
3.0 SABER TECHNICAL SPECIFICATIONS: The SABER Technical Specifications are numbered and organized by the Construction Specification Institute’s (CSI) Master Format. Some specifications are broad scoped in nature and contain a variety of items; therefore, they will have several RS MEANS© Computerized Pricing Guide (MCPG) designators. Other specifications will not have MCPG pricing information; these items are those which are special ordered from the manufacturer or the items involved would be proprietary to each manufacturer’s own equipment. The intent of these specifications is to furnish concise industrial and/or commercial standards for maintenance and repair of Government facilities.
4.0 CONSTRUCTION CODES: The contractor shall comply with the latest edition of the Uniform Building Code, Uniform Mechanical Code, National Electric Code, Standard Plumbing Code, National Fire Protection Association (NFPA) Code, and Building Office Construction Authority (BOCA) Codes for any construction under this contract. The contractor shall have a copy of each of these documents for use during the term of the contract, and furnish one (1) complete set to the government at the beginning of the contract. The contractor shall maintain these code books current throughout the life of the contract by obtaining copies of any and all revisions or updates as they become available, not to exceed 60 days of the release of the revision. If there is a conflict between these codes, regulations, and specifications, the most stringent requirement shall apply at all times.
5.0 PERFORMANCE EVALUATIONS: At the conclusion of each task order, the Contracting Office will complete a contractor’s performance evaluation when applicable. The evaluation will take into account all aspects of the contractor’s performance. Evaluations will be accomplished electronically using the Construction Contractor Appraisal Support System (CCASS).
6.0 EXCLUSION PERIODS: Exclusion Periods may be incorporated into individual Task Orders as determined by the Contracting Officer. Some exterior work may not be able to be performed during the period between November 15th through April 15th inclusive, and such period will not be considered in computing the time allowed for completion. However, the contractor may request and be allowed to work during this period at the contractor’s own risk if permitted by the Contracting Officer.
7.0 CONTRACT ADMINISTRATION: Administration of the Task Orders under this contract will be performed by 62 CONS/LGCA (SABER), Joint Base Lewis-McChord (JBLM), Washington. No changes, deviations, or waivers shall be effected without a modification of the contract, executed by the Contracting Officer authorizing such changes, deviations, or waivers.
8.0 IDENTIFICATION OF CORRESPONDENCE: All correspondence and data submitted by the Contractor under this contract shall reference the contract number, Task Order number, project title, and project number.
9.0 NOTICE OF CONSTRUCTIVE CHANGES: No order, statement or direction of the Contracting Officer, an authorized representative of the Contracting Officer whether or not acting within the limits of his authority, or any other representatives of the Government, shall constitute a change order under the “Changes” clause of this contract or entitle the contractor(s) to an equitable adjustment of the price or delivery schedule, unless such a change is issued in writing and signed by the Contracting Officer.
10.0 NOTIFICATION REQUIREMENTS WHEN CHANGING KEY PERSONNEL: Personnel in key positions are considered essential to the performance of any resultant Task Orders under this contract. Examples of key positions include project manager, superintendents, and quality control inspectors. Prior to diverting any key personnel to other programs/projects, the contractor shall notify the Contracting Officer at least ten (10) working days in advance of the proposed diversion and shall submit justification (including proposed substitutions) in sufficient detail to permit evaluation of the impact on the SABER program. Contractor shall provide a listing of key personnel. This listing of key personnel may be amended from time to time during the course of the contract to either add or delete personnel, as appropriate.
11.0 CONTRACT PHASE-IN/PHASE-OUT:
11.1 The contractor shall commence any mobilization and familiarization activities prior to actual work on individual Task Orders as soon after contract award as practicable. However, within 14 calendar days after contract award, the contractor shall mobilize the necessary personnel and equipment to estimate and negotiate requirements. The contractor shall have a fully operational field office with all required facilities, staff and automated data processing (ADP) capabilities within 30 calendar days after award.
11.2 The Contractor shall be provided a site on base to operate (notification of location will be prior to award). Contractor shall be provided full utilities for a project trailer. These utilities shall include power, water, and sewer. Contractor shall be required to provide temporary fencing at his own expense if required. The color of the building or trailer must match the existing base color scheme. The contractor is responsible for mobilization, set-up, and utility connections. The contractor shall anchor the building securely and install appropriate skirting, provide safe and proper entrances and exits. In the event of a fire or any damage to the building, the contractor shall notify the Base Civil Engineer Squadron immediately. The contractor is responsible for insuring his/her own contents. The government shall not be liable for any loss or damage to the contractor’s property, including stock, or for expenses incidental to such loss or damage.
