26 May 2010
ADDENDUM 2
TO
SCOPE
FOR
Project DEQ000878J Extend Compost Awning, Sequalitchew Training
Area, Landfill No. 5 Building PO7601
The technical provisions of the Scope and attachments are hereby changed in part as follows:
1. Change paragraph 1.7 as follows:
“1.7 Contractor shall design awning to provide moisture control, limiting condensation build up.”
1 Attachment Awning GIS Sewer location.
Page 1 of 2 Attachment 8-6 Solicitation FA4479-10-R-0010
Project DEQ000878J Extend Compost Awning, Sequalitchew Training Area, Landfill No. 5 Building PO7601
GIS Sewer line location, 25 May 2010 Attachment 1, Addendum 2