Attachment 8-6 Addendum 2 to Scope of Work for DEQ000878J .pdf

PDF 529 KB Posted

Attached to
IDIQ SABER Contract
Solicitation number
FA4479-10-R-0002
Issued by

About this file

Addendum 2 to the Scope of Work for DEQ000878J

View the file

Other files

File Type Posted
Questions and Answers for FA4479-10-R-0002 as of 05-26-10 Posted.doc DOC document
FA4479-10-R-0001-0004.doc DOC document
Attachment 10 Addendum 1 SOW 7664.pdf PDF
FA4479-10-R-0002-0003.doc DOC document
Questions and Answers for FA4479-10-R-0002 as of 05-20-10 Posted.doc DOC document
Meeting Memorandum of the Pre-Proposal Site Visits and Meetings.pdf PDF
Questions and Answers for FA4479-10-R-0002 as of 05-10-10.doc DOC document
FA4479-10-R-0002-0002.doc DOC document
Attachment 8-5 DEQ000878J Recycle Ctr Mod As Builts.pdf PDF
Attachment 9 DEQ000878J Addendum 1 Rev.pdf PDF
FA4479-10-R-0002-0001.pdf PDF
Attachment 3 Hold Harmless Agreement.doc DOC document
FA4479-10-R-0002.pdf PDF
Attachment 1 SABER SOW 7664 2010 19 Apr 10.pdf PDF
Attachment 8-1 DEQ000878J Location Map.pdf PDF
Attachment 4 Insurance Compliance Certificate.doc DOC document
Attachment 2 Wage Determination WA100053 03-19-2010.doc DOC document
Attachment 8-0 DEQ000878J Scope of Work.pdf PDF
Attachment 8-2 Solid Waste Permit10.pdf PDF
Attachment 6 Past Performance Survey.doc DOC document
Attachment 5 Base Access List Format.xls XLS spreadsheet
Attachment 8-4 Earthworks Acceptance Criteria.pdf PDF
Attachment 8-3 FtlewisOperPlan0207.pdf PDF
Attachment 7 Subcontactor-Teaming Partner Consent Sample Format.doc DOC document
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

26 May 2010

ADDENDUM 2

TO

SCOPE

FOR

Project DEQ000878J Extend Compost Awning, Sequalitchew Training

Area, Landfill No. 5 Building PO7601

The technical provisions of the Scope and attachments are hereby changed in part as follows:

1. Change paragraph 1.7 as follows:

“1.7 Contractor shall design awning to provide moisture control, limiting condensation build up.”

1 Attachment Awning GIS Sewer location.

Page 1 of 2 Attachment 8-6 Solicitation FA4479-10-R-0010

Project DEQ000878J Extend Compost Awning, Sequalitchew Training Area, Landfill No. 5 Building PO7601

GIS Sewer line location, 25 May 2010 Attachment 1, Addendum 2

Page 2 of 2 Attachment 8-6 Solicitation FA4479-10-R-0010

File details come from the government source that posted it. Updated .