11.3 Contractor must vacate government-furnished office and storage areas on the last day of the contract period. Premises must be returned in the same condition in which they were received or as agreed to by the CO. All ongoing Task Orders must be completed from an approved field office or off-base location.
12.0 DAVIS-BACON WAGE DETERMINATION: Reference FAR 22.404-12(c)(1). The current wage determinations will be incorporated into the contract at the time of option exercise, and the contractor will be required to comply with the revised wages; however, the coefficients will not be adjusted since the updated Unit Prices Book reflecting changed labor costs will also be updated along with the option exercise.
13.0 REQUIRED INSURANCE:
13.1 Reference clause FAR 52.228-5, Insurance - Work on a Government Installation and FAR 28.306(b). The Contractor shall, at its own expense, procure and thereafter maintain the following kinds of insurance with respect to performance under the contract.
13.1.1 Workmen’s Compensation and Employers Liability Insurance as required by law except that if this contract is to be performed in a State which does not require or permit private insurance, then compliance with the statutory or administrative requirements in any such State will be satisfactory. The required Workmen’s Compensation insurance shall extend to cover employer’s liability for accidental bodily injury or death and for occupational disease with a minimum liability limit of $100,000.
13.1.2 General Liability Insurance: Bodily injury liability insurance, in the minimum limits of $500,000 per occurrence shall be required on the comprehensive form of policy.
13.1.3 Automobile Liability Insurance: This insurance shall be required on the comprehensive form of policy and shall provide bodily injury liability and property damage liability covering the operation of all automobiles used in connection with the performance of the contract. At least the minimum limits of $200,000 per person and $500,000 per occurrence for bodily injury and $20,000 per occurrence for property damage shall be required.
13.2 The contractor agrees to execute the insurance certificate included as an attachment to this solicitation/contract with the Contracting Officer within 10 days of contract award. This certificate shall be executed on the form entitled Contract Insurance Requirements Compliance Certificate included as an attachment to this solicitation/contract.
14.0 BONDING:
14.1 A proposal/bid bond is not required for the contract proposal, however a Bid Guarantee shall be included for the seed project DEQ000878J. The offeror shall however, provide a letter or other verifiable evidence from the surety asserting offeror’s ability to obtain adequate bonding at the time of contract award with the contractor’s proposal.
14.2 Reference clause FAR 52.228-15, Performance and Payment Bonds - Construction. The initial bond amount required is based upon the amount of the seed project task order amount which will be issued simultaneously with contract award. Payment and performance bonds will be required for all task orders within 10 calendar days after task order award. Although the amount of the initial bond is based on the seed project task order amount the bond premium costs should be included in the coefficients based on the contract estimated annual amount.
15.0 PREPARATION OF MATERIAL APPROVAL SUBMITTALS:
15.1 Reference clause FAR 52.236-5, Material and Workmanship. The submittals shall be accomplished in accordance with instructions that will be provided with Material Approval Submittal Form which will be provided at the time of contract award.
15.2 Material submittal requirements are normally established in the individual project Scopes of Work but may be found in other contract documents. Within 15 calendar days of receipt of a task order or Notice to Proceed the Contractor shall submit all required material submittals, whether or not listed in the project Scope of Work or submit to the Contracting Officer a Schedule of Material Submittals indicating when the Contractor intends to submit each submittal item not otherwise provided within that 15 day period. If the Contractor identifies any material submittal requirements not reflected on the Scope of Work, the Contractor should add them to the end of the Schedule of Material Submittals prior to its submittal. All proposed schedules for material submittals will be subject to review and approval
16.0 ACCIDENT PREVENTION: Reference clause FAR 52.236-13 Alternate I, Accident Prevention. Prior to commencing work, the contractor shall: (1) submit a written proposed plan for implementing referenced clause. The plan shall include an analysis of the significant hazards to life, limb, and property inherent in contract work performance, and a plan for controlling these hazards; and (2) meet with representatives of the Contracting Officer to discuss and develop a mutual understanding relative to administration of the overall safety program.
17.0 UTILITY SERVICES: Reference clause FAR 52.236-14, Availability and Use of Utility Services and FAR 36.514. Utility Services furnished to the Contractor by the Government from the Government’s existing system outlets and supplies will be at no cost to the Contractor.
18.0 PREPARATION OF SCHEDULES FOR CONSTRUCTION CONTRACTS: Reference clause FAR 52.236-15. The schedules and reports required by FAR 52.236-15 shall be accomplished on and in accordance with instructions contained on the reverse side of the Contract Progress Schedule and Contract Progress Report, which will be provided at the time of contract award. Electronic spreadsheets or word processing documents may be used in lieu of the forms supplied by the Government but must contain the same information and be prepared following the instructions for the appropriate form. Progress schedules and reports will be prepared and utilized for all task orders issued under this contract with a performance period of 60 calendar days or more.
19.0 INCORPORATION OF CONTRACTOR’S PROPOSAL
The successful offeror’s proposal as revised through discussions and final proposal revision dated__*___, submitted in response to Solicitation FA4479-10-R-0002, dated ____*____, and supplemented by Amendment(s) _*___,_*___,__*___, is incorporated into this contract by reference.
SECTION I - CONTRACT CLAUSES
The following have been modified:
THE BID GUARANTEE REQUIRED UNDER THIS SOLICITATION IS APPLICABLE ONLY TO THE ACCOMPANYING SEED PROJECT FOR PROJECT DEQ000878J.
52.228-1 BID GUARANTEE (SEP 1996)
(a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.
(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier's check, irrevocable letter of credit, or, under Treasury Department regulations, certain bonds or notes of the United States. The Contracting Officer will return bid guarantees, other than bid bonds, (1) to unsuccessful bidders as soon as practicable after the opening of bids, and (2) to the successful bidder upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements), as required by the bid as accepted.-
(c) The amount of the bid guarantee shall be _20%_ percent of the bid price for accompanying seed project DEQ000878J or $_3,000,000_, whichever is less.-
(d) If the successful bidder, upon acceptance of its bid by the Government within the period specified for acceptance, fails to execute all contractual documents or furnish executed bond(s) within 10 days after receipt of the forms by the bidder, the Contracting Officer may terminate the contract for default.-
(e) In the event the contract is terminated for default, the bidder is liable for any cost of acquiring the work that exceeds the amount of its bid, and the bid guarantee is available to offset the difference.
THE BID GUARANTEE REQUIRED UNDER THIS SOLICITATION IS APPLICABLE ONLY TO THE ACCOMPANYING SEED PROJECT FOR PROJECT DEQ000878J.
(End of clause)
SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
The following have been modified:
LIST OF ATTACHMENTS
SECTION J List of Documents, Exhibits and Other Attachments
Document Type
Description
Pages
Date
Attachment 1
SABER Statement of Work No. 7664
19 APR 10
Attachment 2
Wage Determination WA100053
03/19/2010 Attachment 3
Hold Harmless Agreement
Undated
Attachment 4
Contract Insurance Requirements
Compliance Certificate Attachment 5
Base Access List Format (Electronic Only)
*Attachment 6
Present Past Performance Questionnaire
May 5, 2010 Attachment 7
Subcontractor/Teaming Partner Consent Form 1
Undated
Attachment 8
Scope of Work for Project DEQ000878J, Extend Compost Awning, Sequalitchew Training
Area, Landfill No. 5 Building PO7601 Attachment 8-1 Project DEQ000878J Location Map
04 Feb 2010
Attachment 8-2 Solid Waste Permit Sequalitchen Landfill 5
June 26 2009
Attachment 8-3 Sequalitchen Composting Plan of Operation
Feb 26, 2007
Attachment 8-4 Fort Lewis Earthworks Acceptance Criteria
Undated
*Attachment 8-5 As-Built Drawings Recycle Center Mods
June 1995
*Attachment 9
Addendum 1 to Scope of Work for Project
14 May 2010
DEQ000878J, Extend Compost Awning, Sequalitchew Training Area, Landfill No. 5
Building PO7601.
* Attachments idenfitied with an * have been changed since the original FBO posting of May 3, 2010.
SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS
The following have been modified:
SABER SOLICITATION INFORMATION
INSTRUCTIONS TO OFFERORS
1.0 SPECIFIC PROPOSAL PREPARATION INSTRUCTIONS:
1.0.1 All prepared documents must be in a font no less than 10 points and have no less than 1 inch margins.
1.0.2 The binders or volumes described in the following will be submitted in an original and 3 (three) copies. The original and copies shall be clearly marked on the face of each volume/binder.
1.1 Executive Summary Section: Each offeror shall submit an Executive Summary of no more than 3 pages total which summarizes the key points from the offeror’s Mission Capability, Past Performance, and Price areas. The Executive Summary Section is not included in the Volume I page limitation.
1.2 Contract Forms: Include the following data in the format indicated. Designate on the cover, which proposal package contains the original or an executed copy of the proposal (RFP). These documents do not count toward the Volume I page limitation.
Section 1: Proposal forwarding letter, if any.
Section 2: A complete copy of this RFP (through Section K, less attachments) with the original signature of an official authorized to contractually bind the offeror in block 20B of the SF 1442. The offeror must complete the following sections within the RFP:
Part I, Section A (SF 1442, Blocks 19-20C).
Part I, Section B (Section B Supplement with proposed coefficients entered).
Part I, Section G – Persons Authorized to Negotiate or Conduct Discussions
Part IV, Section K, Representations, Certifications, and other Statements of Offeror. In addition to the on line representation and certifications the provisions at 52.204-8, 52.219-28 and 252.247-7022 will need to be completed and submitted. (See directions for Online Representations and Certifications Application (ORCA) in section K)
Section 3: Any exceptions to or deviations from, any of the clauses or special contract requirements along with justification therefore.
Section 4: Any information, excluding price, which does not properly belong within the other proposal volumes.
Section 5: Proposal volumes as indicated below:
FACTOR
VOLUME
PAGE LIMIT
Mission Capability Technical/Risk* Volume I
50 (Excluding Seed Project) Past Performance
Volume II
Price/Cost
Volume III
N/A
* Evaluation of Risk is inherent in Factor 1 and is not separately addressed by the offeror.
Then continue the section as follows:
1.3
FACTOR 1
MISSION CAPABILITY TECHNICAL/ RISK
VOLUME I
At a minimum, the submission shall be prepared in a form consistent with the instructions described within this section and the evaluation criteria for award set forth in Section M of this solicitation. All information the offeror deems appropriate to address these criteria should be included in the proposal in an orderly format following the evaluation criteria to include factors and subfactors. To facilitate evaluation, Volume I should be specific, detailed, and clearly demonstrate that the offeror has a thorough understanding of the requirements for the accomplishment of this effort. Statements that the offeror understands, can, or will comply with the Specifications and phrases such as “standard procedures will be employed” or “well known techniques will be used” etc., will be considered unacceptable. The following technical subfactors comprise the Mission Capability Technical/Mission Capability Risk (Volume I) portion of the technical proposal:
1.3.1 SUBFACTOR 1 - Project Management Ability
1.3.1.1 Offerors shall address their management organization, to include a description of functions, authorities and credentials of key management personnel fulfilling at a minimum the personnel requirements specified with the contract specifications section 01000 paragraph 1.2.3 (Project Management, CAD/GIS Support, Site Superintendence, Quality Control, subcontract purchasing and administration and general office administration). Offerors shall address their plan for acquiring qualified subcontractors. The methods and criteria described must include consideration of subcontractor’s previous experience, present capabilities, and quality of previous jobs to ensure effective management of subcontractors and ensure quality workmanship and timely completion. Offerors shall address the proposed support and interface with the company or home office, initial startup/management of contingency situations, quality control plan, response and completion of warranty calls and punch list items, and overall management ability to coordinate multiple subcontractors and multiple projects.
1.3.1.2 Key Project Management Staff: Offerors shall provide an organizational chart describing functions, responsibilities and authorities performing such duties as overall project management, project engineering, CAD support, site superintendence, quality control, and subcontract purchasing and administration. The proposal shall specify hiring criteria (skill levels, experience, and background) for personnel in these positions. Offerors shall provide sample resumes for the type of personnel the offeror considers qualified for key positions to include background, education and experience. Qualified personnel may be able to hold more than one of the required positions. The project manager shall have the services of a Professional Engineer available for project review and certification of drawings when required.
1.3.1.3 Home Office and On-Site Support/Workload Management: The offer shall clearly define on-site support and interface with home office or corporate headquarters for such aspects as management, technical support, minimal design effort and financial support. The offer will demonstrate the ability to execute a large number of multi-discipline delivery orders, demonstrate how staffing and resources will be acquired to meet peak workloads and describe a strategy for executing a large number of delivery orders in a highly compressed timeframe as a result of cyclic nature of Government funding resulting in contract award late in the fiscal year.
1.3.1.4 Response and Completion of Warranty Calls and Punch List Items: The offer will identify and describe plans for warranty of construction as it applies to routine, urgent and emergency calls, as well as punch list items. The plan shall support response and correction completion time frames, personnel responsible for responding to such calls and performing corrections, and provisions for non-standard hour calls.
1.3.2 SUBFACTOR 2 Quality Control Plan
1.3.2.1 Quality Control Plan: The offeror shall provide a summary that will address all aspects of quality control to include responsibility for surveillance of work by both subcontractors and in-house quality control inspectors. The offer will describe the process for acceptance, rejection, documentation and resolution of deficiencies for work performed by the in-house work force or subcontractors, and corrective action to identify poor performance by any work staff. In addition, the Quality Control Plan shall discuss how the inspectors and/or superintendents will be qualified to supervise various trades to ensure quality workmanship.
1.3.3 SUBFACTOR 3 Project Development/Planning
1.3.3.1 This Subfactor will address the Offeror methods and procedures for project development and planning. This Subfactor will cover the development of a plan/checklist for covering these procedures and a plan/checklist for the major items to be included in each minimal design package.
1.3.3.2 Project Development and Planning: The offer shall identify methods and procedures for scheduling work to ensure performance periods are not excessive. Identify a plan and methods to track projects and interface with Government planners and inspectors. Identify a plan for the upkeep of a submittal log throughout the duration of the contract. Identify a plan and specify time for running work clearance requests permits for work on the installation. Identify a plan, contents, and time frame for updating property records and closing out projects
1.3.4 SUBFACTOR 4 Minimal Design and Completeness of Seed Projects:
1.3.4.1 The offeror shall provide a proposal cost breakdown worksheet in Microsoft Excel format of the in R.S. Means© line items selected to complete the seed project as defined in the Scope of Work for the project DEQ000878J, Extend Compost Awning, Sequalitchew Training Area, Landfill No. 5 Building PO7601. Submit one design concept for the seed project which includes a technical description, execution narrative, and engineering calculations to support the design. Include a list of assumptions used to develop concept(s), design drawings, material submittals, a progress schedule and a walk through of the development of performance period.
1.4 FACTOR 2 PAST PERFORMANCE VOLUME II
1.4.1 Contents of Past Performance Volume:
The offeror shall submit a Past Performance Volume containing the following:
Table of Contents
Summary Page describing the role of the offeror and each subcontractor, teaming partner, and /or joint venture partner that the offeror is required to provide Past Performance Information Sheets on in accordance with paragraph 1.4.2 below.
Organization Structure Change History—See paragraph 1.4.5 below.
Past Performance Questionnaire in accordance with Attachment 6, Section J. Past Performance Information and Past Performance Questionnaire—See paragraph 1.4.6. below. Past Performance Questionnaires received from third party evaluators do not count toward the Volume II page limitation.
1.4.2 Past Performance Information Sheets: The offeror shall submit 3 to 5 Past Performance Information Sheets, each for the contractor and/or teaming/JV partner, identifying active or completed contracts, either Government or commercial, for each prime, teaming partner, and/or joint venture partner. Data presented must include only relevant contracts held within the past five (5) years and demonstrate an ability to handle multiple projects with multiple disciplines. The following information must be provided for each contract identified on the Past Performance Information Sheets, limited to two (2) pages per contract described:
Contract Number
Total dollar value
Procuring agency
Title of contract
Name, address and current telephone number of contract administrator/contracting officer
Description of project (including its relevancy to this acquisition)
Period of performance
Type of contract
Offerors are cautioned that the Government will use data provided by each offeror in this volume and data obtained from other sources in the evaluation of past and present performance.
1.4.3 Relevant Contracts: Relevant past performance information must demonstrate non-complex requirements (up to 35% design) with multiple projects being performed simultaneously involving multiple disciplines, such as construction, renovation, alteration and repair, with multiple disciplines, along with specific work in heating, ventilation and air conditioning (HVAC), electrical, mechanical and other major trades. Projects should be similar in size, scope, and complexity as those anticipated under this contract, i.e., having a project value between $2,000 and $750,000, and include projects with the Federal Government, state and local government agencies, and commercial customers.
1.4.4 Provide data for up to 5 relevant contracts held within the last five years for each entity the offeror wants the Government to consider. Performance Information Sheets for each contract is limited to 2 pages. Include rationale supporting your assertion of relevance. Note that the Government will not consider performance on an effort that concluded more than 5 years prior to the issuance date of this solicitation. Offerors are required to explain what aspects of the contracts are deemed relevant to the proposed effort, and to what aspects of the proposed effort they relate. To clearly link the past performance information to the mission capability subfactors, the offeror should identify which contracts are relevant indicators of performance against a mission capability subfactor.
Categorize the relevance information into the specific evaluation subfactor(s) used to evaluate the proposal:
Subfactor 1 – Project Management Ability
Subfactor 2 – Quality Control Plan
Subfactor 3 – Project Development/Planning
Subfactor 4 - Minimal Design and Completeness of Seed Project
1.4.5 Specific Content: Offerors may include a discussion of efforts accomplished by the offeror to resolve problems encountered on prior contracts as well as past efforts to identify and manage program risk. Merely having problems does not automatically equate to a Little Confidence or No Confidence rating, since the problems encountered may have been on a more complex program, or an offeror may have subsequently demonstrated the ability to overcome the problems encountered. The offeror is required to clearly demonstrate management actions employed in overcoming problems and the effects of those actions, in terms of improvements achieved or problems rectified. This may allow the offeror to be considered a High Confidence or Significant Confidence candidate. For example, submittal of quality performance indicators or other management indicators that clearly support that an offeror has overcome past problems is required.
1.4.5 Organizational Structure Change History: Many companies have acquired, been acquired by, or otherwise merged with other companies, and/or reorganized their divisions, business groups, subsidiary companies, etc. In many cases, these changes have taken place during the time of performance of relevant present or past efforts or between conclusion of recent past efforts and this source selection. As a result, it is sometimes difficult to determine what past performance is relevant to this acquisition. To facilitate this relevancy determination, include in this proposal volume a "roadmap" describing all such changes in the organization of your company. As part of this explanation, show how these changes impact the relevance of any efforts you identify for past performance evaluation/performance confidence assessment. Since the Government intends to consider present and past performance information provided by other sources as well as that provided by the offeror(s), your "roadmap" should be both specifically applicable to the efforts you identify and general enough to apply to efforts on which the Government receives information from other sources.
1.4.6 Past Performance Questionnaires: The offeror shall send out Past Performance Questionnaires to each of the Points of Contact (POCs) identified in the Past Performance Volume. In turn, the evaluating agencies shall submit the completed questionnaire directly to Mr. Terry Seaverns at Terry.Seaverns@mcchord.af.mil AND Mr. Clifford Jackson at Clifford.Jackson@mcchord.af.mil or by facsimile to (253) 982-3656 no later than May 20, 2010. No questionnaire submittals will be accepted from the offeror being evaluated. Once the evaluator completes the questionnaires, the information shall be considered sensitive and shall not be released to the offeror. The desired questionnaire that is to be transmitted to each point of contact is provided in Section J, Attachment 6.
1.4.7 Subcontractor Consent: Past performance information pertaining to a subcontractor, Joint Venture Partner or Team Member cannot be disclosed to the prime offeror without the subcontractor’s consent. Provide a consent form all subcontractors, JV Partners or Team Members that will perform major or critical aspects of the requirement, consenting to release of their past performance information to the prime contractor. A sample consent is provided as Attachment 7 in Section J.
1.5
FACTOR 3
PRICE
VOLUME III
1.5.1. Price/Cost: The price/cost proposal shall consist of separate coefficients as solicited in the Schedule B. Offerors shall explain the basis for development of the coefficients. The explanation shall, as a minimum, address offeror’s perception of the accuracy of the unit price book (RSMeans©), and the basis for any assumptions regarding expected volume (dollars) of work under the contract and a list of the components of cost that were used in developing the proposed coefficients. The list of cost components will be used by the evaluation team to be sure all costs that could be reasonably incurred are included in the proposed coefficients.
1.5.2. Bonds: Offeror shall provide a letter from a surety attesting to bonding capability.